A bridge crack repair device and its use method

By introducing unit filler plates and infusion diversion structures into the bridge crack repair device, the problems of adaptability to irregular cracks and insufficient infusion diversion in the prior art are solved, and a more efficient repair effect is achieved.

CN114922102BActive Publication Date: 2024-11-26JIANTAI CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210769476.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-06-30
Publication Date
2024-11-26
Estimated Expiration
2042-06-30

AI Technical Summary

Technical Problem

The existing bridge crack repair devices are only suitable for regular cracks, making it difficult to deal with irregular cracks, and lacking an effective infusion diversion structure, resulting in poor conditions such as hollowing during the infusion process.

Method used

A bridge crack repair device was designed, using unit-filled insert plates, including vertical and horizontal groove structures of perfusion diversion. Combined with anchor rods and jaw mechanisms, it can adapt to regular and irregular cracks, and avoid empty space through perfusion diversion structures. Drum phenomenon.

Benefits of technology

The device can effectively adapt to different types of cracks, ensure the smooth progress of the infusion process, avoid hollowing, and improve the applicability and quality of repair.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114922102B_ABST
    Figure CN114922102B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of bridge crack repair, and specifically relates to a bridge crack repair device and a method of using the same, the device comprising a unit filling plug plate, a plurality of storage slots are arranged in parallel in the middle of the unit filling plug plate, movable slots are symmetrically provided on the inner walls on both sides of the storage slot, a support shaft is provided in the movable slots on both sides for common sliding restriction, two claws are sleeved on the outer side of the support shaft, a pressing block is provided for sliding restriction of the storage slot, a threaded hole connected to the storage slot is provided on the unit filling plug plate, a downward pressing screw is screwed in the threaded hole, and a rotating groove is provided on the top of the pressing block. The structural design of the present invention is reasonable, the angle of the unit filling plug plate can be adjusted after being assembled, the applicability is good, and the repair requirements of regular and irregular cracks are met; the unit filling plug plate is provided with a perfusion guide structure composed of a perfusion guide vertical slot and a perfusion guide horizontal slot, which can effectively avoid the occurrence of hollowing and other undesirable conditions during the perfusion process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of bridge crack repair, and in particular relates to a bridge crack repair device and a use method thereof. Background Art

[0002] Since cracks can appear on bridges due to a variety of reasons, it is necessary to find out the reasons when cracks appear on bridges. If the cracks on the bridge are only surface problems and do not involve the internal structure, surface repair methods are usually used to repair the cracks on the bridge surface. Because when using surface repair methods to repair cracks, resin glue is usually used to seal the cracks. This method basically does not have a significant impact on the structural bearing capacity of concrete. When the cracks on the bridge have affected the internal structure, the surface repair method alone can no longer meet the repair requirements. At this time, the grouting method must be used to treat the cracks. When grouting is done, a solidifiable fluid material is injected into the cracks by pressure to improve the physical properties of the cracks.

[0003] The patent specification with publication number CN108755333B discloses a road bridge crack repair device, including a first connecting member placed in a crack cleaning pit, the first connecting member is a semi-cylindrical body, the concave surface of the semi-cylindrical body faces upward, and a plurality of mounting holes 1 are evenly opened on the arc surface of the semi-cylindrical body, a first nail body connected to the old concrete layer is arranged in the mounting hole 1, a second connecting member is arranged above the first connecting member, a plurality of mounting holes 2 are opened in the middle of the second connecting member, a countersunk screw connected to the first connecting member is arranged in the mounting hole 2, a protective layer is arranged above the second connecting member, the protective layer includes a wire mesh layer fixed to the second connecting member, a carbon fiber cloth layer is arranged above the wire mesh layer, a waterproof layer is arranged above the carbon fiber cloth layer, and a surface layer is arranged above the waterproof layer.

[0004] However, this road bridge crack repair device has some shortcomings. First, it is only suitable for relatively regular cracks. When the cracks are irregular, it is difficult to install the first connector and subsequent operations cannot be carried out smoothly. Second, it does not have an effective pouring diversion structure, which leads to hollowing and other undesirable conditions during the pouring process. Therefore, optimization and improvement are needed. Summary of the invention

[0005] The purpose of the present invention is to overcome the above-mentioned problems existing in the traditional technology and provide a bridge crack repairing device.

[0006] In order to achieve the above technical objectives and the above technical effects, the present invention is implemented through the following technical solutions:

[0007] A bridge crack repair device, the device includes a unit filling plug plate, a plurality of receiving grooves are arranged in parallel in the middle of the unit filling plug plate, movable grooves are symmetrically opened on the inner walls of the two sides of the receiving groove, support shafts are slidably restricted in the movable grooves on both sides, the support shaft is located in the receiving groove and two claws are sleeved on the outer side of the shaft body, the receiving groove is located above the claws and is slidably restricted with a pressure block, a threaded hole connected to the receiving groove is opened inwardly at the top end of the unit filling plug plate, a pressing screw is screwed in the threaded hole, and a rotating groove matching the bottom end of the pressing screw is provided at the top end of the pressing block.

[0008] Furthermore, in the above-mentioned bridge crack repair device, a plurality of vertical pouring diversion grooves are opened inwardly at the upper end of the unit filling plug plate, and a plurality of rows of horizontal pouring diversion grooves connected with the vertical pouring diversion grooves are opened along the thickness direction at the side end of the unit filling plug plate.

[0009] Furthermore, in the above-mentioned bridge crack repairing device, both ends of the unit filling plug plate are respectively provided with connecting protrusions with staggered heights, and the connecting protrusions are provided with anchor holes for passing anchor rods.

[0010] Furthermore, in the above-mentioned bridge crack repairing device, the bottom end of the pressing screw is a T-shaped head, and the rotating groove at the top end of the pressing block is a T-shaped rotating groove.

[0011] Furthermore, in the above-mentioned bridge crack repair device, a bevel is provided on one side of the bottom end of the clamping claw to facilitate its flipping after being subjected to downward pressure, and an arch portion is provided in the middle of the top end of the receiving groove, the height of which gradually decreases from the middle end to both sides.

[0012] Furthermore, in the above-mentioned bridge crack repairing device, a threaded joint is provided at the top of the pouring diversion vertical groove to facilitate the installation of a feed pipe.

[0013] Furthermore, in the above-mentioned bridge crack repairing device, the unit filling plug plate is made of stainless steel material or ceramic material, and the support shaft and the claw are made of stainless steel material.

[0014] Furthermore, in the above-mentioned bridge crack repairing device, the unit filling plug plate is an integrated structure.

[0015] Furthermore, in the above-mentioned bridge crack repairing device, the unit filling plug plate is a split structure, which is formed by two blocks fixed and spliced ​​together by bolts.

[0016] Furthermore, the method for using the above bridge crack repair device comprises the following steps:

[0017] S1. Clean the cracks that have affected the internal structure of the bridge, and remove the rotten and loose residues at the cracks along the cracking direction to form crack grooves;

[0018] S2. Determine the number of unit filling plugs according to the number and direction of the crack grooves, and make preliminary connections using anchor rods;

[0019] S3, insert the connected unit filling plug plate into the crack groove, use the anchor rod to drive into the crack groove foundation to fix the position of the unit filling plug plate, and then use the wrench to drive the pressing screw rod to rotate downward, and the claws are turned over under the pressure and tightly abut against the side wall of the crack groove;

[0020] S4, pouring cement repair slurry into the pouring diversion vertical groove of the unit filling plug plate until the cement repair slurry completely covers the unit filling plug plate to form a cement repair slurry layer;

[0021] S5. Arrange a carbon fiber cloth on the cement repair slurry layer, and apply a waterproof coating on the carbon fiber cloth to form a waterproof layer;

[0022] S6. Lay the concrete surface layer on top of the waterproof layer, smooth the surface layer until it is flush with the upper surface of the old concrete layer, and perform standard curing for 28 days.

[0023] The beneficial effects of the present invention are:

[0024] The structural design of the present invention is reasonable. On the one hand, the angle of the unit filling plug plate can be adjusted after being assembled, and the applicability is good, which meets the needs of repairing regular and irregular cracks. On the other hand, the interior of the unit filling plug plate is provided with a pouring guide structure composed of a pouring guide vertical groove and a pouring guide horizontal groove, which can effectively avoid the occurrence of hollowing and other adverse conditions during the pouring process.

[0025] Of course, any product implementing the present invention does not necessarily need to achieve all of the above advantages at the same time. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for describing the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.

[0027] Figure 1 It is a schematic diagram of the use state of the present invention;

[0028] Figure 2 It is a schematic diagram of the structure of the clamping claws when they are stored in the present invention;

[0029] Figure 3 It is a schematic diagram of the structure of the clamping claws when they are unfolded in the present invention;

[0030] Figure 4 It is a schematic diagram of the structural decomposition of the present invention;

[0031] Figure 5 It is a connection combination schematic diagram of the present invention;

[0032] Figure 6 This is a schematic diagram of the structure of the unit filling plug board in Embodiment 1 / 2 of the present invention;

[0033] Figure 7 This is a schematic diagram of the structure of the unit filling plug board in Embodiment 3 / 4 of the present invention;

[0034] Figure 8 This is a schematic diagram of the structure decomposition of the unit filling plug board in the third / fourth embodiment of the present invention;

[0035] In the accompanying drawings, the reference numerals of the various components are as follows:

[0036] 1-unit filling plug plate, 2-storage slot, 3-movable slot, 4-support shaft, 5-claw, 6-pressure block, 7-pressing screw, 8-casting diversion vertical slot, 9-casting diversion horizontal slot, 10-connecting protrusion, 11-anchor hole, 12-bolt, 13-anchor rod, 14-crack slot foundation, 15-cement repair slurry layer, 16-waterproof layer, 17-concrete surface layer. DETAILED DESCRIPTION

[0037] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0038] Embodiment 1

[0039] See also Figure 1-Figure 6 As shown, this embodiment is a bridge crack repair device, which includes a unit filling plug plate 1, a plurality of receiving grooves 2 are arranged in parallel in the middle of the unit filling plug plate 1, and movable grooves 3 are symmetrically opened on the inner walls of both sides of the receiving grooves 2. A support shaft 4 is slidably restricted in common in the movable grooves 3 on both sides, and two claws 5 are sleeved on the outer side of the shaft body of the support shaft 4 located in the receiving groove 2. A pressing block 6 is slidably restricted above the claws 5 in the receiving groove 2, and a threaded hole connected to the receiving groove 2 is opened inwardly at the top of the unit filling plug plate 1, and a pressing screw 7 is screwed in the threaded hole, and a rotating groove matching the bottom end of the pressing screw 7 is provided at the top of the pressing block 6. The bottom end of the pressing screw 7 is a T-shaped head, and the rotating groove at the top of the pressing block 6 is a T-shaped rotating groove.

[0040] In this embodiment, a plurality of vertical pouring guide grooves 8 are provided inwardly at the upper end of the unit filling plug plate 1, and a plurality of rows of horizontal pouring guide grooves 9 connected to the vertical pouring guide grooves 8 are provided at the side end of the unit filling plug plate 1 along the thickness direction. A threaded joint is provided at the top of the vertical pouring guide groove 8 for facilitating the installation of a feed pipe.

[0041] In this embodiment, both ends of the unit filling plug board 1 are respectively provided with connecting protrusions 10 with staggered heights, and the connecting protrusions 10 are provided with anchor holes 11 for passing the anchor rods 13 .

[0042] In this embodiment, a bevel is provided on one side of the bottom end of the claw 5 to facilitate its flipping after receiving downward pressure, and an arch portion is provided in the middle of the top end of the storage groove 2, the height of which gradually decreases from the middle end to both sides.

[0043] In this embodiment, the unit filling plug plate 1, the support shaft 4 and the claw 5 are made of stainless steel. The unit filling plug plate 1 is an integrated structure.

[0044] The method for using the bridge crack repair device in this embodiment includes the following steps:

[0045] S1. Clean the cracks that have affected the internal structure of the bridge, and remove the rotten and loose residues at the cracks along the cracking direction to form crack grooves;

[0046] S2. Determine the number of unit filling plates 1 according to the number and direction of the crack grooves, and make preliminary connections using anchor rods 13;

[0047] S3, insert the connected unit filling plug plate 1 into the crack groove, use the anchor rod 13 to drive into the crack groove foundation 14 to fix the position of the unit filling plug plate 1, and then use a wrench to drive the pressing screw 7 to rotate downward, and the claw 5 is turned over under the pressure and tightly abuts against the side wall of the crack groove;

[0048] S4, pouring cement repair slurry into the pouring diversion vertical groove 8 of the unit filling plug plate 1 until the cement repair slurry completely covers the unit filling plug plate 1 to form a cement repair slurry layer 15;

[0049] S5, arranging a carbon fiber cloth on the cement repair slurry layer 15, and applying a waterproof coating on the carbon fiber cloth to form a waterproof layer 16;

[0050] S6. Lay the concrete surface layer 17 on the waterproof layer 16, smooth the surface layer until it is flush with the upper surface of the old concrete layer, and perform standard curing for 28 days.

[0051] Embodiment 1

[0052] See also Figure 1-Figure 6As shown, this embodiment is a bridge crack repair device, which includes a unit filling plug plate 1, a plurality of receiving grooves 2 are arranged in parallel in the middle of the unit filling plug plate 1, and movable grooves 3 are symmetrically opened on the inner walls of both sides of the receiving grooves 2. A support shaft 4 is slidably restricted in common in the movable grooves 3 on both sides, and two claws 5 are sleeved on the outer side of the shaft body of the support shaft 4 located in the receiving groove 2. A pressing block 6 is slidably restricted above the claws 5 in the receiving groove 2, and a threaded hole connected to the receiving groove 2 is opened inwardly at the top of the unit filling plug plate 1, and a pressing screw 7 is screwed in the threaded hole, and a rotating groove matching the bottom end of the pressing screw 7 is provided at the top of the pressing block 6. The bottom end of the pressing screw 7 is a T-shaped head, and the rotating groove at the top of the pressing block 6 is a T-shaped rotating groove.

[0053] In this embodiment, a plurality of vertical pouring guide grooves 8 are provided inwardly at the upper end of the unit filling plug plate 1, and a plurality of rows of horizontal pouring guide grooves 9 connected to the vertical pouring guide grooves 8 are provided at the side end of the unit filling plug plate 1 along the thickness direction. A threaded joint is provided at the top of the vertical pouring guide groove 8 for facilitating the installation of a feed pipe.

[0054] In this embodiment, both ends of the unit filling plug board 1 are respectively provided with connecting protrusions 10 with staggered heights, and the connecting protrusions 10 are provided with anchor holes 11 for passing the anchor rods 13 .

[0055] In this embodiment, a bevel is provided on one side of the bottom end of the claw 5 to facilitate its flipping after receiving downward pressure, and an arch portion is provided in the middle of the top end of the storage groove 2, the height of which gradually decreases from the middle end to both sides.

[0056] In this embodiment, the cell filling insert plate 1 is made of ceramic material, and the support shaft 4 and the claw 5 are made of stainless steel material. The cell filling insert plate 1 is an integrated structure.

[0057] The method for using the bridge crack repair device in this embodiment includes the following steps:

[0058] S1. Clean the cracks that have affected the internal structure of the bridge, and remove the rotten and loose residues at the cracks along the cracking direction to form crack grooves;

[0059] S2. Determine the number of unit filling plates 1 according to the number and direction of the crack grooves, and make preliminary connections using anchor rods 13;

[0060] S3, insert the connected unit filling plug plate 1 into the crack groove, use the anchor rod 13 to drive into the crack groove foundation 14 to fix the position of the unit filling plug plate 1, and then use a wrench to drive the pressing screw 7 to rotate downward, and the claw 5 is turned over under the pressure and tightly abuts against the side wall of the crack groove;

[0061] S4, pouring cement repair slurry into the pouring diversion vertical groove 8 of the unit filling plug plate 1 until the cement repair slurry completely covers the unit filling plug plate 1 to form a cement repair slurry layer 15;

[0062] S5, arranging a carbon fiber cloth on the cement repair slurry layer 15, and applying a waterproof coating on the carbon fiber cloth to form a waterproof layer 16;

[0063] S6. Lay the concrete surface layer 17 on the waterproof layer 16, smooth the surface layer until it is flush with the upper surface of the old concrete layer, and perform standard curing for 28 days.

[0064] Embodiment 3

[0065] See also Figure 1-Figure 5 , Figure 7-Figure 8 As shown, this embodiment is a bridge crack repair device, which includes a unit filling plug plate 1, a plurality of receiving grooves 2 are arranged in parallel in the middle of the unit filling plug plate 1, and movable grooves 3 are symmetrically opened on the inner walls of both sides of the receiving grooves 2. A support shaft 4 is slidably restricted in the movable grooves 3 on both sides, and two claws 5 are sleeved on the outer side of the shaft body of the support shaft 4 located in the receiving groove 2. A pressing block 6 is slidably restricted above the claws 5 in the receiving groove 2, and a threaded hole connected to the receiving groove 2 is opened inwardly at the top of the unit filling plug plate 1, and a pressing screw 7 is screwed in the threaded hole, and a rotating groove matching the bottom end of the pressing screw 7 is provided at the top of the pressing block 6. The bottom end of the pressing screw 7 is a T-shaped head, and the rotating groove at the top of the pressing block 6 is a T-shaped rotating groove.

[0066] In this embodiment, a plurality of vertical pouring guide grooves 8 are provided inwardly at the upper end of the unit filling plug plate 1, and a plurality of rows of horizontal pouring guide grooves 9 connected to the vertical pouring guide grooves 8 are provided at the side end of the unit filling plug plate 1 along the thickness direction. A threaded joint is provided at the top of the vertical pouring guide groove 8 for facilitating the installation of a feed pipe.

[0067] In this embodiment, both ends of the unit filling plug board 1 are respectively provided with connecting protrusions 10 with staggered heights, and the connecting protrusions 10 are provided with anchor holes 11 for passing the anchor rods 13 .

[0068] In this embodiment, a bevel is provided on one side of the bottom end of the claw 5 to facilitate its flipping after receiving downward pressure, and an arch portion is provided in the middle of the top end of the storage groove 2, the height of which gradually decreases from the middle end to both sides.

[0069] In this embodiment, the unit filling plug board 1 , the support shaft 4 and the claw 5 are all made of stainless steel. The unit filling plug board 1 is a split structure, which is formed by two blocks fixedly spliced ​​together by bolts 12 .

[0070] The method for using the bridge crack repair device in this embodiment includes the following steps:

[0071] S1. Clean the cracks that have affected the internal structure of the bridge, and remove the rotten and loose residues at the cracks along the cracking direction to form crack grooves;

[0072] S2. Determine the number of unit filling plates 1 according to the number and direction of the crack grooves, and make preliminary connections using anchor rods 13;

[0073] S3, insert the connected unit filling plug plate 1 into the crack groove, use the anchor rod 13 to drive into the crack groove foundation 14 to fix the position of the unit filling plug plate 1, and then use a wrench to drive the pressing screw 7 to rotate downward, and the claw 5 is turned over under the pressure and tightly abuts against the side wall of the crack groove;

[0074] S4, pouring cement repair slurry into the pouring diversion vertical groove 8 of the unit filling plug plate 1 until the cement repair slurry completely covers the unit filling plug plate 1 to form a cement repair slurry layer 15;

[0075] S5, arranging a carbon fiber cloth on the cement repair slurry layer 15, and applying a waterproof coating on the carbon fiber cloth to form a waterproof layer 16;

[0076] S6. Lay the concrete surface layer 17 on the waterproof layer 16, smooth the surface layer until it is flush with the upper surface of the old concrete layer, and perform standard curing for 28 days.

[0077] Embodiment 4

[0078] See also Figure 1-Figure 5 , Figure 7-Figure 8 As shown, this embodiment is a bridge crack repair device, which includes a unit filling plug plate 1, a plurality of receiving grooves 2 are arranged in parallel in the middle of the unit filling plug plate 1, and movable grooves 3 are symmetrically opened on the inner walls of both sides of the receiving grooves 2. A support shaft 4 is slidably restricted in common in the movable grooves 3 on both sides, and two claws 5 are sleeved on the outer side of the shaft body of the support shaft 4 located in the receiving groove 2. A pressing block 6 is slidably restricted above the claws 5 in the receiving groove 2, and a threaded hole connected to the receiving groove 2 is opened inwardly at the top of the unit filling plug plate 1, and a pressing screw 7 is screwed in the threaded hole, and a rotating groove matching the bottom end of the pressing screw 7 is provided at the top of the pressing block 6. The bottom end of the pressing screw 7 is a T-shaped head, and the rotating groove at the top of the pressing block 6 is a T-shaped rotating groove.

[0079] In this embodiment, a plurality of vertical pouring guide grooves 8 are provided inwardly at the upper end of the unit filling plug plate 1, and a plurality of rows of horizontal pouring guide grooves 9 connected to the vertical pouring guide grooves 8 are provided at the side end of the unit filling plug plate 1 along the thickness direction. A threaded joint is provided at the top of the vertical pouring guide groove 8 for facilitating the installation of a feed pipe.

[0080] In this embodiment, both ends of the unit filling plug board 1 are respectively provided with connecting protrusions 10 with staggered heights, and the connecting protrusions 10 are provided with anchor holes 11 for passing the anchor rods 13 .

[0081] In this embodiment, a bevel is provided on one side of the bottom end of the claw 5 to facilitate its flipping after receiving downward pressure, and an arch portion is provided in the middle of the top end of the storage groove 2, the height of which gradually decreases from the middle end to both sides.

[0082] In this embodiment, the unit filling plug board 1 is made of ceramic material, and the support shaft 4 and the claw 5 are made of stainless steel material. The unit filling plug board 1 is a split structure, which is formed by two blocks fixedly spliced ​​by bolts 12.

[0083] The method for using the bridge crack repair device in this embodiment includes the following steps:

[0084] S1. Clean the cracks that have affected the internal structure of the bridge, and remove the rotten and loose residues at the cracks along the cracking direction to form crack grooves;

[0085] S2. Determine the number of unit filling plates 1 according to the number and direction of the crack grooves, and make preliminary connections using anchor rods 13;

[0086] S3, insert the connected unit filling plug plate 1 into the crack groove, use the anchor rod 13 to drive into the crack groove foundation 14 to fix the position of the unit filling plug plate 1, and then use a wrench to drive the pressing screw 7 to rotate downward, and the claw 5 is turned over under the pressure and tightly abuts against the side wall of the crack groove;

[0087] S4, pouring cement repair slurry into the pouring diversion vertical groove 8 of the unit filling plug plate 1 until the cement repair slurry completely covers the unit filling plug plate 1 to form a cement repair slurry layer 15;

[0088] S5, arranging a carbon fiber cloth on the cement repair slurry layer 15, and applying a waterproof coating on the carbon fiber cloth to form a waterproof layer 16;

[0089] S6. Lay the concrete surface layer 17 on the waterproof layer 16, smooth the surface layer until it is flush with the upper surface of the old concrete layer, and perform standard curing for 28 days.

[0090] The preferred embodiments of the present invention disclosed above are only used to help explain the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to specific implementation methods. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.

Claims

1. A bridge crack repair device, characterized in that: The device comprises a unit filling plug plate, a plurality of receiving grooves are arranged in parallel in the middle of the unit filling plug plate, movable grooves are symmetrically provided on the inner walls of both sides of the receiving groove, a support shaft is slidably restricted in common in the movable grooves on both sides, two claws are sleeved on the outer side of the shaft body of the support shaft located in the receiving groove, a pressing block is slidably restricted in the upper part of the receiving groove, a threaded hole communicating with the receiving groove is provided inwardly at the top end of the unit filling plug plate, a pressing screw is screwed in the threaded hole, and a rotating groove matching with the bottom end of the pressing screw is provided at the top end of the pressing block; The upper end of the unit filling plug plate is provided with a plurality of vertical perfusion guide grooves inwardly, and the side end of the unit filling plug plate is provided with a plurality of rows of horizontal perfusion guide grooves connected with the vertical perfusion guide grooves along the thickness direction; Both ends of the unit filling plug plate are respectively provided with connecting protrusions with staggered heights, and the connecting protrusions are provided with anchor holes for passing anchor rods; A bevel is provided on one side of the bottom end of the claw to facilitate its flipping after receiving downward pressure, and an arch portion is provided in the middle of the top end of the storage groove, the height of which gradually decreases from the middle end to both sides; The method of using the device comprises the following steps: S1. Clean the cracks that have affected the internal structure of the bridge, and remove the rotten and loose residues at the cracks along the cracking direction to form crack grooves; S2. Determine the number of unit filling plugs according to the number and direction of the crack grooves, and make preliminary connections using anchor rods; S3, insert the connected unit filling plug plate into the crack groove, use the anchor rod to drive into the crack groove foundation to fix the position of the unit filling plug plate, and then use the wrench to drive the pressing screw rod to rotate downward, and the claws are turned over under the pressure and tightly abut against the side wall of the crack groove; S4, pouring cement repair slurry into the pouring diversion vertical groove of the unit filling plug plate until the cement repair slurry completely covers the unit filling plug plate to form a cement repair slurry layer; S5. Arrange a carbon fiber cloth on the cement repair slurry layer, and apply a waterproof coating on the carbon fiber cloth to form a waterproof layer; S6. Lay the concrete surface layer on top of the waterproof layer, smooth the surface layer until it is flush with the upper surface of the old concrete layer, and perform standard curing for 28 days.

2. The bridge crack repair device according to claim 1, characterized in that: The bottom end of the pressing screw is a T-shaped head, and the rotating groove at the top end of the pressing block is a T-shaped rotating groove.

3. The bridge crack repair device according to claim 1, characterized in that: The top of the perfusion diversion vertical groove is provided with a threaded joint for facilitating installation of a feed pipe.

4. The bridge crack repair device according to claim 1, characterized in that: The unit filling plug plate is made of stainless steel or ceramic material, and the support shaft and the claw are made of stainless steel.

5. The bridge crack repair device according to any one of claims 1 to 4, characterized in that: The unit filling plug board is an integrated structure.