Nuclear power plant main container assembly device and method
By designing the assembly device for the main container of the nuclear power plant, the combination of base, stabilizer, support and adjusting parts is used to solve the problems of equipment installation and safety during the assembly and transportation of the main container, and the safety in the vertical state is achieved Assembly and transport.
Patent Information
- Application Number
- CN202210685921.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-06-16
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2042-06-16
AI Technical Summary
During assembly and transportation of the main container of the nuclear power plant, special tools and supporting processes are required to ensure the safe installation of internal equipment and prevent damage, and must be kept vertical, which is difficult for the prior art to meet these needs.
An assembly device including a base, a stabilizer, a support member and a adjusting member is designed to fix the main body through the base, support the top, and adjust the height and level of the support member with the adjusting member to ensure that the top is aligned with the main body and achieve a vertical state. assembly and transportation under.
Improves the safety of assembly and transportation of main containers, avoids damage to internal equipment, and simplifies the assembly and disassembly process, reduces the cost of tooling and ensures installation efficiency and safety.
Smart Images

Figure CN115036052B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of construction technology, and in particular to the field of nuclear power plant main container assembly. Background Art
[0002] The main vessel of a nuclear power plant is the main equipment of the fourth-generation reactor nuclear energy system. A typical model of the main vessel of a nuclear power plant has a diameter of 2.37m, an upper and lower ellipsoidal head structure, a height of 3.8m, and a cylinder wall thickness of 30mm. The internal equipment installed in the main vessel during the assembly stage mainly includes graphite ceramic components, steel clamping components, lower metal supports, heat exchangers and other items.
[0003] No items need to be installed inside the pressure vessel of a conventional pressurized water reactor nuclear island, but the main vessel of the nuclear power plant needs to be assembled with the above-mentioned internal equipment before entering the nuclear island. This requires a set of matching special tools and supporting processes to meet the needs of internal equipment assembly of the main vessel in a vertical state, and it can be directly transported after assembly without causing damage to the internal equipment. Summary of the invention
[0004] An object of the present invention is to provide a nuclear power plant main container assembly device, which can ensure smooth assembly and transportation of the main container and improve the safety of the main container assembly and transportation.
[0005] The main container assembly device for a nuclear power plant to achieve the above-mentioned purpose is used to assemble the main container of a nuclear power plant, and the main container of the nuclear power plant includes a main body and a top. The device includes a base, a stabilizing member, a plurality of supporting members, and an adjusting member. The base is used to carry the main body; the stabilizing member is used to fix the main body to the base; a plurality of supporting members are used to support the top; the adjusting member is used to adjust the height of some of the supporting members, and then adjust the height and level of the top, so that the top is aligned with the main body.
[0006] In one or more embodiments, the stabilizing member includes a plurality of diagonal braces and a clamp, wherein the clamp is used to clamp the main body, one end of the diagonal brace abuts against the base, and the other end supports the main body.
[0007] In one or more embodiments, the base includes an annular bracket, an annular bracket column and a stand base, wherein the annular bracket is used to provide a concave cavity for accommodating the bottom of the main body, and the annular bracket column is used to fix the annular bracket on the stand base.
[0008] In one or more embodiments, a buffer is provided in the gap between the annular bracket and the stand base.
[0009] In one or more embodiments, the support member includes a vertical support column and a transverse support rod, the vertical support column is used to support the top, the transverse support rod is used to connect the vertical support column, and the adjustment member is connected to the vertical support column to adjust the height of the vertical support column.
[0010] In one or more embodiments, the support member includes a vertical support column and a transverse support rod, and the transverse support rod is used to fix each of the vertical support columns and the clamp.
[0011] In one or more embodiments, the adjusting member is a hydraulic jack.
[0012] In one or more embodiments, the device further includes a lifting device for lifting the main container of the nuclear power plant.
[0013] In one or more embodiments, the main body includes a flange, which is used to provide a first lifting point; the top includes a lifting lug, which is used to provide a second lifting point; the main container of the nuclear power plant also includes a support rod, which is used to connect the top and the main body.
[0014] Another object of the present invention is to provide a method for assembling the main container of a nuclear power plant, the method comprising the following steps: hoisting the main container of the nuclear power plant and embedding the bottom of the main body into the base; using a stabilizing member to fix the main body to the base and installing a support member; completing the installation of equipment in the main body; hoisting the top of the main container of the nuclear power plant so that the top is supported by the support member, using an adjusting member to adjust the position of the top, aligning the top with the main body, and completing docking.
[0015] In one or more embodiments, after the top is aligned with the main body and the installation is completed, the assembly device forms an integrated structure with the main container of the nuclear power plant; the integrated structure is hoisted to complete the vertical transportation of the integrated structure.
[0016] The above-mentioned nuclear power plant main container assembly device can achieve preliminary fixation of the nuclear power plant main container through the base, and can complete the assembly of internal equipment before completing the docking process; in addition, through the cooperation of adjusting parts and supporting parts, the docking accuracy of the top and the main body can be adjusted in time to achieve assembly and transportation in a vertical state without flipping, thereby improving the safety of assembly and transportation of the main container. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The above and other features, properties and advantages of the present invention will become more apparent through the following description in conjunction with the accompanying drawings and embodiments, in which:
[0018] Figure 1 It is a schematic diagram of the main container of the nuclear power plant located on the base.
[0019] Figure 2 It is a structural schematic diagram of the main container assembly device of a nuclear power plant.
[0020] Figure 3 It is a schematic diagram of the cooperation between the fixing member and the main body.
[0021] Figure 4 It is a schematic diagram of the support member setting position.
[0022] Figure 5 This is a schematic diagram of the completed assembly of the main container of a nuclear power plant.
[0023] Figure 6 It is a flow chart of the method of assembling the main vessel of a nuclear power plant.
[0024] Symbols and Markings
[0025] 10. Base
[0026] 11. Ring bracket
[0027] 12. Ring bracket column
[0028] 13. Stand base
[0029] 14. Buffer
[0030] 20. Nuclear power plant main container
[0031] 21. Subject
[0032] 22. Top
[0033] 23. Support rod
[0034] 25. First hoisting point
[0035] 26. Second lifting point
[0036] 30. Stabilizer
[0037] 31. Diagonal brace
[0038] 32. Hoop
[0039] 40. Support
[0040] 50. Lifting parts
[0041] 41. Vertical support column
[0042] 42. Transverse support rod
[0043] 131. Support Point
[0044] 217, bottom
[0045] 218. Flange
[0046] 221. Lugs DETAILED DESCRIPTION
[0047] The present invention is further described below in conjunction with specific embodiments and drawings. More details are elaborated in the following description to facilitate a full understanding of the present invention. However, the present invention can obviously be implemented in a variety of other ways different from the description herein. Those skilled in the art can make similar generalizations and deductions based on actual application situations without violating the connotation of the present invention. Therefore, the protection scope of the present invention should not be limited by the content of this specific embodiment.
[0048] It should be noted that these and other subsequent drawings are only examples and are not drawn to scale, and should not be used to limit the actual scope of protection required by the present invention.
[0049] The main container of a nuclear power plant is the main equipment of the fourth-generation reactor nuclear energy system. It uses a new type of nuclear fuel and fluoride salt as a coolant. It melts natural nuclear fuel and convertible nuclear fuel in high-temperature fluoride salt, and carries the nuclear fuel for circulation inside and outside the reactor. The main container of the nuclear power plant needs to assemble internal equipment before entering the nuclear island, including graphite ceramic components, steel clamping components, lower metal supports, heat exchangers and other items. During assembly, the main container must be kept in a vertical state. After the main container is assembled, the total weight is about 100 tons. Therefore, it is necessary to provide a special device and supporting process for the main container of a nuclear power plant to be used in the internal equipment assembly stage, so as to ensure the smooth assembly and safe transportation of the inside and outside of the main container, and improve the safety of the assembly and transportation of the main container.
[0050] The nuclear power plant main container assembly device disclosed in the present invention is used to solve the above problems. Figure 5 As shown, the main container of the nuclear power plant includes a main body 21 and a top 22 . During the assembly stage, internal equipment such as graphite ceramic components need to be installed inside the main body 21 .
[0051] The nuclear power plant main container assembly device is used to assemble the nuclear power plant main container 20. Figure 1 and Figure 2 As shown, the device includes a base 10, a stabilizing member 30, a plurality of supporting members 40 and an adjusting member. The base 10 is used to carry the main body 21; the stabilizing member 30 is used to fix the main body 21 to the base 10; the plurality of supporting members 40 are used to support the top 22; the adjusting member is used to adjust the height of some supporting members 40, and then adjust the height and level of the top 22, so that the top 22 is aligned with the main body 21.
[0052] Specifically, refer to Figure 2In the embodiment shown, the base 10 includes an annular bracket 11, an annular bracket column 12 and a stand base 13. The annular bracket 11 is used to provide a concave cavity for accommodating the bottom 217 of the main body, and the annular bracket column 12 is used to fix the annular bracket 11 on the stand base 13. Before the main container is in place, the annular bracket 11, the annular bracket column 12 and the stand base 13 can be welded into the base 10 by welding. After the base 10 is completed, preferably, a buffer 14 is set at the gap between the annular bracket 11 and the stand base 13, such as a sandbag or other material to achieve buffer protection, so as to prevent the bottom 217 of the main container from directly contacting the base 10 and causing damage.
[0053] The concave cavity is used to support the bottom 217 of the main body 21. Preferably, the concave cavity is an ellipsoidal structure to adapt to the bottom shape of the main container. In one embodiment, the device also includes a lifting piece 50 for lifting the main container 20 of the nuclear power plant, such as placing the main body 21 in the concave cavity of the annular bracket 11. The main body 21 includes a flange 218, which is used to provide a first lifting point 25. The first lifting point 25 cooperates with the lifting piece 50 to achieve the movement of the main body 21. In addition, the position of the annular bracket 11 and its verticality can be adjusted to ensure that the main body 21 and the base 10 are initially matched.
[0054] In order to further strengthen the fixation of the main body 21 and the base 10, a fixing member 30 is provided to enhance the stability of the two. Figure 3 As shown, in one embodiment, the stabilizing member 30 includes a plurality of diagonal braces 31 and a hoop 32. The hoop 32 is used to tighten the main body 21. One end of the diagonal brace 31 abuts against the base 10, and the other end supports the main body 21 to enhance the stability of the main body 21 and the base 10. Preferably, the support point of the diagonal brace 31 is located on the hoop 32, which can reduce additional connecting parts. The diagonal brace 31 and the hoop 32 are not limited to Figure 3 As for the numbers in the illustrated embodiment, it can be understood by those skilled in the art that the numbers of the diagonal braces 31 and the clamps 32 are determined by the specific support strength.
[0055] Furthermore, in some embodiments, the support member 40 not only supports the weight of the top 22 and adjusts the levelness, but also plays a stabilizing role. Figure 4 In the illustrated embodiment, the support member 40 includes a vertical support column 41 and a transverse support rod 42, and the transverse support rod 42 is used to fix each vertical support column 41 and the clamp 32. Through the connection of the transverse support rod 42, the main body 21 of the nuclear power plant main container and the entire nuclear power plant main container assembly device form a transportable whole.
[0056] In other embodiments, the support member 40 includes a vertical support column 41 and a transverse support rod 42, wherein the vertical support column 41 is used to support the top 22, and the transverse support rod 42 is used to connect the vertical support columns 41. The adjusting member is connected to the vertical support column 41 to adjust the height of the vertical support column 41. The adjusting member may be a hydraulic jack or other structure capable of achieving the extension and retraction of the length of the vertical support column 41.
[0057] When the plurality of vertical support columns 41 respectively support the top 22, the height of the plurality of vertical support columns 41 determines the levelness and height of the top 22. Therefore, by adjusting the adjusting member, such as using a hydraulic jack, the levelness and height of the steel platform of the main container top 22 are adjusted simultaneously. The lower ends of the top 22 are installed one by one into the installation holes of the main body 21, so that the top 22 is connected and fastened to the main body 21, and the assembly of the main container of the nuclear power plant is completed.
[0058] In one embodiment, the vertical support column 41 and the diagonal support 31 are connected to the same support point 131 located on the platform base 13. Figure 2 As shown, the overall structure of the device is simple and forms an integral whole.
[0059] At this time, the assembly device is used as a support platform, and the top 22 can also be hoisted by the hoisting member 50 to achieve the docking process. Figure 5 As shown, in one embodiment, the top 22 is a hanging component, including a lifting lug 221, and the lifting lug 221 is used to provide a second lifting point 26, and the second lifting point 26 cooperates with the lifting member 50 to complete the movement of the top 22. At this time, the bottom of the top 22 is also supported by the vertical support column 41, and the vertical support column 41 and the lifting member 50 act on the top 22 at the same time to complete the posture fine adjustment of the top 22. In addition, the main container 20 of the nuclear power plant also includes a support rod 23, and the support rod 23 is used to connect the top 22 and the main body 21. When the position of the top 22 is determined, the support rod 23 is used to connect the top 22 and the main body 21 to complete the external installation of the main container of the nuclear power plant.
[0060] Before the top 22 is connected, the construction personnel can use the assembly device with the main body 21 fixed thereto as an operating platform to enter the main container to assemble the internal equipment. After the verticality of the nuclear power plant main container 20 is checked to be qualified, the installation of the internal equipment in the main container begins.
[0061] For example, install the lower chamber graphite component into the bottom of the main container, match it with the protrusion on the inner wall, and tighten it with bolts; introduce the lower pipe of the heat exchanger into the main container in sections, pass it through the lower chamber graphite component in turn, model it with a laser measuring instrument, and adjust the center position of both ends of the heat exchanger pipe; introduce the core bottom plate component into the main container and install it; measure the position of the upper side pipe opening and the lower pipe opening of the heat exchanger through laser modeling, calculate the processing allowance of the lower pipe of the heat exchanger, and after the groove processing of the lower pipe opening of the heat exchanger is completed, it is assembled and welded with the heat exchanger; check the number of the core graphite components, and introduce them into the main container in turn for installation. The core graphite is composed of a central polygonal graphite block and multiple fan-shaped graphite blocks. Each layer of core graphite is fixed by pins, keys, and tensioning devices. After each layer of core graphite is installed, it is necessary to restore it with the fixing block at the through-position of the heat exchanger; introduce the upper chamber metal parts into the main container and match them with the protrusions on the inner wall, and then introduce the upper chamber graphite parts into the main container; finally, install the graphite clamping device, which is divided into two layers, the lower layer is divided into blocks, and the upper layer is a whole plate. After matching with the protrusions on the inner wall, it is tightened and fixed with bolts to complete the vertical installation of various components inside the main body 21.
[0062] The above-mentioned nuclear power plant main container assembly device can realize the on-site vertical assembly of the nuclear power plant main container, and can also realize the installation of internal components at the same time; when the nuclear power plant main container and the device form an integrated structure, they can also be transported in a vertical state without changing the equipment state, and will not damage the internal equipment, thereby improving the safety of the main container assembly and transportation. In addition, the overall assembly and disassembly of the device is simple and fast, and can be reused, saving tooling manufacturing costs, improving installation efficiency, and ensuring no risk of equipment damage.
[0063] In combination with the above introduction to the nuclear power plant main container assembly device, a nuclear power plant main container assembly method can also be understood, which uses the above nuclear power plant main container assembly device for assembly.
[0064] The method includes Figure 6 Steps shown. First, perform S1, hoist the main container of the nuclear power plant, and embed the bottom 217 of the main body 21 into the base 10; then perform step S2, use the stabilizing member 30 to fix the main body of the main container 20 of the nuclear power plant to the base 10, and install the support member 40; then perform step S3, complete the installation of equipment in the main body 21, such as graphite ceramic components, steel clamping components, lower metal support components, heat exchangers and other items; then perform step S4, hoist the top 22 of the main container of the nuclear power plant, so that the top 22 is supported by the support member 40, use the adjusting member to adjust the position of the top 22, align the top 22 with the main body 21, and complete the docking installation.
[0065] After the top 22 is docked with the main body 21, the main container of the nuclear power plant and the main container assembly device of the nuclear power plant form an integrated structure. At this time, step S5 can be continued to hoist the integrated structure to complete the vertical transportation of the integrated structure, such as using a special crane hoisting device to load the assembled main container together and seal the vehicle, and then transport it vertically to a designated location for unloading. Finally, the support member 40, the stabilizing member 30 and the base 10 are disassembled, and the device is removed. The final hoisting of the main container can be completed without flipping, thereby realizing the entire process of assembly, transportation and positioning installation of the main container of the nuclear power plant.
[0066] The method is described below with reference to specific embodiments.
[0067] (1) Establish a clean area and control the entry and exit of personnel, tools, and equipment.
[0068] (2) Before the main container is in place, the annular bracket 11, the annular bracket column 12, and the stand base 13 are welded into the base 10, and sandbags and other buffer protection are arranged on the prefabricated base 10 to prevent the main container from directly contacting the base 10.
[0069] (3) Position the main body 21 of the main container on the assembled base 10, adjust the position and verticality of the main body by crane, install the diagonal brace 31 and the clamp 32, and fix the main body 21 and the base 10.
[0070] (4) Use the transverse support rod 42 to fix the vertical support column 41 and the middle clamp 32, so that the entire nuclear power plant main container assembly device and the main body form a whole.
[0071] (5) Construction personnel can use the special tools for the main container as an operating platform to enter the main container to assemble the internal equipment. After checking that the verticality of the main container is qualified, they can start installing the internal equipment of the main container.
[0072] (6) The cover of the main body 21 is hoisted onto the main body 21 to buckle the cover and then welded.
[0073] (7) The steel platform of the top 22 is hoisted above the main body 21 , and the horizontality of the steel platform of the top 22 is adjusted by adjusting the hydraulic jack on the vertical support column 41 , and the support rod 23 is used to connect the steel platform and the main body 21 .
[0074] (8) At this time, the assembly device and the assembled nuclear power plant main container form an integrated structure, and the lifting device 50 is used to load the integrated structure together and seal the vehicle. The main container can always remain in a vertical state during transportation and lifting. After the integrated structure is introduced into the installation area, the assembly device is removed and it can be lifted into the nuclear island without turning the equipment over, completing the final installation of the nuclear power plant main container.
[0075] The above-mentioned nuclear power plant main container assembly method can realize the assembly of internal equipment and can be directly transported in a vertical state after the assembly is completed without changing the equipment state and causing no damage to the internal equipment, thereby ensuring the smooth assembly and safe transportation of the main container.
[0076] It should be noted that the use of terms such as "first" and "second" in the above introduction to limit components is only for the convenience of distinguishing the corresponding components. If not otherwise stated, the above terms have no special meaning and do not represent priority, and therefore cannot be understood as limiting the scope of protection of this application.
[0077] At the same time, the present application uses specific words to describe the embodiments of the present application. For example, "one embodiment", "an embodiment", and / or "some embodiments" refer to a certain feature, structure or characteristic related to at least one embodiment of the present application. Therefore, it should be emphasized and noted that "one embodiment" or "an embodiment" or "an alternative embodiment" mentioned twice or more in different positions in this specification does not necessarily refer to the same embodiment. In addition, some features, structures or characteristics in one or more embodiments of the present application can be appropriately combined.
[0078] Although the present invention is disclosed as above with preferred embodiments, it is not intended to limit the present invention. Any person skilled in the art may make possible changes and modifications without departing from the spirit and scope of the present invention. Therefore, any modification, equivalent change and modification made to the above embodiments according to the technical essence of the present invention without departing from the content of the technical solution of the present invention shall fall within the protection scope defined by the claims of the present invention.
Claims
1. A nuclear power plant main container assembly device, used for assembling a nuclear power plant main container (20), wherein the nuclear power plant main container comprises a main body (21) and a top (22), characterized in that: include: A base (10) for supporting the main body (21); a stabilizing member (30) for fixing the main body (21) and the base (10); a plurality of support members (40) for supporting the top portion (22); and an adjusting member for adjusting the height of a portion of the supporting member (40), thereby adjusting the height and levelness of the top portion (22), so that the top portion (22) is aligned with the main body (21); The support member (40) includes a vertical support column (41) and a transverse support rod (42), wherein the vertical support column (41) is used to support the top (22), and the transverse support rod (42) is used to connect the vertical support column (41), and the adjustment member is connected to the vertical support column (41) to adjust the height of the vertical support column (41); The main body (21) includes a flange (218), and the flange (218) is used to provide a first lifting point (25); the top (22) includes a lifting lug (221), and the lifting lug (221) is used to provide a second lifting point (26); the nuclear power plant main container (20) also includes a support rod (23), and the support rod (23) is used to connect the top (22) and the main body (21).
2. The nuclear power plant main container assembly device according to claim 1, characterized in that: The stabilizing member (30) comprises a plurality of diagonal braces (31) and a hoop (32), wherein the hoop (32) is used to clamp the main body (21), one end of the diagonal brace (31) abuts against the base (10), and the other end supports the main body (21).
3. The nuclear power plant main container assembly device according to claim 1, characterized in that: The base (10) comprises an annular bracket (11), an annular bracket column (12) and a platform base (13), wherein the annular bracket (11) is used to provide a concave cavity for accommodating the bottom of the main body (217), and the annular bracket column (12) is used to fix the annular bracket (11) on the platform base (13).
4. The nuclear power plant main container assembly device according to claim 3, characterized in that: A buffer member (14) is provided in the gap between the annular bracket (11) and the platform base (13).
5. The nuclear power plant main container assembly device according to claim 2, characterized in that: The support member (40) comprises a vertical support column (41) and a transverse support rod (42), and the transverse support rod (42) is used to fix each of the vertical support columns (41) and the hoop (32).
6. The nuclear power plant main container assembly device according to claim 1, characterized in that: The adjusting member is a hydraulic jack.
7. The nuclear power plant main container assembly device according to claim 1, characterized in that: The device also includes a hoisting member (50) for hoisting the nuclear power plant main container (20).
8. A method for assembling a main container of a nuclear power plant, characterized in that: Using the nuclear power plant main container assembly device according to any one of claims 1 to 7, the method comprises the following steps: Hoist the main container of the nuclear power plant and embed the bottom of the main body into the base; Use a stabilizing member to fix the main body and the base, and install a supporting member; Complete the installation of equipment in the main body; Hoisting the top of the main container of the nuclear power plant so that the top is supported by the support member, adjusting the position of the top using an adjusting member, aligning the top with the main body, and completing docking; Adjust the height of the vertical support column to adjust the levelness of the top, and use support rods to connect the top and the main body; The assembly device and the main container of the nuclear power plant are formed into an integrated structure; the integrated structure is hoisted to complete the vertical transportation of the integrated structure.