A quantitative prediction method and system for single perforation production of horizontal gas wells
By combining distributed fiber optic temperature sensors and a vertical pressure drop model with energy conservation and gas-liquid heat conservation models, the problem of predicting production from a single perforation in horizontal wells has been solved, achieving more efficient and accurate oil and gas production calculations.
Patent Information
- Application Number
- CN202210736755.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-06-27
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2042-06-27
AI Technical Summary
Existing technologies struggle to accurately predict the production of a single perforation in horizontal wells, especially due to the difficulty in acquiring data caused by the complex downhole structure. Conventional vertical well section detection technologies cannot meet the detection requirements of horizontal wells, and pressure data is difficult to measure directly, increasing the difficulty of predicting oil and gas production in each section of a horizontal well.
Distributed fiber optic temperature sensors (DTS) are used to acquire downhole temperature data in real time. Pressure data is calculated by combining it with a pre-built vertical pressure drop model. Gas production and liquid production in a single perforation section are calculated by energy conservation and gas-liquid heat conservation models, which simplifies the production calculation model and improves the accuracy and efficiency of the calculation.
By simplifying calculations with a few parameters, the accuracy and efficiency of predicting production from a single perforation in horizontal gas wells are improved, costs are reduced, and a simpler method for oil and gas well development is provided.
Smart Images

Figure CN115062561B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a quantitative prediction method and system for single perforation production of a horizontal gas well, belonging to the technical field of oil and gas well exploitation. Background Art
[0002] A horizontal well is a well with an inclination angle of 90° or close to 90° and a wellbore drilled in a horizontal direction for a certain length. It has been widely used in major oil fields at home and abroad due to its advantages such as large oil leakage area, high single well production, high reserve utilization, large penetration, and the ability to avoid harsh environmental areas and obstacles. With the continuous development of people's practice and drilling and completion technology in recent years, horizontal well technology has become the focus in the scientific research and practice of the oil industry, and its role in increasing reserves and stabilizing production in oil and gas fields has become increasingly important. For oil and gas wells, real-time temperature data at the bottom of the well is crucial for bottom hole environment monitoring and production prediction, while ordinary vertical well section detection technology can no longer meet the detection tasks of horizontal wells, and the pressure data of the horizontal well section is also difficult to measure directly through equipment, which increases the difficulty of predicting the oil and gas production of each segment of the horizontal well. Summary of the invention
[0003] The purpose of the present invention is to overcome the deficiencies in the prior art and provide a quantitative prediction method and system for the single perforation production of a horizontal gas well, which continuously, in real time and accurately provides temperature data of the entire horizontal well section downhole through a distributed fiber optic temperature sensor (DTS), and calculates the pressure data of the horizontal well section through a pre-built vertical pressure drop model, thereby simplifying the horizontal well production calculation model, making the calculation accurate, using fewer parameters, and effectively improving work efficiency.
[0004] To achieve the above object, the present invention is implemented by adopting the following technical solutions:
[0005] In a first aspect, a quantitative prediction method for single perforation production of a horizontal gas well is provided, wherein the horizontal gas well comprises a vertical outlet section, a main section and a single perforation section, and the quantitative prediction method comprises:
[0006] Obtain the temperature and liquid holdup of each section of the horizontal gas well, as well as the total gas production and total liquid production of the vertical outlet section;
[0007] The pressure in the main section is calculated using a pre-built vertical pressure drop model;
[0008] Taking the single perforation near the vertical exit section as the first perforation section, the gas production and liquid production at the first perforation section and the gas production and liquid production of the main section upstream of the first perforation section are calculated according to the pre-established energy conservation model of the mixed fluid of the main section and the produced fluid of the first perforation section and the gas-liquid heat conservation model at the first perforation section;
[0009] According to the gas production and liquid production of the upstream main section of the first perforation, the above steps are repeated to calculate the gas production and liquid production of each perforation section and the gas content and liquid production of the upstream main section of each perforation section.
[0010] Furthermore, the pressure of the horizontal well section is calculated by the vertical pressure drop model, and the specific calculation method includes:
[0011]
[0012] Where h is the depth; ρ m is the density of the mixed fluid; g is the acceleration due to gravity; f m is the mixed friction coefficient; G m is the mass flow rate of the mixed fluid; D is the wellhead diameter of the vertical outlet section; A is the cross-sectional area of the wellhead of the vertical outlet section;
[0013] Where, the density of the mixed fluid ρ m The calculation formula is:
[0014] ρ m=ρ l H l +ρ g (1-H l ) (2)
[0015] In the formula, ρ l is the density of gas in the mixed fluid; H l is the mass liquid holdup; ρ g is the density of the liquid in the mixed fluid;
[0016] Mixed fluid mass flow rate G m The calculation formula is:
[0017] G m =G g +G l =A(v sl ρ l +v sg ρ g ) (3)
[0018] In the formula, G g is the gas production of the mixed fluid; G l is the liquid production in the mixed fluid; v sl is the liquid superficial velocity; v sg is the gas superficial velocity;
[0019] Mixed friction coefficient f m The calculation formula is:
[0020]
[0021] In the formula, e is the base of natural logarithm; Re m is the Reynolds number of gas and liquid phases in the mixed fluid;
[0022] Reynolds number of gas and liquid phases in mixed fluid m The calculation formula is:
[0023]
[0024] In the formula, ρ ns is the density of the mixed fluid without slip; v m is the mixed fluid flow rate; μ m is the viscosity of the mixed fluid;
[0025] Mixed fluid viscosity μ m The calculation formula is:
[0026]
[0027] In the formula, μ l is the viscosity of the liquid in the mixed fluid; μ g is the viscosity of gas in the mixed fluid;
[0028] Mixed fluid flow rate v m The calculation formula is:
[0029]
[0030] In the formula, q l is the gas flow rate in the mixed fluid at the vertical outlet section; q g is the flow rate of liquid in the mixed fluid at the vertical outlet section; q m is the flow rate of the mixed fluid in the vertical outlet section;
[0031] Density of the non-slip mixed fluid ρ ns The calculation formula is:
[0032] ρ ns =ρ l λ l +ρ g (1-λ l ) (8)
[0033]
[0034] In the formula, λ l is the volume holdup;
[0035] By combining formulas (1)-(9), the pressure at each height of the horizontal well section can be calculated.
[0036] Furthermore, the energy conservation model of the mixture of the main stage mixed fluid and the first perforation stage produced fluid is:
[0037] (G g1 CP g01 +G l1 C Pl01 )(T0-T1)=(G g2 C pg2 +G l2 C Pl2 )(T2-T0) (10)
[0038] In the formula, G g1 is the gas production at the first perforation section; G l1 is the liquid production at the first perforation section; G g2 is the gas production of the upstream main section of the first perforation section; G l2 Liquid production of the upstream main section of the first perforation section; CP g01 is the constant pressure specific heat capacity of the gas at the first perforation section at temperature T1; C Pl01 is the constant pressure specific heat capacity of the liquid at the first perforation section at temperature T1; T0 is the temperature of the fluid at the first perforation section after mixing with the fluid in the upstream main section of the first perforation section; T1 is the temperature at the first perforation section; C Pg2 The constant pressure specific heat capacity of the liquid at the upstream main section of the first perforation section at temperature T2; C Pl2 is the constant pressure specific heat capacity of the liquid at the upstream main section of the first perforation section at temperature T2; T2 is the temperature at the upstream main section of the first perforation section;
[0039] Among them, the mass conservation is followed before and after the mixing of the front and rear fluids, and the calculation formula is:
[0040] G g2 =G g0 -G g1 (11)
[0041] G l2 =G l0 -G l1 (12)
[0042] In the formula, G g0 G is the gas production of the mixed fluid after mixing at the first perforation section; l0 is the liquid production of the mixed fluid after mixing at the first perforation section.
[0043] Furthermore, the gas-liquid heat conservation model at the first perforation section includes:
[0044] G g1 C Pg1 T g1 +G l1 C Pl1 T l1 =G g1 CP g01 T1-G l1C Pl01 T1 (13)
[0045] Where, T g1 is the inflow temperature of the gas at the first perforation section; T l1 is the inflow temperature of the liquid at the first perforation section;
[0046] The inflow temperature of the liquid at the first perforation section is T l1 Using the measurable formation temperature T e , the inflow temperature of the gas at the first perforation section is T g1 It is calculated by the coke effect coefficient and the pressure of the horizontal well section.
[0047] Furthermore, by combining formulas (10)-(13), the gas production and liquid production at the first perforation section and the gas production and liquid production of the main section upstream of the first perforation section are calculated.
[0048] In the second aspect, a quantitative prediction system for single perforation production of a horizontal gas well is provided, comprising:
[0049] A data acquisition module, used to obtain the temperature and liquid holdup of each section of the horizontal gas well and the total gas production and total liquid production of the vertical outlet section;
[0050] The pressure drop calculation module is used to calculate the pressure of the main section through the pre-built vertical pressure drop model;
[0051] The single perforation production calculation module is used to take the single perforation near the vertical outlet section as the first perforation section, and calculate the gas production and liquid production at the first perforation section and the gas production and liquid production of the main section upstream of the first perforation section according to the pre-established energy conservation model of the mixed fluid of the main section and the produced fluid of the first perforation section and the gas-liquid heat conservation model at the first perforation section; and repeat the above steps according to the gas production and liquid production of the main section upstream of the first perforation to calculate the gas production and liquid production of each perforation section and the gas content and liquid production of the main section upstream of each perforation section.
[0052] In a third aspect, a computer device is provided, including a processor and a storage medium;
[0053] The storage medium is used to store instructions;
[0054] The processor is used to operate according to the instructions to execute the steps of any of the methods described above.
[0055] In a fourth aspect, a computer-readable storage medium is provided, on which a computer program is stored, and when the program is executed by a processor, the steps of any of the above methods are implemented.
[0056] Compared with the prior art, the present invention has the following beneficial effects:
[0057] The present invention obtains the temperature of each section of the horizontal gas well through DTS measurement, and calculates the oil and gas production of each single perforation in the horizontal well section by building a vertical pressure drop model based on the liquid holdup data. Predicting the production of horizontal gas wells through the minimum test parameters will greatly improve the production efficiency of oil and gas wells, and can accurately judge the oil and gas reserves of the well section in advance to reduce costs and improve work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0058] Figure 1 is a flow chart of the quantitative prediction method of the present invention;
[0059] Figure 2 is a structural diagram of a horizontal gas well in Example 1;
[0060] Figure 3 This is a diagram of the fluid mixing process in the horizontal gas well section in Example 1. DETAILED DESCRIPTION
[0061] The present invention will be further described below in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the present invention, and cannot be used to limit the protection scope of the present invention.
[0062] In the prior art, the production of each single perforation section in the well needs to measure various data in the well and calculate it through complex models. However, due to its extremely complex structure, it is very difficult to obtain various data of each single perforation section, which wastes manpower and material resources. The present invention can estimate the oil and gas production of a single perforation in a horizontal gas well by using the temperature data obtained by DTS and the pressure data calculated by building a vertical pressure drop model. Compared with other methods, it is simpler, uses fewer parameters, and effectively improves work efficiency.
[0063] like Figure 1 As shown, the quantitative prediction method of the present invention includes:
[0064] Obtain the temperature and liquid holdup of each section of the horizontal gas well, as well as the total gas production and total liquid production of the vertical outlet section;
[0065] The pressure in the main section is calculated using a pre-built vertical pressure drop model;
[0066] Taking the single perforation near the vertical exit section as the first perforation section, the gas production and liquid production at the first perforation section and the gas production and liquid production of the main section upstream of the first perforation section are calculated according to the pre-established energy conservation model of the mixed fluid of the main section and the produced fluid of the first perforation section and the gas-liquid heat conservation model at the first perforation section;
[0067] According to the gas production and liquid production of the upstream main section of the first perforation, the above steps are repeated to calculate the gas production and liquid production of each perforation section and the gas content and liquid production of the upstream main section of each perforation section.
[0068] Embodiment 1:
[0069] This embodiment provides a quantitative prediction method for the single perforation production of a horizontal gas well. Figure 2 As shown in the figure, the horizontal gas well used includes a vertical outlet section, a main section and a single perforation section, wherein the main section is connected to the vertical outlet section at the outlet of the horizontal gas well, and the outlet of each single perforation section is connected to the main section, and each single perforation section is named in sequence from the direction away from the vertical outlet section. The single perforation closest to the vertical outlet section is the first perforation section, and the mixing process is as follows: Figure 3 As shown, a mathematical model is established based on the oil-gas mixing process before and after the first perforation section to calculate the gas production and liquid production of the first perforation section.
[0070] Taking the first single perforation section as an example, the temperature of each section of the horizontal gas well, the liquid holdup, and the total gas production and total liquid production of the vertical outlet section are first obtained through DTS. The temperature data of each section include the temperature T0 after the fluid at the first perforation section is mixed with the fluid in the upstream main section of the first perforation section, the temperature T1 at the first perforation section, and the temperature T2 at the upstream main section of the first perforation section; the liquid holdup includes the mass liquid holdup H of the mixed fluid in the vertical outlet section. l and volume holdup λ l .
[0071] Then the pressure of the horizontal well section is calculated by the pre-built vertical pressure drop model. The vertical pressure drop model is:
[0072]
[0073] Where h is the depth; ρ m is the density of the mixed fluid; g is the acceleration due to gravity; f m is the mixed friction coefficient; G m is the mass flow rate of the mixed fluid; D is the wellhead diameter of the vertical outlet section; A is the cross-sectional area of the wellhead of the vertical outlet section.
[0074] Where, the density of the mixed fluid ρ m The calculation formula is:
[0075] ρ m =ρ l H l +ρ g (1-H l ) (2)
[0076] In the formula, ρ l is the density of gas in the mixed fluid; H l is the mass liquid holdup; ρ g is the density of the liquid in the mixed fluid.
[0077] Mixed fluid mass flow rate G m The calculation formula is:
[0078] G m =G g +G l =A(v sl ρ l +v sg ρ g ) (3)
[0079] In the formula, G g is the gas production of the mixed fluid; G l is the liquid production in the mixed fluid; v sl is the liquid superficial velocity; v sg is the gas superficial velocity.
[0080] Mixed friction coefficient f m The calculation formula is:
[0081]
[0082] In the formula, e is the base of natural logarithm; Re m is the Reynolds number of the gas and liquid phases in the mixed fluid.
[0083] Reynolds number of gas and liquid phases in mixed fluid m The calculation formula is:
[0084]
[0085] In the formula, ρ ns is the density of the mixed fluid without slip; v m is the mixed fluid flow rate; μ m is the viscosity of the mixed fluid.
[0086] Mixed fluid viscosity μ m The calculation formula is:
[0087]
[0088] In the formula, μ l is the viscosity of the liquid in the mixed fluid; μ g is the viscosity of gas in the mixed fluid.
[0089] Mixed fluid flow rate b m The calculation formula is:
[0090]
[0091] In the formula, q l is the gas flow rate in the mixed fluid at the vertical outlet section; q g is the flow rate of liquid in the mixed fluid at the vertical outlet section; qm is the flow rate of the mixed fluid in the vertical outlet section.
[0092] Density of the non-slip mixed fluid ρ ns The calculation formula is:
[0093] ρ ns =ρ l λ l +ρ g (1-λ l ) (8)
[0094]
[0095] In the formula, λ l is the volume holdup.
[0096] The viscosity of gas in the mixed fluid μ g The calculation formula is:
[0097]
[0098] Y=2.447-0.224X (13)
[0099]
[0100] M g =28.97ρ g (15)
[0101] In the formula, K is an intermediate variable; Mg is the relative molecular mass of natural gas; T l1 is the inflow temperature of the liquid at the first perforation section. In this embodiment, the measurable formation temperature T e ; X is the intermediate variable; Y is the intermediate variable; γ g is the relative density of gas; P0 is the surface pressure; Z is the compression coefficient of natural gas.
[0102] The viscosity of the liquid in the mixed fluid μ l The calculation formula is:
[0103]
[0104] According to formulas (11)-(15) and combined with formula (10), the viscosity μ of the gas in the mixed fluid can be directly calculated: g , and the viscosity μ of the liquid in the mixed fluid is calculated by formula (16): l Finally, formulas (1)-(9) are combined to calculate the pressure at each height of the horizontal well section.
[0105] An energy conservation model for the mixed fluid in the main section and the fluid produced in the first perforation section is established. The specific calculation formula of the model is:
[0106] (G g1 G Pg01 +G l1 C Pl01 )(T0-T1)=(G g2 C pg2 +G l2 P l2 )(T2-T0) (17)
[0107] In the formula, G g1 is the gas production at the first perforation section; G l1 is the liquid production at the first perforation section; G g2 is the gas production of the upstream main section of the first perforation section; G l2 Liquid production of the upstream main section of the first perforation section; C Pg01 is the constant pressure specific heat capacity of the gas at the first perforation section at temperature T1; C Plo1 is the constant pressure specific heat capacity of the liquid at the first perforation section at temperature T1; T0 is the temperature of the fluid at the first perforation section after mixing with the fluid in the upstream main section of the first perforation section; T1 is the temperature at the first perforation section; C Pg2 The constant pressure specific heat capacity of the liquid at the upstream main section of the first perforation section at temperature T2; C Pl2 is the constant-pressure specific heat capacity of the liquid at the upstream main section of the first perforation section at temperature T2; T2 is the temperature at the upstream main section of the first perforation section.
[0108] In the above formula, the three temperature values can be measured by the DTS system, and the specific heat capacity can also be obtained by looking up the table. The gas production G at the first perforation section needs to be calculated. g1 and liquid production G l1 and the gas production G of the upstream main section of the first perforation section g2 and liquid production G l2 .
[0109] The mass conservation law is followed before and after the mixing of the front and rear fluids, and the calculation formula is:
[0110] G g2 -G g0 -G g1 (18)
[0111] G l2 =G l0 -G l1 (19)
[0112] In the formula, G g0 G is the gas production of the mixed fluid after mixing at the first perforation section; l0 is the liquid production of the mixed fluid after mixing at the first perforation section, and the total gas production of the vertical outlet section is taken as G g0 , the total liquid production of the vertical outlet section is taken as Gl0 Both can be measured at the horizontal well outlet through the automatic gas-liquid metering device at the wellhead of the oil well.
[0113] The gas-liquid heat conservation model at the first perforation section is established. The calculation formula of the model is:
[0114] G g1 G Pg1 T g1 +G l1 G Pl1 T l1 =G g1 G Pg01 T1-G l1 C Pl01 T1 (20)
[0115] Where, T g1 is the inflow temperature of the gas at the first perforation section; T l1 is the inflow temperature of the liquid at the first perforation section. In this embodiment, the measurable formation temperature T e .
[0116] In the above formula, T g1 It can be calculated by the Jiaotang effect formula. The specific calculation formula is:
[0117]
[0118] Where P e is the measurable formation pressure; P is the working pressure of the horizontal well section, which can be directly calculated based on the vertical pressure drop model; α JT is the Jiaotang effect coefficient.
[0119] Jiaotang effect coefficient α JT It can be calculated by empirical formula:
[0120]
[0121]
[0122]
[0123] In the formula, f(P pr , T pr ) is; C pn is the specific molar heat capacity at constant pressure; P pc is the pseudo-critical pressure; T pc is the pseudo-critical temperature; P pr is the pressure to be compared; T pr is the temperature to be compared; P is the working pressure of the horizontal well section; T is the working temperature of fluid 1, that is, T=T1.
[0124] The coke effect coefficient α can be calculated from formulas (22)-(27): JT , and the inflow temperature T of the gas at the first perforation section is calculated according to formula (21): g1 ; Combine formulas (17)-(20) to calculate the gas production G at the first perforation section g1 and liquid production G l1 and the gas production G of the upstream main section of the first perforation section g2 and liquid production G l2 .
[0125] Finally, the gas production of the upstream main section of the first perforation section G g2 and liquid production G l2 As the initial value, the energy conservation model before and after the fluid mixing at the second perforation section and the gas-liquid heat conservation model at the second perforation section are established again. This is a cycle to calculate the gas and liquid production of each perforation section and the gas content and liquid production of the upstream main section of each perforation section.
[0126] The quantitative prediction method for the single perforation production of a horizontal gas well provided in this embodiment can estimate the oil and gas production of a single perforation of a horizontal gas well through the temperature data obtained by DTS and the pressure data calculated by building a vertical pressure drop model. Compared with other methods, it is simpler, uses fewer parameters, and effectively improves work efficiency. It provides our own method in the interpretation of oil and gas well data that is monopolized by foreign countries, and is extremely practical.
[0127] Embodiment 2:
[0128] This embodiment provides a quantitative prediction system for single perforation production of a horizontal gas well, including:
[0129] A data acquisition module, used to obtain the temperature and liquid holdup of each section of the horizontal gas well and the total gas production and total liquid production of the vertical outlet section;
[0130] The pressure drop calculation module is used to calculate the pressure of the main section through the pre-built vertical pressure drop model;
[0131] The single perforation production calculation module is used to take the single perforation near the vertical outlet section as the first perforation section, and calculate the gas production and liquid production at the first perforation section and the gas production and liquid production of the main section upstream of the first perforation section according to the pre-established energy conservation model of the mixed fluid of the main section and the produced fluid of the first perforation section and the gas-liquid heat conservation model at the first perforation section; and repeat the above steps according to the gas production and liquid production of the main section upstream of the first perforation to calculate the gas production and liquid production of each perforation section and the gas content and liquid production of the main section upstream of each perforation section.
[0132] Embodiment three:
[0133] This embodiment also provides a computer device, including a processor and a storage medium;
[0134] The storage medium is used to store instructions;
[0135] The processor is used to operate according to the instructions to perform the steps of the method:
[0136] Obtain the temperature and liquid holdup of each section of the horizontal gas well, as well as the total gas production and total liquid production of the vertical outlet section;
[0137] The pressure in the main section is calculated using a pre-built vertical pressure drop model;
[0138] Taking the single perforation near the vertical exit section as the first perforation section, the gas production and liquid production at the first perforation section and the gas production and liquid production of the main section upstream of the first perforation section are calculated according to the pre-established energy conservation model of the mixed fluid of the main section and the produced fluid of the first perforation section and the gas-liquid heat conservation model at the first perforation section;
[0139] According to the gas production and liquid production of the upstream main section of the first perforation, the above steps are repeated to calculate the gas production and liquid production of each perforation section and the gas production and liquid production of the upstream main section of each perforation section.
[0140] Embodiment 4:
[0141] The embodiment of the present invention further provides a computer-readable storage medium, on which a computer program is stored, and when the program is executed by a processor, the steps of the following method are implemented:
[0142] Obtain the temperature and liquid holdup of each section of the horizontal gas well, as well as the total gas production and total liquid production of the vertical outlet section;
[0143] The pressure in the main section is calculated using a pre-built vertical pressure drop model;
[0144] Taking the single perforation near the vertical exit section as the first perforation section, the gas production and liquid production at the first perforation section and the gas production and liquid production of the main section upstream of the first perforation section are calculated according to the pre-established energy conservation model of the mixed fluid of the main section and the produced fluid of the first perforation section and the gas-liquid heat conservation model at the first perforation section;
[0145] According to the gas production and liquid production of the upstream main section of the first perforation, the above steps are repeated to calculate the gas production and liquid production of each perforation section and the gas production and liquid production of the upstream main section of each perforation section.
[0146] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.
[0147] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0148] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0149] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 A step that specifies a function in one or more boxes.
[0150] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. A quantitative prediction method for single perforation production of a horizontal gas well, wherein the horizontal gas well comprises a vertical outlet section, a main section and a single perforation section, characterized in that: Quantitative forecasting methods include: Obtain the temperature and liquid holdup of each section of the horizontal gas well, as well as the total gas production and total liquid production of the vertical outlet section; The pressure of the main section is calculated by the pre-built vertical pressure drop model; the specific calculation method includes: Where h is the depth; ρ m is the density of the mixed fluid; g is the acceleration due to gravity; f m is the mixed friction coefficient; G m is the mass flow rate of the mixed fluid; D is the wellhead diameter of the vertical outlet section; A is the cross-sectional area of the wellhead of the vertical outlet section; Among them, the calculation formula of the mixed fluid density ρm is: r m =ρ l H l +r g (1-H l ) (2) In the formula, ρ l is the density of gas in the mixed fluid; H l is the mass liquid holdup; ρ g is the density of the liquid in the mixed fluid; Mixed fluid mass flow rate G m The calculation formula is: G m =G g +G l =A(v sl r l +v sg r g ) (3) In the formula, G g is the gas production of the mixed fluid; G l is the liquid production in the mixed fluid; v sl is the liquid superficial velocity; v sg is the gas superficial velocity; Mixed friction coefficient f m The calculation formula is: In the formula, e is the base of natural logarithm; Re m is the Reynolds number of gas and liquid phases in the mixed fluid; Reynolds number of gas and liquid phases in mixed fluid m The calculation formula is: In the formula, ρ ns is the density of the mixed fluid without slip; v m is the mixed fluid flow rate; μ m is the viscosity of the mixed fluid; The calculation formula of the mixed fluid viscosity μm is: In the formula, μ l is the viscosity of the liquid in the mixed fluid; μ g is the viscosity of gas in the mixed fluid; Mixed fluid flow rate v m The calculation formula is: In the formula, q l is the gas flow rate in the mixed fluid at the vertical outlet section; q g is the flow rate of liquid in the mixed fluid at the vertical outlet section; q m is the flow rate of the mixed fluid in the vertical outlet section; Density of the non-slip mixed fluid ρ ns The calculation formula is: r ns =ρ l l l +r g (1-l l ) (8) In the formula, λ l is the volume holdup; By combining formulas (1)-(9), the pressure at each height of the horizontal well section is calculated; Taking the single perforation near the vertical exit section as the first perforation section, the gas production and liquid production at the first perforation section and the gas production and liquid production of the main section upstream of the first perforation section are calculated according to the pre-established energy conservation model of the mixed fluid of the main section and the produced fluid of the first perforation section and the gas-liquid heat conservation model at the first perforation section; According to the gas production and liquid production of the upstream main section of the first perforation, the above steps are repeated to calculate the gas production and liquid production of each perforation section and the gas content and liquid production of the upstream main section of each perforation section.
2. The quantitative prediction method for single perforation production of horizontal gas wells according to claim 1 is characterized in that: The energy conservation model of the mixed fluid in the main section and the produced fluid in the first perforation section is: (G g1 C Pg01 +G l1 C Pl01 )(T0-T1)=(G g2 C pg2 +G l2 C pl2 )(T2-T0) (10) In the formula, G g1 is the gas production at the first perforation section; G l1 is the liquid production at the first perforation section; G g2 is the gas production of the upstream main section of the first perforation section; G l2 Liquid production of the upstream main section of the first perforation section; G Pg01 is the constant pressure specific heat capacity of the gas at the first perforation section at temperature T1; C Pl01 is the constant pressure specific heat capacity of the liquid at the first perforation section at temperature T1; T0 is the temperature of the fluid at the first perforation section after mixing with the fluid in the upstream main section of the first perforation section; T1 is the temperature at the first perforation section; C Pg2 The constant pressure specific heat capacity of the liquid at the upstream main section of the first perforation section at temperature T2; C Pl2 is the constant pressure specific heat capacity of the liquid at the upstream main section of the first perforation section at temperature T2; T2 is the temperature at the upstream main section of the first perforation section; Among them, the mass conservation is followed before and after the mixing of the front and rear fluids, and the calculation formula is: G g2 =G g0 -G g1 (11) G l2 =G l0 -G l1 (12) In the formula, G g0 G is the gas production of the mixed fluid after mixing at the first perforation section; l0 is the liquid production of the mixed fluid after mixing at the first perforation section.
3. The quantitative prediction method for single perforation production of horizontal gas wells according to claim 2 is characterized in that: The gas-liquid heat conservation model at the first perforation section includes: G g1 G Pg1 T g1 +G l1 C Pl1 T l1 =G g1 C Pg0 1 T -G l1 C Pl01 T1 (13) Where, T g1 is the inflow temperature of the gas at the first perforation section; T l1 is the inflow temperature of the liquid at the first perforation section; The inflow temperature of the liquid at the first perforation section is T l1 Using the measurable formation temperature T e , the inflow temperature of the gas at the first perforation section is T g1 It is calculated by the coke effect coefficient and the pressure of the horizontal well section.
4. The quantitative prediction method for single perforation production of horizontal gas wells according to claim 3 is characterized in that: By combining formulas (10)-(13), the gas production and liquid production at the first perforation section and the gas production and liquid production of the main section upstream of the first perforation section are calculated.
5. A quantitative prediction system for single perforation production of horizontal gas wells, characterized in that: include: A data acquisition module, used to obtain the temperature and liquid holdup of each section of the horizontal gas well and the total gas production and total liquid production of the vertical outlet section; The pressure drop calculation module is used to calculate the pressure of the main section through the pre-built vertical pressure drop model; A single perforation production calculation module is used to calculate the gas production and liquid production at the first perforation section and the gas production and liquid production at the main section upstream of the first perforation section, taking the single perforation near the vertical outlet section as the first perforation section, according to a pre-established energy conservation model of the mixed fluid of the main section and the produced fluid of the first perforation section and a gas-liquid heat conservation model at the first perforation section; and repeating the above steps according to the gas production and liquid production of the upstream main section of the first perforation to calculate the gas production and liquid production of each perforation section and the gas content and liquid production of the upstream main section of each perforation section; The pressure drop calculation module is used to calculate the pressure of the main section through a pre-built vertical pressure drop model. The specific calculation method includes: Where h is the depth; ρ m is the density of the mixed fluid; g is the acceleration due to gravity; f m is the mixed friction coefficient; G m is the mass flow rate of the mixed fluid; D is the wellhead diameter of the vertical outlet section; A is the cross-sectional area of the wellhead of the vertical outlet section; Among them, the calculation formula of the mixed fluid density ρm is: r m =p l H l +r g (1-H l ) (2) In the formula, ρ l is the density of gas in the mixed fluid; H l is the mass liquid holdup; ρ g is the density of the liquid in the mixed fluid; Mixed fluid mass flow rate G m The calculation formula is: G m =G g +G l =A(v sl r l +v sg r g ) (3) In the formula, G g is the gas production of the mixed fluid; G l is the liquid production in the mixed fluid; v sl is the liquid superficial velocity; v sg is the gas superficial velocity; Mixed friction coefficient f m The calculation formula is: In the formula, e is the base of natural logarithm; Re m is the Reynolds number of gas and liquid phases in the mixed fluid; Reynolds number of gas and liquid phases in mixed fluid m The calculation formula is: In the formula, ρ ns is the density of the mixed fluid without slip; v m is the mixed fluid flow rate; μ m is the viscosity of the mixed fluid; The calculation formula of the mixed fluid viscosity μm is: In the formula, μl is the viscosity of the liquid in the mixed fluid; μg is the viscosity of the gas in the mixed fluid; Mixed fluid flow rate v m The calculation formula is: In the formula, q l is the gas flow rate in the mixed fluid at the vertical outlet section; q g is the flow rate of liquid in the mixed fluid at the vertical outlet section; q m is the flow rate of the mixed fluid in the vertical outlet section; Density of the non-slip mixed fluid ρ ns The calculation formula is: r ns =ρ l l l +r g (1-l l ) (8) In the formula, λ l is the volume holdup; By combining formulas (1)-(9), the pressure at each height of the horizontal well section can be calculated.
6. A computer device, characterized in that: including processor and storage medium; The storage medium is used to store instructions; The processor is used to operate according to the instructions to execute the steps of the method according to any one of claims 1 to 4.
7. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the steps of the method according to any one of claims 1 to 4 are implemented.
