A method for evaluating slope dynamic stability based on fuzzy set theory

By describing the influencing factors through fuzzy set theory and membership function, combined with the principle of fuzzy transformation, it solves the problem that traditional methods are difficult to quickly and effectively assess the stability of rock slopes, achieves more accurate multi-factor analysis and evaluation, and ensures the stability of slope engineering. Security.

CN114925508BActive Publication Date: 2024-10-08CHINA ROAD & BRIDGE +1
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202210481781.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-05-05
Publication Date
2024-10-08
Estimated Expiration
2042-05-05

AI Technical Summary

Technical Problem

Traditional dynamic stability evaluation methods are difficult to quickly and effectively determine the stability of rock slopes in actual projects, and the influencing factors are complex and difficult to quantitatively analyze.

Method used

A slope dynamic stability evaluation method based on fuzzy set theory is used to describe the influencing factors through membership functions. The fuzzy transformation principle is used to realize multi-factor and multi-level dynamic stability analysis and evaluation, determine the weight of each influencing factor, and construct a fuzzy evaluation. Matrix for comprehensive evaluation.

Benefits of technology

It improves the objectivity and accuracy of dynamic stability evaluation, can quickly and effectively determine the dynamic stability of rocks, and achieve safe construction of slope projects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114925508B_ABST
    Figure CN114925508B_ABST
Patent Text Reader

Abstract

The present invention discloses a slope dynamic stability evaluation method based on fuzzy set theory, comprising the steps of S1. classifying the slope; S2. determining the influencing factors of the slope dynamic stability, quantifying and calculating them; S3. constructing a membership function; S4. determining the weight distribution A i ; S5. Construct fuzzy evaluation matrix R k ; S6. According to the fuzzy comprehensive evaluation model B k =A k ·R k Conduct a comprehensive evaluation on each factor and subset; S7. Conduct a comprehensive secondary evaluation on each influencing factor based on the fuzzy comprehensive evaluation model B=A·R; S8. Classify the slope stability according to the evaluation value interval to which the fuzzy evaluation result belongs; This method applies fuzzy mathematics theory to dynamic stability analysis and evaluation, and uses membership function to describe fuzzy influencing factors. It can effectively and quickly determine the dynamic stability of rocks and realize safe construction of slope engineering.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of slope engineering stability evaluation, and in particular to a slope dynamic stability evaluation method based on fuzzy set theory. Background Art

[0002] my country has a vast territory, complex topography, and numerous artificially excavated and naturally formed slopes. It is one of the countries with the most serious landslide disasters. Therefore, how to scientifically manage slope information and reasonably and effectively determine the stability of rock slopes has become an urgent problem to be solved.

[0003] For a mountain highway or railway with a length of more than 1,000 kilometers, the number of rock slopes is huge, the construction conditions and geological environment are complex, and the management of slope information and stability evaluation are difficult. In addition, the nature and stability of the slope rock mass are unclear, and the factors affecting dynamic stability are numerous and complex, and the degree of influence of various factors is difficult to quantitatively analyze. Therefore, traditional dynamic stability evaluation methods, such as the limit equilibrium method and the reduced strength method, are difficult to quickly and effectively determine the stability of specific slopes in actual projects.

[0004] The birth of fuzzy mathematics provides a powerful tool for solving the problem of pattern discrimination such as dynamic stability which is controlled by multiple factors; with the development of fuzzy mathematics, the concept of fuzzy sets has gradually been accepted by people; fuzzy sets are mainly used to quantitatively describe the concept of fuzziness. It is a bridge connecting the certainty and fuzziness of things, and is the generalization of ordinary sets in concept and scope; fuzzy sets can quantitatively describe the fuzziness of things, which makes it possible to objectively evaluate dynamic stability.

[0005] Therefore, how to effectively apply fuzzy mathematics theory to dynamic stability analysis and evaluation, use membership function instead of the either-or characteristic function in determinism to describe the fuzzy influencing factors, and use fuzzy transformation principle to realize multi-factor and multi-level dynamic stability analysis and evaluation has become the main problem that needs to be solved urgently in this field. Summary of the invention

[0006] In view of the above-mentioned problems, the present invention aims to provide a slope dynamic stability evaluation method based on fuzzy set theory. The method applies fuzzy mathematics theory to dynamic stability analysis and evaluation, uses membership function instead of the either-or characteristic function in determinism to describe the fuzzy influencing factors, and uses fuzzy transformation principle to realize multi-factor and multi-level dynamic stability analysis and evaluation. It can effectively and quickly determine the dynamic stability of rocks and realize safe construction of slope projects.

[0007] In order to achieve the above object, the technical solution adopted by the present invention is as follows:

[0008] A slope dynamic stability evaluation method based on fuzzy set theory includes the following steps:

[0009] S1. Classify slopes according to slope engineering practice and project experience;

[0010] S2. Determine the factors affecting the dynamic stability of the slope, quantify them and calculate them;

[0011] S3. Constructing a membership function based on the quantified factors affecting slope dynamic stability;

[0012] S4. Determine the weight of each influencing factor A i ;

[0013] S5. Evaluate all factors according to the membership function to obtain the fuzzy vector, which further forms the fuzzy evaluation matrix R k ; Use weight distribution A i and the fuzzy evaluation matrix R k Evaluation of dynamic stability of slopes.

[0014] Preferably, the influencing factors described in step S2 include rebound value, rock mass integrity coefficient, comprehensive relative penetration of structural surface, comprehensive stability coefficient of rock slope and number of unstable block types exposed on the rock slope.

[0015] Preferably, the membership function construction process described in step S3 includes:

[0016] The fuzzy statistical method is used to conduct statistical research on rock slope samples and to construct the membership function by fitting with polynomials.

[0017] Preferably, the fuzzy matrix R described in step S5 k The calculation process includes

[0018] S501. Evaluate all factors according to the above membership function to obtain the fuzzy vector, r i =[r i1 ,r i2 ,r i3 ], i is the slope dynamic stability factor, i = 1, 2, ..., 5;

[0019] S502. The r of step S501 i Combine them to get the fuzzy evaluation matrix R k .

[0020] Preferably, the slope dynamic stability evaluation method further comprises the steps of:

[0021] S6. Based on the fuzzy comprehensive evaluation model B k =A k ·Rk Comprehensively evaluate each factor and subset;

[0022] S7. Conduct a comprehensive secondary evaluation of each influencing factor based on the fuzzy comprehensive evaluation model B=A·R;

[0023] S8. Classify the slope stability according to the evaluation value interval to which the fuzzy evaluation result belongs.

[0024] Preferably, the slope dynamic stability factors described in step S2 include topography, geological structure and geological action, climate factors and other factors.

[0025] Preferably, the membership function construction process described in step S3 includes:

[0026] (1) A ridge-shaped membership function is used to construct the membership function of the quantitative factors affecting dynamic stability;

[0027] (2) The trapezoidal membership function is used to construct the membership function of the qualitative factors affecting dynamic stability.

[0028] Preferably, the fuzzy matrix R described in step S5 k The calculation process includes

[0029] S501. Evaluate all factors according to the above membership function to obtain the fuzzy vector, r i =[r i1 ,r i2 ,r i3 ,r i4 ,r i5 ], i is the slope dynamic stability factor, i = 1, 2, ...;

[0030] S502. The r of step S501 i Combine them to get the fuzzy evaluation matrix R k .

[0031] Preferably, the fuzzy comprehensive evaluation model B described in step S6 k =A k ·R k The specific process of comprehensive evaluation of each factor and subset is to conduct comprehensive evaluation on each factor and subset separately, including

[0032] According to the subset U k The relative importance of each factor in the weight vector A k and the fuzzy evaluation matrix R k , and then calculate the corresponding subset level fuzzy vector B as follows k ,

[0033] B k=[b k1 ,b k2 ,b k3 ,b k4 ,b k5 ]=A k ·R k .

[0034] Preferably, the process of performing a secondary comprehensive evaluation on each factor according to the fuzzy comprehensive evaluation model B=A·R in step S7 includes:

[0035] S701. Calculate the fuzzy comprehensive evaluation model B according to the weight distribution A = [a1, a2, a3, a4] of each slope dynamic stability factor and the evaluation matrix R = [B1, B2, B3, B4];

[0036] Where i is the slope dynamic stability factor, i = 1, 2, 3, 4;

[0037] S702. Calculate the fuzzy evaluation result B of the slope according to B=A·R.

[0038] The beneficial effects of the present invention are as follows: the present invention discloses a slope dynamic stability evaluation method based on fuzzy set theory. Compared with the prior art, the present invention has the following improvements:

[0039] In view of the problem that the limit equilibrium method and the strength reduction method are difficult to effectively and quickly evaluate the specific dynamic stability in actual projects, the present invention designs a slope dynamic stability evaluation method based on fuzzy set theory. The method applies fuzzy set theory to dynamic stability analysis, comprehensively considers many factors affecting dynamic stability and determines the weight of each influencing factor, thereby improving the objectivity and accuracy of dynamic stability evaluation; at the same time, the method uses the fuzzy transformation principle to realize multi-factor and multi-level dynamic stability analysis and evaluation, and can effectively and quickly determine the dynamic stability of rocks, thereby realizing safe construction of slope projects. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] Figure 1 The present invention is an algorithm flow chart of the slope dynamic stability evaluation method based on fuzzy set theory. DETAILED DESCRIPTION

[0041] In order to enable those skilled in the art to better understand the technical solution of the present invention, the technical solution of the present invention is further described below in conjunction with the accompanying drawings and embodiments.

[0042] Example 1: Refer to the attached Figure 1 A slope dynamic stability evaluation method based on fuzzy set theory is shown, including the following steps:

[0043] S1. Classify slopes according to slope engineering practice and project experience;

[0044] S2. Determine the factors affecting the dynamic stability of the slope, quantify them and calculate them;

[0045] S3. Constructing a membership function based on the quantified factors affecting slope dynamic stability;

[0046] S4. Determine the weight distribution A i ;

[0047] S5. Evaluate all factors according to the membership function to obtain the fuzzy vector, which further forms the fuzzy evaluation matrix R k ;

[0048] S6. Based on the fuzzy comprehensive evaluation model B k =A k ·R k Comprehensively evaluate each factor and subset;

[0049] S7. Conduct a comprehensive secondary evaluation of each influencing factor based on the fuzzy comprehensive evaluation model B=A·R;

[0050] S8. Classify the slope stability according to the evaluation value interval to which the fuzzy evaluation result belongs.

[0051] Preferably, in step S1 of this embodiment, the rock slope stability level is divided into five categories, namely: stable, basically stable, potentially unstable, unstable and extremely unstable, which are represented by symbols Ⅰ, Ⅱ, Ⅲ, Ⅳ and Ⅴ respectively; specifically, the slope stability level classification is detailed as follows:

[0052] (1) Stable (Grade I) refers to the following types of slopes: There is no unified and regular main sliding control interface (zone): The main sliding zone is irregular and it is difficult to form a control interface (zone) for overall instability; The main sliding zone is horizontal or even tilted inward at the front edge; The saturated sliding resistance of the main sliding zone is sufficient to counteract the thrust of the rear rock mass. After analysis and field investigation, no main inducing factors that can lead to overall instability can be found or the main inducing factors are not obvious. There is no new source of deposits around the collapse and sliding body. The surface drainage ditch inside the collapse and sliding body has been formed and the layout is reasonable. The front edge has formed a river erosion stable slope shape, and there is no condition for the process of retrogression into the collapse and sliding body;

[0053] (2) Basic stability level (level II): The main difference from level I is that it has a roughly uniform and regular main sliding zone, and the overall inclination of the main sliding zone is not small or close to the steady-state slope of the landslide body. The saturated anti-sliding resistance along the main sliding zone has a certain margin;

[0054] (3) Potentially unstable level (III): The main difference from level II is that there is a main sliding zone and the main sliding slope is greater than the steady-state slope of the landslide body. The saturated anti-sliding resistance margin along the main sliding zone is not large or close to the critical steady state. Analysis and field investigation show that there are main inducing factors that lead to overall instability and the critical value of the inducing factors is not large. The surface of the landslide body is obviously transformed, and there are multiple deformations and instabilities in the local shallow layer and on both sides of the gully. The river erosion in the front edge is accompanied by local landslides;

[0055] (4) Unstable level (IV): After the formation of the landslide body, there have been several new deformations or disintegration instabilities, and the surface transformation is obvious and the unstable boundary is distributed. The landslide body was formed late and is still in the process of adjusting the deformation field and seepage field. The surface transformation process of the landslide body is still ongoing, and the front edge area has intensified. The rainfall and earthquakes that can cause the overall instability of the landslide body are very small. The deformation domain has appeared inside the landslide body and the deformation domain has a tendency to expand year by year;

[0056] (5) Extremely unstable level (V): New deformation cracks appear along the rear edge of the collapse and slide body or deformation cracks are widespread in the collapsed collapse and slide body, accompanied by bulging and collapse. The collapse and slide body is basically disintegrated and the deformation of each disintegrated unit is aggravated. Some units have even become unstable. The cracks that appear after a heavy rain may be signs of shallow deformation or deep deformation. The deformation domain refers to the deep deformation geological body.

[0057] S2. Determine the factors affecting the dynamic stability of the slope, quantify them and calculate them

[0058] In step S2 of this embodiment, based on domestic and foreign research results and national standards, following the principles of importance, independence and measurability, and taking into account actual engineering experience, fourteen factors are selected as the main factors affecting rock dynamic stability; specifically, the influencing factors and parameters are shown in Table 1;

[0059] Table 1: Dynamic stability factors (divided into five categories)

[0060]

[0061]

[0062] Preferably, in step S3 of this embodiment, firstly, considering the boundary fuzziness between slope grades and the transition state between grades, a ridge-shaped membership function is used to construct a membership function of the quantitative factors affecting dynamic stability. The specific function is as follows:

[0063] (1) Total slope

[0064]

[0065]

[0066]

[0067]

[0068]

[0069] (2) Total height of slope

[0070]

[0071]

[0072]

[0073]

[0074]

[0075] (3) Internal friction angle of rock mass

[0076]

[0077]

[0078]

[0079]

[0080]

[0081] (4) Slope rock mass cohesion

[0082]

[0083]

[0084]

[0085]

[0086]

[0087] (5) Initial geostress

[0088]

[0089]

[0090]

[0091]

[0092]

[0093] (6) Process rainfall

[0094]

[0095]

[0096]

[0097]

[0098]

[0099] (7) Maximum earthquake intensity

[0100]

[0101]

[0102]

[0103]

[0104]

[0105] Secondly, the qualitative factors are quantified. Specifically, the influence of the factors on dynamic stability is divided into five levels according to the normal distribution: very favorable (100 points); favorable (85 points); average (65 points); unfavorable (30 points); very unfavorable (10 points); or the influence of the factors: no (100 points); slight (85 points); weak (65 points); strong (30 points); very strong (10 points); the trapezoidal membership function is used to construct the membership function of the qualitative factors affecting dynamic stability. The specific formula is as follows:

[0106]

[0107]

[0108]

[0109]

[0110]

[0111] Preferably, in step S4 of this embodiment, the weight A of each influencing factor is determined by combining the expert score with the formula proposed in the relevant literature. i The weights of each factor are shown in Table 2:

[0112] Table 2: Weight table of various influencing factors (divided into five categories)

[0113]

[0114] Preferably, the fuzzy matrix R described in step S5 k The calculation process includes:

[0115] S501. Evaluate all factors according to the above membership function to obtain the fuzzy vector, r i =[r i1 ,r i2 ,r i3 ,r i4 ,r i5 ], i is the slope dynamic stability factor, i = 1, 2, ...;

[0116] S502. The r of step S501 i Combine them to get the fuzzy evaluation matrix R k .

[0117] Preferably, the fuzzy comprehensive evaluation model B described in step S6 k =A k ·R k The specific process of comprehensive evaluation of each factor and subset includes:

[0118] Comprehensive evaluation is performed on each factor and subset. Specifically, according to the subset U k The relative importance of each factor in the weight vector A k and the fuzzy evaluation matrix R k , and then calculate the corresponding subset level fuzzy vector B as follows k ,

[0119] B k =[b k1 ,b k2 ,b k3 ,b k4 ,b k5 ]=A k ·R k .

[0120] Preferably, the process of performing a total secondary comprehensive evaluation of the four factors according to the fuzzy comprehensive evaluation model B=A·R in step S7 includes:

[0121] S701. Calculate the fuzzy comprehensive evaluation model B according to the weight distribution A = [a1, a2, a3, a4] of each slope dynamic stability factor and the evaluation matrix R = [B1, B2, B3, B4];

[0122] Wherein, i is the dynamic stability factor of the slope, i=1, 2, 3, 4; in this embodiment, the dynamic stability factors of the slope are topography, geological structure and geological action, climate factors and other factors;

[0123] S702. Calculate the fuzzy evaluation result B of the slope according to B=A·R.

[0124] Preferably, the specific process of classifying the slope stability according to the evaluation value interval to which the fuzzy evaluation result belongs in step S8 includes:

[0125] The specific principle of classifying slope stability according to the evaluation value interval to which the fuzzy evaluation result belongs is as follows: the fuzzy evaluation result is the percentage score of the slope, where the category corresponding to the largest percentage indicates that the slope is most likely to belong to this category; the hierarchical arrangement of percentages can indicate the stability trend of the slope.

[0126] Embodiment 2: Different from the above-mentioned embodiment 1, this embodiment classifies slope stability into three categories, and its specific steps include:

[0127] S1. Classify slopes according to slope engineering practice and project experience;

[0128] S2. Determine the factors affecting the dynamic stability of the slope, quantify them and calculate them;

[0129] S3. Constructing a membership function based on the quantified factors affecting slope dynamic stability;

[0130] S4. After determining the membership function in step S3, determine the weight distribution A i ;

[0131] S5. Evaluate all factors according to the membership function to obtain the fuzzy vector, which further forms the fuzzy evaluation matrix R k ; Use weight distribution A i and the fuzzy evaluation matrix R k Evaluation of dynamic stability of slopes.

[0132] Preferably, in step S1, the process of classifying the slopes includes: based on the stability of the rock slopes and the engineering treatment at each stage of design, construction and operation, the rock slopes are classified into three categories, namely, Class I stable slopes, Class II basically stable slopes and Class III unstable slopes. The classification is detailed in Table 3:

[0133] Table 3: Rock dynamic stability classification table (divided into three categories)

[0134]

[0135] Preferably, the specific process of determining the influencing factors of the dynamic stability of the slope in step S2, and quantifying and calculating the factors includes:

[0136] S201. Analyze and study the existing rock slope design standards at home and abroad, and select the following factors for evaluating rock dynamic stability:

[0137] Lithology, uniaxial compressive strength of rock, degree of weathering;

[0138] Number, density, extension, opening, filling and degree of connection of joints;

[0139] Joint roughness coefficient (JRC);

[0140] The occurrence of joints (including bedding, schistosity and other structural planes):

[0141] Impact of groundwater:

[0142] The slope and height of the slope;

[0143] S202. The above factors selected in step S201 are converted into quantitative indicators (parameters) as follows:

[0144] The item is merged into the rock rebound value R;

[0145] The first term is merged into the rock mass integrity coefficient I c ;

[0146] The slopes in the , and items are incorporated into the calculation of the stability coefficient K;

[0147] The slope height in the item and the extension in the item are combined into the calculation of relative penetration P;

[0148] The groundwater has an important influence on the dynamic stability, but this method takes the effect of groundwater on the slope into consideration in the slope design and adopts the method of correcting the rock mass quality to deal with it, so that the groundwater problem will not cause a large error due to artificial determination of its identification index;

[0149] The above selected parameters are used as five calculation parameters for evaluation in the following form:

[0150] The rock rebound value is R;

[0151] The rock mass integrity coefficient is I c ;

[0152] The comprehensive relative penetration of the structural surface is GP;

[0153] The comprehensive stability coefficient of rock slope is GK;

[0154] The number of unstable block types exposed on the rock slope is N; the dynamic stability calculation parameters and their discriminant factors are detailed in Table 4:

[0155] Table 4: Dynamic stability calculation parameters and their discriminant factors (divided into three categories)

[0156]

[0157] S203. Calculate the above five parameters

[0158] (1) The rebound value R is measured by a rebound tester;

[0159] (2) Rock mass integrity coefficient

[0160] Among them, in the formula, a i For each factor to I c Contribution weight function; x i g is the characterization parameter of rock mass structure type, including the number of structural surface groups, extension, density, combination, size of structure, etc.; i (x i ) is the effect of each factor on I c Contribution value;

[0161] And for layered rock masses:

[0162] I c =a1g1(n)+a2g2(f)+a3g3(l)+a4g4(D)+a5g5(C)

[0163] For non-stratified rock masses:

[0164] I c =a'1g1(n)+a'2g2(f)+a'3g3(l)+a'4g4(D)+a'5g5(C)+a'6g6(t)

[0165] Among them, in the above formula, n, f, l, D, C, t are the number of joint groups, density, extension length, block size, bonding condition, and layer thickness respectively; except for n, the values ​​of other factors are all taken as the comprehensive value or average value of the entire slope rock mass, that is, the value that can represent the structural characteristics of the slope rock mass;

[0166] In actual calculations, the contribution values ​​of each factor can be approximately solved according to the values ​​in Table 5:

[0167] Table 5: Contribution value of each factor

[0168]

[0169] (3) Comprehensive relative penetration GP

[0170] Assume the slope height is H, a joint J i Total length L i , when the joint Ji When the cut structure is exposed on the rock slope and the stability coefficient K<1, J i Relative penetration:

[0171]

[0172] Otherwise P i =0; for bedding, its relative penetration P i =1;

[0173] All P i The arithmetic mean of (Pi≠0) is taken as the comprehensive relative penetration of the entire slope:

[0174]

[0175] Among them, if a certain section J i When multiple unstable blocks are formed at the same time, their P i being double counted;

[0176] (4) Comprehensive stability coefficient GK

[0177] Assume the slope direction is The slope is α, and the structural surface inclination is The inclination angle is β f , the friction coefficient is The dihedral intersection tendency is The inclination angle is β w , the angles between each face of the bihedron and the perpendicular plane passing through the intersection line are θ1, θ2, and the cohesion C = 0;

[0178] According to the limit equilibrium theory, the plane failure is:

[0179] When |φ s -φ f |≤30, and α>β f When , its stability coefficient is:

[0180]

[0181] The wedge damage is:

[0182] When |φ s -φ w |≤60, and α<β w When , its wedge stability coefficient is:

[0183]

[0184] In the above formula, JRC is the structural surface roughness coefficient, JRC = 0.36n + 0.73H, n is the number of structural surface protrusions within a certain length (taken as 50cm), and H is the average height of the corresponding protrusions;

[0185] Since in most rock mass stability problems, there are As a railway rock slope with a low slope height, Then φ i =φ b +JRC i ;

[0186] For all exposed K on the slope f , K w , calculate the comprehensive stability coefficient according to the following formula:

[0187]

[0188] (5) Number of exposed unstable block types N

[0189] The number of exposed unstable block types N is the total number of all sliding block types with K < 1 on the rock slope.

[0190] Preferably, the specific process of using fuzzy statistics method to conduct statistical research on samples, fitting with polynomials, and constructing the membership function of quantitative factors affecting dynamic stability in step S3 includes:

[0191] S301. Using fuzzy statistics method, we conducted statistical research on 147 rock slope samples across the country and used polynomial fitting to construct the membership function as shown in the following equations:

[0192] Category I:

[0193]

[0194]

[0195]

[0196]

[0197]

[0198] Category II:

[0199]

[0200]

[0201]

[0202]

[0203]

[0204] Category III:

[0205]

[0206]

[0207]

[0208]

[0209]

[0210] Preferably, after the membership function is determined by research and trial calculation in step S3, the weight distribution of the weight distribution is determined as shown in Table 6:

[0211] Table 6: Weight table of various influencing factors (divided into three categories)

[0212] Trait conditions <![CDATA[A=(R,I c ,GP,GK,N)]]> R<30 A=(5,4,0.5,0.5,0) GK≧4, R≧30 A=(2,3,0.5,2,1) 1≦GK<4,R≧30 A=(3,5,0.2,1.5,0.3) GK<1,0.15<GP<0.55,R≧30 A=(2,3,1.5,1.5,2) GK<1,GP<0.15,R≧30 A=(3,4,1.5,1,1.5) GK<1,GP≧0.55,R≧30 A=(1,1.5,3,2,1.5)

[0213] Preferably, the fuzzy matrix R described in step S5 k The calculation process includes:

[0214] S501. Evaluate all factors according to the above membership function to obtain the fuzzy vector, r i =[r i1 ,r i2 ,r i3 ], (i=1,2,……,5);

[0215] S502. The r of step S501 i Combine them to get the fuzzy evaluation matrix R k .

[0216] The original classified samples were re-judged using the method described in the above embodiment 2, and the results are shown in Table 7:

[0217] Table 7: Return judgment results table (divided into three categories)

[0218]

[0219] It can be seen from Table 7 that the slope dynamic stability evaluation method based on fuzzy set theory described in this embodiment meets the requirements of slope classification for slope stability classification.

[0220] In this specification, equivalent embodiments are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same and similar parts between equivalent embodiments can be referred to each other. For the system disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part.

[0221] This article uses specific examples to illustrate the principles and implementation methods of the invention. The description of the above embodiments is only used to help understand the method of the present invention and its core idea. The described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

Claims

1. A slope dynamic stability evaluation method based on fuzzy set theory, characterized by: Included steps S1. Classify slopes according to slope engineering practice and project experience; S2. Determine the factors affecting the dynamic stability of the slope, quantify them and calculate them; The slope dynamic stability factors described in step S2 include topography, geological structure and geological action and climate factors; S3. Constructing a membership function based on the quantified factors affecting slope dynamic stability; The membership function construction process described in step S3 includes: (1) A ridge-shaped membership function is used to construct the membership function of the quantitative factors affecting dynamic stability; (2) Using trapezoidal membership function to construct the membership function of qualitative factors affecting dynamic stability; S4. Determine the weight of each influencing factor A i ; S5. Evaluate all factors according to the membership function to obtain the fuzzy vector, which further forms the fuzzy evaluation matrix R k ; Use weight distribution A i and the fuzzy evaluation matrix R k Evaluation of slope dynamic stability; The fuzzy evaluation matrix R described in step S5 k The calculation process includes S501. Evaluate all factors according to the above membership function to obtain the fuzzy vector, r i =[r i1 ,r i2 ,r i3 ,r i4 ,r i5 ], i is the slope dynamic stability factor, i = 1, 2, ...; S502. The r of step S501 i Combine them to get the fuzzy evaluation matrix Rk; The slope dynamic stability evaluation method also includes the steps of S6. Based on the fuzzy comprehensive evaluation model B k =A k ·R k Comprehensively evaluate each factor and subset; Step S6 described in accordance with the fuzzy comprehensive evaluation model B k =A k ·R k The specific process of comprehensive evaluation of each factor and subset is to conduct comprehensive evaluation on each factor and subset separately, including According to the subset U k The relative importance of each factor in the weight vector A k and the fuzzy evaluation matrix R k , and then calculate the corresponding subset level fuzzy vector B as follows k , B k =[b k1 ,b k2 ,b k3 ,b k4 ,b k5 ]=A k ·R k ; S7. Conduct a comprehensive secondary evaluation of each influencing factor based on the fuzzy comprehensive evaluation model B=A·R; The process of performing a secondary comprehensive evaluation on each factor according to the fuzzy comprehensive evaluation model B=A·R in step S7 includes: S701. Calculate the fuzzy comprehensive evaluation model B according to the weight distribution A = [a1, a2, a3, a4] of each slope dynamic stability factor and the evaluation matrix R = [B1, B2, B3, B4]; Where i is the slope dynamic stability factor, i = 1, 2, 3, 4; S702. Calculate the fuzzy evaluation result B of the slope according to B=A·R; S8. Classify the slope stability according to the evaluation value interval to which the fuzzy evaluation result belongs.

Citation Information

Patent Citations

  • Rock mass quality non-linear fuzzy classification method

    CN107633269A

  • Overhead weapon station grey fuzzy comprehensive evaluation method

    CN108256761A

  • Deep foundation pit blasting vibration velocity risk level big data evaluation method

    WO2021169038A1