An integral pull-out TBM invert block core mold
Through the design of the integral pull-out TBM arch core mold, and technical means such as positioning rods and limit blocks are used to solve the problems of long assembly time of the arch core mold and formwork deformation in existing tunnel construction, achieving efficient and stable tunnel construction and concrete pouring.
Patent Information
- Application Number
- CN202210474947.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-04-29
- Publication Date
- 2025-03-14
- Estimated Expiration
- 2042-04-29
AI Technical Summary
In the existing tunnel construction technology, the assembly and dismantling of the core mold of the arch is longer, and the formwork is prone to deformation, affecting the construction efficiency and quality.
The integrated pull-out TBM arch core die is adopted to achieve precise installation and adjustment through the sliding connection of multiple sets of positioning rods, eliminating the connection method of bolts and snaps, increasing assembly efficiency, and providing stable support through the coordination of limiting blocks and extrusion rods to reduce quality problems in concrete pouring.
It reduces the assembly and removal time of the core mold of the arch block, improves construction efficiency, ensures the stability and quality of concrete pouring, and provides a stable tunnel construction foundation.
Smart Images

Figure CN114876502B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of tunnel construction, in particular to an integral pull-out type TBM invert block core mould. Background Art
[0002] Tunnels are a common transportation facility in modern society. Tunnels are used to provide traffic conditions for vehicles, while reducing driving distances and crossing complex terrain that is difficult to navigate.
[0003] A Chinese patent with publication number CN202213043U discloses a reinforced concrete inverted arch block mold, including a stabilizing device for pre-embedded hangers and a stabilizing device for pre-embedded spikes. It also includes various hole and groove forming devices, such as a core mold device for grouting holes, a core mold device for drain holes, a model device for sealing grooves, a model device for arch frame grooves, etc.
[0004] In the prior art, in order to improve the stress of the upper support structure during the tunnel construction phase, a reverse arch structure is often required at the bottom of the tunnel. Existing tunnel construction often prefabricates the arch block mold by installing it and then casting it. During the production process, multiple sets of arch block core molds are often connected by bolts, buckles, etc., which results in a long time for assembly and dismantling, and the template will be deformed during dismantling.
[0005] To this end, the present invention provides an integral pull-out type TBM invert block core mold. Summary of the invention
[0006] In order to make up for the deficiencies of the prior art, at least one technical problem raised in the background technology is solved.
[0007] The technical solution adopted by the present invention to solve its technical problems is: the integral pull-out type TBM arch block core mold described in the present invention comprises an arch block core mold; the bottom surface of the arch block core mold is fixedly connected with a bottom membrane; the top surface of the bottom membrane is located at the four corners and is penetrated by a No. 1 slide groove; multiple groups of No. 1 slide grooves are slidably connected to the inside thereof; when working, the multiple groups of positioning rods are used to determine the position in advance, which can facilitate the subsequent installation and placement of the arch block core mold, and at the same time eliminate the connection method of bolts and buckles, reduce the time during assembly, and increase work efficiency. At the same time, the position adjustment of the positioning rod is more convenient than adjusting the arch block core mold as a whole.
[0008] Preferably, the side wall of the positioning rod is located below the bottom membrane and is provided with a pair of No. 2 slide grooves relative to the position; the No. 2 slide groove is slidably connected with an extrusion rod; the No. 2 slide groove and the extrusion rod are connected by a spring; the side wall of the positioning rod is located above the No. 1 slide groove and a No. 3 slide groove is provided after the No. 1 slide groove is fitted; the No. 3 slide groove is slidably connected with a pair of limit blocks; the pair of limit blocks are connected by an elastic rope; the middle part of the No. 3 slide groove is slidably connected with a limit block; the extrusion plate and the extrusion rod are connected by a linkage rod; the central axis of the linkage rod is hinged to the inner side wall of the positioning rod; when working, the bottom membrane is blocked by the limit blocks, which can provide strong support for the pouring of concrete after the core mold of the arch block is assembled, reduce the occurrence of bubbles, joints, leakage and other common quality problems during the concrete pouring process, and provide a stable foundation for the subsequent tunnel construction and vehicle passage.
[0009] Preferably, a No. 4 slide slot is provided at the bottom of the limit block; a support plate is hinged on the side wall of the No. 4 slide slot away from the extrusion plate; the support plate and the No. 4 slide slot are connected by a torsion spring; one end of a support rod is hinged on the side wall of the support plate and the top of the No. 4 slide slot; the support rods are a pair and are connected by a torsion spring; when working, the rotation of the support plate can fill the gap between the limit block and the bottom membrane, further reducing the shaking caused by the gap between the bottom membrane and the limit block, thereby affecting the occurrence of bubbles and voids in the subsequent concrete filling process, thereby affecting the quality and leaving safety hazards for tunnel construction.
[0010] Preferably, No. 5 slide grooves are provided at corresponding positions on both sides of the No. 1 slide groove; a connecting block is slidably connected inside the No. 5 slide groove; the connecting block is rotatably connected to a rotating shaft at the end near the positioning rod; and multiple groups of No. 6 slide grooves are provided on both sides of the positioning rod; when working, the downward movement of the bottom membrane can drive the collision between the connecting block and the No. 6 slide groove, so that the bottom membrane makes a sound during the movement, reminding the staff of the position of the bottom membrane, reducing the deviation of the bottom membrane during the installation process, and at the same time using sound to remind the staff that the bottom membrane is in the installation process, increasing the construction safety of the staff.
[0011] Preferably, a No. 7 slide groove is opened inside the positioning rod; a connecting rope is fixedly connected to the top of the No. 7 slide groove; a plurality of groups of impact balls are fixedly connected to the middle of the connecting rope; a No. 1 magnet is fixedly connected inside the impact ball; a No. 2 magnet is fixedly connected inside the connecting block; the No. 1 magnet and the No. 2 magnet are magnetically attracted to each other; during operation, the magnetic attraction between the No. 1 magnet and the No. 2 magnet can be used to make a pair of impact balls collide with each other during the movement of the bottom film, generating sound, and the sound of the movement of the connecting block can further remind the staff that the bottom film is in the installation process, thereby reducing the problem of staff not paying attention to the position of the bottom film, resulting in collision with the bottom film and causing injuries, thereby improving construction safety.
[0012] Preferably, guide grooves are provided on both sides of the No. 1 slide groove on the bottom surface of the base membrane; rubber plates are fixedly connected to the side walls of the guide grooves; the rubber plates are in contact with the side walls of the positioning rods, and the rubber plates are arc-shaped and bent upward; when working, the guide grooves provided on the ground of the base membrane are used in conjunction with the rubber plates to fill the gap between the No. 1 slide groove and the positioning rod during the movement of the base membrane, thereby increasing the base membrane's stable posture during the subsequent concrete filling process and reducing the possibility of shaking.
[0013] Preferably, a No. 8 slide groove is provided on the side wall where the rubber plate and the positioning rod are in contact; the No. 8 slide grooves are in multiple groups and are evenly arranged; suction cups are fixed inside the multiple groups of No. 8 slide grooves; when working, the suction cups installed on the side walls of the rubber plate can further assist the rubber plate to fit on the side walls of the positioning rod, thereby increasing the fixing effect and reducing the shaking of the base film.
[0014] Preferably, a cleaning plate is fixedly connected to the side wall of the guide groove; the rubber plate slides in the middle of the cleaning plate; a No. 9 slide groove is provided on the cleaning plate at the contact position with the rubber plate; a brush is slidably connected inside the No. 9 slide groove; the brush and the No. 9 slide groove are connected by a spring; the brush is in contact with the side wall of the rubber plate; during operation, the contact between the brush and the rubber plate can reduce the adhesion of dust and impurities on the suction cup, further improve the adsorption effect after the rubber plate and the positioning rod are in contact, strengthen the fixing effect, and reduce the shaking of the bottom film.
[0015] Preferably, a cam is rotatably connected to the middle part of the cleaning plate and the side wall in contact with the rubber plate; when working, the rotation of the cam can increase the contact between the rubber plate and the brush, further improving the cleaning effect of the suction cup and reducing the adhesion of impurities on the suction cup.
[0016] Preferably, a pair of rollers are rotatably connected to the top side walls of the extrusion plate; the rollers are in contact with the ends of the limit blocks; when working, the rotatability of the rollers themselves can assist in smoothly pushing out the limit blocks, reduce jamming, and improve the stability of the equipment during operation.
[0017] The beneficial effects of the present invention are as follows:
[0018] 1. The integrally retractable TBM invert block core mold described in the present invention can facilitate the subsequent installation and placement of the invert block core mold by using multiple groups of positioning rods to determine the position in advance, while eliminating the connection methods of bolts and buckles, reducing the time during assembly and increasing work efficiency. At the same time, adjusting the position of the positioning rods is more convenient than adjusting the entire invert block core mold.
[0019] 2. The integrally retractable TBM arch block core mold described in the present invention can provide strong support for concrete pouring after the arch block core mold is assembled by blocking the bottom membrane with a limit block, thereby reducing the common quality defects such as bubbles, joints, and leakage during the concrete pouring process, and providing a stable foundation for subsequent tunnel construction and vehicle passage. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] The present invention will be further described below in conjunction with the accompanying drawings.
[0021] Figure 1 is a stereogram of the present invention;
[0022] Figure 2 is a cross-sectional view of the present invention;
[0023] Figure 3 is a cross-sectional view of the positioning rod in the present invention;
[0024] Figure 4 is a cross-sectional view of the limit block in the present invention;
[0025] Figure 5 It is a schematic diagram of the structure of the limit block in the present invention;
[0026] Figure 6 It is a structural schematic diagram of the rubber sheet in the present invention;
[0027] Figure 7 is a structural diagram of Embodiment 2;
[0028] In the figure: 1. core mold of the inverted arch block; 11. bottom film; 12. No. 1 slide; 13. positioning rod; 2. No. 2 slide; 21. extrusion rod; 22. No. 3 slide; 23. limit block; 24. extrusion plate; 25. linkage rod; 3. support plate; 31. No. 4 slide; 32. support rod; 4. No. 5 slide; 41. connecting block; 42. No. 6 slide; 5. No. 7 slide; 51. connecting rope; 52. impact ball; 53. No. 1 magnet; 54. No. 2 magnet; 6. guide groove; 61. rubber plate; 7. No. 8 slide; 71. suction cup; 8. cleaning plate; 81. No. 9 slide; 82. brush; 9. cam; 101. roller. DETAILED DESCRIPTION
[0029] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.
[0030] Embodiment 1
[0031] like Figure 1 to Figure 2As shown, an integral pull-out TBM invert block core mold described in an embodiment of the present invention comprises an invert block core mold 1; a bottom membrane 11 is fixedly connected to the bottom surface of the invert block core mold 1; a No. 1 slide groove 12 is penetrated through the top surface of the bottom membrane 11 at the four corners; a plurality of groups of No. 1 slide grooves 12 are slidably connected to the inside thereof; during operation, in the tunnel construction stage, as the excavation depth continues to increase, in order to protect the tunnel safety, it is often necessary to gradually lay invert blocks, disperse the force of the supporting structure above the tunnel to both sides, and at the same time effectively resist the reaction force from the lower stratum of the tunnel. The existing invert is often a reinforced concrete structure, and the staff inside the tunnel first dig a downward ditch of sufficient depth, and first align the plurality of groups of positioning rods 13. The positions of the inverted arch block core mold 1 and the bottom membrane 11 are determined, and the inverted arch block core mold 1 is moved by the lifting equipment. At this time, the bottom membrane 11 installed on the bottom of the inverted arch block core mold 1 can allow the positioning rod 13 to pass through the No. 1 slide groove 12 opened on its four corners, so that the inverted arch block core mold 1 is accurately placed at the predetermined position, and then this step is repeated to install multiple groups of inverted arch block core molds 1 to provide support for subsequent concrete pouring. The position is determined in advance by using multiple groups of positioning rods 13, which can facilitate the subsequent installation and placement of the inverted arch block core mold 1. At the same time, the connection method of bolts and buckles is omitted, the time during assembly is reduced, and the work efficiency is increased. At the same time, the position adjustment of the positioning rod 13 is more convenient than adjusting the inverted arch block core mold 1 as a whole.
[0032] like Figure 4As shown, the side wall of the positioning rod 13 is located below the bottom film 11 and is provided with a pair of No. 2 slide grooves 2 relative to the position; the No. 2 slide groove 2 is slidably connected with an extrusion rod 21; the No. 2 slide groove 2 and the extrusion rod 21 are connected by a spring; the side wall of the positioning rod 13 is located above the No. 1 slide groove 12 after the No. 1 slide groove 12 is fitted; a pair of limit blocks 23 are slidably connected inside the No. 3 slide groove 22; a pair of the limit blocks 23 are connected by an elastic rope; the middle part of the No. 3 slide groove 22 is slidably connected with the limit block 23; the extrusion plate 24 and the extrusion rod 21 are connected by a linkage rod 25; the central axis of the linkage rod 25 is hinged on the inner side wall of the positioning rod 13; during operation, when the staff drives the arch block core mold 1 to move, the arch block core mold 1 will drive the bottom film 11 to move to Just above the positioning rod 13, as the inverted arch block core mold 1 descends, the positioning rod 13 gradually passes through the No. 1 slide groove 12. During the continuous descending process of the inverted arch block core mold 1, the extrusion rod 21 will be squeezed to move the extrusion rod 21 downward, driving the linkage rod 25 to move along the central axis, so that the other end of the linkage rod 25 drives the extrusion plate 24 to rise upward, and pushes the ends of a pair of limit blocks 23 to move the limit blocks 23 outward to block the No. 1 slide groove 12, restricting the bottom membrane 11 from moving upward, and keeping it stable during concrete pouring. The blocking of the bottom membrane 11 by the limit blocks 23 can provide strong support for the pouring of concrete after the inverted arch block core mold 1 is assembled, reduce the quality problems such as bubbles, joints, and leakage during concrete pouring, and provide a stable foundation for subsequent tunnel construction and vehicle traffic.
[0033] like Figure 5 As shown, a fourth slide slot 31 is provided at the bottom of the limit block 23; a support plate 3 is hingedly connected to the side wall of the fourth slide slot 31 away from the extrusion plate 24; the support plate 3 and the fourth slide slot 31 are connected by a torsion spring; one end of a support rod 32 is hingedly connected to the side wall of the support plate 3 and the top of the fourth slide slot 31; the support rods 32 are a pair and are connected by a torsion spring; when working, when the limit block 23 moves out of the third slide slot 22 under the extrusion of the extrusion plate 24, the support plate 3 moves under the torsion force of the torsion spring after there is no shielding from the third slide slot 22 The support plate 3 rotates downward, and at the same time, a pair of support rods 32 assist the support plate 3 to rotate under the action of the torsion spring, so that the angle between the pair of support plates 3 changes to 180 degrees. At the same time, the support plate 3 vertically downward contacts the top surface of the bottom membrane 11. The rotation of the support plate 3 can fill the gap between the limit block 23 and the bottom membrane 11, and further reduce the shaking caused by the gap between the bottom membrane 11 and the limit block 23, thereby affecting the appearance of bubbles and voids in the subsequent concrete filling process, thereby affecting the quality and leaving safety hazards for tunnel construction.
[0034] like Figure 3As shown, No. 5 slide grooves 4 are provided at corresponding positions on both sides of the No. 1 slide groove 12; a connecting block 41 is slidably connected inside the No. 5 slide groove 4; the connecting block 41 is rotatably connected to the end of the positioning rod 13 with a rotating shaft; multiple groups of No. 6 slide grooves 42 are provided on both sides of the positioning rod 13; during operation, when the bottom film 11 is located above the positioning rod 13 and slides, the connecting block 41 contacts the side wall of the positioning rod 13 under the action of the spring. At this time, the No. 6 slide groove 42 provided on the side wall of the positioning rod 13 can allow the connecting block 41 to enter, so that a collision effect is generated during the movement of the connecting block 41, causing a sound, and the downward movement of the bottom film 11 can drive the connecting block 41 and the No. 6 slide groove 42 to collide, so that the bottom film 11 produces a sound during the movement, reminding the staff of the position of the bottom film 11, reducing the deviation of the bottom film 11 during the installation process, and at the same time using sound to remind the staff that the bottom film 11 is in the installation process, increasing the construction safety of the staff.
[0035] like Figure 3 As shown, the positioning rod 13 is provided with a seventh slide groove 5 inside; a connecting rope 51 is fixedly connected to the top of the seventh slide groove 5; a plurality of groups of impact balls 52 are fixedly connected to the middle of the connecting rope 51; a first magnet 53 is fixedly connected to the inside of the impact ball 52; a second magnet 54 is fixedly connected to the inside of the connecting block 41; the first magnet 53 and the second magnet 54 are magnetically attracted to each other; during operation, during the movement of the bottom film 11, as the bottom film 11 continues to move downward, the magnetic attraction effect between the first magnet 53 and the second magnet 54 mobilizes the impact ball 52 to move left and right Movement, after one pair of the impact balls 52 leaves the range of the second magnet 54, the pair of impact balls 52 approach each other and collide with each other, and the magnetic attraction between the first magnet 53 and the second magnet 54 can be used to make the pair of impact balls 52 collide with each other during the movement of the bottom membrane 11 to produce a sound, and the sound of the movement of the connecting block 41 can further remind the staff that the bottom membrane 11 is in the process of installation, thereby reducing the problem of injuries caused by the staff not paying attention to the position of the bottom membrane 11 and colliding with the bottom membrane 11, thereby improving construction safety.
[0036] like Figure 3As shown, the bottom surface of the bottom membrane 11 is provided with guide grooves 6 on both sides of the No. 1 slide groove 12; the side walls of the guide grooves 6 are fixedly connected with rubber plates 61; the rubber plates 61 are in contact with the side walls of the positioning rods 13, and the rubber plates 61 are arc-shaped and bent upward; during operation, when the bottom membrane 11 is installed and fixed, the rubber plates 61 provided on the bottom surface of the bottom membrane 11 can assist the positioning rods 13 in installation, and at the same time, the rubber plates 61 installed on the side walls of the guide grooves 6 can contact the side walls of the No. 6 slide grooves 42 during the downward movement of the bottom membrane 11, and fill the gap between the No. 1 slide groove 12 and the positioning rods 13 according to the continuous descent of the bottom membrane 11, and utilize the guide grooves 6 provided on the ground of the bottom membrane 11, in conjunction with the rubber plates 61, to fill the gap between the No. 1 slide groove 12 and the positioning rods 13 during the movement of the bottom membrane 11, thereby increasing the stability of the bottom membrane 11 during the subsequent concrete filling process and reducing the possibility of shaking.
[0037] like Figure 6 As shown, the side wall where the rubber plate 61 and the positioning rod 13 are in contact is provided with a No. 8 slide groove 7; the No. 8 slide grooves 7 are multiple groups and are evenly arranged; the multiple groups of No. 8 slide grooves 7 are fixedly connected with suction cups 71 inside; during operation, after the rubber plate 61 and the positioning rod 13 are in contact, the bottom film 11 continues to drop, which will cause the contact area between the rubber plate 61 and the positioning rod 13 to increase continuously, and at this time, the suction cup 71 installed on the side wall of the rubber plate 61 can be adsorbed on the side wall of the positioning rod 13, and the suction cup 71 installed on the side wall of the rubber plate 61 can be used to further assist the rubber plate 61 to fit on the side wall of the positioning rod 13, thereby increasing the fixing effect and reducing the shaking of the bottom film 11.
[0038] like Figure 6 As shown, the side wall of the guide groove 6 is fixedly connected with a cleaning plate 8; the rubber plate 61 slides in the middle of the cleaning plate 8; the cleaning plate 8 is provided with a No. 9 slide groove 81 at the contact position with the rubber plate 61; the No. 9 slide groove 81 is slidably connected with a brush 82; the brush 82 and the No. 9 slide groove 81 are connected by a spring; the brush 82 is in contact with the side wall of the rubber plate 61; when working, the rubber plate 61 will move on the cleaning plate 8 during movement, and at this time, the brush 82 will contact the side wall of the rubber plate 61 under the action of the spring, and scrape and clean the suction cup 71 installed inside the No. 8 slide groove 7, and the auxiliary rubber plate 61 is attached to the side wall of the positioning rod 13. The contact between the brush 82 and the rubber plate 61 can reduce the adhesion of dust and impurities on the suction cup 71, further improve the adsorption effect after the rubber plate 61 and the positioning rod 13 are in contact, strengthen the fixing effect, and reduce the shaking of the bottom film 11.
[0039] like Figure 6As shown, the middle part of the cleaning plate 8 and the side wall in contact with the rubber plate 61 are rotatably connected with a cam 9; during operation, during the movement of the rubber plate 61, the cam 9 rotates during the contact with the rubber plate 61, causing the rubber plate 61 to jump, thereby increasing the contact between the rubber plate 61 and the brush 82. The rotation of the cam 9 can increase the contact between the rubber plate 61 and the brush 82, further improving the cleaning effect of the suction cup 71 and reducing the adhesion of impurities on the suction cup 71.
[0040] Embodiment 2
[0041] like Figure 7 As shown, compared with Example 1, another implementation of the present invention is: the top side wall of the extrusion plate 24 is rotatably connected to a pair of rollers 101; the rollers 101 are in contact with the ends of the limit blocks 23; during operation, when the extrusion plate 24 is pushed by the linkage rod 25, the rollers 101 installed on the top thereof utilize their own rotation to contact the ends of the limit blocks 23, and assist the limit blocks 23 to be pushed outward. The self-rotatability of the rollers 101 can assist the limit blocks 23 to be pushed out smoothly, thereby reducing the occurrence of jams and improving the stability of the equipment during operation.
[0042] During the tunnel construction phase, as the excavation depth continues to increase, in order to protect the safety of the tunnel, it is often necessary to gradually lay inverted arch blocks to disperse the force on the supporting structure above the tunnel to both sides, and at the same time effectively resist the reaction force from the lower stratum of the tunnel. The existing inverted arch is often a reinforced concrete structure. The tunnel internal workers first dig a downward ditch of sufficient depth, and first fix multiple groups of positioning rods 13 to determine the positions of the inverted arch block core mold 1 and the bottom membrane 11. Then, the inverted arch block core mold 1 is moved by the lifting equipment. At this time, the bottom membrane 11 installed on the bottom of the inverted arch block core mold 1 can allow the positioning rod 13 to pass through the No. 1 slide groove 12 opened on its four corners, so that the inverted arch block core mold 1 is accurately placed in the predetermined position. Repeat this step to install multiple sets of inverted arch block core molds 1 to provide support for subsequent concrete pouring. When the staff drives the inverted arch block core mold 1 to move, the inverted arch block core mold 1 will drive the bottom membrane 11 to move to just above the positioning rod 13. As the inverted arch block core mold 1 descends, the positioning rod 13 gradually passes through the No. 1 slide groove 12. During the continuous descending process of the inverted arch block core mold 1, the extrusion rod 21 will be squeezed to move the extrusion rod 21 downward, driving the linkage rod 25 to move along the central axis, so that the other end of the linkage rod 25 drives the extrusion plate 24 to rise upward, push the ends of a pair of limit blocks 23, so that the limit blocks 23 move outward, block the No. 1 slide groove 12, and limit the bottom membrane 11 so that it cannot move upward, so as to ensure that the bottom membrane 11 can be placed in the concrete pouring state. The support plate 3 rotates downward under the torsion force of the torsion spring after the limit block 23 moves out of the No. 3 slide groove 22 under the extrusion of the extrusion plate 24, and at the same time, a pair of support rods 32 assist the support plate 3 to rotate under the action of the torsion spring, so that the angle between the pair of support plates 3 changes to 180 degrees. At the same time, the support plate 3 vertically downward contacts the top surface of the bottom film 11. When the bottom film 11 slides above the positioning rod 13, the connecting block 41 contacts the side wall of the positioning rod 13 under the action of the spring. At this time, the No. 6 slide groove 42 opened on the side wall of the positioning rod 13 can allow the connecting block 41 to enter, so that a collision effect is generated during the movement of the connecting block 41, causing a sound. During the movement of the bottom film 11, as the bottom film 11 continues to move, The bottom film 11 moves downward, so that the magnetic attraction effect between the No. 1 magnet 53 and the No. 2 magnet 54 mobilizes the impact ball 52 to move left and right. After a pair of impact balls 52 leave the range of the No. 2 magnet 54, the pair of impact balls 52 approach each other and collide. When the bottom film 11 is installed and fixed, the rubber plate 61 opened on the bottom surface of the bottom film 11 can assist the installation of the positioning rod 13. At the same time, the rubber plate 61 installed on the side wall of the guide groove 6 can contact the side wall of the No. 6 slide groove 42 during the downward movement of the bottom film 11, and fill the gap between the No. 1 slide groove 12 and the positioning rod 13 according to the continuous descent of the bottom film 11. After the rubber plate 61 and the positioning rod 13 are in contact, the bottom film 11 continues to descend, which will increase the contact area between the rubber plate 61 and the positioning rod 13.At this time, the suction cup 71 installed on the side wall of the rubber plate 61 can be adsorbed on the side wall of the positioning rod 13. The rubber plate 61 will move on the cleaning plate 8 during movement. At this time, the brush 82 will contact the side wall of the rubber plate 61 under the action of the spring, and scrape and clean the suction cup 71 installed inside the No. 8 slide 7, and assist the rubber plate 61 to fit on the side wall of the positioning rod 13. During the movement of the rubber plate 61, the cam 9 will rotate during the contact process with the rubber plate 61, causing the rubber plate 61 to jump, so that the contact between the rubber plate 61 and the brush 82 is increased.
[0043] The above-mentioned front, back, left, right, top and bottom are all based on the figures in the specification. Figure 1 As a benchmark, according to the person's observation perspective, the side of the device facing the observer is defined as the front, the left side of the observer is defined as the left, and so on.
[0044] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the scope of protection of the present invention.
[0045] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. An integral pull-out TBM invert block core mold, characterized in that: It comprises an arch block core mold (1); a bottom film (11) is fixedly connected to the bottom surface of the arch block core mold (1); a No. 1 slide groove (12) is penetrated at the top surface of the bottom film (11) at the four corners; and positioning rods (13) are slidably connected inside a plurality of groups of the No. 1 slide grooves (12); The side wall of the positioning rod (13) is located below the bottom film (11) and is provided with a pair of No. 2 slide grooves (2) relative to the position; the No. 2 slide groove (2) is slidably connected to an extrusion rod (21); the No. 2 slide groove (2) and the extrusion rod (21) are connected by a spring; the side wall of the positioning rod (13) is located above the No. 1 slide groove (12) after being fitted with the No. 1 slide groove (12); the No. 3 slide groove (22) is slidably connected to a pair of limit blocks (23); the pair of limit blocks (23) are connected by an elastic rope; the middle part of the No. 3 slide groove (22) is slidably connected to the limit block (23); the extrusion plate (24) and the extrusion rod (21) are connected by a linkage rod (25); the central axis of the linkage rod (25) is hinged to the inner side wall of the positioning rod (13); A fourth slide groove (31) is provided at the bottom of the limit block (23); a support plate (3) is hingedly connected to the side wall of the fourth slide groove (31) away from the extrusion plate (24); the support plate (3) and the fourth slide groove (31) are connected via a torsion spring; one end of a support rod (32) is hingedly connected to the side wall of the support plate (3) and the top of the fourth slide groove (31); the support rods (32) are a pair and are connected via a torsion spring; A No. 5 slide groove (4) is provided at corresponding positions on both sides of the No. 1 slide groove (12); a connecting block (41) is slidably connected inside the No. 5 slide groove (4); the end of the connecting block (41) close to the positioning rod (13) is rotatably connected to a rotating shaft; a plurality of groups of No. 6 slide grooves (42) are provided on both sides of the positioning rod (13); A seventh slide groove (5) is provided inside the positioning rod (13); a connecting rope (51) is fixedly connected to the top of the seventh slide groove (5); a plurality of groups of impact balls (52) are fixedly connected to the middle of the connecting rope (51); a first magnet (53) is fixedly connected inside the impact ball (52); a second magnet (54) is fixedly connected inside the connecting block (41); the first magnet (53) and the second magnet (54) are magnetically attracted to each other.
2. The integral pull-out TBM invert block core mold according to claim 1, characterized in that: The bottom surface of the bottom film (11) is provided with guide grooves (6) on both sides of the No. 1 slide groove (12); the side walls of the guide groove (6) are fixedly connected with a rubber plate (61); the rubber plate (61) is in contact with the side wall of the positioning rod (13); the rubber plate (61) is arc-shaped and bends upward.
3. The integral pull-out TBM invert block core mold according to claim 2, characterized in that: The side wall where the rubber plate (61) and the positioning rod (13) are in contact is provided with a No. 8 slide groove (7); the No. 8 slide grooves (7) are in multiple groups and are evenly arranged; and suction cups (71) are fixedly connected inside the multiple groups of the No. 8 slide grooves (7).
4. The integral pull-out TBM invert block core mold according to claim 3, characterized in that: The side wall of the guide groove (6) is fixedly connected with a cleaning plate (8); the rubber plate (61) slides in the middle of the cleaning plate (8); a ninth slide groove (81) is provided at the contact position between the cleaning plate (8) and the rubber plate (61); a brush (82) is slidably connected inside the ninth slide groove (81); the brush (82) and the ninth slide groove (81) are connected via a spring; and the brush (82) is in contact with the side wall of the rubber plate (61).
5. The integral pull-out TBM invert block core mold according to claim 4, characterized in that: The middle part of the cleaning plate (8) is rotatably connected to the side wall in contact with the rubber plate (61) and is provided with a cam (9).
6. The integral pull-out TBM invert block core mold according to claim 5, characterized in that: A pair of rollers (101) are rotatably connected to the top side wall of the extrusion plate (24); the rollers (101) are in contact with the ends of the limit blocks (23).
Citation Information
Patent Citations
Reinforced concrete inverted arch block die
CN202213043U
High-speed rail long tunnel inverted arch integral mobile formwork construction method
CN106223960A
Tunnel inverted arch one-time pouring forming device and method
CN109736852A