Aluminum veneer subframe and its application in aluminum veneer fine seam installation method
By designing the aluminum veneer sub-frame and the thin seam installation method, the problem of large gap width and unsightly appearance in the installation of aluminum veneer curtain wall is solved, the gap width is reduced and the amount of glue is saved, and the facade effect and installation are improved. efficiency.
Patent Information
- Application Number
- CN202210588188.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-05-27
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2042-05-27
AI Technical Summary
There are hidden dangers of water leakage and unsightly appearance in the existing aluminum veneer curtain wall installation process. This is mainly because the gaps between the aluminum veneers require a large amount of silicone weather-resistant sealant to be filled, resulting in large glue joint widths and easy bulging and cracking, which affects Overall facade effect.
Design an aluminum veneer sub-frame, including an irregular rectangular frame and EPDM tape. The sub-frame is fixed to the edge of the aluminum veneer through stud welding technology to reduce the gap width and the amount of glue. A thin seam installation method is used. Realize the thin seam connection between aluminum veneers.
It effectively reduces the gap width to ≤6mm, reduces the amount of glue by 50%, improves the facade effect, saves glue costs, realizes mechanical connection, reduces material and labor costs, and improves installation efficiency and appearance aesthetics.
Smart Images

Figure CN115110679B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of aluminum plate installation, and in particular to an aluminum single plate sub-frame and an application thereof in a thin-slit installation method of an aluminum single plate. Background Art
[0002] In the prior art, the installation method of aluminum veneer mainly has the following defects:
[0003] The first is the hidden danger of water leakage. The existing installation process of aluminum veneer curtain wall is: measurement and layout → installation and verification of connectors → steel frame installation → metal plate installation → sealant application → surface cleaning. After the manufacturer folds the edges and rolls the shape according to the requirements of the drawing, folds the four sides of the aluminum plate, and locks the installation angle code and reinforcement according to the drawing, and then paints the aluminum veneer panel according to the color requirements. After the panel is transported to the site, the panel is fixed to the steel keel with screws at the designated position. Because it is connected by screws, in order to facilitate the operation of the installation tool, a gap of not less than 12mm wide must be left between the aluminum veneer and the aluminum veneer. The conventional existing aluminum veneer curtain wall glue seam is 18mm. A large amount of silicone weather-resistant sealant is needed to fill the gap, which is easy to cause the weather-resistant sealant to bulge, crack, and age, thus causing the hidden danger of water leakage in the aluminum veneer curtain wall.
[0004] Second, it affects the appearance. Since the gaps between aluminum panels are filled with silicone weather-resistant sealant, there are gaps in the appearance, which is not beautiful. In addition, due to the limited processing technology of the manufacturer, the on-site installation conditions, and the limited structural shape, the aluminum single panel curtain wall needs to be disconnected and glued at certain positions. The entire shape effect is weakened due to the existence of glue gaps.
[0005] Therefore, starting from the sub-frame structure used for connecting the aluminum veneers, the structure can be improved to achieve the installation connection of the fine seams between the aluminum veneers. Summary of the invention
[0006] Technical problem to be solved: In view of the shortcomings of the prior art, the present invention provides an aluminum veneer sub-frame and its application in the fine seam installation method of aluminum veneers. The structure of the sub-frame can realize the fine seam connection between aluminum veneers. The original seam width between aluminum veneers can be reduced from ≥12mm to ≤6mm, and the glue seam width is reduced by 50%, thereby improving the overall facade effect and making the facade effect more beautiful. At the same time, when the sub-frame is used for installation between aluminum veneers, the amount of glue used can be reduced by 50%, thereby saving glue costs.
[0007] Technical solution: An aluminum veneer sub-frame, the sub-frame includes an irregular rectangular frame, a fixed plate and an EPDM rubber strip, the irregular rectangular frame is vertically fixed on one side of the fixed plate, and the EPDM rubber strip is inserted in the irregular rectangular frame; the irregular rectangular frame is composed of a vertical plate a, a vertical plate b, a vertical plate c perpendicular to the fixed plate, and a parallel plate a and a parallel plate b parallel to the fixed plate, the edges of the vertical plate a, the parallel plate a, the vertical plate b, the parallel plate b, and the vertical plate c are vertically connected in sequence, and the vertical plate a and the vertical plate c are vertically connected. Fixed on the fixing plate, the vertical plate c is connected to the edge of the fixing plate, the inner cavity shape of the irregular rectangular frame is divided into a connected large rectangular cavity and a small rectangular cavity, and the large rectangular cavity is located on the side away from the fixing plate; the vertical plate b is provided with a slot from the outer surface to the inner surface, the opening width of the slot on the vertical plate b is smaller than the width of the inner side of the slot, and an EPDM rubber strip is interspersed in the slot, and the thickness of the EPDM rubber strip on the outer side of the vertical plate b is 3-4 cm; a row of stud holes is provided on the fixing plate along the length direction.
[0008] The sub-frame described above is obtained by welding the studs passing through the stud holes to the edge of the aluminum veneer, at which time the vertical plate b is flush with the edge of the aluminum veneer.
[0009] The cross section of the EPDM rubber strip in the vertical length direction is divided into an arrow portion, a waist portion and a hollow elliptical portion. The arrow portion is inserted into the slot, the waist portion abuts against the vertical plate b, and the hollow elliptical portion is exposed on the outer side of the vertical plate b.
[0010] The thickness of the hollow elliptical portion is 3-4 cm.
[0011] The above-mentioned aluminum veneer sub-frame is used in the fine seam installation method of aluminum veneer.
[0012] The above-mentioned fine seam installation method of the aluminum veneer is as follows:
[0013] 1) Measurement and layout: On the completed main structure, measurement and layout are reviewed based on the construction blueprint, and the reference axis, horizontal elevation, and embedded parts positions are fully reviewed and recorded;
[0014] 2) Verification of connector installation: Place two connectors on both sides of the steel column, lock the connectors and the column with two sets of stainless steel bolts, place the column with the connector at the embedded part position, and make the bottoms of the two connectors close to the embedded parts and weld them effectively;
[0015] 3) Steel frame installation: connect the hot-dip galvanized angle steel of the horizontal keel with the columns according to the blueprint aluminum plate partition to complete the steel frame installation;
[0016] 4) Insert the EPDM strip into the sub-frame: Cut the sub-frame and EPDM strip according to the size requirements of the drawing, make them equal in length and mark them. Hold the EPDM strip, align the foot with the slot of the sub-frame, and press or pull the EPDM strip into the slot;
[0017] 5) Connection between the sub-frame and the aluminum veneer: Pass one end of the stud through the stud hole and lock it, place the sub-frame on the edge of the aluminum veneer, and make one end of the stud contact with the surface of the aluminum veneer. Use the stud welding process, energize and strike the arc, and after the contact surface is melted, apply a certain pressure to the stud to complete the welding;
[0018] 6) Injection of structural sealant into the sub-frame: After the sub-frame is connected to the aluminum veneer, inject structural sealant into the groove formed by the aluminum veneer, vertical plate c, and parallel plate b and wait for the structural sealant to dry before proceeding to the next process;
[0019] 7) Panel installation: After all aluminum veneer panels are installed with sub-frames and injected with structural sealant in the processing plant according to the modeling requirements of the drawings, the anti-galvanic corrosion single-sided stickers are firmly pasted on the fixing surface of the aluminum plate connection angle code, and the aluminum veneers are fixed on the steel main and secondary keels by connecting the aluminum angle codes with stainless steel hexagonal self-drilling nails. Adjacent aluminum veneers are installed in order according to the aluminum plate numbering diagram. After the EPDM strips on the sub-frames of the two adjacent aluminum veneers are bitten with each other, the gap width is ≤6mm and the second waterproof sealing effect of the aluminum veneer curtain wall is formed;
[0020] 8) Leveling: Use a rubber hammer to tap the uneven positions between the aluminum panels for leveling;
[0021] 9) Glue seam treatment: Fill the gaps between the aluminum panels with foam rods that are 2mm larger than the gap width, and apply silicone weather-resistant sealant into the glue seams filled with foam rods to complete the fine seam installation method.
[0022] Beneficial effects: The aluminum veneer sub-frame provided by the present invention and its application in the thin seam installation method of the aluminum veneer have the following beneficial effects:
[0023] 1. The aluminum veneer sub-frame of the present invention can reduce the original seam width between aluminum veneers from ≥12mm to ≤6mm by adjusting the thickness of the EPDM rubber strip, and reduce the amount of glue by 50%, thereby saving glue costs and achieving green environmental protection effects, and reducing the frequency of manual glue replacement, thereby improving the efficiency of manual glue application and shortening the glue application period;
[0024] 2. The structure of the sub-frame of the present invention can realize the fine seam connection between the aluminum veneers, thereby improving the overall facade effect and making the facade effect more beautiful;
[0025] 3. The sub-frame of the present invention adopts stud welding, and the aluminum veneers are effectively mechanically connected to each other. No steel keel is required between the aluminum veneers, which saves materials, costs, labor and construction time;
[0026] 4. The appearance, injection quality, adhesion, hardness, tensile bonding strength, shear strength and elongation at break of the structural adhesive between the sub-frame and the aluminum veneer of the present invention meet the standard requirements, ensuring that the aluminum alloy sub-frame and the aluminum veneer can achieve effective bonding within the service life of the structural adhesive. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 It is a schematic structural diagram of the sub-frame of the present invention.
[0028] Figure 2 for Figure 1 Top view.
[0029] Figure 3 This is a diagram of the installation method between aluminum veneers.
[0030] In the figure: 1. irregular rectangular frame; 11. vertical plate a; 12. vertical plate b; 121. slot; 13. vertical plate c; 14. parallel plate a; 15. parallel plate b; 2. fixed plate; 21. stud hole; 3. EPDM rubber strip; 31. arrow part; 32. waist; 33. hollow elliptical part; 4. stud; 5. aluminum single plate. DETAILED DESCRIPTION
[0031] The technical solution of the present invention is described below through specific examples. It should be understood that one or more method steps mentioned in the present invention are not exclusive, and there are other method steps before and after the combination step, or other method steps can be inserted between these explicitly mentioned steps; it should also be understood that these embodiments are only used to illustrate the present invention and are not used to limit the scope of the present invention. Moreover, unless otherwise specified, the numbering of each method step is only a convenient tool for identifying each method step, and is not intended to limit the order of arrangement of each method step or to limit the scope of the present invention. The change or adjustment of the relative relationship thereof, without substantially changing the technical content, should also be regarded as the scope of the present invention.
[0032] In order to better understand the above technical scheme, the exemplary embodiments of the present invention are described in more detail below. Although exemplary embodiments of the present invention are shown, it should be understood that the present invention can be implemented in various other forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided in order to enable a more thorough understanding of the present invention and to enable the scope of the present invention to be fully communicated to those skilled in the art.
[0033] The present embodiment provides an aluminum single plate sub-frame, which includes an irregular rectangular frame 1, a fixed plate 2 and an EPDM rubber strip 3. The irregular rectangular frame 1 is vertically fixed on one side of the fixed plate 2, and the EPDM rubber strip 3 is inserted in the irregular rectangular frame 1; the irregular rectangular frame 1 is composed of a vertical plate a11, a vertical plate b12, a vertical plate c13 vertical to the fixed plate 2, and a parallel plate a14 and a parallel plate b15 parallel to the fixed plate 2. The edges of the vertical plate a11, the parallel plate a14, the vertical plate b12, the parallel plate b15, and the vertical plate c13 are vertically connected in sequence, and the vertical plate a11, the vertical plate c13 They are all vertically fixed on the fixed plate 2, the vertical plate c13 is connected to the edge of the fixed plate 2, and the inner cavity shape of the irregular rectangular frame 1 is divided into a connected large rectangular cavity and a small rectangular cavity, and the large rectangular cavity is located on the side away from the fixed plate 2; the vertical plate b12 is provided with a slot 121 from the outer surface to the inner surface, and the opening width of the slot 121 on the vertical plate b12 is smaller than the width of the inner side of the slot 121, and an EPDM rubber strip 3 is inserted in the slot 121, and the thickness of the EPDM rubber strip 3 on the outer side of the vertical plate b12 is 3-4cm; a row of stud holes 21 is provided on the fixed plate 2 along the length direction.
[0034] The sub-frame is welded to the edge of the aluminum veneer 5 by welding the studs 4 penetrating the stud holes 21, and at this time, the vertical plate b12 is flush with the edge of the aluminum veneer.
[0035] The cross section of the EPDM rubber strip 3 in the vertical length direction is divided into an arrow portion 31, a waist portion 32 and a hollow elliptical portion 33. The arrow portion 31 is inserted into the slot 121, the waist portion 32 abuts against the vertical plate b12, and the hollow elliptical portion 33 is exposed on the outer side of the vertical plate b12. The thickness of the hollow elliptical portion 33 is 3-4 cm.
[0036] The aluminum veneer sub-frame provided in this embodiment is used in the thin seam installation method of the aluminum veneer, and the steps are as follows:
[0037] 1) Measurement and layout: On the completed main structure, the measurement and layout shall be reviewed based on the construction blueprint, and the reference axis, horizontal elevation, and embedded parts position shall be reviewed and recorded. The reviewed measurement and layout records and structural compliance records shall be complete;
[0038] 2) Verification of connector installation: Place two connectors on both sides of the steel column, lock the connectors and the column with two sets of M12 stainless steel bolts, place the column with the connector at the embedded part position, and make the bottoms of the two connectors close to the embedded parts and weld them effectively;
[0039] 3) Steel frame installation: After the connectors are effectively connected to the embedded parts, the steel column keel has been installed because the steel column and the connector have been locked by 2 sets of M12 stainless steel bolts. Then, the transverse keel L50*5 hot-dip galvanized angle steel is effectively connected to the column according to the blueprint aluminum single plate partition, and the steel frame installation is completed;
[0040] 4) Insert the EPDM rubber strip 3 into the sub-frame: Cut the sub-frame and the EPDM rubber strip 3 according to the size requirements of the drawing, make them equal in length and mark them well. Hold the EPDM rubber strip 3, align the foot position with the sub-frame slot 121, and press or pull the EPDM rubber strip 3 into the slot 121;
[0041] 5) The sub-frame is connected to the aluminum veneer 5: The diameter of the stud hole 21 on the sub-frame is 8mm, and the spacing of the stud holes 21 is 300mm. Pass one end of the stud 4 through the stud hole 21 and lock it. Place the sub-frame on the edge of the aluminum veneer 5. The sub-frame is flush with the aluminum veneer. One end of the stud 4 contacts the surface of the aluminum veneer 5. Use the stud welding process, turn on the power to start the arc, and after the contact surface is melted, apply a certain pressure to the stud 4 to complete the welding;
[0042] 6) Injection of structural sealant into the sub-frame: After the sub-frame is connected to the aluminum veneer 5, inject structural sealant into the 12mm*8mm groove surrounded by the aluminum veneer 5, the vertical plate c13, and the parallel plate b15 and let it stand until the structural sealant is dry before entering the next process;
[0043] 7) Panel installation: After all aluminum veneer panels are installed with sub-frames and injected with structural sealant in the processing plant according to the modeling requirements of the drawings, 2mm anti-electrochemical corrosion single-sided stickers are securely pasted on the fixing surface of the aluminum plate connection angle code, and the aluminum veneer 5 is fixed on the steel main and secondary keels by connecting the aluminum angle code spacing (≤300mm) with 2 ST4.2*16 stainless steel hexagonal self-drilling nails. The finished surface of the aluminum veneer is 30mm away from the keel surface. Adjacent aluminum veneers 5 are installed in order according to the aluminum plate numbering diagram. According to the water resistance principle of EPDM strips, after the EPDM strips 3 on the sub-frames of two adjacent aluminum veneers 5 are bitten with each other, the gap width is ≤6mm and the second waterproof sealing effect of the aluminum veneer curtain wall is formed. The gap between the aluminum veneers is designed according to the width of the strips to achieve a fine seam effect, abandoning the original aluminum veneer design glue seam width requirement of ≥12mm;
[0044] 8) Leveling: Use a rubber hammer to tap the uneven positions between the aluminum veneers 5 to level them, so that all the aluminum veneers are at the same level as much as possible.
[0045] 9) Glue seam treatment: fill the gap between the aluminum panels 5 with a foam rod that is 2mm larger than the gap width, and apply silicone weather-resistant sealant into the glue seam filled with the foam rod to complete the fine seam installation method.
[0046] The basic principle of stud welding in step 5) is to ignite an arc between the stud to be welded and the workpiece. When the stud and the workpiece are heated to a suitable temperature, the stud is sent into the welding pool on the workpiece under the action of external force to form a welded joint. The stud welding nail effectively connects the aluminum alloy sub-frame and the aluminum single plate, and the screws are not exposed.
[0047] In step 6), the structural sealant is injected into the notch, and the aluminum alloy sub-frame and the aluminum veneer are tightly bonded together according to the principle that the structural sealant wets the surface of the adherend through the adhesive, mechanical interlocking, and primary bond to form a stable, long-lasting, hyperstatic structure. The structural adhesive has the bonding technology to transmit large static and dynamic loads and can reliably bond with the working structure for a long time in the use environment. Therefore, the aluminum alloy sub-frame and the aluminum veneer can withstand the static and dynamic loads of the environment under the action of the structural adhesive, ensuring the durability of the bonding between the aluminum alloy sub-frame and the aluminum veneer.
[0048] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.
Claims
1. An aluminum veneer subframe, Features: The sub-frame comprises an irregular rectangular frame (1), a fixed plate (2) and an EPDM rubber strip (3); the irregular rectangular frame (1) is vertically fixed to one side of the fixed plate (2), and the EPDM rubber strip (3) is inserted into the irregular rectangular frame (1); the irregular rectangular frame (1) is composed of a vertical plate a (11), a vertical plate b (12), a vertical plate c (13) vertical to the fixed plate (2), and a parallel plate a (14) and a parallel plate b (15) parallel to the fixed plate (2); the edges of the vertical plate a (11), the parallel plate a (14), the vertical plate b (12), the parallel plate b (15), and the vertical plate c (13) are vertically connected in sequence, and the vertical plate a (11) and the vertical plate c (13) are all vertically connected. The vertical plate c (13) is vertically fixed on the fixing plate (2), the vertical plate c (13) is connected to the edge of the fixing plate (2), the inner cavity of the irregular rectangular frame (1) is divided into a large rectangular cavity and a small rectangular cavity which are connected, and the large rectangular cavity is located on the side away from the fixing plate (2); the vertical plate b (12) is provided with a slot (121) from the outer surface to the inner surface, the opening width of the slot (121) on the vertical plate b (12) is smaller than the width of the inner side of the slot (121), and an EPDM rubber strip (3) is inserted in the slot (121), and the thickness of the EPDM rubber strip (3) on the outer side of the vertical plate b (12) is 3-4 cm; and a row of stud holes (21) is provided on the fixing plate (2) along the length direction.
2. The aluminum veneer sub-frame according to claim 1, Features: The sub-frame is welded to the edge of the aluminum veneer (5) by means of studs (4) inserted into the stud holes (21), and at this time, the vertical plate b (12) is flush with the edge of the aluminum veneer.
3. The aluminum veneer sub-frame according to claim 1, Features: The cross section of the EPDM rubber strip (3) in the vertical length direction is divided into an arrow portion (31), a waist portion (32) and a hollow elliptical portion (33), the arrow portion (31) is inserted into the slot (121), the waist portion (32) abuts against the vertical plate b (12), and the hollow elliptical portion (33) is exposed on the outer side of the vertical plate b (12).
4. The aluminum veneer sub-frame according to claim 3, Features: The thickness of the hollow elliptical portion (33) is 3-4 cm.
5. An application of the aluminum veneer sub-frame according to claim 1 in a thin seam installation method of an aluminum veneer, Features The installation method of fine seams of aluminum veneer is as follows: 1) Measurement and layout: On the completed main structure, measurement and layout are reviewed based on the construction blueprint, and the reference axis, horizontal elevation, and embedded parts positions are fully reviewed and recorded; 2) Verification of connector installation: Place two connectors on both sides of the steel column, lock the connectors and the column with two sets of stainless steel bolts, place the column with the connector at the embedded part position, and make the bottoms of the two connectors close to the embedded parts and weld them effectively; 3) Steel frame installation: connect the hot-dip galvanized angle steel of the horizontal keel with the columns according to the blueprint aluminum plate partition to complete the steel frame installation; 4) Inserting the EPDM rubber strip (3) into the sub-frame: the sub-frame and the EPDM rubber strip (3) are cut according to the size requirements of the drawing, the lengths are equal and they are marked, the EPDM rubber strip (3) is held, the foot is aligned with the slot (121) of the sub-frame, and the EPDM rubber strip (3) is pressed or inserted into the slot (121); 5) Connecting the sub-frame to the aluminum veneer (5): insert one end of the stud (4) through the stud hole (21) and tighten it, place the sub-frame on the edge of the aluminum veneer (5), and make one end of the stud (4) contact the surface of the aluminum veneer (5). Use the stud welding process, turn on the power to start the arc, and after the contact surface is melted, apply a certain pressure to the stud (4) to complete the welding; 6) Injecting structural sealant into the sub-frame: After the sub-frame is connected to the aluminum veneer (5), inject structural sealant into the groove formed by the aluminum veneer (5), the vertical plate c (13), and the parallel plate b (15) and leave it to stand until the structural sealant is dry before proceeding to the next step; 7) Panel installation: After all aluminum veneer panels are installed with sub-frames and injected with structural sealant in the processing plant according to the modeling requirements of the drawings, the anti-galvanic corrosion single-sided sticker is firmly pasted on the fixing surface of the aluminum plate connection angle code, and the aluminum veneer (5) is fixed on the steel main and secondary keels by connecting the aluminum angle code with stainless steel hexagonal self-drilling nails. Adjacent aluminum veneers (5) are installed in order according to the aluminum plate numbering diagram. After the EPDM strips (3) on the sub-frames of the two adjacent aluminum veneers (5) are interlocked, the gap width is ≤6mm and the second waterproof sealing effect of the aluminum veneer curtain wall is formed; 8) Leveling: Use a rubber hammer to tap the uneven positions between the aluminum panels (5) to level them; 9) Glue joint treatment: The gaps between the aluminum panels (5) are filled with foam rods that are 2 mm larger than the gap width. Silicone weatherproof sealant is applied to the glue joints filled with foam rods to complete the fine joint installation method.