A multi-blank multi-contract cutting and feeding method based on cutting sub-mode

By calculating the feasible length and cutting sub-mode of the casting billet, the multi-bill material and multi-contract cutting and feeding in steel pipe rolling solves the problem that the length of the casting billet is difficult to meet the needs of multiple contracts, improves the yield and production efficiency, and achieves the More flexible blank length adjustment.

CN114819359BActive Publication Date: 2024-11-01ZHEJIANG UNIV
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202210472417.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-04-29
Publication Date
2024-11-01
Estimated Expiration
2042-04-29

AI Technical Summary

Technical Problem

In the multi-variety small batch production mode, it is difficult to meet the optimal production requirements of all contracts in steel pipe rolling at the same time, resulting in a decrease in production capacity and material yield. The existing methods are complex in calculations and it is difficult to flexibly adjust the length of the blank to improve material yield.

Method used

Using multi-blank multi-contract cutting and feeding method based on cutting sub-mode, the feasible length of the casting blank is calculated by reverse estimating, and a collection of cutting sub-modes are established, and these modes are used to cut and combine casting blanks of different lengths, and the cutting scheme is optimized to maximize Raw material yield and production efficiency.

Benefits of technology

It effectively solves the problem of many-to-many cutting and cutting optimization, improves the raw material formation rate and production efficiency, and can flexibly adjust the blank length according to actual production conditions, avoids the risk of short rulers, and makes the calculation results more accurate.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114819359B_ABST
    Figure CN114819359B_ABST
Patent Text Reader

Abstract

The present invention discloses a multi-blank multi-contract cutting and feeding method based on a cutting sub-mode. In the hot rolling production process of steel pipes, the selection of the ingot cutting scheme has a significant impact on key indicators such as the production efficiency and yield rate of steel pipe rolling. To this end, the present invention takes into account the needs of continuous production and reduced scheduling in the on-site production organization process, proposes to use the reverse method to obtain a feasible cutting sub-mode for each contract, and proposes a ingot cutting method based on the cutting sub-mode, designs a comprehensive evaluation index composed of raw material yield and production efficiency for optimization, and uses a sorting and optimization algorithm in the overall arrangement to ensure that the overall comprehensive evaluation index is the highest. The method of the present invention can realize the automatic compilation of multi-to-multi cutting and blanking plans in actual production, with high raw material yield and production efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of steel pipe rolling production, and in particular relates to a multi-blank multi-contract cutting and feeding method based on a cutting sub-mode. Background Art

[0002] Seamless steel pipe is a very important industrial material, widely used in various fields such as petroleum, chemical industry, boiler, power station, shipbuilding, machinery manufacturing, automobile, aviation, aerospace, energy, geology, construction and military industry. In the steel pipe rolling process, the selection of the billet cutting scheme has a significant impact on key indicators such as production efficiency and yield rate. However, in the large-scale centralized production mode, after the steel pipe is batched by the contract, the length of the continuous casting billet generally meets the requirements of the steel pipe rolling table, that is, the billet is cut and produced according to the length defined in the rolling table, which basically meets the requirements of maximum production efficiency and yield rate. However, under the current production situation of multi-variety small batches and non-fixed-length products corresponding to contracts, it is difficult for the billet length to meet the optimal production requirements of all contracts at the same time. Therefore, in the case of many-to-many billets and contracts (that is, matching billets of multiple specifications under the same material with contracts with multiple rolling requirements), how to cut and cut the inventory billets to improve production capacity and yield rate is a practical problem faced on site.

[0003] The many-to-many cutting optimization problem can be described as: there are N existing contracts with different rolling requirements and M types of ingots with different lengths. For N types of contracts i, how many ingots j should be selected from M and how to cut the ingot j for the first time before hot rolling, so that the final cutting plan can maximize the raw material yield and production efficiency while meeting the contract requirements and production constraints.

[0004] In previous studies, the ingot cutting problem is often treated as a one-dimensional cutting problem, that is, cutting several raw materials of different lengths into short materials of different lengths and quantities, so that the raw material utilization rate is as high as possible while meeting the demand.

[0005] However, this method has the following limitations: First, the length and corresponding quantity of different L2 billets need to be determined in advance, that is, in the actual billet cutting problem, the planned number of billet lengths corresponding to each contract of the same type must be determined first before it can be treated as a one-dimensional cutting problem. This limits the billet length corresponding to the contract to the planned billet length or other fixed combinations provided by the rolling table, and cannot be flexibly changed according to the billet length to further improve the yield rate; second, the combined production of the billets required for all contracts using the combination optimization method will result in the calculation result that one raw material supplies multiple contracts, which greatly increases the difficulty of on-site scheduling and may lead to the inability to continuously schedule production on site, reducing production efficiency; third, due to the first limitation, the billet length is determined, and it is impossible to use non-fixed-length contracts (the delivery length can be any value within the specified range) to flexibly improve the overall yield rate of the raw materials. Summary of the invention

[0006] In order to realize the automatic compilation of multi-to-multi cutting and feeding plans in actual production and improve the comprehensive yield rate and production capacity of raw materials, the present invention proposes a multi-bill and multi-contract cutting and feeding method based on cutting sub-patterns. The method reversely calculates the feasible length of L2 billet from the finished product required by the contract, establishes a feasible cutting sub-pattern set, and then uses the cutting sub-pattern to cut and combine billets of different lengths to obtain the best cutting plan with the maximum raw material yield rate and production efficiency. Finally, the cutting and feeding optimization of multi-bill and multi-contract sorts all the best cutting plans and arranges them one by one to ensure that the arrangement results can meet the contract requirements while maximizing the raw material yield rate and production efficiency.

[0007] The specific technical solutions of the present invention are as follows:

[0008] A multi-blank multi-contract cutting and feeding method based on cutting sub-mode, the method comprising the following steps:

[0009] Step 1: Calculate the contract's rolling and sawing standards, modify the process length limit, and modify the rolling standards based on whether the contract is a special case; specifically:

[0010] According to the contract and rolling table information, the rolling and sawing standards of the contract are calculated, including the length loss in each process and the cutting sub-mode of rolling and sawing according to the planned billet length; the cutting sub-mode is the combination of parameters involved in the process of rolling, cutting, sawing and cutting to size to obtain the finished product in the subsequent production of L2 billet length; the L2 billet length is the length of the tube billet obtained by the first cutting of the raw material in actual production;

[0011] Modify the process length limits of the respective contracts according to the material of the blank and the type of the finished product;

[0012] For each contract, check whether the contract is in the following situations. If so, handle it accordingly:

[0013] First, determine whether the contract is a cold-drawn seamless or cold-rolled seamless contract. If so, the length of the finished product after cold rolling on such contracts shall be used as the delivery length, and the sawing length in the hot rolling production process of such contracts shall be used as the auxiliary delivery length of such contracts;

[0014] Then, determine whether the ratio of the remaining length / sawing length in the cutting sub-mode of the planned billet length is greater than or equal to 0.9. If so, set the remaining length to 0, add 1 sawing length to reversely calculate the L2 billet length; if the reversed L2 billet length meets the process length limit, modify the planned billet length accordingly, and recalculate the parameters of the contract rolling sawing standard; if the reversed L2 billet length does not meet the process length limit, the original planned billet length provided in the rolling table shall prevail;

[0015] Finally, determine whether the remaining length in the cutting sub-mode of the planned billet length is: when the sawing length is n times the length, the ratio of the remaining length / the sawing length is less than Where n is a positive integer. If so, the remaining length is set to 0 and the result is recalculated.

[0016] The number of finished products with the same planned billet length and the total length of the auxiliary delivery length to be rolled in the contract;

[0017] Step 2: Calculate the feasible range of L2 billet length for each contract;

[0018] The machine length limit for each process and the maximum and minimum billet length limits are converted into the length of the billet with the same cross-sectional area as the L2 billet length. The interval of all lengths is taken as the feasible range of the L2 billet length, recorded as L2 min ~L2 max ;

[0019] Step 3: Reverse the feasible cutting sub-patterns of each contract;

[0020] Step 4: For each type of ingot with the same material and different lengths under different contracts, if the ingot is the main ingot in the storage location, the ingot is first cut into equal parts; when the inventory quantity of the ingot or the quantity of the ingot required by the contract is less than the maximum number of ingots to be cut in parallel, or the yield rate is less than the specified threshold, the ingot is cut in the form of k regular ingot lengths + 1 surplus ingot length, where k is a positive integer; during the calculation process, the cutting scheme with the highest comprehensive evaluation index is always retained as the best cutting scheme for the ingot under the contract, and the comprehensive evaluation index is obtained by weighted calculation of utilization rate and production efficiency; if the ingot is a non-main ingot in the storage location, the ingot is cut based on the regular ingot length of the main ingot in the same storage location;

[0021] Step 5: The best cutting plans for all the ingots of all the contracts are ranked by comprehensive evaluation indicators, and the final cutting and feeding results for all the contracts are determined according to the ranking.

[0022] Furthermore, the calculation of the contract rolling sawing standard in step 1 is achieved by the following steps:

[0023] (1) Determine the perforation elongation coefficient K based on rolling requirements and contract information extend1 , empty minus extension coefficient K extend2 , continuous rolling elongation coefficient K extend3 , tension reduction coefficient K extend4 , first cutting loss SP12, cutting head and tail allowance SP23, sawing length k saw , cutting length allowance SP440, auxiliary delivery length l 4act , feasible sawing length l saw ;

[0024] Among them, the elongation coefficients of the four processes of perforation, hollow reduction, continuous rolling and tension reduction are Wherein, I is any positive integer in {1,2,3,4};

[0025] The first cutting loss SP12 is the average value of the first cutting loss of the machine;

[0026] The trimming margin SP23 = rolling table tension reduction length - rolling table effective length;

[0027] The sawing multiple k saw The sawing length l is the planned billet length provided by the rolling table saw0 The number of finished products obtained;

[0028] The calculation formula of the cut length allowance SP440 is as follows:

[0029]

[0030] Among them, l from The starting value of the contract delivery length;

[0031] The auxiliary delivery length l 4act The delivery length with cut-to-length allowance SP440 is calculated as follows:

[0032]

[0033] in, The maximum sawing length of the non-fixed-length contract, that is, the maximum allowable length of the rolling machine; l to The delivery length termination value of the contract;

[0034] The feasible sawing length l of the fixed-length contract saw = l saw0 , the feasible sawing length of non-fixed-length contracts is l saw =k saw × 4act The interval is calculated as:

[0035]

[0036] (2) According to the effective length l of the planned billet length provided by the rolling table valid0 , sawing length l saw0 , calculate other parameters in the cutting sub-mode of the planned billet length, including the number of sawing cuts n saw0 , remaining length l remain0 、Number of finished products n pro0 , Auxiliary delivery length l 4act0 The subscript 0 in the parameter indicates the corresponding value of the parameter under the planned billet length. The calculation formula is as follows:

[0037]

[0038] l remain0 = l valid0 -l saw0 ×n saw0

[0039]

[0040] l 4act0 = l saw0 / k saw

[0041] in, is the floor symbol;

[0042] (3) Calculate the required rolling l of the contract 4act Total length L reqr = planned number of roots provided by the rolling table × n pro0 × 4act0 .

[0043] Furthermore, the step three is implemented through the following sub-steps:

[0044] (3.1) For a fixed-length contract, the number of finished products that can be produced by traversing the billet length L2 is n pro , and the number of finished products k of the remaining length of the cutting sub-mode corresponding to the L2 billet length can be obtained by reverse calculation remain 、Number of sawing saw , remaining length l remain 、L2 effective length of billet length l valid 、L2 billet length L feas The value of

[0045] (3.2) For non-fixed-length contracts, the number of possible finished products n for L2 billet length pro , and the number of finished products k of the remaining length of the cutting sub-mode corresponding to the L2 billet length can be obtained by reverse calculation remain 、Number of sawing saw and the remaining length l remain 、L2 effective length of billet length l valid 、L2 billet length L feas The upper and lower limits of the three parameters are obtained. remain , l valid , L feas The interval representation is then discarded if it does not satisfy L2 min ≤L feas ≤L2 max Result;

[0046] The reverse calculation formula for fixed-length contracts and non-fixed-length contracts is:

[0047]

[0048] k remain =n pro %k saw

[0049] l remain =max(l 4act ×k remain , the minimum sawing length allowed by the process)

[0050] l valid = l saw ×n saw +l remain

[0051]

[0052] Among them, n saw 、n pro They are the number of sawings of L2 billet length and the number of finished products.

[0053] Furthermore, the calculation method of the optimal cutting scheme of the main ingot in step 4 is implemented through the following sub-steps:

[0054] (4.1) Determine whether the length of the ingot is an integer multiple of the planned ingot length. If so, directly cut it into integers of the planned ingot length in equal parts, and use the following formula to calculate the comprehensive evaluation index of the cutting plan, which is the best cutting plan for the ingot for the contract;

[0055]

[0056] Among them, x k is the number of L2 billet lengths of the kth cutting sub-mode in the cutting scheme; is the L2 billet length, number of finished products and auxiliary delivery length of the kth cutting sub-mode; θ is the weighting factor of utilization and production efficiency, 0≤θ≤1; when the billet length is an integer multiple of the planned billet length, the kth cutting sub-mode is the cutting sub-mode of the planned billet length in step 1;

[0057] If not, and the billet length L mat ≥L2 min , continue to step (4.2); otherwise, the billet cannot be used for rolling under the contract;

[0058] (4.2) Traverse the possible number of equal divisions N cut, determine the corresponding cutting sub-mode according to the actual billet length, calculate the comprehensive evaluation index value according to the same comprehensive evaluation index calculation formula as step (4.1), and continuously update the cutting plan with the highest current comprehensive evaluation index; the methods for determining the cutting sub-mode corresponding to the actual billet length for fixed-length contracts and non-fixed-length contracts are different, specifically:

[0059] ① If it is a fixed-length contract, the actual length of the blank after equal division is L cut In step 3, the cutting sub-pattern set is found to match the length L of the blank. cut The closest available L feas , L feas ≤L cut At this time, the remaining blank length L remain 、Number of remaining materials remain is 0;

[0060] ② If it is a non-fixed-length contract, the actual length of the blank after equal division is L cut , find L in the cutting sub-pattern set in step 3 cut Where L feas interval, if the interval is found, then according to K extend4 and SP23 to calculate L cut The effective length of the remaining blank is L remain 、Number of remaining materials remain is 0; if no matching interval is found, it means L cut exist Upper limit Between the lower limits, according to The number of finished products, number of sawings, and sawing length in the cutting sub-mode are The upper limit of auxiliary delivery length; where, represents the L2 billet length in the jth sub-mode;

[0061] (4.3) If the number of ingots in stock or the number required by the contract is not greater than the maximum number of ingots to be cut in parallel, or the yield rate of the best equal-division cutting scheme is lower than a preset threshold, all possible long-short combination cutting schemes for the ingot are traversed, and the comprehensive evaluation index value is calculated according to the same formula as step (4.1), and the cutting scheme with the highest comprehensive evaluation index is continuously updated to obtain the best cutting scheme that considers both equal-division cutting and long-short combination cutting;

[0062] The method for determining the length and shortness matching cutting plan for fixed-length contracts and non-fixed-length contracts is:

[0063] ① If it is a fixed-length contract, from L feas The longest cutting mode starts, the length of the blank is L cut =L feas , Calculate the remaining billet length R = Lmat -N cut ×L cut -(N cut -1)×SP12; if R is in L2 min ~L2 max The remaining ingots are all used as the residual material L remain Investment; if R<L2 min , judge R+L cut Ability to produce finished products greater than L cut When the number of finished products that can be produced is remain =R+L cut , the number of positive materials N cut =N cut -1; then in L feas Find the L in the collection remain The closest cutting sub-pattern, as the cutting sub-pattern for the remaining material;

[0064] ② If it is a non-fixed-length contract, from L feas The largest cutting sub-pattern begins traversal; for each sub-pattern, in L feas Within the interval, try L with a preset step size feas The value in , sets the traversed billet length to L cut ; Calculate the remaining billet length R = L mat -N cut ×L cut -(N cut -1)×SP12; if R is in L2 min ~L2 max The remaining ingots are all used as the residual material L remain Investment; if R<L2 min , judge R+L cut Available and better than L cut The effective length is longer, then the remaining material L remain =R+L cut , the number of positive materials N cut =N cut -1; then in L feas Find the length L of the remaining blank in the collection remain The closest cutting sub-pattern, as the cutting sub-pattern for the remaining material.

[0065] Furthermore, the step 5 is implemented by the following sub-steps:

[0066] (5.1) For N contracts and M warehouse locations, N×M optimal cutting schemes for main ingots are sorted in descending order according to the comprehensive evaluation index. The result is: Arrange the sorting results of these N×M best cutting solutions one by one;

[0067] (5.2) Arrangement When the solution is traversed, determine whether it has been traversed or the remaining rolling length of the contract is 0. If so, end; if not, determine the l that can be produced by all the unscheduled ingots in the storage location m 4act Is the total length greater than the remaining l of the contract n that needs to be rolled? 4act length; if not greater than, all the billets in location m are allocated to contract n; if greater than, the billets in location m are optimized for combination, and the combination that meets the contract requirements and has the smallest total length is selected; after the arrangement is completed After that, update the remaining available number of billets in storage location m and the remaining rolling length of contract n;

[0068] (5.3) Repeat step (5.2) until all contracts are satisfied or the number of remaining available strands is 0 or all cutting plans have been traversed.

[0069] The beneficial effects of the present invention are:

[0070] The present invention can effectively solve the problem of cutting and feeding multiple billets and multiple contracts in the actual rolling production process of seamless steel pipes. Among them, the reverse calculation method can more accurately calculate all the cutting sub-patterns of the contract that meet the process constraints, including a variety of feasible L2 billet lengths. Compared with only using the planned billet length as the only length of the L2 tube billet, it can provide more cutting combinations for the cast billet to improve the raw material yield rate; for non-fixed-length contracts, the delivery length can be flexibly determined according to the actual billet length obtained by cutting to ensure that the billet is not wasted; at the same time, the reverse calculation takes into account the constraints of the sawing to finished product process, avoiding the risk of short length. The cast billet cutting combination method of the present invention can calculate the comprehensive evaluation index of raw material yield rate and production efficiency based on the actual tube billet length that is convenient for production, taking the closest and available cutting sub-pattern as the standard, which is more accurate than the existing forward estimation. BRIEF DESCRIPTION OF THE DRAWINGS

[0071] Figure 1 It is the overall flow chart of the two-stage cutting and feeding optimization model;

[0072] Figure 2 It is a schematic diagram of the production process of seamless steel pipe rolling area. DETAILED DESCRIPTION

[0073] The present invention will be described in detail below based on the accompanying drawings and preferred embodiments, and the purpose and effects of the present invention will become more clear. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0074] The present invention establishes a two-stage cutting and feeding optimization model according to the staged nature of steel pipe rolling production. The flow chart of the method is as follows: Figure 1As shown, it can be divided into two parts. The first stage is the cutting optimization stage, which solves the problem of how to cut each ingot for the first time under the rolling and sawing conditions of each contract to maximize the yield rate and production efficiency; the second stage is the feeding optimization stage, which solves the problem of how to match the materials between contracts with different rolling and sawing conditions and ingot raw materials of different lengths to maximize the overall yield rate and production efficiency. Figure 2 It shows the various stages of the tube billet in the production process of the seamless steel tube rolling area. The L1-L2 stage is the process of cutting the ingot from the electric furnace or converter into the L2 tube billet of the middle length. The L2 tube billet is rolled into a more slender steel tube through the processes of heating, perforation, hollow diameter reduction, continuous rolling, and tension reduction. It is then cut into multiple sawing lengths by cutting the head and tail and cold sawing. The sawing length is then cut into the head and tail and cut to the fixed length to become a finished tube.

[0075] The method of the present invention comprises the following specific steps:

[0076] Step 1: Calculate the contract's rolling and sawing standards, modify the process length limit, and modify the rolling standards based on whether the contract is a special case;

[0077] (1.1) According to the contract and rolling table information, the contract rolling and sawing standards are calculated, including the length loss in each process and the cutting sub-mode of rolling and sawing according to the planned billet length; the cutting sub-mode is the combination of parameters involved in the process of rolling, cutting, sawing and cutting to size in the subsequent production of the L2 billet length to obtain the finished product; the L2 billet length is the length of the tube billet obtained by the first cutting of the raw material in actual production; specifically:

[0078] ① Determine the piercing elongation coefficient K according to rolling requirements and contract information extend1 , empty minus extension coefficient K extend2 , continuous rolling elongation coefficient K extend3 , tension reduction coefficient K extend4 , first cutting loss SP12, cutting head and tail allowance SP23, sawing length k saw , cutting length allowance SP440, auxiliary delivery length l 4act , feasible sawing length l saw ;

[0079] Among them, the elongation coefficients of the four processes of perforation, hollow reduction, continuous rolling and tension reduction are Wherein, I is any positive integer in {1,2,3,4};

[0080] The first cutting loss SP12 is the average value of the first cutting loss of the machine, which is assumed to be 0.01m / cutting tool.

[0081] The trimming margin SP23 = rolling table tension reduction length - rolling table effective length;

[0082] The sawing multiple k saw The sawing length l is the planned billet length provided by the rolling table saw0 The number of finished products obtained;

[0083] The calculation formula of the cut length allowance SP440 is as follows:

[0084]

[0085] Among them, l from The starting value of the contract delivery length;

[0086] The auxiliary delivery length l 4act The delivery length with cut-to-length allowance SP440 is calculated as follows:

[0087]

[0088] in, The maximum sawing length of the non-fixed-length contract, that is, the maximum allowable length of the rolling machine; l to The delivery length termination value of the contract;

[0089] The calculation formula of the feasible sawing length is as follows:

[0090]

[0091] ② According to the effective length l of the planned billet length provided by the rolling table valid0 , sawing length l saw0 , calculate other parameters in the cutting sub-mode of the planned billet length, including the number of sawing cuts n saw0 , remaining length l remain0 、Number of finished products n pro0 , Auxiliary delivery length l 4act0 The subscript 0 in the parameter indicates the corresponding value of the parameter under the planned billet length. The calculation formula is as follows:

[0092]

[0093] l remain0 = l valid0 -l saw0 ×n saw0

[0094]

[0095] l 4act0 = l saw0 / k saw

[0096] in, is the floor symbol;

[0097] ③Calculate the required rolling l of the contract 4act Total length L reqr = planned number of roots provided by the rolling table × n pro0 × 4act0 .

[0098] (1.2) Modify the process length limits of each contract according to the material of the billet and the type of finished product. For billets with special purposes or specific materials, there are stricter restrictions on the process length during processing. Therefore, it is necessary to modify the corresponding process length limits of contracts using such materials;

[0099] (1.3) For each contract, check whether the contract is in the following situations. If so, handle it accordingly:

[0100] ① First determine whether the contract is a cold-drawn seamless or cold-rolled seamless contract. If so, the length of the finished product after cold rolling in such contracts shall be used as the delivery length. The sawing length in the hot rolling production process of such contracts shall be used as the auxiliary delivery length of such contracts;

[0101] ② Then determine whether the ratio of the remaining length / sawing length in the cutting sub-mode of the planned billet length is greater than or equal to 0.9. This is because the sawing length is changed from multiple lengths to single lengths on site, which is easy to cause short lengths. Therefore, if so, it is necessary to: set the remaining length to 0, increase 1 sawing length to reversely calculate the L2 billet length; the L2 billet length is the length of the tube billet obtained by the first cutting of the raw material in actual production;

[0102] If the L2 billet length obtained by reverse calculation meets the process length limit, the planned billet length is modified accordingly, and the parameters of the contract rolling sawing standard are recalculated; if the L2 billet length obtained by reverse calculation does not meet the process length limit, the original planned billet length provided in the rolling table shall prevail;

[0103] ③Finally, determine whether the ratio of the remaining length to the sawing length is less than n times the length in the cutting sub-mode of the planned billet length. Where n is a positive integer; this situation affects the continuous production of the on-site sawing process, so if so, it is necessary to: set the remaining length to 0, recalculate the number of finished products of the planned billet length of the contract and the total length required to be rolled in the contract.

[0104] Step 2: Calculate the feasible range of L2 billet length for each contract;

[0105] The machine length limit for each process and the maximum and minimum billet length limits are converted into the length of the billet with the same cross-sectional area as the L2 billet length. The interval of all lengths is taken as the feasible range of the L2 billet length, recorded as L2 min ~L2 max ;

[0106] Step 3: Reverse the feasible cutting sub-patterns of each contract;

[0107] (3.1) For a fixed-length contract, the number of finished products that can be produced by traversing the billet length L2 is n pro , and the number of finished products k of the remaining length of the cutting sub-mode corresponding to the L2 billet length can be obtained by reverse calculation remain 、Number of sawing saw , remaining length l remain 、L2 effective length of billet length l valid 、L2 billet length L feas The value of

[0108] (3.2) For non-fixed-length contracts, the number of possible finished products n for L2 billet length pro , and the number of finished products k of the remaining length of the cutting sub-mode corresponding to the L2 billet length can be obtained by reverse calculation remain 、Number of sawing saw and the remaining length l remain 、L2 effective length of billet length l valid 、L2 billet length L feas The upper and lower limits of the three parameters are obtained. remain , l valid , L feas The interval representation is then discarded if it does not satisfy L2 min ≤L feas ≤L2 max Result;

[0109] The reverse calculation formula for fixed-length contracts and non-fixed-length contracts is:

[0110]

[0111] k remain =n pro %k saw

[0112] l remain =max(l 4act ×k remain , the minimum sawing length allowed by the process)

[0113] l valid = l saw ×n saw +l remain

[0114]

[0115] Among them, n saw 、n pro They are the number of sawings of L2 billet length and the number of finished products.

[0116] Step 4: For each ingot of the same material but different lengths under different contracts, if the ingot is the main ingot in the warehouse, the ingot is cut into equal parts first; when the inventory quantity of the ingot or the quantity of the ingot required by the contract is less than the maximum quantity of ingot parallel cutting, or the yield rate is less than the specified threshold, the ingot is cut in the manner of k positive ingot lengths + 1 surplus ingot length, where k is a positive integer; during the calculation process, the cutting scheme with the highest comprehensive evaluation index is always retained as the optimal cutting scheme for the ingot under the contract, and the comprehensive evaluation index is obtained by weighted calculation of utilization rate and production efficiency; if the ingot is a non-main ingot in the warehouse, the ingot is cut based on the positive ingot length of the main ingot in the same warehouse; wherein the optimal cutting scheme for the main ingot is calculated as follows:

[0117] (4.1) Determine whether the length of the ingot is an integer multiple of the planned ingot length. If so, directly cut it into integers of the planned ingot length in equal parts, and use the following formula to calculate the evaluation index of the cutting plan, which is the best cutting plan for the ingot for the contract;

[0118]

[0119] Among them, x k is the number of L2 billet lengths of the kth cutting sub-mode in the cutting scheme; is the L2 billet length, number of finished products and auxiliary delivery length of the kth cutting sub-mode; θ is the weighting factor of utilization and production efficiency, 0≤θ≤1; when the billet length is an integer multiple of the planned billet length, the kth cutting sub-mode is the cutting sub-mode of the planned billet length in step 1;

[0120] If not, and the billet length L mat ≥L2 min , continue to step (4.2); otherwise, the billet cannot be used for rolling under the contract;

[0121] (4.2) Traverse the possible number of equal divisions N cut , determine the corresponding cutting sub-mode according to the actual billet length, calculate the comprehensive evaluation index value according to the same comprehensive evaluation index calculation formula as step (4.1), and continuously update the cutting plan with the highest current comprehensive evaluation index; the methods for determining the cutting sub-mode corresponding to the actual billet length for fixed-length contracts and non-fixed-length contracts are different, specifically:

[0122] ① If it is a fixed-length contract, the actual length of the blank after equal division is L cut In step 3, the cutting sub-pattern set is found to match the length L of the blank. cut The closest available L feas , L feas ≤L cut At this time, the remaining blank length L remain 、Number of remaining materialsremain is 0;

[0123] ② If it is a non-fixed-length contract, the actual length of the blank after equal division is L cut , find L in the cutting sub-pattern set in step 3 cut Where L feas interval, if the interval is found, then according to K extend4 and SP23 to calculate L cut The effective length of the remaining blank is L remain 、Number of remaining materials remain is 0; if no matching interval is found, it means L cut exist Upper limit Between the lower limits, according to The number of finished products, number of sawings, and sawing lengths produced in the cutting sub-mode. The upper limit of auxiliary delivery length; where, represents the L2 billet length in the jth sub-mode;

[0124] (4.3) If the number of ingots in stock or the number required by the contract is not greater than the maximum number of ingots to be cut in parallel, or the yield rate of the best equal-division cutting scheme is lower than a preset threshold, all possible long-short combination cutting schemes for the ingot are traversed, and the comprehensive evaluation index value is calculated according to the same formula as step (4.1), and the cutting scheme with the highest comprehensive evaluation index is continuously updated to obtain the best cutting scheme that considers both equal-division cutting and long-short combination cutting;

[0125] The method for determining the length and shortness matching cutting plan for fixed-length contracts and non-fixed-length contracts is:

[0126] ① If it is a fixed-length contract, from L feas The longest cutting mode starts, the length of the blank is L cut =L feas , Calculate the remaining billet length R = L mat -N cut ×L cut -(N cut -1)×SP12; if R is in L2 min ~L2 max The remaining ingots are all used as the residual material L remain Investment; if R<L2 min , judge R+L cut Ability to produce finished products greater than L cut When the number of finished products that can be produced is remain =R+L cut , the number of positive materials N cut =N cut -1; then in Lfeas Find the L in the collection remain The closest cutting sub-pattern, as the cutting sub-pattern for the remaining material;

[0127] ② If it is a non-fixed-length contract, from L feas The largest cut sub-pattern begins traversal. For each sub-pattern, in L feas Within the interval, try L with a preset step size feas The value in , sets the traversed billet length to L cut ; Calculate the remaining billet length R = L mat -N cut ×L cut -(N cut -1)×SP12; if R is in L2 min ~L2 max The remaining ingots are all used as the residual material L remain Investment; if R<L2 min , judge R+L cut Available and better than L cut The effective length is longer, then the remaining material L remain =R+L cut , the number of positive materials N cut =N cut -1; then in L feas Find the length L of the remaining blank in the collection remain The closest cutting sub-pattern, as the cutting sub-pattern for the remaining material.

[0128] Step 5: The best cutting schemes for all the ingots of all the contracts are ranked by comprehensive evaluation indicators, and the final cutting and feeding results for all the contracts are determined according to the ranking. Specifically:

[0129] (5.1) For N contracts and M warehouse locations, N×M optimal cutting schemes for main ingots are sorted in descending order according to the comprehensive evaluation index. The result is: Arrange the sorting results of these N×M best cutting solutions one by one;

[0130] (5.2) Arrangement When the solution is traversed, determine whether it has been traversed or the remaining rolling length of the contract is 0. If so, end; if not, determine the l that can be produced by all the unscheduled ingots in the storage location m 4act Is the total length greater than the remaining l of the contract n that needs to be rolled? 4act length; if not greater than, all the billets in location m are allocated to contract n; if greater than, the billets in location m are optimized for combination, and the combination that meets the contract requirements and has the smallest total length is selected; after the arrangement is completed After that, update the remaining available number of billets in storage location m and the remaining rolling length of contract n;

[0131] (5.3) Repeat step (5.2) until all contracts are satisfied or the number of remaining available strands is 0 or all cutting plans have been traversed.

[0132] Example

[0133] The present invention is described below with reference to a specific embodiment of multi-blank multi-contract cutting and feeding in actual production.

[0134] In a certain actual production, there are 5 contracts for the same material with different rolling and sawing requirements. The contract situation is shown in Table 1. There are 7 warehouse locations of ingots in the inventory, as shown in Table 2.

[0135] Table 1: Contract Status

[0136]

[0137] Table 2: Inventory of raw materials of the same material

[0138]

[0139]

[0140] Since the calculation logic of fixed-length contracts and non-fixed-length contracts is basically the same, the only difference is that the auxiliary delivery lengths of the two are different. The former is a fixed value, while the latter is a variable range. Therefore, the corresponding sawing length, effective length, and L2 billet length of the latter are all variable ranges. Take the first contract as an example to illustrate the calculation process of the best cutting plan for a single contract.

[0141] (1) Calculate the contract rolling sawing standard, modify the process length limit and the rolling standard modification. According to step 1 of the technical solution, the modified rolling sawing standard of Contract 1 is obtained as shown in Table 3.

[0142] Table 3: Revised Rolling Sawing Standards for Contract 1

[0143]

[0144]

[0145] (2) Calculate the feasible range of the billet length of contract L2. For contract 1, the feasible range of the billet length of L2 is calculated as follows: min ~L2 max , is 1.6m~2.8364m.

[0146] (3) Reverse the feasible cutting sub-patterns of the contract. According to the calculation method of the non-fixed-length contract in step 3 of the technical solution, the feasible cutting sub-patterns of Contract 1 are calculated to obtain the set of cutting sub-patterns shown in Table 4.

[0147] Table 4: Set of feasible cutting sub-patterns for Contract 1

[0148]

[0149] (4) Determine the optimal cutting scheme for the 7 main billets in the 7 warehouses under Contract 1, and cut the non-main billets according to the length of the main billets in the same warehouse. The cutting scheme for the main billets is calculated by step 4. The threshold of the comprehensive evaluation index of the equal-division cutting scheme as the optimal cutting scheme is set to 0.8, and the maximum number of billets to be cut in parallel is 8. That is, when the number of billets in stock or the number required by the contract is not more than 8, or the yield rate of the optimal equal-division cutting scheme is lower than 0.8, the length-matching cutting scheme of the billets is calculated; the non-main billets are cut according to the length of the main billets in the same warehouse. The optimal cutting scheme and comprehensive evaluation index of all billets are obtained as shown in Table 5. Here, the weighting factor θ in the comprehensive evaluation index is 0, that is, only the maximization of the raw material yield rate is considered.

[0150] Table 5: Optimal cutting solutions and yield rates for all stock ingots for Contract 1

[0151]

[0152]

[0153] (5) The calculation of the best cutting scheme for the inventory billets under the other four contracts is the same as the calculation example of contract 1 above, and the best cutting schemes for 7×5=35 main billets are obtained. According to step 5, the schemes for the 35 main billets are sorted from high to low according to the yield rate, and the contracts and billets involved in the best cutting scheme are arranged one by one, and the type of billet to be used and the number of billets required for each contract are determined until all contracts are satisfied or the number of billets remaining is 0 or all cutting schemes are traversed. The final cutting and feeding results are shown in Table 6. From Table 6, we can see that the final cutting and feeding results for contract 1 are the first three rows of data, and 3 8.35m billets in storage location 2 and 20 8.15m main billets + 1 5.24m non-main billet in storage location 3 are selected.

[0154] Table 6: Final cutting and feeding results

[0155]

[0156]

[0157] Those skilled in the art can understand that the above are only preferred examples of the invention and are not intended to limit the invention. Although the invention is described in detail with reference to the above examples, those skilled in the art can still modify the technical solutions recorded in the above examples or replace some of the technical features therein with equivalents. Any modification, equivalent replacement, etc. made within the spirit and principle of the invention shall be included in the protection scope of the invention.

Claims

1. A multi-blank multi-contract cutting and feeding method based on cutting sub-mode, It is characterized in that The method comprises the following steps: Step 1: Calculate the contract's rolling and sawing standards, modify the process length limit, and modify the rolling standards based on whether the contract is a special case; specifically: According to the contract and rolling table information, the rolling and sawing standards of the contract are calculated, including the length loss in each process and the cutting sub-mode of rolling and sawing according to the planned billet length; the cutting sub-mode is the combination of parameters involved in the process of rolling, cutting, sawing and cutting to size to obtain the finished product in the subsequent production of L2 billet length; the L2 billet length is the length of the tube billet obtained by the first cutting of the raw material in actual production; Modify the process length limits of the respective contracts according to the material of the blank and the type of the finished product; For each contract, check whether the contract is in the following situations. If so, handle it accordingly: First, determine whether the contract is a cold-drawn seamless or cold-rolled seamless contract. If so, the length of the finished product after cold rolling on such contracts shall be used as the delivery length, and the sawing length in the hot rolling production process of such contracts shall be used as the auxiliary delivery length of such contracts; Then, determine whether the ratio of the remaining length / sawing length in the cutting sub-mode of the planned billet length is greater than or equal to 0.

9. If so, set the remaining length to 0, add 1 sawing length to reversely calculate the L2 billet length; if the reversed L2 billet length meets the process length limit, modify the planned billet length accordingly, and recalculate the parameters of the contract rolling sawing standard; if the reversed L2 billet length does not meet the process length limit, the original planned billet length provided in the rolling table shall prevail; Finally, determine whether the ratio of the remaining length to the sawing length is less than n times the length in the cutting sub-mode of the planned billet length. Where n is a positive integer; if yes, the remaining length is set to 0, and the number of finished products of the planned billet length of the contract and the total length of the auxiliary delivery length to be rolled in the contract are recalculated; Step 2: Calculate the feasible range of L2 billet length for each contract; The machine length limit for each process and the maximum and minimum billet length limits are converted into the length of the billet with the same cross-sectional area as the L2 billet length. The interval of all lengths is taken as the feasible range of the L2 billet length, recorded as L2 min ~L2 max ; Step 3: Reverse the feasible cutting sub-patterns of each contract; Step 4: For each type of ingot with the same material and different lengths under different contracts, if the ingot is the main ingot in the storage location, the ingot is first cut into equal parts; when the inventory quantity of the ingot or the quantity of the ingot required by the contract is less than the maximum number of ingots to be cut in parallel, or the yield rate is less than the specified threshold, the ingot is cut in the form of k regular ingot lengths + 1 surplus ingot length, where k is a positive integer; during the calculation process, the cutting scheme with the highest comprehensive evaluation index is always retained as the best cutting scheme for the ingot under the contract, and the comprehensive evaluation index is obtained by weighted calculation of utilization rate and production efficiency; if the ingot is a non-main ingot in the storage location, the ingot is cut based on the regular ingot length of the main ingot in the same storage location; Step 5: The best cutting plans for all the ingots of all the contracts are ranked by comprehensive evaluation indicators, and the final cutting and feeding results for all the contracts are determined according to the ranking.

2. The multi-blank multi-joint cutting and feeding method based on the cutting sub-mode according to claim 1, It is characterized in that The calculation of the rolling sawing standard of the contract in step 1 is achieved by the following steps: (1) Determine the perforation elongation coefficient K based on rolling requirements and contract information extend1 , empty minus extension coefficient K extend2 , continuous rolling elongation coefficient K extend3 , tension reduction coefficient K extend4 , first cutting loss SP12, cutting head and tail allowance SP23, sawing length k saw , cutting length allowance SP440, auxiliary delivery length l 4act , feasible sawing length l saw ; Among them, the elongation coefficients of the four processes of perforation, hollow reduction, continuous rolling and tension reduction are Wherein, I is any positive integer in {1,2,3,4}; The first cutting loss SP12 is the average value of the first cutting loss of the machine; The trimming margin SP23 = rolling table tension reduction length - rolling table effective length; The sawing multiple k saw The sawing length l is the planned billet length provided by the rolling table saw0 The number of finished products obtained; The calculation formula of the cut length allowance SP440 is as follows: Among them, l from The starting value of the contract delivery length; The auxiliary delivery length l 4act The delivery length with cut-to-length allowance SP440 is calculated as follows: in, The maximum sawing length of the non-fixed-length contract, that is, the maximum allowable length of the rolling machine; l to The delivery length termination value of the contract; The calculation formula of the feasible sawing length is as follows: (2) According to the effective length l of the planned billet length provided by the rolling table valid0 , sawing length l saw0 , calculate other parameters in the cutting sub-mode of the planned billet length, including the number of sawing cuts n saw0 , remaining length l remain0 、Number of finished products n pro0 , Auxiliary delivery length l 4act0 The subscript 0 in the parameter indicates the corresponding value of the parameter under the planned billet length. The calculation formula is as follows: l remain0 =l valid0 -l saw0 ×n saw0 l 4act0 =l saw0 / k saw in, is the floor symbol; (3) Calculate the required rolling l of the contract 4act Total length L reqr = planned number of roots provided by the rolling table × n pro0 × 4act0 .

3. The multi-blank multi-joint cutting and feeding method based on the cutting sub-mode according to claim 2, It is characterized in that The step three is implemented through the following sub-steps: (3.1) For a fixed-length contract, the number of finished products that can be produced by traversing the billet length L2 is n pro , and the number of finished products k of the remaining length of the cutting sub-mode corresponding to the L2 billet length can be obtained by reverse calculation remain 、Number of sawing saw , remaining length l remain 、L2 effective length of billet length l valid 、L2 billet length L feas The value of (3.2) For non-fixed-length contracts, the number of possible finished products n for L2 billet length pro , and the number of finished products k of the remaining length of the cutting sub-mode corresponding to the L2 billet length can be obtained by reverse calculation remain 、Number of sawing saw and the remaining length l remain 、L2 effective length of billet length l valid 、L2 billet length L feas The upper and lower limits of the three parameters are obtained. remain , l valid , L feas The interval representation is then discarded if it does not satisfy L2 min ≤L feas ≤L2 max Result; The reverse calculation formula for fixed-length contracts and non-fixed-length contracts is: k remain =n pro %k saw l remain =max(l 4act ×k remain , the minimum sawing length allowed by the process) l valid =l saw ×n saw +l remain Among them, n saw 、n pro They are the number of sawings of L2 billet length and the number of finished products.

4. The multi-blank multi-joint cutting and feeding method based on the cutting sub-mode according to claim 3, It is characterized in that The calculation method of the optimal cutting scheme of the main ingot in step 4 is implemented through the following sub-steps: (4.1) Determine whether the length of the ingot is an integer multiple of the planned ingot length. If so, directly cut it into integers of the planned ingot length in equal parts, and use the following formula to calculate the comprehensive evaluation index of the cutting plan, which is the best cutting plan for the ingot for the contract; Among them, x k is the number of L2 blank lengths of the kth cutting sub-mode in the cutting scheme; is the L2 billet length, number of finished products and auxiliary delivery length of the kth cutting sub-mode; θ is the weighting factor of utilization and production efficiency, 0≤θ≤1; when the billet length is an integer multiple of the planned billet length, the kth cutting sub-mode is the cutting sub-mode of the planned billet length in step 1; If not, and the billet length L mat ≥L2 min , continue to step (4.2); otherwise, the billet cannot be used for rolling under the contract; (4.2) Traverse the possible number of equal divisions N cut , determine the corresponding cutting sub-mode according to the actual billet length, calculate the comprehensive evaluation index value according to the same comprehensive evaluation index calculation formula as step (4.1), and continuously update the cutting plan with the highest current comprehensive evaluation index; the methods for determining the cutting sub-mode corresponding to the actual billet length for fixed-length contracts and non-fixed-length contracts are different, specifically: ① If it is a fixed-length contract, the actual length of the blank after equal division is L cut In step 3, the cutting sub-pattern set is found to match the length L of the blank. cut The closest available L feas , L feas ≤L cut At this time, the remaining blank length L remain 、Number of remaining materials remain is 0; ② If it is a non-fixed-length contract, the actual length of the blank after equal division is L cut , find L in the cutting sub-pattern set in step 3 cut Where L feas interval, if the interval is found, then according to K extend4 and SP23 to calculate L cut The effective length of the remaining blank is L remain 、Number of remaining materials remain is 0; if no matching interval is found, it means L cut exist Upper limit Between the lower limits, according to The number of finished products, number of sawings, and sawing length in the cutting sub-mode are The upper limit of auxiliary delivery length; where, represents the L2 billet length in the jth sub-mode; (4.3) If the number of ingots in stock or the number required by the contract is not greater than the maximum number of ingots to be cut in parallel, or the yield rate of the best equal-division cutting scheme is lower than a preset threshold, all possible long-short combination cutting schemes for the ingot are traversed, and the comprehensive evaluation index value is calculated according to the same formula as step (4.1), and the cutting scheme with the highest comprehensive evaluation index is continuously updated to obtain the best cutting scheme that considers both equal-division cutting and long-short combination cutting; The method for determining the length and shortness matching cutting plan for fixed-length contracts and non-fixed-length contracts is: ① If it is a fixed-length contract, from L feas The longest cutting mode starts, the length of the blank is L cut =L feas , Calculate the remaining billet length R = L mat -N cut ×L cut -(N cut -1)×SP12; if R is in L2 min ~L2 max The remaining ingots are all used as the residual material L remain Investment; if R<L2 min , judge R+L cut Ability to produce finished products greater than L cut When the number of finished products that can be produced is remain =R+L cut , the number of positive materials N cut =N cut -1; then in L feas Find the L in the collection remain The closest cutting sub-pattern, as the cutting sub-pattern for the remaining material; ② If it is a non-fixed-length contract, from L feas The largest cutting sub-pattern begins traversal; for each sub-pattern, in L feas Within the interval, try L with a preset step size feas The value in , sets the traversed billet length to L cut ; Calculate the remaining billet length R = L mat -N cut ×L cut -(N cut -1)×SP12; if R is in L2 min ~L2 max The remaining ingots are all used as the residual material L remain Investment; if R<L2 min , judge R+L cut Available and better than L cut The effective length is longer, then the remaining material L remain =R+L cut , the number of positive materials N cut =N cut -1; then in L feas Find the length L of the remaining blank in the collection remain The closest cutting sub-pattern, as the cutting sub-pattern for the remaining material.

5. The multi-blank multi-concurrent cutting and feeding method based on the cutting sub-mode according to claim 4, It is characterized in that The step 5 is implemented through the following sub-steps: (5.1) For N contracts and M warehouse locations, N×M optimal cutting schemes for main ingots are sorted in descending order according to the comprehensive evaluation index. The result is: Arrange the sorting results of these N×M best cutting solutions one by one; (5.2) Arrangement When the solution is traversed, determine whether it has been traversed or the remaining rolling length of the contract is 0. If so, end; if not, determine the l that can be produced by all the unscheduled ingots in the storage location m 4act Is the total length greater than the remaining l of the contract n that needs to be rolled? 4act length; if not greater than, all the billets in location m are allocated to contract n; if greater than, the billets in location m are optimized for combination, and the combination that meets the contract requirements and has the smallest total length is selected; after the arrangement is completed After that, update the remaining available number of billets in storage location m and the remaining rolling length of contract n; (5.3) Repeat step (5.2) until all contracts are satisfied or the number of remaining available strands is 0 or all cutting plans have been traversed.

Citation Information

Patent Citations

  • Mobile on-line casting blank length measuring device and measuring method thereof

    CN103611906A

  • Continuous casting formation machining device and method used for metal

    CN104624989A

  • Method of considering flexibility of non-sizing order specification to design hot-rolled plate group plates and plate slabs and model system

    CN110404965A

  • Method for Producing Seamless Pipe and Method for Determining Length of Billet for Use in Producing Seamless Pipe

    US20110056263A1

  • Method for production scheduling in small-scale rolling mill and system thereof

    WO2012123526A1