A method for weighing and optimizing the layout of multi-parameter monitoring points for water quality in water supply network

By adopting the multi-parameter monitoring point trade-off optimization layout method in the water supply pipeline network, using the EPANET toolbox to build a hydraulic model to calculate the weights of each node, the problem of insufficient arrangement of water quality monitoring points in the water supply pipeline network is solved, and more scientific and reasonable water quality monitoring is achieved , improve the ability to respond to water quality pollution incidents.

CN114861375BActive Publication Date: 2024-11-05POWERCHINA HUADONG ENG CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210440100.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-04-25
Publication Date
2024-11-05
Estimated Expiration
2042-04-25

AI Technical Summary

Technical Problem

The existing water quality monitoring points of the water supply pipeline network are insufficiently arranged, and they cannot fully and accurately reflect the operating status of the water supply pipeline network, resulting in the inability to respond to sudden water source pollution incidents quickly.

Method used

The optimization layout method of multi-parameter monitoring point trade-off of water quality in the water supply pipeline network is adopted. The hydraulic model is constructed through the EPANET toolbox, the weights of each node are calculated, and the number and location of water quality monitoring points of large water users, water supply boundary lines and conventional nodes are determined, combining with multiple factors. The water quality parameters are reasonably arranged.

Benefits of technology

The early warning response time and response speed for water quality pollution incidents have been improved, and the scientific monitoring and safety of the water supply pipeline system have been ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114861375B_ABST
    Figure CN114861375B_ABST
Patent Text Reader

Abstract

The present invention discloses a weighing optimization arrangement method for water quality multi-parameter monitoring points in a water supply network. The actual water supply network is constructed into a hydraulic model by using EPANET simulation software. The hydraulic model is calculated and run to obtain various nodes on the water supply demarcation line, nodes with the most unfavorable hydraulic conditions, and nodes of large water users. The weights of the arrangement of the multi-parameter water quality monitoring points are calculated. The total number of water quality monitoring points is determined according to the size of the actual urban water supply network system. According to Qi=aQ i1 +b Q i2 +cQ i3 After determining the weight of each node, the number of water quality monitoring points for large water users, water supply demarcation lines and regular nodes is determined; finally, the locations of water quality monitoring points on large water users' nodes, water supply demarcation line nodes and regular nodes can be calculated. The present invention helps to strengthen water quality monitoring in the water supply network system to improve the early warning response time when water pollution incidents occur, and has the advantages of good effect and rapid response.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of water quality monitoring of municipal water supply pipe networks, and in particular relates to a method for weighing and optimizing the arrangement of multi-parameter monitoring points for water quality in water supply pipe networks. Background Art

[0002] With the acceleration of my country's urbanization level, the construction of urban and rural water supply pipe networks has basically been connected to form an integrated development trend. The topological structure of the water supply pipe network system has become more and more complex, and the requirements for water supply safety have become higher and higher. Based on the water quality and quantity safety of the water supply pipe network and the livelihood issues of the grassroots people, it is necessary to set up certain monitoring points on the water supply pipe network for real-time monitoring. The monitoring point layout of the water supply pipe network refers to the distribution and installation of a certain number of flow, pressure and other sensors in the water supply pipe network to monitor the operation conditions of the pipe network and provide data support for the dispatching and analysis of the pipe network. At present, more attention is paid to the monitoring of water supply pipe network pressure, flow and other data, while there are fewer water quality monitoring points for the water supply pipe network. This lacks systematic consideration for the entire pipe network system, and cannot fully and accurately reflect the operation status of the water supply pipe network, and then cannot respond quickly and effectively to sudden water source pollution incidents.

[0003] Therefore, it is necessary to arrange water quality monitoring points for the water supply network topology system with multiple water sources, and, unlike conventional single water quality factors such as residual chlorine, multi-factor water quality parameters should be rationally arranged through weight proportions, so as to control the entire water supply network system with a minimum of reasonable monitoring point arrangements. Summary of the invention

[0004] The purpose of the present invention is to overcome the deficiencies of the prior art and provide a new technical solution to efficiently monitor the water quality of a water supply network by weighing multiple water quality factors.

[0005] To achieve the above object, the present invention adopts a method for weighing and optimizing the arrangement of multi-parameter water quality monitoring points in a water supply network, which is characterized in that the method for optimizing the arrangement of water quality monitoring points includes the following steps:

[0006] (S1) Using the open source water supply network simulation software of the EPANET toolbox, the actual urban water supply network is constructed into a hydraulic model, and the ground elevation, node water volume, node residual chlorine concentration, node water age, and node water pressure elevation data of each node in the water supply network are input into the hydraulic model;

[0007] (S2) Calculate the weight of the multi-parameter water quality monitoring point layout, the calculation formula is: Q i =aQ i1 +b Q i2 +cQ i3 ; Among them, in the formula: Q i is the weight of the node as a water quality monitoring point; a, b, c are the weight coefficients; Qi1 Indicates the water quality weight ratio of conventional nodes; Q i2 is the weight ratio of large water users; Q i3 Indicates the weight ratio at the water supply boundary line;

[0008] (S3) According to the actual scale of the urban water supply network system, the total number of water quality monitoring points is determined, and the total number of water quality monitoring points is calculated according to the formula Qi = aQ i1 +b Q i2 +cQ i3 After determining the weight of each node, the number of water quality monitoring points allocated to large water users, water supply demarcation lines and regular nodes is determined;

[0009] (S4) The locations of water quality monitoring points at nodes of large water users, water supply demarcation nodes, and conventional nodes can be obtained by using the open source water supply network simulation software of the EPANET toolbox.

[0010] Furthermore, the Q in step (S2) i1 Using formula (1),

[0011]

[0012] In formula (1): It represents the time it takes for water to flow from the water source to the conventional node i along the nth water supply route of the conventional node i, in units of h; It represents the residual chlorine concentration when the water flows from the water source to the conventional node i along the nth water supply route of the conventional node i, in mg / L; is the water demand flowing through the nth water supply path, in m 3 / h; T avg Indicates the average water age of the water supply network, in h; C avg Indicates the average residual chlorine concentration in the water supply network, in mg / L; q avg is the average water demand of the water supply network, in m 3 / h; U' is the set of all upstream water supply paths of node i.

[0013] Furthermore, the weight proportion Q of large water users in step (S3) is i2 Using formula (2),

[0014]

[0015] In formula (2), Q i is the water demand of large user node i, Q min is the minimum water demand of large user nodes, Q max is the maximum water demand of the large user node.

[0016] Furthermore, the water quality weight ratio Q on the water supply demarcation line in step (S2) is i3 Using formula (3),

[0017]

[0018] In formula (3): K i is the number of water flow changes at water supply boundary node i, K min K is the minimum number of node flow changes within 24 hours on the water supply boundary line, max It is the minimum number of node water flow changes on the water supply boundary line within 24 hours.

[0019] Furthermore, in the step (S2), a1, a2, and a3 respectively represent the weight coefficients of conventional nodes, nodes of large water users, and nodes on the water supply demarcation line, wherein a1+a2+a3=1, and a1:a2:a3 is equal to the ratio of the flow rates of conventional nodes, nodes of large water users, and nodes on the water supply demarcation line.

[0020] The present invention constructs a hydraulic model as a basis, performs standardization processing on multiple water quality parameter factors in the water supply network between 0 and 1, and provides a scientific basis for more rationally arranging water quality monitoring points on conventional nodes, large water consumption nodes and nodes on the water supply demarcation line in the water supply network according to the weight ratio, strengthens water quality monitoring in the water supply network system to improve the early warning response time when water pollution incidents occur, and has the advantages of good effect and rapid response. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 A hydraulic model diagram of the water supply network of the implementation case is shown;

[0022] Figure 2 Represents the distribution of water quality testing points in the water supply network of the implementation case. DETAILED DESCRIPTION

[0023] Combined with the following instructions Figure 1-2 A method for optimizing the layout of water quality multi-parameter monitoring points in a water supply network in this implementation case includes the following steps:

[0024] (S1) Use the EPANET toolbox open source water supply network simulation software to construct a hydraulic model of the actual urban water supply network. Figure 1 As shown, the ground elevation, node water volume, node residual chlorine concentration, node water age, and node water pressure elevation data of each node in the water supply network are input into the hydraulic model;

[0025] (S2) When there are multiple water supply sources in the water supply network, the open source software EPANET computing engine is used to calculate and run the hydraulic model to obtain the nodes on the water supply boundary line, the nodes with the most unfavorable hydraulic conditions, and the nodes of large water users;

[0026] Calculate the weight of the multi-parameter water quality monitoring point layout, the calculation formula is: Q i =aQ i1 +b Q i2 +cQ i3 ; Among them, in the formula: Q i is the weight of the node as a water quality monitoring point; a, b, c are the weight coefficients; Q i1 Indicates the water quality weight ratio of conventional nodes; Q i2 is the weight ratio of large water users; Q i3 Indicates the weight ratio at the water supply boundary line;

[0027] (S3) According to the actual scale of the urban water supply network system, the total number of water quality monitoring points is determined, and the total number of water quality monitoring points is calculated according to the formula Qi = aQ i1 +b Q i2 +cQ i3 After determining the weight of each node, the number of water quality monitoring points allocated to large water users, water supply demarcation lines and regular nodes is determined;

[0028] (S4) Using the EPANET toolbox open source water supply network simulation software, we can calculate the locations of water quality monitoring points at the nodes of large water users, water supply boundary nodes, and conventional nodes. The calculation results are as follows: Figure 2 shown.

[0029] In the step (S2) of this embodiment, Q i1 Using formula (1),

[0030]

[0031] In formula (1): It represents the time it takes for water to flow from the water source to the conventional node i along the nth water supply route of the conventional node i, in units of h; It represents the residual chlorine concentration when the water flows from the water source to the conventional node i along the nth water supply route of the conventional node i, in mg / L; is the water demand flowing through the nth water supply path, in m 3 / h; T avg Indicates the average water age of the water supply network, in h; C avg Indicates the average residual chlorine concentration in the water supply network, in mg / L; q avg is the average water demand of the water supply network, in m3 / h; U' is the set of all upstream water supply paths of node i.

[0032] The weight proportion Q of large water users in step (S2) of this implementation is i2 Using formula (2),

[0033]

[0034] In formula (2): Q i is the water demand of large user node i, Q min is the minimum water demand of large user nodes, Q max is the maximum water demand of the large user node.

[0035] The water quality weight ratio Q at the water supply boundary line in step (S2) of this embodiment is i3 Using formula (3),

[0036]

[0037] In formula (3): K i is the number of water flow changes at water supply boundary node i, K min K is the minimum number of node flow changes within 24 hours on the water supply boundary line, max It is the minimum number of node water flow changes on the water supply boundary line within 24 hours.

[0038] In step (S2) of this embodiment, a1, a2, and a3 respectively represent the weight coefficients of conventional nodes, nodes with large water consumption, and nodes on the water supply demarcation line, wherein a1+a2+a3=1, and a1:a2:a3 is equal to the ratio of the flow rates of conventional nodes, nodes with large water consumption, and nodes on the water supply demarcation line.

[0039] The embodiments of this specific implementation method are all preferred embodiments of the present application and are not intended to limit the protection scope of the present application. Therefore, all equivalent changes made based on the structure, shape, principle, etc. of the present application should be included in the protection scope of the present application.

Claims

1. A method for weighing and optimizing the layout of multi-parameter monitoring points for water quality in a water supply network. It is characterized in that The steps include: (S1) Using the open source water supply network simulation software of the EPANET toolbox, the actual urban water supply network is constructed into a hydraulic model, and the ground elevation, node water volume, node residual chlorine concentration, node water age, and node water pressure elevation data of each node in the water supply network are input into the hydraulic model; (S2) Calculate the weight of the multi-parameter water quality monitoring point layout, the calculation formula is: Q i =aQ i1 +bQ i2 +cQ i3 ; Where: Q i is the weight of the node as a water quality monitoring point; a, b, c are the weight coefficients; Q i1 Indicates the water quality weight ratio of conventional nodes; Q i2 is the weight ratio of large water users; Q i3 Indicates the weight ratio at the water supply boundary line; (S3) According to the actual scale of the urban water supply network system, the total number of water quality monitoring points is determined, and the total number of water quality monitoring points is calculated according to the formula Qi = aQ i1 +b Q i2 +cQ i3 After determining the weight of each node, the number of water quality monitoring points allocated to large water users, water supply demarcation lines and regular nodes is determined; (S4) The water supply network simulation software of EPANET toolbox is used to calculate the locations of water quality monitoring points at the nodes of large water users, water supply demarcation nodes and conventional nodes; The Q of step (S2) i1 Using formula (1), In formula (1): It represents the time it takes for water to flow from the water source to the conventional node i along the nth water supply route of the conventional node i, in units of h; It represents the residual chlorine concentration when the water flows from the water source to the conventional node i along the nth water supply route of the conventional node i, in mg / L; is the water demand flowing through the nth water supply path, in m 3 / h; T avg Indicates the average water age of the water supply network, in h; C avg Indicates the average residual chlorine concentration in the water supply network, in mg / L; q avg is the average water demand of the water supply network, in m 3 / h; U' is the set of all upstream water supply paths of node i; The weight proportion Q of large water users in step (S2) i2 Using formula (2), In formula (2): Q i is the water demand of large user node i, Q min is the minimum water demand of large user nodes, Q max is the maximum water demand of the large user node; The water quality weight ratio Q on the water supply demarcation line in the step (S2) is i3 Using formula (3), In formula (3): K i is the number of water flow changes at water supply boundary node i, K min K is the minimum number of node flow changes within 24 hours on the water supply boundary line, max It is the minimum number of node water flow changes on the water supply boundary line within 24 hours.