A method for two-level voltage risk control strategy in distribution network with high photovoltaic penetration
By establishing photovoltaic output and load probability models and new voltage risk indicators, and using genetic algorithms to optimize and adjust controllable variables, the problem of distribution network voltage fluctuation and limit violation in high-penetration photovoltaic scenarios has been solved, and the operation safety of the distribution network has been improved. sex.
Patent Information
- Application Number
- CN202210834697.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-07-14
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2042-07-14
AI Technical Summary
Voltage fluctuations and over-limit problems in distribution network operation in high-penetration photovoltaic scenarios affect operational safety. Especially when the load suddenly increases or photovoltaic output changes drastically, it is difficult to effectively control voltage risks.
Establish photovoltaic output and load probability models, construct new voltage risk indicators and minimum objective functions, optimize and adjust controllable variables through genetic algorithms, estimate and reduce distribution network voltage risks, and take voltage control measures in advance.
Nodes with large voltage change rates can be discovered in advance, reducing potential voltage over-limit risks and improving the safety of distribution network operations.
Smart Images

Figure CN115102178B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a method for a two-stage voltage risk control strategy for a distribution network in a high-penetration photovoltaic scenario, and belongs to the field of operation safety optimization and energy scheduling. Background Art
[0002] With the implementation of global carbon reduction policies, photovoltaic power has great potential as a new type of power source. All countries are actively developing photovoltaic power generation technology and promoting the development of the photovoltaic industry. However, due to the volatility and uncertainty of photovoltaic output, a series of operational safety issues have been caused when photovoltaic grid-connected. Especially in high-penetration photovoltaic scenarios, the voltage over-limit problem is particularly serious. In emergencies such as sudden increase in load or drastic changes in photovoltaic output, the safety of distribution network operation is affected. Summary of the invention
[0003] Technical issues
[0004] The present invention provides a method for a two-stage voltage risk control strategy for a distribution network in a high-penetration photovoltaic scenario, which can detect potential voltage risk nodes in advance and take voltage control measures to reduce the risk of distribution network operation.
[0005] Technical Solution
[0006] A method for a two-level voltage risk control strategy for a distribution network in a high-penetration photovoltaic scenario, the method comprising the following steps:
[0007] (1) Establishing a photovoltaic output and load probability model, wherein the photovoltaic output and load probability model includes: a photovoltaic output probability model, which is used to feedback the probability density of active power output by photovoltaic power sources in the distribution network; and a load output probability model, which is used to feedback the probability density of active power and reactive power of loads in the distribution network;
[0008] (2) Establish a new voltage risk indicator and a voltage risk minimization objective function for high-penetration photovoltaic scenarios constrained by photovoltaic output and load probability models;
[0009] (3) Adjusting controllable variables, including active power and reactive power of photovoltaic output of the distribution network in a 24-hour period, active power of load response and reactive power of load, connecting the adjusted controllable variables to the photovoltaic output and load probability model, and performing time series power flow optimization based on genetic algorithm for estimation;
[0010] (4) According to the objective function in step (2), the optimal input quantity for establishing the photovoltaic output and load probability model under each controllable variable is determined, so as to output the optimal controllable variable, and the daily distribution network voltage risk is minimized by outputting the optimal controllable variable.
[0011] Furthermore, the photovoltaic output probability model is constructed as follows:
[0012] In different scenarios, the sunlight intensity can be approximated as a Beta distribution, and its probability density function is as follows:
[0013]
[0014] In the formula, r max and r are the maximum light intensity and actual light intensity during this period, respectively. α and β are the shape parameters of the Beta distribution, which can be obtained from the mean μ and variance σ of the illumination in different scenes:
[0015]
[0016]
[0017] Assume that a solar cell array has m solar cell modules, and the photoelectric conversion efficiency and module area of the photovoltaic cell module are η respectively. i and A i (i=1,2,…,m), then the active power output by the photovoltaic cell array is:
[0018]
[0019] When considering the impact of photovoltaic power generation on the power grid, the principle of natural radiation conditions should be considered, and the influence of ambient temperature should be ignored. The above formula can be simplified as follows:
[0020]
[0021] Photovoltaic output is closely related to light intensity, and its specific expression is shown in (5);
[0022]
[0023] Combining the above formula, the probability density function of the active power output of the photovoltaic power source can be derived, as shown in the following formula:
[0024]
[0025] To simplify it:
[0026]
[0027] Where P max is the maximum output active power of the photovoltaic power source, P max =μηAr max ; r n is the rated light intensity.
[0028] Furthermore, the load output probability model is constructed as follows:
[0029]
[0030] Where P L is the active power of the load; μ P is the mathematical expectation value of the load active power; σ P is the standard deviation of load active power; Q L is the reactive power of the load; μ q is the mathematical expectation value of load reactive power; σ q is the standard deviation of the load reactive power.
[0031] Furthermore, new voltage risk indicators in high-penetration photovoltaic scenarios include:
[0032] Voltage timing fluctuation risk index
[0033]
[0034] ΔV i,s (t)=|V i,s (t)-V i,s (t-1)| (10)
[0035]
[0036] In the formula, Sev flu (V i,s ) is the voltage fluctuation risk severity function of node i in scenario S; V i,t,s is the voltage of node i at time t in scenario S; T is the number of cycles divided evenly per hour; Represents the average value of voltage change within a cycle; is the voltage fluctuation risk of node i at time t; ρ t,s is the probability of voltage fluctuation risk occurring at node i at time t under scenario S; is a binary variable indicating whether voltage fluctuation risk occurs;
[0037] Voltage timing over-limit risk indicator
[0038]
[0039] Among them, Sev vh (V i,t,s ) and Sev vL (V i,t,s ) represent the voltage overvoltage severity function of node i at time t and the voltage undervoltage severity function of node i at time t in scenario S respectively; voltage V max Indicates the upper limit of voltage, Vmin Indicates the lower limit of voltage;
[0040]
[0041] in, and is the node overvoltage risk and node undervoltage risk of node i at time t; ρ t,s It refers to the probability of overvoltage or undervoltage at node i at time t in scenario S; S∈Ω t is the set of selected scenes; and They are binary representations, using 0 and 1 to indicate whether overvoltage or undervoltage occurs; Represents any node; represents any time t;
[0042] Distribution network time sequence voltage risk index
[0043]
[0044] Where CRI is the comprehensive distribution network voltage risk index; weight values are α, β and γ.
[0045] Furthermore, the voltage risk minimization objective function includes:
[0046] Objective Function
[0047]
[0048] Constraints
[0049] d) Power flow equality constraints
[0050]
[0051] Where P i t and are the active power and reactive power injected by the i-th node at time t respectively; and are the active power and reactive power of the i-th PV unit at time t respectively; and are the active power and reactive power of the load at time t respectively; N is the number of photovoltaic units at time t.
[0052] e) PV output and load constraints
[0053]
[0054] In the formula, and It represents the predicted active and reactive output of photovoltaic power at time t; and It represents the controllable active power and reactive power of the i-th node load at time t.
[0055] f) Risk constraints
[0056] The distribution network needs to operate within a safe range, so voltage risks need to be constrained.
[0057]
[0058] In the formula, ε 1 ,ε 2 ,ε 3 Respectively indicate that overvoltage, undervoltage, and voltage fluctuation are acceptable risk levels.
[0059] Furthermore, the controllable variables are adjusted, including the active power and reactive power of the photovoltaic output of the distribution network in a 24-hour period, the active power of the load response and the reactive power of the load. The adjusted controllable variables are connected to the photovoltaic output and load probability model, and the time series power flow optimization based on the genetic algorithm is performed to make an estimate, including:
[0060] Step 1: Chromosome encoding of the controllable variables of the distribution network in a 24-hour period, including: photovoltaic output active power, reactive power, load response active power and load reactive power of the distribution network in a 24-hour period; photovoltaic output active power, reactive power, load response active power and load reactive power;
[0061] Step 2: Input each variable into the photovoltaic output and load probability model to calculate the power flow, conduct voltage timing risk assessment on each variable, and calculate the risk value of the distribution network in each time period;
[0062] Output the comprehensive distribution network voltage risk index under each variable, and calculate the fitness function of each population individual. The fitness function refers to the optimal objective function after satisfying the constraint conditions. For the population individuals that do not meet the constraints, they are eliminated by setting the penalty item 0, and those that meet the requirements proceed to step 6.
[0063] Step 3: When the number of iterations is met, go to step 4; if not, generate a new population through selection, crossover, and mutation operations between populations, and repeat steps 2-3.
[0064] The probability of each population being selected is:
[0065]
[0066] Among them, f iis the fitness function of the ith population.
[0067] Step 4: According to the fitness function, output the best variable that can minimize the daily distribution network voltage risk.
[0068] In some disclosures, the present application provides a device comprising:
[0069] one or more processors;
[0070] A memory for storing one or more programs;
[0071] When the one or more programs are executed by the one or more processors, the one or more processors implement the above-mentioned method of the two-level voltage risk control strategy for the distribution network in the high-penetration photovoltaic scenario.
[0072] In some disclosures, the present application provides a storage medium containing computer executable instructions, which, when executed by a computer processor, are used to implement the above-mentioned method of the two-level voltage risk control strategy for the distribution network in the high-penetration photovoltaic scenario.
[0073] Beneficial Effects
[0074] Compared with the prior art, the present invention has the following advantages:
[0075] The present invention proposes a new voltage risk indicator which takes voltage volatility into consideration. It can detect nodes with large voltage change rates in advance and take risk control measures in advance to reduce the risk of each potential voltage node exceeding the limit, thereby improving the safety of distribution network operation. BRIEF DESCRIPTION OF THE DRAWINGS
[0076] Figure 1 It is a flow chart of an embodiment of the present invention.
[0077] Figure 2 It is a new type of voltage risk indicator diagram of a distribution network established under an embodiment of the present invention.
[0078] Figure 3 It is a new voltage risk management flow chart based on genetic algorithm proposed in one embodiment of the present invention. DETAILED DESCRIPTION
[0079] The present invention is described in detail below with reference to the accompanying drawings.
[0080] The overall method flow of the present invention is described as follows:
[0081] Step 1: The present invention performs simulation analysis on the IEEE 33-node power distribution system, where the base capacity and base voltage of the system are 10 MVA and 12.66 kV respectively. There are 34 nodes in the system, and the photovoltaic installation nodes are nodes 5, 15, 18, 23, 26 and 31, with photovoltaic installation capacities of 1.2, 1.6, 1.2, 0.8, 1.3 and 1.5 MVA respectively, and the minimum power factor is set to 0.95;
[0082] Step 2: Establish a photovoltaic output and load probability model;
[0083] Photovoltaic output probability model
[0084] In different scenarios, the sunlight intensity can be approximated as a Beta distribution, and its probability density function is as follows:
[0085]
[0086] In the formula, r max and r are the maximum light intensity and actual light intensity during this period, respectively. α and β are the shape parameters of the Beta distribution, which can be obtained from the mean μ and variance σ of the illumination in different scenes:
[0087]
[0088]
[0089] Assume that a solar cell array has m solar cell modules, and the photoelectric conversion efficiency and module area of the photovoltaic cell module are η respectively. i and A i (i=1,2,…,m), then the active power output by the photovoltaic cell array is:
[0090]
[0091] When considering the impact of photovoltaic power generation on the power grid, the principle of natural radiation conditions should be considered, and the influence of ambient temperature should be ignored. The above formula can be simplified as follows:
[0092]
[0093] Photovoltaic output is closely related to light intensity, and its specific expression is shown in (5).
[0094]
[0095] Combining the above formula, the probability density function of the active power output of the photovoltaic power source can be derived, as shown in the following formula:
[0096]
[0097] To simplify it:
[0098]
[0099] Where P max is the maximum output active power of the photovoltaic power source, P max =μηAr max ; r n is the rated light intensity.
[0100] Load output probability model
[0101]
[0102] Where P L is the active power of the load; μ P is the mathematical expectation value of the load active power; σ P is the standard deviation of load active power; Q L is the reactive power of the load; μ q is the mathematical expectation value of load reactive power; σ q is the standard deviation of the load reactive power.
[0103] Step 3: Define new voltage risk indicators in high-penetration PV scenarios;
[0104] Voltage timing fluctuation risk index
[0105]
[0106] ΔV i,s (t)=|V i,s (t)-V i,s (t-1)| (10)
[0107]
[0108] In the formula, Sev flu (V i,s ) is the voltage fluctuation risk severity function of node i in scenario S; V i,t,s is the voltage of node i at time t in scenario S; T is the number of cycles divided evenly per hour; Represents the average value of voltage change within a cycle; is the voltage fluctuation risk of node i at time t; ρ t,s is the probability of voltage fluctuation risk occurring at node i at time t under scenario S; It is a binary variable indicating whether voltage fluctuation risk occurs.
[0109] Voltage timing over-limit risk indicator
[0110]
[0111] Among them, Sev vh (V i,t,s ) and Sev vL (V i,t,s ) represent the voltage overvoltage severity function of node i at time t and the voltage undervoltage severity function of node i at time t in scenario S respectively; voltage V max Indicates the upper limit of voltage, V min Indicates the lower limit of voltage.
[0112]
[0113] in, and is the node overvoltage risk and node undervoltage risk of node i at time t; ρ t,s It refers to the probability of overvoltage or undervoltage at node i at time t in scenario S; S∈Ω t is the set of selected scenes; and They are binary representations, using 0 and 1 to indicate whether overvoltage or undervoltage occurs; Represents any node; represents any time t.
[0114] Distribution network time sequence voltage risk index
[0115]
[0116] Where CRI is the comprehensive distribution network voltage risk index; the weight values α, β and γ are determined jointly according to the analytic hierarchy process and the entropy method; if the weight values α, β and γ are determined jointly according to the analytic hierarchy process and the entropy method, that is, the weights corresponding to the three indicators are first determined by the analytic hierarchy process as (a1, a2, a3) and then the weights corresponding to the three indicators are determined by the entropy method as (b1, b2, b3), then the weights of the three indicators obtained in combination are (c1, c2, c3), where c(i) = a(i)*b(i) / ∑(a(i)*b(i))(i = 1, 2, 3).
[0117] Step 4: Construct voltage risk minimization objective function;
[0118] 1. Objective Function
[0119]
[0120] 2. Constraints
[0121] g) Power flow equality constraints
[0122]
[0123] Where P i t and are the active power and reactive power injected by the i-th node at time t respectively; and are the active power and reactive power of the i-th PV unit at time t respectively; and are the active power and reactive power of the load at time t respectively; N is the number of photovoltaic units at time t.
[0124] h) Photovoltaic output and load constraints
[0125]
[0126] In the formula, and It represents the predicted active and reactive output of photovoltaic power at time t; and It represents the controllable active power and reactive power of the i-th node load at time t.
[0127] i) Risk Constraints
[0128] The distribution network needs to operate within a safe range, so voltage risks need to be constrained.
[0129]
[0130] In the formula, ε 1 ,ε 2 ,ε 3 Respectively indicate that overvoltage, undervoltage, and voltage fluctuation are acceptable risk levels.
[0131] Step 5: Voltage risk control solution strategy based on improved genetic algorithm;
[0132] 1. Read basic data, including distribution network load, line power, photovoltaic output and other basic parameters.
[0133] 2. Perform chromosome encoding on controllable variables such as active power, reactive power, and load response of photovoltaic power output in a 24-hour period.
[0134] 3. Population initialization, each individual in the population represents a solution.
[0135] 4. Convert the coded binary into real numbers, conduct voltage timing risk assessment for each scheme, and calculate the risk value of the distribution network in each time period.
[0136] 5. Output the CRI under each scheme and calculate the fitness function of each population individual. The fitness function refers to the optimal objective function after satisfying the constraints. For population individuals that do not meet the constraints, set the penalty item 0 to eliminate them, and those that meet the requirements proceed to step 6.
[0137] 6. When the number of iterations is met, go to step 7; if not, generate a new population through selection, crossover, and mutation operations between populations, and repeat steps 4-6.
[0138] The probability of each population being selected is:
[0139]
[0140] Among them, f i is the fitness function of the ith population.
[0141] 7. According to the fitness function, output the best optimization plan. This optimization plan can minimize the daily distribution network voltage risk.
[0142] The above describes the specific embodiments of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The above embodiments and the description are only method descriptions of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of the present invention is defined by the attached claims and their equivalents.
Claims
1. Method of two-level voltage risk control strategy for distribution network in high penetration photovoltaic scenario, It is characterized in that The method comprises the following steps: (1) Establishing a photovoltaic output and load probability model, wherein the photovoltaic output and load probability model includes: a photovoltaic output probability model, which is used to feedback the probability density of active power output by photovoltaic power sources in the distribution network; and a load output probability model, which is used to feedback the probability density of active power and the probability density of reactive power of load responses in the distribution network; (2) Establish a new voltage risk indicator and a voltage risk minimization objective function for high-penetration PV scenarios constrained by the PV output and load probability model; (3) Adjust the controllable variables, which include: the active power and reactive power of the photovoltaic output of the distribution network in a 24-hour period, the active power of the load response, and the reactive power of the load response. The adjusted controllable variables are connected to the photovoltaic output and load probability model to perform time series power flow optimization based on genetic algorithms and make estimates; (4) According to the objective function in step (2), determine the optimal input quantity for establishing the photovoltaic output and load probability model under each controllable variable, so as to output the optimal controllable variable, and use the output optimal controllable variable to achieve the minimum daily distribution network voltage risk; The photovoltaic output probability model is constructed as follows: In different scenarios, the sunlight intensity is considered as Beta distribution, and its probability density function is as follows: (1) Where f(r) is the probability density function of photovoltaic density, r max and r are the maximum light intensity and the actual light intensity during this period, α and β are the shape parameters of the Beta distribution, which can be obtained from the mean illumination value under different scenes. μ and variance σ Find: (2) Assume that a solar cell array is given with m The photovoltaic cell module has a photoelectric conversion efficiency and a module area of η i and A i ( i =1, 2, ⋯, m ), then the photovoltaic cell array at t 0 The active power output at any moment is: (3) When considering the impact of photovoltaic power generation on the power grid, the principle of natural radiation conditions should be considered, and the influence of ambient temperature should be ignored. The above formula can be simplified as follows: (4) Photovoltaic output is closely related to light intensity. r n is the rated light intensity, P max is the maximum output active power of the photovoltaic power source, and its specific expression is shown in (5): (5) Combining the above formula, the probability density function of the active power output of the photovoltaic power source can be derived, as shown in the following formula: (6) To simplify it: (7) In the formula, P max is the maximum output active power of the photovoltaic power source, P max = μηAr max ; r n is the rated light intensity; The load output probability model is constructed as follows: (8) In the formula, is the active power of load response; is the mathematical expectation value of the load active power; is the standard deviation of load active power; is the reactive power of the load response; is the mathematical expectation value of the load reactive power; is the standard deviation of the load reactive power.
2. The method of the two-level voltage risk control strategy for the distribution network in the high penetration photovoltaic scenario according to claim 1, It is characterized in that New voltage risk indicators in high-penetration photovoltaic scenarios include: Voltage timing fluctuation risk index (9) (10) (11) In the formula, is the voltage fluctuation risk severity function of node i under scenario S; is the voltage of node i at time t in scenario S; T is the number of cycles divided evenly per hour; Represents the average value of voltage change within a cycle; is the voltage fluctuation risk of node i at time t; is the probability of voltage fluctuation risk occurring at node i at time t under scenario S; is a binary variable indicating whether voltage fluctuation risk occurs; Voltage timing over-limit risk indicator (12) in, and They represent the voltage overvoltage severity function of node i at time t and the voltage undervoltage severity function of node i at time t in scenario S respectively; voltage Indicates the upper limit of voltage, Indicates the lower limit of voltage; (13) in, and is the node overvoltage risk and node undervoltage risk of node i at time t; It refers to the probability of overvoltage or undervoltage at node i at time t in scenario S; is the selected scene set; and They are binary representations, using 0 and 1 to indicate whether overvoltage or undervoltage occurs; Represents any node; represents any time t; Distribution network time sequence voltage risk index (14) In the formula, is the comprehensive distribution network voltage risk indicator; weight value , and .
3. The method of the double-stage voltage risk control strategy for the distribution network in the high penetration photovoltaic scenario according to claim 1, It is characterized in that Voltage risk minimization objective function, including: Objective Function (15) Constraints a) Power flow equality constraints (16) In the formula, and are the active power and reactive power injected by the i-th node at time t respectively; and are the active power and reactive power of the i-th PV unit at time t respectively; and are the active power and reactive power of the load response at time t respectively; N is the number of photovoltaic units at time t; b) PV output and load constraints (17) In the formula, and It represents the predicted active and reactive output of photovoltaic power at time t; and represents the controllable active power and reactive power of the i-th node load at time t; c) Risk Constraints The distribution network needs to operate within a safe range, so voltage risks need to be constrained; (18) In the formula, , , Respectively indicate that overvoltage, undervoltage, and voltage fluctuation are acceptable risk levels.
4. The method of the double-stage voltage risk control strategy for the distribution network in the high penetration photovoltaic scenario according to claim 1, It is characterized in that Adjust the controllable variables, which include: the active power and reactive power of the photovoltaic output of the distribution network in the 24-hour period, the active power of the load response and the reactive power of the load response. Connect the adjusted controllable variables to the photovoltaic output and load probability model, and perform time-series power flow optimization based on genetic algorithms to make estimates, including: Step 1: Chromosome encoding of the controllable variables of the distribution network in a 24-hour period, including: the active power and reactive power of the photovoltaic output of the distribution network in a 24-hour period, the active power of the load response, and the reactive power of the load response; Step 2: Input each variable into the photovoltaic output and load probability model to calculate the power flow, conduct voltage timing risk assessment on each variable, and calculate the risk value of the distribution network in each time period; Output the comprehensive distribution network voltage risk index under each variable, calculate the fitness function of each population individual, the fitness function refers to the optimal objective function after satisfying the constraint conditions; for the population individuals that do not meet the constraints, set the penalty item to eliminate them, and those that meet the requirements proceed to step 6; Step 3: When the number of iterations is met, go to step 4; if not, generate a new population through selection, crossover, and mutation operations between populations, and repeat steps 2-3; The probability of each population being selected is: (19) in, is the fitness function of the ith population; Step 4: According to the fitness function, output the best variable that can minimize the daily distribution network voltage risk.
5. A device, It is characterized in that include: one or more processors; A memory for storing one or more programs; When the one or more programs are executed by the one or more processors, the one or more processors implement the method for a two-level voltage risk control strategy for a distribution network in a high-penetration photovoltaic scenario as described in any one of claims 1-4.
6. A storage medium containing computer executable instructions, It is characterized in that The computer executable instructions are used to execute the method of the two-level voltage risk control strategy for the distribution network in the high penetration photovoltaic scenario as described in any one of claims 1-4 when executed by a computer processor.
