A source-grid-load coordinated dispatching method and system taking air conditioning load into consideration
By incorporating the air conditioner load into the source grid-load collaborative scheduling model and dealing with the problem of linear planning as a mixed integer, the problems of carbon emission impact and insufficient load scheduling accuracy in the power system are solved, and fast and effective source grid-load collaborative scheduling is achieved.
Patent Information
- Application Number
- CN202210499433.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-05-09
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2042-05-09
AI Technical Summary
The existing power system has not fully considered the impact of carbon emissions in the coordinated scheduling of source and grid loads, the load scheduling accuracy is insufficient, and the scheduling speed is slow, especially the role of air conditioning load in scheduling has not been fully utilized.
The air conditioner load is included in the source network load collaborative scheduling model and dealt with as a mixed integer linear planning problem. Through the virtual energy storage model and carbon emission marginal cost optimization, the scheduling results of the generator set and air conditioner load are quickly and efficiently obtained.
提高了发电厂发电机组和空调负荷的调度精度和速度,充分考虑了碳排放影响,实现了源网荷协同调度的快速有效性。
Smart Images

Figure CN115062817B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of source-grid-load coordinated scheduling, and in particular, relates to a source-grid-load coordinated scheduling method and system taking air-conditioning load into consideration. Background Art
[0002] The statements in this section merely provide background information related to the present invention and do not necessarily constitute prior art.
[0003] The proportion of new energy installed capacity continues to rise, and the traditional power system continues to evolve towards a new power system with new energy as the main body. Carbon emissions need to be fully considered in dispatching and operation. New energy power generation is characterized by randomness and intermittency, and new energy as the main body will inevitably lead to a decrease in the proportion of traditional thermal power. It will be very difficult for the power system to regulate only by the power supply side. The traditional "source follows load" power system operation mode needs to be transformed into a "source-grid-load interaction" mode, and the role of controllable loads in power system control has begun to become prominent.
[0004] Air conditioning load is a typical controllable load. On the one hand, it accounts for a high proportion of the load; on the other hand, air conditioning load has a certain "thermal inertia" and the temperature changes relatively slowly. Short-term control of air conditioning load will not affect user comfort. These two reasons make air conditioning load a focus of attention in power system control, and its effectiveness has also been verified in many projects.
[0005] The current power system source-grid-load coordinated dispatching operation has the following shortcomings:
[0006] (1) The impact of carbon emissions is not fully considered in current dispatch operations;
[0007] (2) The load is not considered deeply enough, which affects the dispatching accuracy of generator sets and air conditioning loads;
[0008] (3) It is not possible to quickly and effectively obtain the coordinated dispatch results of sources, grids and loads, and to quickly dispatch generator sets and air-conditioning loads. Summary of the invention
[0009] In order to solve the technical problems existing in the above-mentioned background technology, the present invention provides a source-grid-load coordinated scheduling method and system taking into account the air-conditioning load, which fully considers the influence of the air-conditioning load and processes the model into a mixed integer linear programming problem, so that the scheduling results can be obtained quickly and effectively, thereby improving the scheduling accuracy and speed of the power plant's generator sets and air-conditioning loads.
[0010] In order to achieve the above object, the present invention adopts the following technical solution:
[0011] A first aspect of the present invention provides a source-grid-load coordinated scheduling method taking into account air conditioning load, comprising:
[0012] Obtain power system related parameters;
[0013] Based on relevant parameters, the source-grid-load coordinated scheduling model and solver are used to obtain the generating power, generating reserve and air conditioning load reserve of the generating set;
[0014] Based on the power generation power of the generator set, the generator set power generation standby and the air conditioning load standby, the generator set and the air conditioning load in the power system are dispatched;
[0015] Among them, the source-grid-load coordinated dispatch model includes the load response constraints and power balance constraints of the power system under several anticipated accidents. The load response constraints and power balance constraints under each anticipated accident are related to the air-conditioning load response amount. The air-conditioning load response amount under each anticipated accident is constrained by the virtual energy storage model of the air-conditioning load.
[0016] Furthermore, the load response condition under each anticipated accident is constrained as follows: the air-conditioning load response amount under each anticipated accident is less than or equal to the air-conditioning load reserve under the corresponding anticipated accident.
[0017] Furthermore, the power balance constraint under the kth anticipated accident is:
[0018]
[0019] in, is the node admittance matrix under the kth anticipated accident, is the generator unit position matrix under the kth expected accident, is the phase angle of the tth period under the kth anticipated accident, is the generator power generated in the tth period under the kth expected accident, d t is the load vector of the tth period, It represents the response of all air conditioning loads in the tth period under the kth expected accident.
[0020] Furthermore, the virtual energy storage model of the air conditioning load is:
[0021]
[0022] Among them, X t is the amount of virtual energy storage corresponding to the air conditioning load in the tth period, λ=(1-a)C / K, a=e -Kτ / C is the loss rate of virtual energy storage, K is the thermal conductivity of the room, C is the heat capacity of the room, τ is the control interval, y ini is the proportion of air conditioning load in the on state in the initial state, is the air conditioning load response in the tth period under a certain expected accident, P ac,iniis the air conditioning load power in the initial state, P N Indicates the rated power of the air conditioning load, T o 、T + and T - They represent outdoor temperature, upper limit of air-conditioning set temperature and lower limit of air-conditioning set temperature respectively, and α represents the energy efficiency ratio of air-conditioning load.
[0023] Furthermore, the source-grid-load coordinated dispatch model also includes line power equation constraints, line power upper and lower limit constraints, and power generation power upper and lower limit constraints under several anticipated accidents of the power system.
[0024] Furthermore, the source-grid-load coordinated dispatching model also includes power generation balance constraints, line power equality constraints, line power upper and lower limit constraints, power generation upper and lower limit constraints, power generation ramp constraints, power generation reserve constraints and load reserve non-negative constraints during normal operation of the power system.
[0025] Furthermore, the source-grid-load coordinated dispatch model aims to minimize the power generation operation costs of all units, the power generation standby costs of all units, the air conditioning load standby costs and the marginal costs of carbon emissions.
[0026] A second aspect of the present invention provides a source-grid-load coordinated dispatching system taking into account air conditioning load, comprising:
[0027] A parameter acquisition module, which is configured to: acquire power system related parameters;
[0028] A calculation module is configured to: obtain the power generation of the generator set, the power generation reserve of the generator set and the air conditioning load reserve through a source-grid-load coordinated scheduling model and a solver based on relevant parameters;
[0029] A scheduling module, which is configured to: schedule the generator sets and air conditioning loads in the power system based on the generator set power generation, generator set power generation reserve and air conditioning load reserve;
[0030] Among them, the source-grid-load coordinated dispatch model includes the load response constraints and power balance constraints of the power system under several anticipated accidents. The load response constraints and power balance constraints under each anticipated accident are related to the air-conditioning load response amount. The air-conditioning load response amount under each anticipated accident is constrained by the virtual energy storage model of the air-conditioning load.
[0031] A third aspect of the present invention provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the steps in the source-grid-load coordinated scheduling method taking into account air conditioning load as described above.
[0032] The fourth aspect of the present invention provides a computer device, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, the steps in the source-grid-load coordinated scheduling method taking into account the air conditioning load as described above are implemented.
[0033] Compared with the prior art, the present invention has the following beneficial effects:
[0034] The present invention provides a source-grid-load coordinated scheduling method taking into account air-conditioning load, which fully considers the influence of air-conditioning load and processes the model into a mixed integer linear programming problem, so that the source-grid-load coordinated scheduling result can be obtained quickly and effectively, thereby improving the scheduling accuracy and speed of power plant generator sets and air-conditioning loads. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] The accompanying drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.
[0036] Figure 1 This is a flow chart of a source-grid-load coordinated scheduling method taking into account air conditioning load in accordance with the first embodiment of the present invention;
[0037] Figure 2 is an equivalent piecewise linearization schematic diagram of the carbon emission trading model of the first embodiment of the present invention;
[0038] Figure 3 This is a schematic diagram of a standby configuration in a scenario where air conditioning load is considered but carbon emissions are not considered according to the first embodiment of the present invention;
[0039] Figure 4 This is a schematic diagram of the standby configuration in the scenario of considering air conditioning load and carbon emission according to the first embodiment of the present invention. DETAILED DESCRIPTION
[0040] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0041] It should be noted that the following detailed descriptions are all illustrative and intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used herein have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs.
[0042] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit exemplary embodiments according to the present invention. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprising" and / or "including" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.
[0043] Embodiment 1
[0044] This embodiment provides a source-grid-load coordinated scheduling method taking into account air conditioning load, such as Figure 1 As shown, the specific steps include:
[0045] Step 1: Obtain power system related parameters.
[0046] Among them, power system related parameters include generator power parameters, power network parameters and power generation carbon emission parameters.
[0047] The power parameters of the generator include: the number of thermal power units, the capacity of the thermal power units, the climbing ability of the thermal power units (the down-climbing rate vector and the up-climbing rate vector of the generator), the power generation cost data (the power generation cost of a single unit) and the standby cost data (the standby cost coefficient of the generator, the standby cost of a single air-conditioning load aggregator), etc.
[0048] The power network parameters include: node admittance matrix, phase angle-line power matrix under DC power flow, line power limit, etc.
[0049] Power generation carbon emission parameters include: carbon emission per unit fuel consumption of all units C bf .
[0050] Step 2: Based on the relevant parameters obtained, the dispatching output (generated power) of the generator set, the generator set power reserve and the air conditioning load reserve are obtained through the source-grid-load coordinated dispatching model and the solver.
[0051] The source-grid-load coordinated dispatch model aims to minimize the power generation operation cost of all units, the power generation reserve cost of all units, the air conditioning load reserve cost and the marginal cost of carbon emissions, that is:
[0052]
[0053] Where: For power generation operating costs; For power generation standby costs; is the air conditioning load standby cost; p t , and They represent the power generation, power generation reserve and load reserve vectors in the tth period respectively; FC is the marginal cost of carbon emissions.
[0054] (1) Power generation and operation costs Among them, f i is the power generation cost of the i-th unit, p i,t is the output of the i-th unit in the t-th period, N G is the number of thermal power units.
[0055] (2) Power generation standby cost Among them, k R is the generator standby cost coefficient, R i,t is the backup capacity of the i-th unit in the t-th period.
[0056] (3) Air conditioning load standby cost Among them, f ac,i is the reserve cost of the i-th air conditioning load aggregator, R ac,i,t is the reserve of the i-th air conditioning load aggregator in the t period, N ac is the number of air conditioning load aggregators.
[0057] (4) Marginal cost of carbon emissions F C Carbon emissions per unit fuel consumption of all units C bf The specific calculation method of marginal cost of carbon emissions is as follows:
[0058] The traditional carbon emission cost is calculated by a step-by-step method. Under the premise that carbon emissions are higher than the free quota, when carbon emissions are lower than the carbon emission target, the marginal cost of carbon emissions will implement the first step-by-step price; when carbon emissions are higher than the carbon emission target, the marginal cost of carbon emissions will also increase accordingly. The formula is:
[0059]
[0060]
[0061] Where: F C is the carbon emission cost; E u is the carbon emission target; K E is the first stage price; K F is the price of each step; σ is the penalty coefficient; η is the interval length of the step; E p is carbon emissions; E q Free carbon emission quota.
[0062] The present invention selects the baseline method to set the free quota, which is more conducive to the implementation of the emission reduction incentive mechanism. The free carbon emission quota of the baseline method is
[0063]
[0064] Where: δ is the quota coefficient, the weighted result of the marginal emission factor of the power consumption and capacity of the present invention is 0.648; T is the optimization period; N G is the number of units; P Gti The output of the i-th thermal power unit in the t-th time period.
[0065] It should be noted that the traditional carbon emission cost model is a step-by-step model, which has nonlinear characteristics and is not conducive to subsequent optimization solutions. Figure 2 As shown, the traditional carbon emission cost model is equivalently piecewise linearized to obtain the carbon emission marginal cost calculation method of the present invention.
[0066]
[0067] Where: is a 0-1 integer variable constraining the nth segment, and is the carbon emission of each segment under the nth segment, and each segment corresponds to the carbon emission under each step. Indicates that the carbon emissions completely cover the sub-segment amounts under the nth segment, It means that the carbon emissions cannot fully cover the sub-segment amount under the nth segment. is the carbon emission of the nth segment, F C (0) is the initial carbon emission cost, s n is the slope of the nth segment, E p Carbon emissions are calculated based on the carbon emissions data of all units under unit fuel consumption. bf , combined with the amount C of unit fuel consumption tf and the unit fuel cost F G , the calculation method of carbon emissions is given as:
[0068]
[0069] The source-grid-load coordinated dispatch model includes normal operation constraints and accident constraints.
[0070] Normal operation constraints include power balance constraints, line power equality constraints, line power upper and lower limit constraints, power generation upper and lower limit constraints, power generation ramp constraints, power generation reserve constraints and load reserve non-negative constraints during normal operation of the power system.
[0071] The DC power flow is used to deal with the power balance problem, and the power balance constraint is
[0072] -M B θ t +M H p t =dt
[0073] Where: M B 、M H are the node admittance matrix and generator position matrix respectively; θ t and d t are the phase angle and load vector of the tth period respectively.
[0074] The line power equation constraint is
[0075] p f,t =M T θ t
[0076] Where: M T is the phase angle-line power matrix under DC power flow; p f,t is the line power.
[0077] The upper and lower limits of line power and the upper and lower limits of power generation are:
[0078] -p f,max ≤p f,t ≤p f,max
[0079] p min ≤p t ≤p max
[0080] Where: p min and p max Respectively represent the minimum and maximum values of the generated power, p f,max Indicates the line power limit.
[0081] The power generation ramp constraint is
[0082] -r d Δt≤p t -p t-1 ≤r u Δt
[0083] Where: r d 、r u are the generator down ramp rate vector and up ramp rate vector respectively, and Δt is the scheduling time interval.
[0084] In addition to considering the power margin, the power reserve also needs to consider whether the ramp rate can be met. The power reserve constraint is
[0085]
[0086] In the formula, τ R Indicates the backup response time after an incident.
[0087] The load reserve non-negative constraint is
[0088]
[0089] The accident constraints include load response constraints of the power system under several (K) expected accidents, power balance constraints, line power equation constraints, line power upper and lower limit constraints, and power generation power upper and lower limit constraints.
[0090] The load response constraint under the kth expected accident is: the air conditioning load response under each expected accident is less than or equal to the air conditioning load reserve under the corresponding expected accident, expressed as:
[0091]
[0092] Where: superscript k represents the kth anticipated accident, k = 1, 2,…, K.
[0093] The power balance constraint under the kth anticipated accident is:
[0094]
[0095] Where: It represents the response of all air-conditioning loads in the system in the tth period under the kth expected accident, and is constrained by the virtual energy storage model of the air-conditioning load; is the node admittance matrix under the kth anticipated accident, is the generator unit position matrix under the kth expected accident, is the phase angle of the tth period under the kth anticipated accident, is the generator power generated in the tth period under the kth expected accident, d t is the load vector of the tth period (the load situation will not change under different expected accidents). The air conditioning load is a typical temperature control load with a certain "thermal inertia", that is, short-term control will not significantly affect the user's comfort. The essence of the "thermal inertia" of the air conditioning load is that it has the "thermal energy storage" characteristic. The energy is stored in the room in the form of a temperature gradient, corresponding to the amount of energy stored, and the air conditioning load corresponds to the power situation of the energy storage. The room temperature is changed by controlling the air conditioning load. Generally, the temperature changes slowly, thus showing "thermal inertia". Therefore, the virtual energy storage model of the air conditioning load is:
[0096]
[0097] Where: X t is the amount of energy corresponding to the virtual energy storage in the air conditioning load during the tth period; a = e -Kτ / C is the loss rate of virtual energy storage, corresponding to the speed of energy change; K and C are the thermal conductivity and heat capacity of the room respectively; T o 、T+ and T - Respectively represent the outdoor temperature, the upper limit of the air conditioning set temperature and the lower limit of the air conditioning set temperature; ini is the proportion of air conditioning load in the on state in the initial state, P ac,ini is the air conditioning load power in the initial state; α and P N They represent the energy efficiency ratio (Coefficient of Performance, COP) and rated power of the air conditioning load respectively; is the response of the air conditioning load in the tth period under a certain expected accident (i.e., the response result of an air conditioning load aggregator); τ is the control interval; λ = (1-a) C / K is the approximation of the air conditioning control interval, and its value is close to τ. Traditional scheduling is mainly the tracking of the power supply to the load. The present invention further considers the participation of the load in scheduling, thereby realizing "source-load interaction".
[0098] The line power equation constraint under the kth anticipated accident is:
[0099]
[0100] The upper and lower limits of line power under the kth expected accident are:
[0101]
[0102] The upper and lower limits of power generation under the kth anticipated accident are:
[0103]
[0104] Where: is the start and stop status of the unit in period t under the kth anticipated accident.
[0105] It can be clearly seen from the source-grid-load coordinated scheduling model of the present invention that the objectives and constraints are linear, and the problem to be solved becomes a mixed integer linear programming, which can be solved by mature solvers (such as CPLEX, GUROBI, etc.).
[0106] Step 3: Based on the obtained generating power of the generating set, generating reserve of the generating set and air conditioning load reserve, the generating set and air conditioning load in the power system are dispatched.
[0107] The present invention converts the problem into a mixed integer linear programming problem by linearizing the nonlinear links, which is convenient for solving and can quickly and effectively obtain the source-grid-load coordinated scheduling result; the present invention fully considers the impact of carbon emissions, deeply considers the characteristics of air-conditioning loads, quickly and effectively obtains the source-grid-load coordinated scheduling result, and improves the scheduling accuracy and speed of power plant generator sets and air-conditioning loads.
[0108] Considering the scenario of air conditioning load without carbon emission and considering the scenario of air conditioning load and carbon emission, the power generation and load standby are as follows: Figure 3 and Figure 4 shown.
[0109] Embodiment 2
[0110] This embodiment provides a source-grid-load coordinated scheduling system taking into account air conditioning load, which specifically includes the following modules:
[0111] A calculation module is configured to: obtain the power generation of the generator set, the power generation reserve of the generator set and the air conditioning load reserve through a source-grid-load coordinated scheduling model and a solver based on relevant parameters;
[0112] A scheduling module, which is configured to: schedule the generator sets and air conditioning loads in the power system based on the generator set power generation, generator set power generation reserve and air conditioning load reserve;
[0113] Among them, the source-grid-load coordinated dispatch model includes the load response constraints and power balance constraints of the power system under several anticipated accidents. The load response constraints and power balance constraints under each anticipated accident are related to the air-conditioning load response amount. The air-conditioning load response amount under each anticipated accident is constrained by the virtual energy storage model of the air-conditioning load.
[0114] It should be noted here that each module in this embodiment corresponds to each step in Example 1 one by one, and the specific implementation process is the same, which will not be repeated here.
[0115] Embodiment 3
[0116] This embodiment provides a computer-readable storage medium having a computer program stored thereon. When the program is executed by a processor, the steps in the source-grid-load coordinated scheduling method taking into account the air-conditioning load as described in the first embodiment above are implemented.
[0117] Embodiment 4
[0118] This embodiment provides a computer device, including a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the program, the steps in the source-grid-load coordinated scheduling method taking into account the air conditioning load as described in the first embodiment above are implemented.
[0119] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of hardware embodiments, software embodiments, or embodiments combining software and hardware. Furthermore, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage and optical storage, etc.) containing computer-usable program code.
[0120] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0121] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0122] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0123] A person skilled in the art can understand that all or part of the processes in the above-mentioned embodiments can be implemented by instructing the relevant hardware through a computer program, and the program can be stored in a computer-readable storage medium, and when the program is executed, it can include the processes of the embodiments of the above-mentioned methods. The storage medium can be a disk, an optical disk, a read-only memory (ROM) or a random access memory (RAM), etc.
[0124] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A source-grid-load coordinated dispatching method taking into account air conditioning load, characterized in that: include: Obtain power system related parameters; Based on relevant parameters, the source-grid-load coordinated scheduling model and solver are used to obtain the generating power, generating reserve and air conditioning load reserve of the generating set; Based on the power generation power of the generator set, the generator set power generation standby and the air conditioning load standby, the generator set and the air conditioning load in the power system are dispatched; The source-grid-load coordinated dispatch model includes load response constraints and power balance constraints of the power system under several expected accidents. The load response constraints and power balance constraints under each expected accident are related to the air-conditioning load response amount. The air-conditioning load response amount under each expected accident is constrained by the virtual energy storage model of the air-conditioning load. The source-grid-load coordinated dispatch model aims to minimize the power generation operation cost of all units, the power generation reserve cost of all units, the air conditioning load reserve cost and the marginal cost of carbon emissions; Among them, the marginal cost of carbon emissions F C Carbon emissions per unit fuel consumption of all units C bf The specific calculation method of marginal cost of carbon emissions is as follows: Where: is a 0-1 integer variable constraining the nth segment, and is the carbon emission of the nth segment, Indicates that the carbon emissions completely cover the sub-segment amounts under the nth segment, It means that the carbon emissions cannot fully cover the sub-segment amount under the nth segment. is the carbon emission of the nth segment, F C (0) is the initial carbon emission cost, s n is the slope of the nth segment, E p For carbon emissions.
2. A source-grid-load coordinated dispatching method taking into account air conditioning load as claimed in claim 1, characterized in that: The load response constraint under each anticipated accident is that the air conditioning load response amount under each anticipated accident is less than or equal to the air conditioning load reserve under the corresponding anticipated accident.
3. A source-grid-load coordinated dispatching method taking into account air conditioning load as claimed in claim 1, characterized in that: The power balance constraint under the kth anticipated accident is: in, is the node admittance matrix under the kth anticipated accident, is the generator unit position matrix under the kth expected accident, is the phase angle of the tth period under the kth anticipated accident, is the generator power generated in the tth period under the kth expected accident, d t is the load vector of the tth period, It represents the response of all air conditioning loads in the tth period under the kth expected accident.
4. A source-grid-load coordinated dispatching method taking into account air conditioning load as claimed in claim 1, characterized in that: The virtual energy storage model of the air conditioning load is: Among them, X t is the amount of virtual energy storage corresponding to the air conditioning load in the tth period, λ=(1-a)C / K, a=e -Kτ / C is the loss rate of virtual energy storage, K is the thermal conductivity of the room, C is the heat capacity of the room, τ is the control interval, y ini is the proportion of air conditioning load in the on state in the initial state, is the air conditioning load response in the tth period under a certain expected accident, P ac,ini is the air conditioning load power in the initial state, P N Indicates the rated power of the air conditioning load, T o 、T + and T - They represent outdoor temperature, upper limit of air-conditioning set temperature and lower limit of air-conditioning set temperature respectively, and α represents the energy efficiency ratio of air-conditioning load.
5. The source-grid-load coordinated dispatching method taking into account air conditioning load as claimed in claim 1, characterized in that: The source-grid-load coordinated dispatch model also includes line power equation constraints, line power upper and lower limit constraints, and power generation power upper and lower limit constraints under several anticipated accidents of the power system.
6. The source-grid-load coordinated dispatching method taking into account air conditioning load as claimed in claim 1, characterized in that: The source-grid-load coordinated dispatching model also includes power generation balance constraints, line power equality constraints, line power upper and lower limit constraints, power generation upper and lower limit constraints, power generation ramp constraints, power generation reserve constraints and load reserve non-negative constraints during normal operation of the power system.
7. A source-grid-load coordinated dispatching system taking into account air conditioning load, characterized in that: include: A parameter acquisition module, which is configured to: acquire power system related parameters; A calculation module is configured to: obtain the power generation of the generator set, the power generation reserve of the generator set and the air conditioning load reserve through a source-grid-load coordinated scheduling model and a solver based on relevant parameters; A scheduling module, which is configured to: schedule the generator sets and air conditioning loads in the power system based on the generator set power generation, generator set power generation reserve and air conditioning load reserve; The source-grid-load coordinated dispatch model includes load response constraints and power balance constraints of the power system under several expected accidents. The load response constraints and power balance constraints under each expected accident are related to the air-conditioning load response amount. The air-conditioning load response amount under each expected accident is constrained by the virtual energy storage model of the air-conditioning load. The source-grid-load coordinated dispatch model aims to minimize the power generation operation cost of all units, the power generation reserve cost of all units, the air conditioning load reserve cost and the marginal cost of carbon emissions; Among them, the marginal cost of carbon emissions F C Carbon emissions per unit fuel consumption of all units C bf The specific calculation method of marginal cost of carbon emissions is as follows: Where: is a 0-1 integer variable constraining the nth segment, and is the carbon emission of the nth segment, Indicates that the carbon emissions completely cover the sub-segment amounts under the nth segment, It means that the carbon emissions cannot fully cover the sub-segment amount under the nth segment. is the carbon emission of the nth segment, F C (0) is the initial carbon emission cost, s n is the slope of the nth segment, E p For carbon emissions.
8. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the steps in a source-grid-load coordinated scheduling method taking into account air-conditioning load are implemented as described in any one of claims 1-6.
9. A computer device comprising a memory, a processor and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the program, the steps in the source-grid-load coordinated scheduling method taking into account the air-conditioning load are implemented as described in any one of claims 1-6.