A multi-operating condition power quality analysis method for high-speed railway traction power supply system

CN114818552BActive Publication Date: 2024-10-11PINGYUAN HONGDA POWER IND CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210269603.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-03-18
Publication Date
2024-10-11
Estimated Expiration
2042-03-18

AI Technical Summary

Technical Problem

[0004]谐波谐振的发生会给牵引供电系统带来极大的危害,如:谐振会引起动车组传动系统控制的不稳定,加剧牵引电机的损坏;谐振产生的过电压施加在回路中的互感器、断路器、避雷器等设备上,引起电气设备的绝缘损坏;过电流会引起磁场的畸变,从而产生较大的电磁福射,干扰通信系统和电磁敏感设施;谐振进一步加重电压、电流的畸变并引起电网谐波损耗的增加;谐振使互感器铁芯饱和从而使测量误差增大,影响计量和测量精度

Benefits of technology

[0032] The present invention is a multi-working mode power quality analysis method for high-speed railway traction power supply system. Aiming at the problem of current and voltage sag under different working conditions, the opening and closing time setting of the circuit breaker is used to simulate the impact of the tram load entering the work section on the system ground. Instantaneous impact, the problems and solutions of inrush current and voltage sag are analyzed based on the measured data. This model uses impedance to simulate equivalent train operation, thus simplifying the problem and reducing unnecessary interference, which is conducive to the analysis of test results, and thus more accurate judgments on impulse current and voltage sag problems. In terms of power quality analysis of traction power supply systems of great significance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114818552B_ABST
    Figure CN114818552B_ABST
Patent Text Reader

Abstract

The invention discloses a multi-operating condition power quality analysis method for a high-speed railway traction power supply system, comprising step 1: using simulink to build a traction power supply simulation circuit including a power supply, a traction transformer, an AT station, a sequence component detection module, and a current observation module; step 2: setting parameters of the power supply, the traction transformer, the AT station, the sequence component detection module, and the current observation module, setting the uplink and downlink circuit breaker states to be open, and setting the load impedance value; step 3: circuit breaker open: current passing through the internal resistance of the circuit breaker indicates no-load; circuit breaker closed: current flowing through the load through the conductor indicates that a train is running; step 4: starting simulation: obtaining different three-phase current and negative sequence current values ​​under three traction power supply operating conditions of no-load, single train, and full load; step 5: setting the running time of the uplink train to 3 to 5 cycles, and the running time of the downlink train to 6 to 8 cycles; step 6: simulating and observing waveforms, comparing waveforms of different voltages, and observing and analyzing voltage sag conditions.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of electric power, and in particular to a multi-operating condition power quality analysis method for a high-speed railway traction power supply system. Background Art

[0002] With the rapid development of the electric locomotive industry, the most important thing for high-speed railway construction is the safe and reliable operation, and the most critical one is the traction power supply system, which is inseparable from the safe and high-speed operation of high-speed railways. The most significant difference between high-speed railways and ordinary trains is the greater load, vehicle density and higher safety requirements. There are also differences in digital design simulation and initial scheme design. Therefore, the research on the corresponding technology and equipment of high-speed railways is urgent, especially the research on traction power supply systems.

[0003] Compared with conventional electrified locomotive loads, my country's high-speed railway EMU trains use high-power AC-DC-AC traction drive systems. The locomotive load has a large power, frequent fluctuations, and its single-phase asymmetry is also very obvious. In addition, due to the traction power supply wiring method and power supply method of the high-speed railway traction power supply system, the three-phase imbalance is very serious. However, high-speed rail has become an indispensable part of national life and economy, and its importance does not need to be elaborated. Therefore, while vigorously developing high-speed rail, the power quality problems it generates, especially the imbalance and negative sequence problems, are particularly serious. High-speed railways use three-phase three-wire system for traction power supply, so only positive and negative sequence currents exist in the system.

[0004] The occurrence of harmonic resonance will bring great harm to the traction power supply system. For example, resonance will cause instability in the control of the EMU transmission system and aggravate the damage to the traction motor. The overvoltage generated by resonance is applied to the transformers, circuit breakers, lightning arresters and other equipment in the circuit, causing insulation damage to the electrical equipment. Overcurrent will cause magnetic field distortion, thereby generating large electromagnetic radiation, interfering with communication systems and electromagnetic sensitive facilities. Resonance further aggravates the distortion of voltage and current and causes an increase in harmonic losses in the power grid. Resonance saturates the transformer core, thereby increasing the measurement error and affecting the metering and measurement accuracy.

[0005] Due to the high cost of high-speed rail construction and maintenance, pre-simulation and signal analysis are crucial. A reliable power quality analysis model can avoid risks from the initial design to ensure a certain degree of system safety. For the problems of negative sequence and voltage sag, a simplified traction power supply system model is built to simulate the system side current distribution under different working conditions, and the corresponding power quality analysis scheme can be classified, which is of vital importance to the stable operation and fault prediction of the high-speed railway traction power supply system. Summary of the invention

[0006] In order to overcome the shortcomings of the prior art, the present invention provides a multi-operating condition power quality analysis method for a high-speed railway traction power supply system. A simplified traction power supply system model is constructed to simulate the system-side current distribution under different operating conditions to perform power quality analysis and propose corresponding compensation schemes.

[0007] In order to achieve the above-mentioned invention object, the technical solution adopted to solve the technical problem is as follows:

[0008] A multi-operating condition power quality analysis method for a high-speed railway traction power supply system comprises the following steps:

[0009] Step 1: Use simulink to build a traction power supply simulation circuit including power supply, traction transformer, AT station, sequence component detection module, and current observation module;

[0010] Step 2: Set the parameters of the power supply, traction transformer, AT station, sequence component detection module, and current observation module, set the status of the upstream and downstream circuit breakers to open, and set the impedance value of the load;

[0011] Step 3: Circuit breaker open: current flows through the internal resistance of the circuit breaker, indicating no load; circuit breaker closed: current flows through the load through the wire, indicating that a train is running;

[0012] Step 4: Start simulation: obtain different three-phase current and negative sequence current values ​​under three traction power supply conditions: no-load, single-row, and full-load;

[0013] Step 5: Set the running time of the up train to 3 to 5 cycles, and the running time of the down train to 6 to 8 cycles;

[0014] Step 6: Simulate and observe the waveforms, compare the waveforms of different voltages, and observe and analyze the voltage sag.

[0015] Furthermore, in step 2, the power supply adopts 220kV / 50Hz three-phase AC power supply, the traction transformer adopts V / x power supply mode, and the AT uses the opposite-name ends of an ordinary linear transformer to form an autotransformer with a transformation ratio of 55 / 27.5.

[0016] Furthermore, in step 3, when the circuit breaker is open, the current passes through the internal resistance of the circuit breaker, indicating no load; when the circuit breaker is closed, the current flows through the load through the conductor, indicating that a train is running, and the negative sequence current theory is applied to analyze the imbalance caused by the V / x wiring method.

[0017] Furthermore, in step 4, the unbalance degree is positively correlated with the negative sequence current value, and the three-phase voltage and current on the power supply side of the system are respectively expressed as The corresponding locomotive load side current and terminal voltage are expressed as I P , U P, P=1,2,…,n,U A As a reference phase:

[0018]

[0019]

[0020]

[0021] In the formula, represents the unit vector operator, Compare Lag phase angle Compare Lagging power factor angle In the case of independent operation, all ports on the traction side will not cause zero-sequence current on the system side, so I P The three-phase current generated is P Collinear and satisfying I AP +I BP +I CP =0, from this we can get the conservation principle formula:

[0022]

[0023] The three-phase current expression can be obtained by the symmetrical component method and superposition principle:

[0024]

[0025] Then the expressions of positive-sequence and negative-sequence current components and the unbalance degree of negative-sequence current are obtained:

[0026]

[0027] Imbalance

[0028] Furthermore, in step 4, the no-load state means that both the upstream and downstream circuit breakers on the load side of the circuit breaker are always kept open, that is, no load is connected, and single-train operation means closing the circuit breaker on one side, and load is connected, indicating that a train passes on this side; the closure of the circuit breakers on both sides indicates full load; the negative sequence current detection is obtained using the sequence component detection module provided by the simulation, the sequence component selects the negative sequence, and the frequency is set to the industrial frequency 50Hz.

[0029] Furthermore, in step 5, the voltage sag observation method is to set the running time of the up train to 3 to 5 cycles and the running time of the down train to 6 to 8 cycles, so as to simulate the voltage sag situation.

[0030] Furthermore, in step 6, the simulation observes the waveform and analyzes the voltage sag, that is, observes the results through an oscilloscope and a numerical display, and compares different voltage waveforms to analyze the voltage sag.

[0031] Due to the adoption of the above technical solution, the present invention has the following advantages and positive effects compared with the prior art:

[0032] The invention discloses a multi-operating condition power quality analysis method for a high-speed railway traction power supply system. Aiming at the current and voltage sag problems under different operating conditions, the invention uses the opening and closing time setting of the circuit breaker to simulate the instantaneous impact of the tram load entering the section on the system, and analyzes the impact current and voltage sag problems and solutions in combination with measured data. The model uses impedance to equivalent train operation, thereby simplifying the problem, reducing unnecessary interference, and facilitating the analysis of test results, thereby making the judgment of the impact current and voltage sag problems more accurate, and has great significance in the power quality analysis of the traction power supply system. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative work. In the drawings:

[0034] Figure 1 is a schematic diagram of a traction power supply system model flow chart of an embodiment of the present invention;

[0035] Figure 2 is a multi-operating-condition simulation model diagram of a traction power supply system according to an embodiment of the present invention;

[0036] Figure 3 It is the circuit device parameter setting of the embodiment of the present invention;

[0037] Figure 4 is a description of the circuit breaker status under different working conditions of an embodiment of the present invention;

[0038] Figure 5 It is a voltage, current and negative sequence measurement module of an embodiment of the present invention;

[0039] Figure 6 is the simulation result of the three-phase current effective value under different working conditions of the embodiment of the present invention;

[0040] Figure 7 is the simulation result of negative sequence current value under different working conditions of the embodiment of the present invention;

[0041] Figure 8 1 is the voltage sag waveform result under different working conditions of the embodiment of the present invention;

[0042] Fig. 9 1 and 2 are three-phase current waveform results under different working conditions of the embodiment of the present invention. DETAILED DESCRIPTION

[0043] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0044] like Figure 1 As shown, this embodiment discloses a multi-operating condition power quality analysis method for a high-speed railway traction power supply system, comprising the following steps:

[0045] Step 1: Use simulink to build a traction power supply simulation circuit including power supply, traction transformer, AT station, sequence component detection module, and current observation module;

[0046] Step 2: Set the parameters of the power supply, traction transformer, AT station, sequence component detection module, and current observation module, set the status of the upstream and downstream circuit breakers to open, and set the impedance value of the load;

[0047] Step 3: Circuit breaker open: current flows through the internal resistance of the circuit breaker, indicating no load; circuit breaker closed: current flows through the load through the wire, indicating that a train is running;

[0048] Step 4: Start simulation: obtain different three-phase current and negative sequence current values ​​under three traction power supply conditions: no-load, single-row, and full-load;

[0049] Step 5: Set the running time of the up train to 3 to 5 cycles, and the running time of the down train to 6 to 8 cycles;

[0050] Step 6: Simulate and observe the waveforms, compare the waveforms of different voltages, and observe and analyze the voltage sag.

[0051] See also Figure 2 Regarding the traction power supply multi-operating condition power quality analysis model of the embodiment of the present invention, the specific implementation steps are as follows:

[0052] In step 2, the power supply adopts 220kV / 50Hz three-phase AC power supply, the traction transformer adopts V / x power supply mode, and the AT uses the opposite-name ends of ordinary linear transformers to form an autotransformer with a transformation ratio of 55 / 27.5, and then designs the circuit breaker impedance model. The parameters of the above devices are set at Figure 3 Described in.

[0053] In step S2, the initial state of the uplink and downlink circuit breakers is set to open (set to 0), indicating no load, and the load impedance value is set to 30Ω.

[0054] In step 3, see Figure 4 , circuit breaker is open: current passes through the internal resistance of the circuit breaker, indicating no load; circuit breaker is closed: current flows through the load through the wire, indicating that a train is running. The negative sequence current theory is used to analyze the imbalance problem caused by the V / x wiring method.

[0055] In step 4, the imbalance degree is positively correlated with the negative sequence current value, and the three-phase voltage and current on the power supply side of the system are respectively expressed as The corresponding locomotive load side current and terminal voltage are expressed as I P , U P , P=1,2,…,n,U A As a reference phase:

[0056]

[0057]

[0058]

[0059] In the formula, represents the unit vector operator, Compare Lag phase angle Compare Lagging power factor angle In the case of independent operation, all ports on the traction side will not cause zero-sequence current on the system side, so I P The three-phase current generated is P Collinear and satisfying I AP +I BP +I CP =0, from this we can get the conservation principle formula:

[0060]

[0061] The three-phase current expression can be obtained by the symmetrical component method and superposition principle:

[0062]

[0063] Then the expressions of positive-sequence and negative-sequence current components and the unbalance degree of negative-sequence current are obtained:

[0064]

[0065] Imbalance

[0066] Furthermore, in step 4, the no-load state means that both the uplink and downlink circuit breakers on the load side of the circuit breaker are always open, that is, no load is connected. Single-train operation means closing the circuit breaker on one side, and load connection means that a train is passing on this side; closing the circuit breakers on both sides means full load; negative sequence current detection is obtained using the sequence component detection module provided by the simulation, the sequence component selects negative sequence, and the frequency is set to the power frequency 50Hz. For specific model construction, see Figure 5 , the three-phase current measurement results under different working conditions refer to Figure 6 , the negative sequence current value measurement results under different working conditions refer to Figure 7 .

[0067] Through simulation, it can be seen that when the train is running on a single-side line, the three-phase current is extremely unbalanced. The downlink line connected to phase B has no load, so the current is very small, while the line where phase A is located has a large load and a large current. At this time, the negative sequence current of the system is also very prominent, and the imbalance is extremely high. This working condition is very common in engineering. Therefore, under the premise of no compensation and restriction measures, the high-speed rail transit will cause a large negative sequence current on the system side. From the results in the figure, it can be found that when the double-line is running at full load, although the negative sequence current is relatively small and the imbalance is reduced, it is still not negligible.

[0068] Many experts, including those in my country, have conducted in-depth research on the three-phase imbalance problem of high-speed railways and proposed some compensation methods. The more unified and recognized methods can be roughly divided into two types: starting from the power supply mode of the traction power supply system to change the overall structure and compensating the imbalance of the system by installing various compensation equipment. Changing the overall power supply structure can use the phase-changing access mentioned above and the use of some balanced wiring transformers, but fundamentally these methods will still cause a certain imbalance in the system and cannot meet the requirements of power quality. There is also a method of directly increasing the system voltage level to limit imbalance and negative sequence, but in this way, the insulation requirements of the entire line and substation equipment will be greatly increased, and the cost is unacceptable.

[0069] In step 5, the voltage sag observation method is to set the running time of the up train to 3 to 5 cycles and the running time of the down train to 6 to 8 cycles, so as to simulate the voltage sag situation.

[0070] In step 6, the simulation observation waveform and analysis of voltage sag is to observe the results through an oscilloscope and a numerical display, see Figure 8 and 9 , compare different voltage waveforms to analyze voltage sag.

[0071] The simulation results show that when the train enters the up line, the A-phase current rises sharply within half a cycle, and the A-phase voltage drops to 90% of the rated voltage; when the train runs from the up line to the down line, the A-phase current drops back and the voltage rises back to normal, while the B-phase current rises sharply, causing the voltage to drop to 80% of the rated voltage; when the train leaves the section, the B-phase current drops back and the voltage rises back to normal; the C-phase current remains basically stable from the time the train enters the section to the time it leaves, and there is only a certain fluctuation when the train switches from the up line to the down line, and the C-phase voltage is at 80% of the rated voltage when the train enters the up line, with a temporary sag depth of 20%, and a temporary sag depth of 10% when the train enters the down line. After the train leaves, the voltage returns to normal levels.

[0072] The impact of voltage problems on the normal operation of the line cannot be ignored, and the best way to solve voltage problems is dynamic compensation technology. This technology can be divided into series voltage compensation and parallel current compensation. This compensation scheme is classified by different types of compensation signals and different wiring types of installed compensation devices.

[0073] (1) Series voltage compensation

[0074] This compensation method is mainly carried out from the load side. In order to offset the transient part of the system voltage, the series voltage compensation device provides a three-phase voltage that is connected in series with the system three-phase voltage and can set the amplitude, frequency and phase angle by itself. Series voltage compensation is divided into three categories according to the phase difference between the compensation voltage and the system voltage: in-phase compensation, constant phase compensation and leading phase compensation. (2) Parallel current compensation

[0075] Compared with series compensation, parallel compensation technology is mainly used to avoid the following two influences: first, by injecting compensation current with opposite phase and equal amplitude into the power grid, the influence of distorted harmonic current generated by large load connected to the grid is reduced, and temporary voltage drop on the bus is effectively avoided; second, when voltage sag or fluctuation has occurred, it can effectively avoid the voltage of the compensated load from being greatly affected.

[0076] The specific compensation scheme to be used needs to be selected based on more complex working conditions.

[0077] This embodiment is a multi-operating condition power quality analysis method for a high-speed railway traction power supply system. A simplified traction power supply system model is constructed to simulate the current distribution on the system side under different operating conditions. The model is mainly composed of a three-phase source, a traction transformer, an AT station, a sequence component detection module, and a current observation module. Two up and down lines are established. The opening and closing of the circuit breaker combined with the equivalent load impedance is used to characterize whether there is a train passing through. The distribution of positive and negative sequence currents under three states of no-load, single-row, and full-load is simulated respectively. Through current testing, it is concluded that the simulation experiment can reflect the typical current distribution, which is consistent with the actual results of the project. The voltage sag is simulated by reasonably adjusting the frequency range, and the corresponding waveform is subjected to sag analysis, and a corresponding compensation scheme is proposed based on this analysis. The present invention has great research potential and application value in the field of high-speed railway power quality analysis, and is of vital importance to the stable operation and fault prediction of the traction power supply system.

[0078] The above is only a preferred specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily thought of by a person skilled in the art within the technical scope disclosed by the present invention should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.

Claims

1. A multi-operating condition power quality analysis method for a high-speed railway traction power supply system, characterized in that: The following steps are involved: Step 1: Use simulink to build a traction power supply simulation circuit including power supply, traction transformer, AT station, sequence component detection module, and current observation module; Step 2: Set the parameters of the power supply, traction transformer, AT station, sequence component detection module, and current observation module, set the status of the upstream and downstream circuit breakers to open, and set the impedance value of the load; Step 3: Circuit breaker open: current flows through the internal resistance of the circuit breaker, indicating no load; circuit breaker closed: current flows through the load through the wire, indicating that a train is running; Step 4: Start simulation: obtain different three-phase current and negative sequence current values ​​under three traction power supply conditions: no-load, single-row, and full-load; In step 4, the imbalance degree is positively correlated with the negative sequence current value, and the three-phase voltage and current on the power supply side of the system are respectively expressed as , The corresponding locomotive load side current and terminal voltage are expressed as , As a reference phase: (1) (2) (3) In the formula, , represents the unit vector operator, Compare Lag phase angle , Compare Lagging power factor angle , in the case of independent operation, all ports on the traction side will not cause zero-sequence current on the system side, so The three-phase current generated is Collinear and satisfying , from which we can get the conservation principle formula: (4) The three-phase current expression can be obtained by the symmetrical component method and superposition principle: (5) Then the expressions of positive-sequence and negative-sequence current components and the unbalance degree of negative-sequence current are obtained: (6) Imbalance (7) Step 5: Set the running time of the up train to 3~5 cycles, and the running time of the down train to 6~8 cycles; Step 6: Simulate and observe the waveforms, compare the waveforms of different voltages, and observe and analyze the voltage sag.

2. The multi-operating condition power quality analysis method of a high-speed railway traction power supply system according to claim 1 is characterized in that: In step 2, the power supply adopts 220kV / 50Hz three-phase AC power supply, the traction transformer adopts V / x power supply mode, and the AT uses the opposite-name ends of an ordinary linear transformer to form an autotransformer with a transformation ratio of 55 / 27.

5.

3. The multi-operating condition power quality analysis method of a high-speed railway traction power supply system according to claim 2 is characterized in that: In step 3, the circuit breaker is open: the current passes through the internal resistance of the circuit breaker, indicating no load; Circuit breaker closed: current flows through the load through the conductor, indicating that a train is running. The negative sequence current theory is used to analyze the imbalance caused by the V / x wiring method.

4. The multi-operating condition power quality analysis method of a high-speed railway traction power supply system according to claim 1 is characterized in that: In step 4, the no-load state means that both the upstream and downstream circuit breakers on the load side of the circuit breaker are always kept open, that is, no load is connected. Single-train operation means closing the circuit breaker on one side and connecting the load, indicating that a train passes through this side. Closing the circuit breakers on both sides indicates full load. The negative sequence current detection is obtained using the sequence component detection module provided by the simulation, the sequence component selects the negative sequence, and the frequency is set to the industrial frequency 50Hz.

5. The multi-operating condition power quality analysis method of a high-speed railway traction power supply system according to claim 1 is characterized in that: In step 5, the voltage sag observation method is to set the running time of the up train to 3 to 5 cycles and the running time of the down train to 6 to 8 cycles, so as to simulate the voltage sag situation.

6. The multi-operating condition power quality analysis method of a high-speed railway traction power supply system according to claim 1 is characterized in that: In step 6, the simulation observes the waveform and analyzes the voltage sag, that is, observes the results through an oscilloscope and a numerical display, and compares different voltage waveforms to analyze the voltage sag.