A method for reinforcing tunnel strip rock burst and detached tunnel section
By using a support structure combining anchor rods, reinforcement rods and steel mesh in tunnel construction, the surrounding rock fracture and safety hazards caused by strip rock bursts are solved, and the self-supporting capacity and construction safety of the rock wall are improved.
Patent Information
- Application Number
- CN202210570921.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-05-24
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2042-05-24
AI Technical Summary
During tunnel construction, strip-shaped rock explosions lead to cracking of surrounding rocks and elastic release, causing safety hazards and slow construction progress.
The structure of an anchor rod and reinforcement rod is combined with a reinforcement mesh and support components, and is inserted along the tunnel rock wall at equal intervals through the anchor rod and reinforcement rod. The reinforcement mesh covers and passes through the anchor rod and reinforcement rod. The support device cooperates with the reinforcement steel plate. Adjust the position to absorb dynamic stress, improve the self-supporting capacity of the rock wall, and avoid the expansion of the rock burst area.
It effectively improves the elastic strain energy and support capacity of the tunnel rock wall, avoids the continuous expansion of the rock explosion area, provides a safer construction environment, and creates safer conditions for subsequent construction and support operations.
Smart Images

Figure CN114893230B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of tunnel construction, and in particular to a method for reinforcing a tunnel strip rock burst-shedding tunnel section. Background Art
[0002] Rockburst is a destructive phenomenon that occurs during the construction of hard rock tunnels with high ground stress. The tunnel excavation unloading causes stress differentiation in the surrounding rock, resulting in internal cracks in the rock and sudden release of elastic energy, which leads to bursting, loosening, peeling, catapulting and even throwing damage, seriously endangering the safety of construction workers and machinery, slowing down the construction progress and extremely high risks.
[0003] Among them, relatively minor strip rock bursts, especially strip rock bursts along the tunnel axis, will continue to occur with the tunnel construction. Therefore, if reinforcement and support are not carried out in time, or the support is not in place, the inner wall of the tunnel surrounding rock will easily continue to deform toward the free surface and cause spalling damage. Moreover, with the tunnel construction, it will continue to expand along the tunnel axis, posing a safety hazard. Summary of the invention
[0004] In order to overcome the defects of the prior art, the technical problem to be solved by the present invention is to propose a reinforcement structure that can timely perform compression support in the strip-shaped rock burst detachment area, avoid continuous expansion of the rock burst area, improve the self-bearing capacity of the rock wall, and provide a safer construction environment for subsequent tunnel construction, support and other operations.
[0005] To achieve this object, the present invention adopts the following technical solutions:
[0006] The present invention provides a method for reinforcing a tunnel strip rock burst detached tunnel section, comprising a plurality of groups of anchor rods and reinforcement rods distributed along the strip rock burst detached area of the tunnel excavation inner wall, wherein the anchor rods and reinforcement rods are distributed at intervals, and a steel mesh is laid on the tunnel excavation inner wall, and the steel mesh passes through the anchor rods and reinforcement rods;
[0007] A support assembly is set up on the side of the steel mesh away from the inner wall of the tunnel, and the support assembly includes a support device for supporting the top side of the tunnel and reinforcing steel plates supporting both sides of the tunnel. Two groups of the reinforcing steel plates are close to each other and an upward supporting connection assembly is set on one side, and one end of the connection assembly is supported on the bottom side of the support device, and anchor rods and reinforcing rods are inserted at equal intervals around the tunnel rock wall to reinforce the blasting working face and improve the elastic strain energy of the tunnel rock wall. The steel mesh is hung to cover the rock wall, which has a supporting and buffering effect on the broken rock. By adjusting the positional relationship between the support device and the reinforcing steel plate, the reinforcing steel plate passes through the reinforcing rod and is tightly attached to the steel mesh, and pressure is applied to the reinforcing steel plates on both sides through the connecting device, so that the reinforcing steel plate and the steel mesh can better absorb the dynamic stress generated when the rock burst occurs, improve the stress state of the tunnel rock wall, avoid continuous expansion of the rock burst area, and provide a safer construction environment for subsequent tunnel construction, support and other operations.
[0008] The preferred technical solution of the present invention is that the reinforcement rod includes a reinforcement end that passes through a steel mesh and a reinforcement steel plate and is arranged in the tunnel, one end of the reinforcement end arranged inside the tunnel is provided with a spike portion, and the outer wall of the reinforcement end is provided with an anchoring steel sheet to avoid continuous expansion of the rock burst area and improve the purpose of reinforcement.
[0009] The preferred technical solution of the present invention is that the anchor steel sheets are evenly distributed around the outer wall of the reinforcement end, and at least two groups are arranged along the axial direction of the reinforcement end, thereby increasing the bearing capacity of the area around the reinforcement rod, avoiding stress concentration, and improving the supporting effect.
[0010] The preferred technical solution of the present invention is that the support device includes a support frame abutting against the steel mesh, and adjustment plates slidably connected to the slide groove are arranged inside the two ends of the support frame. The adjustment plate is rotatably connected to the fixed end on the top side of the connecting assembly at one end away from the support frame. The support frame and the adjustment plate are adapted to the shape of the arched area where the steel mesh is connected to the top side of the inner wall of the tunnel, thereby increasing the buffering and supporting effect of the steel mesh on the rock wall of the tunnel and avoiding injuries to personnel caused by rock bursts.
[0011] The preferred technical solution of the present invention is that the two sides of the adjustment plate close to one end of the support frame are rotatably connected to the inner wall of the support frame, and movable openings cooperating with the rotation of the adjustment plate are provided at both ends of the support frame, so that it can adapt to the use of surrounding rocks with different arch requirements and improve the supporting effect and stability of the arch area.
[0012] The preferred technical solution of the present invention is that the connecting assembly includes a supporting part and a connecting part that is telescopically adjusted along both ends of the supporting part, and the connecting part is provided with a fixing part that is slidably connected to the reinforcing steel plate at one end away from the supporting part, and the fixing part is fixedly connected to the reinforcing steel plate by a set screw, and a supporting member for supporting the support frame is provided on the top side of the supporting part, which strengthens the protective effect of the reinforced steel plate and the steel mesh on the rock walls on both sides of the tunnel, and can deform in time when impacted to avoid local excessive load.
[0013] The preferred technical solution of the present invention is that the support member includes a telescopic rod arranged on the top side of the support part, the movable end of the telescopic rod is provided with a support plate abutting against the bottom side of the support frame, and is fixedly connected by a fixing rod, thereby improving the energy absorption effect of the arched area of the tunnel rock wall, improving its stress state, and improving the support effect.
[0014] A method for reinforcing a tunnel strip rock burst section, characterized in that it comprises the following steps:
[0015] Step 1: Use a mobile water tank and a high-pressure nozzle to spray along the blasted rock wall to moisten the rock surface and lower the temperature of the rock wall, and spray a layer of concrete on the cleaned tunnel rock surface;
[0016] Step 2: Drill holes at equal intervals along the tunnel rock wall after blasting, insert anchor rods and pre-tighten them. The spacing between anchor rods should not exceed 2m.
[0017] Step 3: Place the steel mesh close to the rock wall and use iron rings to fix it to the exposed ring sleeves of the anchor rods. Install reinforcement rods between every two groups of anchor rods. The anchor rods and reinforcement rods are distributed at equal angles along the tunnel axis.
[0018] Step 4: The reinforcement steel plate passes through the reinforcement end of the reinforcement rod and is close to the steel mesh on both sides. By adjusting the length and angle of the adjustment plates at both ends of the support frame, the support frame and the adjustment plate pass through the reinforcement end and are close to the arched area of the steel mesh. Install a locking ring on the end of the reinforcement end away from the rock wall to fix the connection between the adjustment plate, the reinforcement steel plate, the steel mesh and the rock wall.
[0019] Step 5: Adjust the connection parts at both ends to make the fixing part slide along one side of the reinforcement steel plate, move until the support plate abuts against the bottom side of the support frame, fix the position of the support part with the set screw, and support the support plate on the bottom side of the support frame through the telescopic rod, and fix the rod to ensure the reinforcement effect of the support frame on the rock wall;
[0020] By adopting the above technical scheme, when a rock burst occurs in the tunnel, the anchor steel sheets on the reinforcement rods are compressed and react to the pressure generated by the rock burst in the surrounding rock, thereby improving the bearing capacity of the surrounding rock. The setting of anchor rods and reinforcement rods improves the toughness of the surrounding rock at multiple angles, avoiding the continuous expansion of the rock burst area. The tunnel rock wall is further covered by the cooperation of steel mesh and reinforcement steel plates as well as support frames and adjustment plates. When a rock burst occurs, it can deform in time to absorb the energy generated by the rock burst impact, avoid rock breakage and falling to cause harm to personnel, improve the self-bearing capacity of the rock wall and the support effect on the rock wall, and provide a safer construction environment for subsequent tunnel construction, support and other operations.
[0021] Compared with the prior art, the beneficial effects of the present invention are as follows: the present invention inserts anchor rods and reinforcing rods at equal intervals around the tunnel rock wall to reinforce the blasting working surface, improve the elastic strain energy of the tunnel rock wall, hangs a steel mesh to cover the rock wall, and has a supporting and buffering effect on the broken rock. Through the cooperation of the reinforcing steel plate, the supporting frame and the adjusting plate, the reinforcing steel plate and the supporting device pass through the reinforcing rod and are tightly attached to the steel mesh, and the reinforcing steel plates on both sides are pressed through the connecting parts on both sides. The supporting effect of the supporting plate on the supporting frame enables the reinforcing steel plate and the steel mesh to better absorb the dynamic stress generated when the rock burst occurs, thereby improving the stress state of the tunnel rock wall and avoiding rock burst. The explosion area continues to expand, providing a safer construction environment for subsequent tunnel construction, support and other operations; when a rock burst occurs in the tunnel, the anchor steel sheets on the reinforcement rods are compressed and react to the pressure generated by the surrounding rock when it bursts, thereby increasing the bearing capacity of the surrounding rock. The setting of anchor rods and reinforcement rods improves the toughness of the surrounding rock at multiple angles, avoiding the continuous expansion of the rock burst area. The tunnel rock wall is further covered by the cooperation of steel mesh and reinforcement steel plates as well as support frames and adjustment plates. When a rock burst occurs, it can deform in time to absorb the energy generated by the rock burst impact, avoid the rock from breaking and falling to cause harm to personnel, and improve the self-bearing capacity of the rock wall and the support effect on the rock wall.
[0022] The present invention provides a reinforcement structure that can timely perform compression and support in the strip-shaped rock burst detachment area, avoid continuous expansion of the rock burst area, improve the self-bearing capacity of the rock wall, and provide a safer construction environment for subsequent tunnel construction, support and other operations. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a schematic diagram of the reinforcement structure of the rock burst and fall-off cave section of the present invention;
[0024] Figure 2 The present invention Figure 1 A schematic diagram of the structure enlargement in the middle;
[0025] Figure 3 The present invention Figure 1 Enlarged schematic diagram of the structure at point B in the middle.
[0026] In the accompanying drawings, the components represented by the reference numerals are listed as follows:
[0027] 1. Tunnel; 11. Anchor rod; 12. Steel mesh; 2. Reinforcement steel plate; 3. Support device; 31. Support frame; 32. Adjustment plate; 33. Slide; 34. Movable opening; 35. Fixing rod; 4. Reinforcement rod; 41. Reinforcement end; 42. Spike; 43. Anchor steel sheet; 5. Connection assembly; 51. Support part; 52. Connection part; 53. Fixing part; 54. Telescopic rod; 55. Set screw; 56. Support plate. DETAILED DESCRIPTION
[0028] The technical solution of the present invention is further described below with reference to the accompanying drawings and through specific implementation methods.
[0029] A reinforcement structure for a tunnel strip rock burst detachment cave section, comprising a plurality of groups of anchor rods 11 and reinforcement rods 4 distributed along the strip rock burst detachment area of the inner wall of the tunnel 1 excavation, wherein the anchor rods 11 and reinforcement rods 4 are distributed at intervals, a steel mesh 12 is laid on the inner wall of the tunnel 1 excavation, the steel mesh 12 passes through the anchor rods 11 and reinforcement rods 4, a support assembly is set up on the side of the steel mesh 12 away from the inner wall of the tunnel 1, the support assembly comprises a support device 3 for supporting the top side of the tunnel 1 and reinforcement steel plates 2 supporting both sides of the tunnel 1, two groups of the reinforcement steel plates 2 are close to each other and a connection assembly 5 for upward support is arranged, one end of the connection assembly 5 is supported on the bottom side of the support device 3, and the anchor rods are connected to the inner wall of the tunnel 1. 11 and the reinforcing rods 4 are inserted at equal intervals around the rock wall of the tunnel 1 to reinforce the blasting working face and improve the elastic strain energy of the rock wall of the tunnel 1. The steel mesh 12 is hung to cover the rock wall, which has a supporting and buffering effect on the broken rock. By adjusting the positional relationship between the support device 3 and the reinforcing steel plate 2, the reinforcing steel plate 2 passes through the reinforcing rod 4 and is tightly attached to the steel mesh 12, and the reinforcing steel plates 2 on both sides are pressurized by the connecting device 5, so that the reinforcing steel plate 2 and the steel mesh 12 can better absorb the dynamic stress generated when the rock burst occurs, improve the stress state of the rock wall of the tunnel 1, avoid the continuous expansion of the rock burst area, and provide a safer construction environment for subsequent tunnel 1 construction, support and other operations.
[0030] As a possible implementation mode of the present scheme, preferably, the reinforcing rod 4 includes a reinforcing end 41 passing through the steel mesh 12 and the reinforcing steel plate 2 and arranged in the tunnel 1, and one end of the reinforcing end 41 arranged inside the tunnel 1 is provided with a spike portion 42, and the outer wall of the reinforcing end 41 is provided with an anchoring steel sheet 43. The anchoring steel sheet 43 on the outer wall of the reinforcing rod 4 can generate lateral supporting force on the surrounding rock, thereby avoiding continuous expansion of the rock burst area and improving the purpose of reinforcement.
[0031] As a possible implementation mode of the present scheme, preferably, the anchoring steel sheets 43 are evenly spaced around the outer wall of the reinforcement end 41, and at least two groups are arranged axially along the reinforcement end 41, so as to increase the bearing capacity of the area around the reinforcement rod 4, avoid stress concentration, and improve the supporting effect.
[0032] As a possible implementation mode of the present scheme, preferably, the support device 3 includes a support frame 31 abutting against the steel mesh 12, and adjustment plates 32 slidably connected to the slide groove 33 are arranged inside the two ends of the support frame 31, and the adjustment plate 32 is rotatably connected to the fixed end on the top side of the connecting component 5 at one end away from the support frame 31, and the support frame 31 and the adjustment plate 32 are adapted to the shape of the arched area where the steel mesh 12 is connected to the top side of the inner wall of the tunnel 1. Through the cooperation between the support frame 31 and the adjustment plate 32, the buffering and supporting effect of the steel mesh 12 on the rock wall of the tunnel 1 is increased, thereby avoiding the occurrence of rock bursts and injuries to personnel.
[0033] As a possible implementation mode of the present scheme, preferably, the two sides of the adjustment plate 32 close to one end of the support frame 31 are rotatably connected to the inner wall of the support frame 31, and movable openings 34 for cooperating with the rotation of the adjustment plate 32 are provided at both ends of the support frame 31, so that it can adapt to the surrounding rocks with different arch requirements and improve the supporting effect and stability of the arch area.
[0034] As a possible implementation mode of the present scheme, preferably, the connecting assembly 5 includes a supporting portion 51 and a connecting portion 52 that is telescopically adjustable along both ends of the supporting portion 51, and the connecting portion 52 is provided with a fixing portion 53 that is slidably connected to the reinforcing steel plate 2 at one end away from the supporting portion 51, and the fixing portion 53 is fixedly connected to the reinforcing steel plate 2 by a set screw 55, and a supporting member for supporting the support frame 31 is provided on the top side of the supporting portion 51. Through the cooperation between the connecting portion 52 and the fixing portion 53, the protective effect of the reinforcing steel plate 2 and the steel mesh 12 on the rock walls on both sides of the tunnel 1 is strengthened, and deformation can be generated in time when impacted to avoid excessive local load.
[0035] As a possible implementation mode of the present scheme, preferably, the supporting member includes a telescopic rod 54 arranged on the top side of the supporting portion 51, and the movable end of the telescopic rod 54 is provided with a supporting plate 56 that abuts against the bottom side of the supporting frame 31, and is fixedly connected by a fixing rod 35 through the cooperation between the supporting portion 51 and the supporting plate 56, thereby improving the energy absorption effect of the arched area of the rock wall of the tunnel 1, improving its stress state, and improving the supporting effect.
[0036] A method for reinforcing a tunnel strip rock burst section, characterized in that it comprises the following steps:
[0037] Step 1: Use a mobile water tank and a high-pressure nozzle to spray along the blasted rock wall to moisten the rock surface and lower the temperature of the rock wall, and spray a layer of concrete on the cleaned rock surface of tunnel 1;
[0038] Step 2: Drill holes at equal intervals along the rock wall of the tunnel 1 after blasting, insert anchor rods 11 and pre-tighten them. The spacing of the anchor rods 11 should not exceed 2m.
[0039] Step 3: The steel mesh 12 is pressed against the rock wall and fixedly connected to the exposed ring sleeve of the anchor rod 11 by using an iron ring, and a reinforcing rod 4 is installed between every two groups of anchor rods 11, and the anchor rods 11 and the reinforcing rods 4 are distributed at equal angles along the axial direction of the tunnel 1;
[0040] Step 4: The reinforcing steel plate 2 passes through the reinforcing end 41 of the reinforcing rod 4 and is tightly attached to the steel mesh 12 on both sides. By adjusting the length and angle of the adjusting plates 32 at both ends of the support frame 31, the support frame 31 and the adjusting plate 32 pass through the reinforcing end 41 and are tightly attached to the arched area of the steel mesh 12. A locking ring is installed on the end of the reinforcing end 41 away from the rock wall to fix the connection between the adjusting plate 32, the reinforcing steel plate 2 and the steel mesh 12 and the rock wall.
[0041] Step 5: Adjust the connecting parts 52 at both ends so that the fixing part 53 slides along one side of the reinforcing steel plate 2, moves until the supporting plate 56 abuts against the bottom side of the supporting frame 31, and fixes the position of the supporting part 51 with the set screws 55. Then, the supporting plate 56 is supported on the bottom side of the supporting frame 31 through the action of the telescopic rod 54, and fixed with the fixing rod 35 to ensure the reinforcing effect of the supporting frame 31 on the rock wall.
[0042] By adopting the above technical scheme, when a rock burst occurs in the tunnel 1, the anchor steel sheet 43 on the reinforcement rod 4 is compressed and reacts to the pressure generated by the rock burst of the surrounding rock, thereby improving the bearing capacity of the surrounding rock. The setting of the anchor rod 11 and the reinforcement rod 4 improves the toughness of the surrounding rock at multiple angles, avoiding the continuous expansion of the rock burst area. The rock wall of the tunnel 1 is further covered by the cooperation of the steel mesh 12 and the reinforcement steel plate 2 as well as the support frame 31 and the adjustment plate 32. When the rock burst occurs, it can be deformed in time to absorb the energy generated by the rock burst impact, avoid the rock from breaking and falling to cause harm to personnel, improve the self-bearing capacity of the rock wall and the support effect on the rock wall, and provide a safer construction environment for subsequent tunnel 1 construction, support and other operations.
[0043] The present invention is described by preferred embodiments, and those skilled in the art will appreciate that various changes or equivalent substitutions may be made to these features and embodiments without departing from the spirit and scope of the present invention. The present invention is not limited to the specific embodiments disclosed herein, and other embodiments falling within the claims of this application are within the scope of protection of the present invention.
Claims
1. A method for reinforcing a tunnel section with strip-shaped rock burst, comprising a reinforcement structure, the reinforcement structure comprising a plurality of groups of anchor rods (11) and reinforcement rods (4) distributed along the strip-shaped rock burst detachment area of the inner wall of the tunnel (1), the anchor rods (11) and reinforcement rods (4) being distributed at intervals, a steel mesh (12) being laid on the inner wall of the tunnel (1), the steel mesh (12) passing through the anchor rods (11) and reinforcement rods (4); A support assembly is provided on the side of the steel mesh (12) away from the inner wall of the tunnel (1), the support assembly comprising a support device (3) for supporting the top side of the tunnel (1) and reinforcement steel plates (2) supporting both sides of the tunnel (1), and a connection assembly (5) for supporting upward is provided on one side of the two groups of reinforcement steel plates (2) close to each other, and one end of the connection assembly (5) is supported on the bottom side of the support device (3); the support device (3) comprises a support frame (31) abutting against the steel mesh (12), and adjustment plates (32) slidably connected to the slide grooves (33) are provided inside the two ends of the support frame (31), and the end of the adjustment plate (32) away from the support frame (31) is rotatably connected to the fixed end of the top side of the reinforcement steel plate (2); Both sides of the adjustment plate (32) close to one end of the support frame (31) are rotatably connected to the inner wall of the support frame (31), and both ends of the support frame (31) are provided with movable openings (34) that cooperate with the rotation of the adjustment plate (32); The support frame (31) and the adjustment plate (32) are adapted to the shape of the arched area where the steel mesh (12) is connected to the top side of the inner wall of the tunnel (1); The connecting assembly (5) comprises a supporting portion (51) and connecting portions (52) that are telescopically adjustable along both ends of the supporting portion (51); a fixing portion (53) that is slidably connected to the reinforcing steel plate (2) is provided at one end of the connecting portion (52) away from the supporting portion (51); the fixing portion (53) is fixedly connected to the reinforcing steel plate (2) via a set screw (55); and a supporting member for supporting the support frame (31) is provided on the top side of the supporting portion (51); The support member comprises a telescopic rod (54) arranged on the top side of the support portion (51); a movable end of the telescopic rod (54) is provided with a support plate (56) abutting against the bottom side of the support frame (31); the support plate (56) and the support frame (31) are fixedly connected via a fixing rod (35); and the characteristics are: The following steps are involved: Step 1: Use a mobile water tank and a high-pressure nozzle to spray along the blasted rock wall to moisten the rock surface and lower the temperature of the rock wall, and spray a layer of concrete on the cleaned rock surface of the tunnel (1); Step 2: drilling holes at equal intervals along the rock wall of the tunnel (1) after blasting, inserting anchor rods (11) and pre-tightening them, wherein the spacing between the anchor rods (11) is not more than 2 m; Step 3: The steel mesh (12) is placed close to the rock wall and fixedly connected to the exposed ring sleeve of the anchor rod (11) by using an iron ring, and a reinforcing rod (4) is installed between every two groups of anchor rods (11), and the anchor rods (11) and the reinforcing rods (4) are distributed at equal angles along the axial direction of the tunnel (1); Step 4: The reinforcing steel plate (2) passes through the reinforcing end (41) of the reinforcing rod (4) and is closely attached to the steel mesh (12) on both sides. By adjusting the length and angle of the adjusting plates (32) at both ends of the supporting frame (31), the supporting frame (31) and the adjusting plates (32) pass through the reinforcing end (41) and are closely attached to the arched area of the steel mesh (12). A locking ring is installed at the end of the reinforcing end (41) away from the rock wall to fix the connection between the adjusting plates (32), the reinforcing steel plate (2) and the steel mesh (12) and the rock wall. Step 5: Adjust the connecting parts (52) at both ends so that the fixing part (53) slides along one side of the reinforcing steel plate (2) and moves until the supporting plate (56) abuts against the bottom side of the support frame (31). After fixing the position of the supporting part (51) with the set screws (55), the supporting plate (56) is supported on the bottom side of the support frame (31) by the telescopic rod (54) and fixed with the fixing rod (35) to ensure the reinforcement effect of the support frame (31) on the rock wall.
2. A method for reinforcing a tunnel strip rock burst section according to claim 1, characterized in that: The reinforcing rod (4) comprises a reinforcing end (41) that passes through a steel mesh (12) and a reinforcing steel plate (2) and is arranged in the tunnel (1); one end of the reinforcing end (41) arranged inside the tunnel (1) is provided with a spike portion (42); and an outer wall of the reinforcing end (41) is provided with an anchoring steel sheet (43).
3. A method for reinforcing a tunnel strip rock burst section according to claim 2, characterized in that: The anchoring steel sheets (43) are distributed at equal intervals around the outer wall of the reinforcement end (41), and at least two groups are arranged along the axial direction of the reinforcement end (41).
Citation Information
Patent Citations
Adaptive composite lining structure suitable for large-deformation soft rock tunnel
CN110206560A
U type shed capable of extending to change diameter
CN110985065A
Rolling hinge joint anchor beam supporting method suitable for soft rock large-deformation tunnel
CN114109437A
Tunnel surrounding rock supporting system
CN114412526A
Strong rockburst section tunnel supporting structure
CN209115122U