A communication channel construction method using a hanger to transport slag out

By using a hanger to transport slag outside during the construction of the communication channel, and using a hoisting device to transport the slag into the subway tunnel for unloading, the problem of frequent equipment movement and rearrangement during the construction of the communication channel is solved, and the construction efficiency is improved. and security.

CN114876492BInactive Publication Date: 2024-10-15CHINA RAILWAY GUANGZHOU ENG BUREAU GRP URBAN CONSTR ENG CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202210509875.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-05-11
Publication Date
2024-10-15
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During the construction process of the communication channel, because the communication channel and the subway tunnel are perpendicular to each other, the equipment needs to be frequently moved and rearranged, resulting in low construction efficiency and affecting the construction progress.

Method used

The construction method is to use the hanger to transport the slag out. By building the support frame, driving the advance pipe, pouring concrete slurry, building the hanger and conveying track, the hoisting device is used to transport the slag to the subway tunnel for unloading to avoid frequent equipment Move and rearrange.

Benefits of technology

It improves the efficiency of communication channel construction, reduces the time for equipment movement and rearrangement, and ensures construction safety and on-site stability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114876492B_ABST
    Figure CN114876492B_ABST
Patent Text Reader

Abstract

The present application discloses a method for constructing a communication channel using a hanger to transport slag out, wherein a support frame is first built in the subway tunnel, and then the concrete pipe segments at the face of the communication channel are removed; then the advance guide tube is driven into the soil layer around the face of the communication channel, and then concrete slurry is poured into the advance guide tube; then the communication channel is excavated, and then the hanger is hoisted on the arch of the subway tunnel and the excavated communication channel, and the slag bucket is transported through the hanger; after the slag is cleared, the arch wall steel frame and steel mesh are installed in the communication channel, and the initial support concrete is sprayed to reinforce the soil layer. By arranging the hanger inside the communication channel, the slag bucket filled with soil slag can pass over the equipment arranged at the junction of the communication channel and the subway tunnel, so there is no need to move and rearrange the excavation equipment, which saves a lot of time and improves construction efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of tunnel construction, and in particular to a method for constructing a communication channel using a hanger to transport slag out. Background Art

[0002] A connecting channel refers to a tunnel that runs through two subway tunnels. Its function is to ensure driving safety and communication in the two parallel tunnels. Once a traffic accident, fire or other accident occurs in a tunnel, the relevant personnel can be safely transferred from the connecting channel to another tunnel for escape.

[0003] When excavating the connecting channel, temporary support frames must be arranged inside the subway tunnel to ensure the safety and force conversion of the shield tunnel lining during the segment opening and connecting channel excavation. Then, advance guide tubes are driven around the cross section of the connecting channel and grouting is performed for pre-reinforcement, so that the soil is not easy to collapse during the subsequent excavation. Then, the excavation and slag removal are carried out in sections while the support structure is constructed to reduce the possibility of collapse of the connecting channel.

[0004] When clearing slag, since the connecting channel and the subway tunnel are perpendicular to each other, and a large amount of equipment will be piled up in the connecting channel and at the entrance during the excavation process, it is often necessary to move the equipment when transporting the soil debris, and then rearrange the equipment after the slag is cleared. In addition, since the connecting channel is excavated in sections, frequent movement and rearrangement of equipment will waste a lot of time, thus affecting construction efficiency. Summary of the invention

[0005] In order to promptly transport away the soil debris generated during the excavation of the communication channel to improve the construction efficiency, the present application provides a communication channel construction method that uses a hanger to transport the debris out.

[0006] The present application provides a method for constructing a communication channel using a hanger to transport slag out, which adopts the following technical solution:

[0007] A method for constructing a communication channel using a hanger to transport slag out, comprising the following steps:

[0008] S1. Build a support frame in the subway tunnel and then remove the concrete segments at the face of the connecting channel;

[0009] S2. Drive the advance conduit into the soil layer around the face of the communication channel according to the construction drawings, and then pour concrete slurry into the advance conduit;

[0010] S3, excavation of communication channel;

[0011] S4. Build hangers in subway tunnels and excavated communication passages;

[0012] S5, loading the soil slag into the slag transport bucket, and then transporting the slag transport bucket by using the hanger;

[0013] S6. After the slag is cleared, the arch wall steel frame and steel mesh are installed in the communication channel, and then the primary support concrete is sprayed to reinforce the soil layer;

[0014] S7, repeat S3, S5 and S6 until the construction of the communication channel is completed;

[0015] The hanger includes a conveying device for conveying the slag bucket and a lifting device for lifting the slag bucket, the conveying device includes a conveying track lifted between the connecting passage and the subway tunnel arch and a driving vehicle arranged on the conveying track; the conveying track includes a first track and a second track that are perpendicular to each other and an arc track connected between the first track and the second track; the first track includes an end track and a multi-section connecting track, and the connecting track is detachably connected between the end track and the arc track.

[0016] By adopting the above technical solution, before cleaning the soil and debris in the communication channel, the hanger is first hoisted on the vault of the communication channel and the subway tunnel. When arranging the hanger, it is necessary to ensure that the arc track is located at the junction of the communication channel and the subway tunnel, the first track will extend into the communication channel, and the second track will extend along the direction of the subway tunnel, thereby forming a conveying track. And as the excavation depth increases, the length of the first track can be changed by connecting the connecting track to avoid the equipment arranged in the communication channel. When cleaning the soil and debris, the soil and debris are shoveled into the slag bucket, and then the slag bucket is lifted by the hoisting device. When the slag bucket moves to the conveying track, the driving vehicle is used to drive the slag bucket to move on the conveying track. The slag bucket passes over the equipment arranged at the junction of the communication channel and the subway tunnel, so that the slag bucket is transported to the subway tunnel, and then the material is unloaded. In this way, during the slag cleaning process, there is no need to move and rearrange the excavation equipment, thereby saving a lot of time and improving construction efficiency.

[0017] Preferably, the hoisting device includes a guide rail hoisted on the connecting channel and the subway tunnel arch, the structure of the guide rail is consistent with the structure of the conveying track, the guide rail is located above the conveying track, a moving seat is slidably connected to the guide rail, a winch is installed on the moving seat, and both the guide rail and the conveying track are provided with a through groove along the length direction for the pull rope of the winch to pass through.

[0018] By adopting the above technical solution, when the driving vehicle drives the slag bucket to move on the conveying guide rail, the moving seat moves synchronously on the guide rail. Therefore, after the slag bucket is lifted by the winch, there is no need to perform unhooking operation, making the slag cleaning process more convenient.

[0019] Preferably, a connecting seat is slidably connected to the conveying track, the connecting seat is fixedly connected to the driving vehicle, the connecting seat has a through hole for the pull rope of the winch to pass through, and the slag bucket is provided with a connecting device for connecting to the connecting seat.

[0020] By adopting the above technical solution, when the winch lifts the slag bucket, the slag bucket is connected to the connecting seat through the connecting device, so that the subsequent slag bucket remains stable during the movement on the conveying track. On the one hand, the slag bucket will not collide with the support frame set inside the subway tunnel. On the other hand, the slag bucket is not easy to spill material during the movement, thereby ensuring the safety of on-site construction.

[0021] Preferably, the connecting device includes a fixed plate fixed at the loading opening of the slag bucket, the fixed plate is provided with an insertion rod, the insertion rod is slidably connected to the fixed plate in a direction perpendicular to the fixed plate, two groups of clamping assemblies are provided on the insertion rod, and a driving assembly for driving the insertion rod to move downward is provided on the connecting seat. When the insertion rod moves downward, the two groups of clamping assemblies move in opposite directions, and an elastic member for resetting the insertion rod is provided on the fixed plate. When the elastic member is not subjected to external force, the spacing between the two groups of clamping assemblies is greater than the width of the connecting seat.

[0022] By adopting the above technical solution, when the slag bucket is lifted by the winch, the driving component drives the plunger to move downward, and the plunger moves downward to drive the two sets of clamping components to move in a direction close to each other until the clamping components are clamped on the connecting seat, so that the slag bucket can remain stable during the movement on the conveying track. When the slag bucket needs to be lowered after unloading, the driving component releases the plunger, the plunger is reset under the action of the elastic member, the clamping component releases the connecting seat, and then the slag bucket is lowered by the winch.

[0023] Preferably, the clamping assembly includes a connecting strip hinged to the insertion rod, a movable strip is hinged at one end of the connecting strip away from the insertion rod, the movable strip is slidably connected to a fixed plate, a clamping strip is fixedly connected at one end of the movable strip away from the connecting strip, a slot is provided on the connecting seat for inserting the clamping strip, and when the elastic member is not subjected to external force, the movable strip is horizontally arranged.

[0024] By adopting the above technical solution, when the insertion rod moves downward, the end of the connecting bar hinged to the insertion rod moves downward with the insertion rod, and the movement of the connecting bar drives the movable bar to move relative to the fixed plate in the direction close to the insertion rod, thereby driving the two clamping bars to move in the direction close to each other until the clamping bar is inserted into the slot, so that the slag bucket is stably installed on the connecting seat.

[0025] Preferably, the driving assembly includes a push rod arranged on the connecting seat and a driving member driving the push rod to move in the vertical direction.

[0026] By adopting the above technical solution, the driving member drives the top rod downward to drive the insertion rod downward, so that the two clamping strips move in opposite directions, and at this time, the elastic member is deformed. When the driving member drives the top rod upward, the elastic member rebounds to reset the insertion rod, and the two clamping strips move in directions away from each other, thereby exiting the slot, and then the slag bucket can be lowered by the winch.

[0027] Preferably, the elastic member comprises a fixing tube fixed on the fixing plate, a spring is arranged in the fixing tube, the insertion rod is slidably inserted in the fixing tube and connected to the spring, and when the spring is not subjected to external force, the upper end of the insertion rod extends out of the fixing tube.

[0028] By adopting the above technical solution, when the insertion rod moves downward under the action of the push rod, the spring is compressed. When the push rod releases the insertion rod, the spring rebounds and pushes the insertion rod upward, causing the two clamping bars to move in opposite directions, thereby automatically loosening the connecting seat to allow the slag bucket to be lowered.

[0029] Preferably, a guide assembly is provided on the end rail, and the guide assembly includes two vertical guide rails, which are symmetrically distributed on both sides of the end rail. A pair of outer walls opposite to each other of the slag bucket are fixedly connected with guide blocks, and the guide blocks are slidably plugged into the guide rails. The side walls of the guide rails are provided with connecting grooves for the guide blocks to pass through. When the clamping bar is plugged into the slot, the connecting grooves are located on the moving track of the horizontal plane of the guide block.

[0030] By adopting the above technical solution, the guide block cooperates with the guide rail to guide the slag bucket, so that after the slag bucket is lifted by the winch, the insertion rod can be aligned with the top rod, so that the slag bucket can be locked on the connection seat through the connection assembly. At the same time, the existence of the connection groove allows the guide block to be disengaged from the guide rail, so that the slag bucket can move smoothly on the conveying track. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 It is a schematic diagram of the overall structure of the slag bucket lifted by the hanger in the present application;

[0032] Figure 2 It is a structural schematic diagram of the connecting seat in this application;

[0033] Figure 3 It is a schematic diagram of the overall structure after the slag bucket is lifted by the hanger in this application;

[0034] Figure 4 is a schematic diagram of the structure of the connection device in this application;

[0035] Figure 5 It is a schematic diagram of the internal structure of the fixed tube in this application.

[0036] Description of reference numerals:

[0037] 1. Slag bucket; 2. Conveying track; 21. First track; 211. End track; 212. Connecting track; 22. Second track; 23. Arc track; 3. Hanging rod; 4. Driving vehicle; 5. Connecting seat; 6. Guide rail; 7. Moving seat; 8. Winch; 9. Through slot; 10. Through hole; 11. Electronic valve; 12. Fixed plate; 13. Insert rod; 14. Elastic member; 141. Fixed tube; 142. Spring; 15. Clamping assembly; 151. Connecting strip; 152. Movable strip; 153. Clamping strip; 16. Movable slot; 17. Slide slot; 18. Slot; 19. Driving assembly; 191. Push rod; 192. Electric cylinder; 20. Guide assembly; 201. Crossbeam; 202. Guide rail; 203. Guide block; 204. Connecting slot. DETAILED DESCRIPTION

[0038] The following is combined with Figure 1-5 This application is described in further detail.

[0039] The present application discloses a method for constructing a communication channel using a hanger to transport slag out. The method comprises the following steps:

[0040] S1. Build a support frame inside the subway tunnel. The support frame is arranged on both sides of the connecting channel face. An opening for the platen to pass through the subway tunnel must be reserved on the support frame so as not to affect the construction of the subway tunnel. After the support frame is completed, the concrete pipe segment at the connecting channel face will be removed.

[0041] S2. According to the construction drawings, the advance guide tube is driven into the soil layer around the face of the connecting channel, and then the concrete slurry is poured into the advance guide tube using a grouting machine.

[0042] S3. After the concrete slurry solidifies, use an excavator to dig the connecting channel. The excavation of the connecting channel is carried out in sections.

[0043] S4. After the excavation of a section of the connecting passage is completed, a hanger is built in the subway tunnel and the excavated connecting passage.

[0044] The hanger comprises a conveying device for conveying the slag bucket 1 and a hoisting device for hoisting the slag bucket 1 .

[0045] Reference Figure 1 The conveying device includes a conveying track 2 and a plurality of hangers 3 for hoisting the conveying track 2. The plurality of hangers 3 are spaced apart along the length direction of the conveying track 2. The upper ends of some hangers 3 are driven into the vault soil layer of the connecting channel, and the upper ends of some hangers 3 are driven into the vault soil layer of the subway tunnel, so that the conveying track 2 can be stably hoisted between the connecting channel and the subway tunnel.

[0046] Reference Figure 1The conveying track 2 includes a first track 21 and a second track 22 which are perpendicular to each other, and an arc track 23 connected between the first track 21 and the second track 22. The arc track 23 is locked and connected with the first track 21 and the second track 22 by bolts and nuts. Among them, the first track 21 includes an end track 211 and a multi-section connecting track 212. The connecting track 212 is detachably connected between the end track 211 and the arc track 23. The connecting track 212 is locked and connected with the end track 211 and the arc track 23 by bolts and nuts, and two adjacent connecting tracks 212 are locked and connected by bolts and nuts. As the excavation depth increases, the length of the first track 21 can be changed by connecting the connecting track 212, thereby facilitating the transportation of the slag bucket 1.

[0047] Reference Figure 1 A driving vehicle 4 and a connecting seat 5 are slidably connected to the conveying track 2, and the driving vehicle 4 and the connecting seat 5 are fixedly connected. The driving vehicle 4 adopts an existing self-propelled rail vehicle. In order to avoid redundancy, it will not be described in detail here.

[0048] Reference Figure 1 and Figure 2 The hoisting device includes a guide rail 6 and a moving seat 7 slidably arranged on the guide rail 6, and a winch 8 is installed on the moving seat 7. The structure of the guide rail 6 is consistent with that of the conveying track 2. The guide rail 6 is locked on the suspension rod 3 by bolts and nuts. The guide rail 6 is located above the conveying track 2 and parallel to the conveying track 2. The guide rail 6 and the conveying track 2 are both provided with a through groove 9 along their length direction for the pull rope of the winch 8 to pass through, and the connecting seat 5 is provided with a through hole 10 for stretching. In order to make the moving seat 7 move synchronously with the connecting seat 5, a driving vehicle 4 is also provided on the guide rail 6 to drive the moving seat 7 to move.

[0049] When arranging the hanger, it is necessary to ensure that the arc track 23 is located at the junction of the communication channel and the subway tunnel, the first track 21 extends along the excavation direction of the communication channel, and the second track 22 extends along the length direction of the subway tunnel. In this way, the slag bucket 1 filled with soil slag can pass over the equipment arranged in the communication channel and at the entrance, and then move to the non-operated area for unloading, so there is no need to frequently move and rearrange the equipment, saving a lot of time, thereby improving the construction efficiency of the communication channel.

[0050] S5, put the soil slag into the slag bucket 1, and then use the hanger to transport the slag bucket 1. Specifically:

[0051] Reference Figure 1 , an electronic valve 11 is provided at the bottom of the slag bucket 1. At the same time, in order to eliminate the shaking of the slag bucket 1 during the movement of the slag bucket 1 on the conveying track 2, a connecting device for connecting with the connecting seat 5 is provided on the slag bucket 1.

[0052] Reference Figure 1 and Figure 4 The connection device includes a fixed plate 12 fixed at the loading opening of the slag bucket 1, a plug rod 13 is arranged at the center of the fixed plate 12, the plug rod 13 is perpendicular to the fixed plate 12, the plug rod 13 penetrates the fixed plate 12 and is slidably connected with the fixed plate 12, and an elastic member 14 is arranged on the fixed plate 12 to limit and hinder the downward movement of the plug rod 13. The elastic member 14 includes a fixed tube 141 fixed to the lower surface of the fixed plate 12, the fixed tube 141 is closed at one end away from the fixed plate 12, a spring 142 is arranged in the fixed tube 141, and the plug rod 13 is movably inserted in the fixed tube 141. When the spring 142 is not subjected to external force, the upper end of the plug rod 13 is higher than the upper surface of the fixed plate 12.

[0053] Reference Figure 4 and Figure 5 , two groups of clamping assemblies 15 are arranged on the insertion rod 13, and the two groups of clamping assemblies 15 are evenly distributed on the insertion rod 13. The clamping assembly 15 includes a connecting bar 151 hinged to the insertion rod 13, and a movable groove 16 for the connecting bar 151 to move is opened on the fixed plate 12, and the movable groove 16 penetrates the fixed plate 12. A movable bar 152 is hinged to the end of the connecting bar 151 away from the insertion rod 13, and a slide groove 17 is recessed in the fixed plate 12 along the length direction. The slide groove 17 is connected to the movable groove 16, and the movable bar 152 is slidably inserted in the slide groove 17. A clamping bar 153 is vertically fixedly connected to the end of the movable bar 152 away from the connecting bar 151, and the clamping bar 153 is arranged in an L shape, and the ends of the two clamping bars 153 away from the movable bar 152 are arranged opposite to each other. When the elastic member 14 is not subjected to external force, the connecting bar 151 and the movable bar 152 are both arranged horizontally, and the distance between the ends of the two clamping bars 153 away from the movable bar 152 is greater than the width of the connecting seat 5. The side wall of the connecting seat 5 is provided with a slot 18 for inserting the clamping bar 153.

[0054] Reference Figure 2 and Figure 3 , a driving assembly 19 for driving the insertion rod 13 to move downward is provided on the connection seat 5. The driving assembly 19 includes a push rod 191 provided on the connection seat 5 and a driving member for driving the push rod 191 in a vertical direction, the driving member adopts an electric cylinder 192, the cylinder body of the electric cylinder 192 is installed on the lower surface of the connection seat 5, and the piston rod of the electric cylinder 192 passes through the through slot 9 and is fixedly connected to the push rod 191. In order to make the push rod 191 and the axis of the insertion rod 13 collinear after the slag bucket 1 is lifted by the winch 8, a guide assembly 20 is provided on the end track 211.

[0055] Reference Figure 1 and Figure 2The guide assembly 20 includes a crossbeam 201 fixed on the lower surface of the end rail 211, and the crossbeam 201 is horizontally arranged and the crossbeam 201 and the end rail 211. Both ends of the crossbeam 201 are fixedly connected with guide rails 202, and the end of the guide rail 202 away from the crossbeam 201 extends in the direction away from the arch of the communication channel, and the distance between the guide rail 202 and the ground is greater than the height of the slag bucket 1, and the distance between the two guide rails 202 matches the width of the slag bucket 1. A pair of opposite outer side walls of the slag bucket 1 are fixedly connected with guide blocks 203, and the guide blocks 203 are slidably connected with the guide rails 202. The side wall of the guide rail 202 is provided with a connecting groove 204 for the guide rail 202 to pass through. When the clamping bar 153 is inserted into the slot 18, the connecting groove 204 is on the moving track in the horizontal direction with the guide block 203.

[0056] When hoisting the slag bucket 1, tie the pull rope to the slag bucket 1, and then hoist the slag bucket 1. During the hoisting process, adjust the position of the slag bucket 1 so that the guide block 203 can slide smoothly between the two guide rails 202, and then continue to hoist. When the slag bucket 1 moves up to the preset hoisting height, the electric cylinder 192 drives the top rod 191 to move down to press the plug rod 13. The plug rod 13 moves down to drive the connecting bar 151 and the movable bar 152 to move, so that the two clamping bars 153 move in opposite directions until the clamping bar 153 is inserted into the slot 18. Then the driving vehicle 4 drives the connecting seat 5 to move, thereby driving the slag bucket 1 to move stably on the conveying track 2, so that the slag bucket 1 will not spill material or collide with the slag bucket 1 and the support frame, which is conducive to ensuring construction safety. When the slag bucket 1 moves to the end of the second track 22, open the electronic valve 11 to unload the soil slag onto the transport vehicle.

[0057] S6. After the slag is cleared, the arch wall steel frame and steel mesh are installed in the connecting channel, and then the initial support concrete is sprayed to reinforce the soil layer.

[0058] S7, repeat S3, S5 and S6 until the construction of the communication channel is completed. During this period, the connecting rail 212 can be connected according to the construction situation to facilitate the lifting of the slag bucket 1.

[0059] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A method for constructing a communication channel using a hanger to transport slag out, characterized in that: The following steps are involved: S1. Build a support frame in the subway tunnel and then remove the concrete segments at the face of the connecting channel; S2. Drive the advance conduit into the soil layer around the face of the communication channel according to the construction drawings, and then pour concrete slurry into the advance conduit; S3, excavation of communication channel; S4. Build hangers in subway tunnels and excavated communication passages; S5, loading the soil slag into the slag transport bucket (1), and then transporting the slag transport bucket (1) using a hanger; S6. After the slag is cleared, the arch wall steel frame and steel mesh are installed in the communication channel, and then the primary support concrete is sprayed to reinforce the soil layer; S7, repeat S3, S5 and S6 until the construction of the communication channel is completed; The hanger comprises a conveying device for conveying a slag bucket (1) and a hoisting device for hoisting the slag bucket (1); the conveying device comprises a conveying track (2) hoisted between a connecting passage and a subway tunnel vault and a driving vehicle (4) arranged on the conveying track (2); the conveying track (2) comprises a first track (21), a second track (22) and a curved track (23) connected between the first track (21) and the second track (22); the first track (21) comprises an end track (211) and a plurality of connecting tracks (212); the connecting track (212) is detachably connected between the end track (211) and the curved track (23); The hoisting device comprises a guide rail (6) hoisted on the connecting passage and the subway tunnel vault, the structure of the guide rail (6) being consistent with the structure of the conveying track (2), the guide rail (6) being located above the conveying track (2), a moving seat (7) being slidably connected to the guide rail (6), a winch (8) being installed on the moving seat (7), and a through groove (9) for a pull rope of the winch (8) to pass through is provided along the length direction of the guide rail (6) and the conveying track (2); A connecting seat (5) is slidably connected to the conveying track (2), the connecting seat (5) is fixedly connected to the driving vehicle (4), the connecting seat (5) is provided with a through hole (10) for the pull rope of the hoist (8) to pass through, and the slag transport bucket (1) is provided with a connecting device for connecting to the connecting seat (5).

2. A method for constructing a communication channel using a hanger to transport slag out according to claim 1, characterized in that: The connecting device comprises a fixed plate (12) fixed at a loading opening of a slag bucket (1), the fixed plate (12) being provided with an insertion rod (13), the insertion rod (13) being slidably connected to the fixed plate (12) in a direction perpendicular to the fixed plate (12), two groups of clamping assemblies (15) being provided on the insertion rod (13), a driving assembly (19) for driving the insertion rod (13) to move downward being provided on the connecting seat (5), when the insertion rod (13) moves downward, the two groups of clamping assemblies (15) move in opposite directions, an elastic member (14) for resetting the insertion rod (13) being provided on the fixed plate (12), when the elastic member (14) is not subjected to external force, the spacing between the two groups of clamping assemblies (15) is greater than the width of the connecting seat (5).

3. A method for constructing a communication channel using a hanger to transport slag out according to claim 2, characterized in that: The clamping assembly (15) comprises a connecting strip (151) hinged to the insertion rod (13); a movable strip (152) is hinged to one end of the connecting strip (151) away from the insertion rod (13); the movable strip (152) is slidably connected to the fixed plate (12); one end of the movable strip (152) away from the connecting strip (151) is fixedly connected to a clamping strip (153); a slot (18) for inserting the clamping strip (153) is provided on the connecting seat (5); and when the elastic member (14) is not subjected to external force, the movable strip (152) is arranged horizontally.

4. A method for constructing a communication channel using a hanger to transport slag out according to claim 2, characterized in that: The driving assembly (19) comprises a push rod (191) arranged on the connecting seat (5) and a driving member driving the push rod (191) to move in a vertical direction.

5. The method for constructing a communication channel using a hanger to transport slag out according to claim 2 is characterized in that: The elastic member (14) comprises a fixing tube (141) fixed on the fixing plate (12), a spring (142) being arranged in the fixing tube (141), the insertion rod (13) being slidably inserted in the fixing tube (141) and connected to the spring (142), and when the spring (142) is not subjected to external force, the upper end of the insertion rod (13) extends out of the fixing tube (141).

6. The method for constructing a communication channel using a hanger to transport slag out according to claim 3 is characterized in that: A guide assembly (20) is provided on the end rail (211), and the guide assembly (20) comprises two vertical guide rails (202), and the two guide rails (202) are symmetrically distributed on both sides of the end rail (211); a pair of opposite outer side walls of the slag transport bucket (1) are fixedly connected with guide blocks (203), and the guide blocks (203) are slidably plugged with the guide rails (202); the side walls of the guide rails (202) are provided with connection grooves (204) for the guide blocks (203) to pass through; when the clamping strip (153) is plugged into the slot (18), the connection grooves (204) are located on the moving track of the horizontal plane of the guide blocks (203).

Citation Information

Patent Citations

  • Outer shipping unit of dregs for shield zone contact channel

    CN207161090U

  • Movable belt deslagging outward transportation stress bracket for shield interval communication channel

    CN210509189U

  • Gantry crane special for subway shield deslagging

    CN212671796U

  • Shield construction muck transfer device

    CN214247336U

  • Hoist rail mounting structure

    JP2021161747A