A drilling blowout prevention and high-efficiency slag removal device and use method

By designing an automatic negative pressure slag discharge system, the problem of the threat of gas injection holes during drilling construction is solved, the continuity and safety of drilling are achieved, the equipment structure is simplified, the labor intensity and installation difficulty are reduced, and the construction efficiency and Security.

CN114856529BActive Publication Date: 2024-10-29HUAINAN MINING IND GRP +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202210646313.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-06-09
Publication Date
2024-10-29
Estimated Expiration
2042-06-09

AI Technical Summary

Technical Problem

During the coal mine drilling construction process, gas blowout holes threaten safety. Traditional blowout prevention devices cannot automatically discharge slag, resulting in discontinuous drilling and increasing the risk of gas exceeding limits. The equipment is heavy, difficult to install, and manual cleaning lags behind, affecting construction. Efficiency and safety.

Method used

Design a high-efficiency slag discharge device for drilling and blowout prevention. It creates negative pressure through the extraction main pipe and automatically opens the one-way valve. Powdered coal and gas enter the box, and the residue is discharged into the tank through the slag discharge pipe. Filters and dust reduction are used. The device and flushing device filter and clean to realize automatic slag discharge, reduce labor intensity and ensure continuous construction.

Benefits of technology

It achieves the continuity of drilling construction, reduces the risk of gas exceeding limits, reduces the need for manual cleaning, improves work efficiency and safety, simplifies equipment structure and installation, and reduces costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114856529B_ABST
    Figure CN114856529B_ABST
Patent Text Reader

Abstract

The present invention discloses a drilling and blowout prevention and efficient slag removal device and a use method thereof, wherein the first joint is connected to the extraction system through an extraction main pipe, the lower right end of the box body is connected to a plurality of air inlet joints, the plurality of air inlet joints are all connected to the drilling rig orifice, the lower left end of the box body is connected to a first slag removal pipe, the outer side of the first slag removal pipe is connected to a connecting pipe, the outer side of the connecting pipe is fixedly connected to a first one-way valve, the other end of the connecting pipe is connected to a tank body, the lower right end of the tank body is connected to a second slag removal pipe, the outer side of the second slag removal pipe is fixedly connected to a second one-way valve. The present invention has a simple structure and is easy to operate, can effectively remove dust generated during drilling, and can achieve continuous extraction and automatic cleaning, which not only meets the needs of blowout prevention, but also ensures that the pipeline is always unobstructed, realizes the multifunctional integration of drilling, blowout prevention, dust prevention and slag removal, and greatly improves the practicability of the device.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to coal mine drilling and extraction, and more specifically to a drilling blowout prevention and high-efficiency slag removal device and a use method thereof. Background Art

[0002] The main means of gas control in some mines is drilling and extraction. As the mining depth of mines continues to increase, the gas pressure in the coal seam is also increasing. During daily drilling construction, the threat of gas blowouts is always present, seriously affecting drilling safety.

[0003] Traditional blowout preventers cannot automatically discharge slag. When the amount of drill cuttings exceeds the volume of the blowout preventer tank, drilling needs to be stopped and the blowout preventer negative pressure needs to be turned off for cleaning. Drilling through coal cannot be continuous, and the hole is prone to pressure buildup, causing delayed blowout, which in turn causes gas to exceed the limit. Therefore, in order to increase the volume of the tank, the overall weight of the tank is more than 80 kilograms, making underground transportation and installation difficult and requiring the cooperation of multiple people; and slag removal is mainly based on regular manual cleaning. When cleaning the blowout preventer, it is necessary to stop pumping, which affects the continuous construction of drilling. There is a risk of gas exceeding the limit due to the blowout when stopping pumping to clean the blowout preventer; delayed and incomplete cleaning by employees often leads to blockage of the extraction main pipe. Summary of the invention

[0004] The technical problem to be solved by the present invention is: how to ensure continuous drilling construction while ensuring the safety of personnel.

[0005] The present invention solves the above-mentioned technical problems through the following technical means: a drilling and blowout prevention and high-efficiency slag discharge device, a box body, a hose, a connecting pipe, and a tank body, the box body includes a first joint, the first joint is connected to the extraction system through an extraction main pipe, the upper right side of the box body is connected to a second joint, the second joint is communicated with the tank body through a hose, the lower right end of the box body is connected to a plurality of air intake joints, the plurality of air intake joints are all connected to the drilling rig orifice, the lower left end of the box body is connected to a first slag discharge pipe, the outer side of the first slag discharge pipe is connected to the connecting pipe, the outer side of the connecting pipe is fixedly connected to a first one-way valve, the other end of the connecting pipe is connected to the tank body, the lower right end of the tank body is connected to a second slag discharge pipe, the outer side of the second slag discharge pipe is fixedly connected to a second one-way valve.

[0006] The present application connects the first joint with the extraction system through an extraction main pipe, so that the inner cavity of the box is evacuated into a negative pressure, and then connects a plurality of air inlet joints with the drilling rig orifices, starts the drilling rig, and allows coal powder and gas to enter the inner cavity of the box along the air inlet joints, and negative pressure is balanced in the inner cavity of the box and the tank through a hose, thereby automatically opening or closing the first one-way valve, so that the residue enters the inner cavity of the tank from the first slag discharge pipe through the connecting pipe, and then the residue is discharged into the water through the second slag discharge pipe. The device is fully automatic and does not need to stop for manual cleaning, thereby ensuring continuous drilling construction, reducing the labor intensity of employees, and ensuring the life and health of the staff.

[0007] Preferably: the inner cavity of the box is provided with a filter, and the filter is fixedly installed in the inner cavity of the box at an angle of 15°.

[0008] Advantages: Used to filter slag, reduce gas flow rate and disperse gas flow state.

[0009] Preferably: a dust suppression device is welded to the upper left end of the inner cavity of the box body, one end of the dust suppression device passes through the inner wall of the box body and extends to the outside to be connected to the high-pressure water pipe, and the nozzle of the dust suppression device corresponds vertically to the filter screen.

[0010] Advantages: Used for dust reduction and dust collection.

[0011] Preferably, the bottom of the inner cavity of the box is inclined at 15°, and a bottom plate matching the bottom area of ​​the box is fixedly installed.

[0012] Advantages: It allows the water slag to enter the first slag discharge pipe more effectively through the inclined bottom.

[0013] Preferably: the inner cavity of the box is located at the upper end of the bottom plate and is fixedly connected to a flushing device, and one end of the flushing device extends to the inner wall of the box and is connected to a high-pressure water pipe, and a plurality of flushing nozzles with corresponding angles are installed at the front end of the flushing device.

[0014] Advantages: Used to flush the airflow entering from the high-velocity and large-residue drilling holes.

[0015] Preferably, a first observation window made of transparent glass is welded to the middle position of the outer side of the box.

[0016] Advantages: It is convenient for staff to observe.

[0017] Preferably: the upper right end of the tank body is connected with a water-slag joint, the upper end of the water-slag joint is connected with a connecting branch pipe, and the connecting branch pipe is connected with a hose.

[0018] Advantages: Effectively balance the negative pressure between the box and the inner cavity of the hose.

[0019] Preferably: a third joint is connected to the upper right end of the tank body, and a solenoid valve is fixedly connected to the outer side of the third joint.

[0020] Advantages: Effectively balance the negative pressure inside the tank.

[0021] Preferably, a second observation window made of transparent glass is fixedly connected to the upper end of the tank body.

[0022] Advantages: It is convenient for staff to observe.

[0023] According to the above-mentioned drilling blowout prevention and efficient slag discharge device and use method, the following steps are included: the first joint is connected to the extraction system through the extraction main pipe, the inner cavity of the box body is made into negative pressure, a plurality of the air inlet joints are connected to the drilling rig orifices, the drilling rig is started, coal powder and gas enter the inner cavity of the box body along the air inlet joints, the hose balances the negative pressure in the inner cavity of the box body and the tank body, thereby automatically opening or closing the first one-way valve, and then the residue enters the inner cavity of the tank body from the first slag discharge pipe through the connecting pipe, and then the second slag discharge pipe is opened through the second one-way valve to discharge the residue into the water.

[0024] The advantages of the present invention are as follows: the present invention connects the first joint with the extraction system through the extraction main pipe, so that the inner cavity of the box is evacuated to a negative pressure, and then connects a plurality of air inlet joints with the drilling rig orifices, starts the drilling rig, and allows coal powder and gas to enter the inner cavity of the box along the air inlet joints, and negative pressure balance is performed on the inner cavity of the box and the tank through the hose, thereby automatically opening or closing the first one-way valve, so that the residue enters the inner cavity of the tank through the connecting pipe from the first slag discharge pipe, and then the residue is discharged into the water through the second slag discharge pipe. The device is fully automatic, and does not need to stop extraction for manual cleaning, thereby ensuring continuous drilling construction, reducing the labor intensity of employees, and ensuring the life and health of the staff;

[0025] By setting a filter screen and dust suppression device in the inner cavity of the box, the inner cavity of the box can be effectively dust-proof and dust-collected, thereby filtering the slag, reducing the gas flow rate and dispersing the gas flow state;

[0026] By installing a flushing device in the inner cavity of the box, and making the flushing nozzle installed obliquely so that it corresponds to the direction of the air inlet joint, the airflow entering from the high-flow rate and large-slag drilling hole orifice can be effectively flushed;

[0027] A first observation window and a second observation window made of transparent glass are installed on the outside of the box and the upper end of the tank, which effectively facilitates observation by staff; the present application has a simple structure, low cost, safety and reliability, does not require stopping for manual cleaning, ensures continuous drilling construction, improves work efficiency, reduces the labor intensity of employees, ensures life and health safety, and greatly improves practicality. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 This is a schematic diagram of the overall structure of a drilling blowout prevention and high-efficiency slag removal device according to an embodiment of the present invention;

[0029] Figure 2 It is a schematic front view and cross-sectional view of the partial structure of a drilling blowout prevention and high-efficiency slag removal device according to an embodiment of the present invention;

[0030] Figure 3 It is a schematic front view and cross-sectional view of the partial structure of a drilling blowout prevention and efficient slag removal device according to an embodiment of the present invention;

[0031] Figure 4 The present invention is a top view and cross-sectional schematic diagram of the local structure of a drilling blowout prevention and high-efficiency slag removal device according to an embodiment of the present invention.

[0032] In the figure: 1-box; 11-first joint; 12-second joint; 13-dust suppression device; 14-filter; 15-first observation window; 16-air inlet joint; 17-first slag discharge pipe; 18-bottom plate; 19-flushing device; 191-flushing nozzle; 2-hose; 3-connecting pipe; 4-first one-way valve; 5-tank; 51-water slag joint; 511-connecting branch pipe; 52-second observation window; 53-third joint; 54-solenoid valve; 55-second slag discharge pipe; 56-second one-way valve. DETAILED DESCRIPTION

[0033] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in combination with the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0034] See also Figure 1 This embodiment discloses a drilling blowout prevention and efficient slag removal device, including a box body 1, a hose 2, a connecting pipe 3, a first one-way valve 4, and a tank body 5.

[0035] See also Figure 1-2 4. The box body 1 is a "rectangular" structure welded with 3mm thick steel plates as a whole. The box body 1 includes a first joint 11, a second joint 12, a dust suppression device 13, a filter 14, a first observation window 15, an air inlet joint 16, a first slag discharge pipe 17, a bottom plate 18, and a flushing device 19. The first joint 11 is fixedly connected to the left side of the upper end of the box body 1 and is connected to the remote extraction system through an extraction main pipe.

[0036] In this embodiment, the box body 1 is opened before construction to perform pressure extraction, and the extraction negative pressure is not less than 13 kPa.

[0037] The second joint 12 is fixedly connected to the right side of the upper end of the box body 1 , and a negative pressure gauge is installed on the upper end of the second joint 12 for observing the pressure condition of the inner cavity of the box body 1 .

[0038] The dust suppression device 13 is welded to the upper left end of the box body 1. One end of the dust suppression device 13 passes through the inner wall of the box body 1 and extends to the outside to be connected to a high-pressure water pipe. The water pressure is not less than 4 MPa. The other half of the dust suppression device 13 is connected to a nozzle, which is effectively used for dust reduction and dust capture.

[0039] The filter screen 14 is installed in the inner cavity of the box body 1 at an angle of 15 degrees, and is effectively used to filter slag, reduce gas flow rate and disperse the gas flow state.

[0040] In this embodiment, the nozzle of the dust suppression device 13 corresponds vertically to the filter screen 14 .

[0041] The first observation window 15 is fixedly installed on the outside of the box body 1 at the center. The box body 1 is a "round" structure made of transparent glass material, which is convenient for staff to observe the inner cavity of the box body 1.

[0042] There are several air inlet joints 16, two in this embodiment, which are installed side by side at the lower right end of the box body 1, and one end of the two air inlet joints 16 is connected to the drilling rig orifice blowout preventer through a pipeline.

[0043] The first slag discharge pipe 17 is fixedly installed at the lower left end of the box body 1. The bottom plate 18 is a steel plate that matches the bottom area of ​​the box body 1. It is installed in the inner cavity of the box body 1 with a 15° tilt, with the left side lower and the right side higher. The lower surface of the bottom plate 18 corresponds to the first slag discharge pipe 17, and the higher surface of the bottom plate 18 corresponds to the air inlet joint 16, which effectively facilitates the residue to slide along the surface of the bottom plate 18 into the inner cavity of the first slag discharge pipe 17.

[0044] The flushing device 19 is fixedly installed in the inner cavity of the box body 1, located at the upper end of the bottom plate 18. One end of the flushing device 19 passes through the inner wall of the box body 1 and extends to the outside to be connected to the high-pressure water pipe. The water pressure is not less than 4 MPa. The flushing device 19 includes a plurality of flushing nozzles 191, 3 in this embodiment. The 3 flushing nozzles 191 are all installed at an angle corresponding to the angle of the air inlet joint 16, which effectively flushes the airflow entering from the high-flow rate and large-slag drilling orifice, making it easier to slide off the surface of the bottom plate 18.

[0045] See also Figure 1 The hose 2 is a rubber hose, and one end of the hose 2 is connected to the second joint 12.

[0046] One end of the connecting pipe 3 is connected to the first slag discharge pipe 17 , and a first one-way valve 4 is fixedly connected to the outer side of the connecting pipe 3 .

[0047] Referring to 1 and 3 at the same time, the tank body 5 is connected to the box body 1 through the connecting pipe 3. The tank body 5 is a "cylindrical" structure as a whole. The tank body 5 includes a water-slag joint 51, a second observation window 52, ​​a third joint 53, a solenoid valve 54, and a second slag discharge pipe 55. The water-slag joint 51 is fixedly connected to the upper right end of the tank body 5. The water-slag joint 51 includes a connecting branch pipe 511. The connecting branch pipe 511 is connected to the upper end of the water-slag joint 51 and is connected to the other end of the hose 2.

[0048] In this embodiment, two ends of the hose 2 are connected to the box body 1 and the tank body 5 respectively, so as to balance the negative pressure in the inner cavities of the box body 1 and the tank body 5 .

[0049] The second observation window 52 is fixedly installed at the upper end of the tank body 5 . The second observation window 52 is a “round” structure made of transparent glass material, which is convenient for the staff to observe the inner cavity of the tank body 5 .

[0050] The third connector 53 is fixedly connected to the upper left end of the tank body 5 , and the end of the third connector 53 is fixedly connected to a solenoid valve 54 , to which a 12V safety power supply is outputted through a power box to balance the pressure in the inner cavity of the tank body 5 .

[0051] The solenoid valve 54 is fixedly connected to the lower left end of the tank body 5 , and a second one-way valve 56 is fixedly connected to the end of the solenoid valve 54 .

[0052] In this embodiment, the weight of each of the box body 1 and the tank body 5 does not exceed 40 kg, which is convenient for employees to transport and install.

[0053] The working principle of this embodiment is as follows: before construction, the staff uses the extraction system to extract the pressure of the box body 1 so that the internal pressure is not less than 13 kPa, then opens the dust suppression device 13 and the flushing device 19, starts the drilling rig, and the coal slag and gas enter the inner cavity of the box body 1 through the air inlet joint 16, is cleaned by the flushing device 19, filtered by the filter screen 14, and the dust suppression device 13 is used to capture dust, so that the filtered gas is drawn into the extraction main pipe, and the filtered slag and sewage are driven by the water flow and the inclination of the bottom plate 18 through the connecting pipe 3 and flow into the inner cavity of the tank body 5. At this time, the solenoid valve 54 at the upper end of the tank body 5 is in a normally closed state, and the tank body 5 is closed. The interior is in a negative pressure state. According to the amount of water, the closing and opening frequency of the electromagnetic valve 54 is adjusted. When the electromagnetic valve 54 is opened, the first one-way valve 4 is closed, and the sewage and slag are discharged into the water through the second slag discharge pipe 55 under the action of gravity. The present invention has a simple structure and is easy to operate. It can effectively remove the dust generated during the drilling process and achieve continuous extraction and automatic cleaning, which not only meets the needs of blowout prevention, but also ensures that the pipeline is always unobstructed, realizing the integration of drilling, blowout prevention, dust prevention and slag removal, without manual cleaning, effectively ensuring the life, health and safety of the staff, and greatly improving the practicality of the device.

[0054] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A high-efficiency slag removal device for drilling and blowout prevention, It is characterized in that A box (1), a hose (2), a connecting pipe (3), and a tank (5), wherein the box (1) comprises a first joint (11), the first joint (11) being connected to a drainage system via a drainage main pipe, a second joint (12) being connected to the right side of the upper end of the box (1), the second joint (12) being connected to the tank (5) via a hose (2), a plurality of air inlet joints (16) being connected to the lower right end of the box (1), the plurality of air inlet joints (16) being connected to a drilling rig orifice, a first slag discharge pipe (17) being connected to the lower left end of the box (1), the outer side of the first slag discharge pipe (17) being connected to the connecting pipe (3), the outer side of the connecting pipe (3) being fixedly connected to a first non-return valve (4), the other end of the connecting pipe (3) being connected to the tank (5), a second slag discharge pipe (55) being connected to the lower right end of the tank (5), the outer side of the second slag discharge pipe (55) being fixedly connected to a second non-return valve (56); The inner cavity of the box body (1) is provided with a filter screen (14), and the filter screen (14) is fixedly installed in the inner cavity of the box body (1) at an angle of 15°; A dust suppression device (13) is welded to the upper left end of the inner cavity of the box body (1), one end of the dust suppression device (13) penetrates the inner wall of the box body (1) and extends to the outside to be connected to the high-pressure water pipe, and the nozzle of the dust suppression device (13) corresponds vertically to the filter screen (14); The bottom of the inner cavity of the box (1) is inclined at 15°, and a bottom plate (18) matching the bottom area of ​​the box (1) is fixedly installed; The inner cavity of the box body (1) is located at the upper end of the bottom plate (18) and is fixedly connected to a flushing device (19), and one end of the flushing device (19) extends to the inner wall of the box body (1) and is connected to a high-pressure water pipe, and a plurality of flushing nozzles (191) with angles corresponding to (7) are installed at the front end of the flushing device (19); The upper right end of the tank body (5) is connected to a water-slag joint (51), the upper end of the water-slag joint (51) is connected to a connecting branch pipe (511), and the connecting branch pipe (511) is connected to a hose (2); The left upper end of the tank body (5) is connected to a third joint (53), and the outer side of the third joint (53) is fixedly connected to a solenoid valve (54).

2. A drilling blowout prevention and high-efficiency slag removal device according to claim 1, It is characterized in that A first observation window (15) made of transparent glass is welded to the middle position of the outer side of the box body (1).

3. A drilling blowout prevention and high-efficiency slag removal device according to claim 1, It is characterized in that A second observation window (52) made of transparent glass is fixedly connected to the upper end of the tank body (5).

4. A method for using a drilling blowout prevention and high-efficiency slag removal device according to any one of claims 1 to 3, It is characterized in that The method comprises the following steps: connecting the first joint (11) to the extraction system through an extraction main pipe, making the inner cavity of the box body (1) negative pressure, connecting a plurality of the air inlet joints (16) to the orifice of the drilling rig, starting the drilling rig, and allowing coal powder and gas to enter the inner cavity of the box body (1) along the air inlet joints (16); the hose (2) balances the negative pressure in the inner cavities of the box body (1) and the tank body (5), thereby automatically opening or closing the first one-way valve (4), and then allowing the residue to enter the inner cavity of the tank body (5) from the first slag discharge pipe (17) through the connecting pipe (3); and then opening the second slag discharge pipe (55) through the second one-way valve (56) to discharge the residue into the water.

Citation Information

Patent Citations

  • Gas-water separation, water discharging and slag discharge integrated device for drill hole in gas extraction crossheading drill site

    CN102337921A

  • Negative pressure blowout prevention and dust falling device for orifice and using method

    CN113266298A