How to lift a vertical spindle drilling rig using a faucet

By designing the faucet and lifting system for vertical shaft drilling rigs, the problems of chuck drilling and drill pipe clamping wear of traditional vertical shaft drilling rigs during deep hole heavy loads are solved, and heavy load bearing and continuous feed are achieved, which improves drill pipe lifting and lifting Safety and efficiency.

CN115126426BActive Publication Date: 2024-11-12CHINA GEOLOGICAL EQUIP RES INSTITUDE CO LTD
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
CN202210567550.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-05-23
Publication Date
2024-11-12
Estimated Expiration
2042-05-23

AI Technical Summary

Technical Problem

Traditional vertical shaft drilling rigs have problems with chuck drilling and drill rod clamping wear during heavy loading of deep holes, and drill rod lifting efficiency is low and the safety is poor.

Method used

A faucet for vertical shaft drilling rigs is designed, including a shell, pipe assembly and a lifting system. Through the combination of central pipe, thrust bearing, angular contact ball bearing and through groove, heavy load bearing and continuous feeding is achieved, and through pulley mechanism The hooks are removed at low levels with the lifting card to improve operational efficiency and safety.

Benefits of technology

It effectively reduces maintenance costs, extends the service life of the faucet, avoids the wear of the drill rod clamping, and improves the safety and efficiency of continuous feeding of the drill rod and lifting operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115126426B_ABST
    Figure CN115126426B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of geological prospecting technology, and in particular to a method for lifting a faucet for a vertical axis drilling rig. The faucet for the vertical axis drilling rig includes a shell and a pipe assembly arranged inside the shell. Since a connecting pipe and a transition connecting shell are arranged, the replacement of the connecting pipe is convenient and the maintenance cost is reduced. At the same time, since a through groove is arranged on the transition connecting shell, when mud leaks, it can flow out through the through groove to prevent the leaked mud from entering between the center pipe and the lower shell, thereby increasing the service life of the faucet. Since a supporting portion is arranged on the center pipe and a thrust bearing is arranged in the lower shell, the faucet can withstand heavy loads, thereby realizing continuous feeding of the drill rod, and a positioning portion for installing an elevator is formed at the bottom end of the lower shell, so that when the drilling depth is deepened and the drill rod is increased, the low-position unhooking of the elevator can be facilitated, making the operation safe and simple and improving the working efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of geological exploration, and in particular to a faucet for a vertical shaft drilling rig, a faucet lifting system and a lifting method. Background Art

[0002] The faucet is an important connector for establishing a mud circulation channel in geological drilling. In traditional geological drilling, the faucet can only bear its own weight. However, as the depth of geological drilling gradually increases, many hidden dangers arise when using traditional vertical shaft drilling rigs that rely on the chuck to bear the weight of the drill string. For example, the chuck slips when the vertical shaft drilling rig is overloaded in a deep hole. Even if the problem is solved by increasing the clamping force of the chuck on the active drill rod, this method will cause wear on the chuck on the active drill rod.

[0003] Moreover, during the drilling process of the existing vertical shaft drilling rig, the traveling block is connected to the swivel lifting device. When a drill rod is drilled, this connection needs to be disconnected, and a new drill rod is lifted by the disconnected lifting traveling block for operation. At the same time, when adding a connecting rod, it is necessary to manually remove the hook at a high position of the drilling tower, which has poor safety and low operating efficiency. Summary of the invention

[0004] 1. Technical issues to be resolved

[0005] In view of the above-mentioned shortcomings and deficiencies of the prior art, the present invention provides a faucet, a faucet lifting system and a lifting method for a vertical shaft drilling rig, which can withstand heavy loads, facilitate maintenance and reduce maintenance costs, and can achieve continuous feeding. When the drilling depth is deepened and the drill rod is increased, it is convenient to remove the hook at a low position. The operation is safe and simple and the working efficiency is improved.

[0006] (II) Technical solution

[0007] In order to achieve the above object, the main technical solutions adopted by the present invention include:

[0008] An embodiment of the present invention provides a faucet for a vertical axis drilling rig, comprising a shell and a pipe assembly arranged inside the shell; the shell comprises an upper shell, a transition connection shell and a lower shell that are threadedly connected in sequence; the structure of the pipe assembly comprises a channel opened inside the upper shell, a center pipe arranged in the lower shell and a connecting pipe that passes through the center through hole of the transition connection shell and is respectively connected with the channel and the center pipe, and the channel, the connecting pipe and the center pipe are connected to form a mud channel; the center pipe is rotatably connected to the lower shell and the center pipe extends out of the lower shell for connection with an active drill rod, a supporting portion is provided on the circumference of the center pipe, a thrust bearing is provided in the lower shell, the supporting portion is provided on the thrust bearing, an angular contact ball bearing is provided in the transition connection shell, and the angular contact ball bearing is sleeved on the center pipe; a through groove is provided in the horizontal direction of the transition connection shell, the through groove passes through the axis of the transition connection shell, and a positioning portion for installing a hanging card is formed at the bottom end of the shell.

[0009] Preferably, it also includes a V-shaped sealing ring; the liquid outlet of the channel is arranged at the center of the bottom end of the upper shell body, and the liquid inlet of the channel is arranged on the side wall of the upper shell body; the bottom of the upper shell body is upwardly concavely provided with a first groove, one end of the connecting tube is arranged in the first groove, and the top end of the connecting tube is connected to the liquid outlet; the V-shaped sealing ring is arranged between the connecting tube and the inner wall of the first groove.

[0010] Preferably, it also includes an adjusting disk; the adjusting disk is arranged in the through groove and sleeved on the connecting pipe; a protrusion is provided on the adjusting disk, the protrusion extends into the first groove and abuts against the end of the V-shaped sealing ring.

[0011] Preferably, a second groove is recessed upwards at the bottom end of the transition connection shell, and the angular contact ball bearing is arranged in the second groove; a positioning step is provided on the supporting portion of the central tube, and the bottom end of the angular contact ball bearing abuts against the positioning step.

[0012] Preferably, it also includes multiple sets of sealing rings; the multiple sets of sealing rings are arranged between the central tube and the transition connection shell.

[0013] Preferably, it also includes a lifting rod; a third groove is opened on the top of the upper shell body, and the end of the lifting rod extends into the third groove and is threadedly connected to the third groove.

[0014] Preferably, it also includes a cylindrical bearing and a bearing end cover; the bottom end of the lower shell is upwardly recessed with a fourth groove, the cylindrical bearing is arranged in the fourth groove and sleeved on the outer side of the central tube, and the bearing end cover is covered on the cylindrical bearing.

[0015] Preferably, it also includes a bent pipe; the bent pipe is detachably connected to the side wall of the upper shell and is connected to the liquid inlet.

[0016] The present invention also provides a lifting system for a vertical axis drilling rig using a faucet, comprising a derrick, a pulley mechanism, the above-mentioned vertical axis drilling rig faucet, an elevator and a vertical axis drilling rig; the elevator is sleeved on a center pipe, and the top of the elevator abuts against a positioning portion of a lower shell; one end of the pulley mechanism is connected to the top of the derrick, and the other end of the pulley mechanism is connected to the elevator through a lifting ring; the bottom end of the center pipe is used to connect to the top of an active drill rod; the vertical axis drilling rig is used to drive the active drill rod to move horizontally and rotate, and the bottom end of the active drill rod is used to connect to the drill rod in the hole.

[0017] The present invention further provides a method for lifting a vertical shaft drilling rig using a water tap, comprising the following steps:

[0018] S1. The vertical axis drilling rig drives the active drill pipe to rotate. One end of the pulley mechanism is fixed on the derrick. The other end of the pulley mechanism is connected to the elevator through a lifting ring. The pulley mechanism drives the elevator to move downward, thereby causing the active drill pipe and the first drill pipe connected to the central pipe to move downward in sequence.

[0019] S2. When the drilling depth increases and the second drill rod is added, the pulley mechanism drives the elevator to move upward, so that the active drill rod and the first drill rod move upward, and the first drill rod is clamped by the clamping mechanism on the ground, and the connection between the active drill rod and the first drill rod is opened;

[0020] S3, the vertical axis drilling rig drives the active drill rod to move in the horizontal direction to make way for the lowering working position of the pulley mechanism, and at the same time the pulley mechanism drives the lifting ring to move downward, so that the lifting card connected to the lifting ring moves downward along the active drill rod;

[0021] S4. When the pulley mechanism drives the elevator to move to the bottom end of the active drill pipe, the connection between the elevator and the active drill pipe is removed;

[0022] S5, connecting the elevator to the top of the second drill pipe, and the pulley mechanism drives the elevator to move upward to lift the second drill pipe and place it vertically;

[0023] S6, the pulley mechanism drives the elevator to move downward so that the bottom end of the vertically placed second drill rod is docked with the top end of the first drill rod;

[0024] S7, the clamping mechanism releases the clamping of the first drill rod, and the pulley mechanism drives the elevator to continue to move downward so that the second drill rod and the first drill rod after docking enter the hole;

[0025] S8, remove the elevator from the second drill rod, install the elevator on the active drill rod, the vertical axis drilling rig drives the active drill rod to reset horizontally so that the bottom end of the active drill rod is connected to the top end of the second drill rod, and the pulley mechanism drives the elevator to move upward so that the elevator is connected to the positioning part of the faucet of the vertical axis drilling rig;

[0026] S9. When the vertical axis drilling rig drives the active drill rod to rotate, the pulley mechanism drives the vertical axis drilling rig to use the faucet to gradually move downward through the hanging card, and then drives the active drill rod, the second drill rod and the first drill rod connected below the faucet to gradually move downward.

[0027] (III) Beneficial effects

[0028] The beneficial effects of the present invention are:

[0029] The present invention provides a faucet for a vertical axis drilling rig. Since a connecting pipe and a transition connection shell are provided, the connection pipe can be easily replaced and the maintenance cost can be reduced. At the same time, since a through groove is provided on the transition connection shell, when mud leaks, it can flow out through the through groove to prevent the leaked mud from entering between the central tube and the lower shell, thereby improving the service life of the faucet. Since a supporting portion is provided on the central tube and a thrust bearing is provided in the lower shell, the faucet can withstand heavy loads, thereby realizing continuous feeding of the drill rod, and a positioning portion for installing an elevator is formed at the bottom end of the lower shell, so that when the drilling depth is deepened and the drill rod is added, the low-position unhooking of the elevator can be facilitated, making the operation safe and simple and improving the working efficiency.

[0030] The present invention provides a lifting system for a vertical axis drilling rig using a faucet. Since a supporting portion is provided on the central tube in the faucet and a thrust bearing is provided in the lower shell, the faucet can withstand heavy loads, thereby enabling continuous feeding of the drill rod. The lifting card is located on the positioning portion at the bottom of the faucet, and when the drilling depth is deepened and the drill rod is increased, the lifting card can be easily unhooked at a low position, making the operation safe and simple and improving the working efficiency.

[0031] The present invention provides a method for lifting a vertical axis drilling rig using a faucet, which eliminates the clamping force of the vertical axis drilling rig on an active drill rod, avoids wear on the active drill rod, and can achieve continuous feeding of the drill rod. When the drilling depth is deepened and the drill rod is increased, the low-position unhooking of the elevator can be facilitated, making the operation safe and simple and improving the working efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] Figure 1 It is a cross-sectional view from a first perspective of a vertical axis drilling rig using a water tap in the first embodiment;

[0033] Figure 2 It is a cross-sectional view from a second perspective of the vertical axis drilling rig using the water tap in the first embodiment;

[0034] Figure 3 for Figure 1 Schematic diagram of the structure of the middle transition connection shell;

[0035] Figure 4 for Figure 1 The structural diagram of the middle adjustment plate;

[0036] Figure 5 This is a structural schematic diagram of a lifting system using a faucet for a vertical axis drilling rig in Example 2;

[0037] Figure 6 for Figure 5 Schematic diagram of the structure of the water tap lifting system of the neutral axis drilling rig (the derrick is not shown);

[0038] Figure 7 for Figure 5 Schematic diagram of the connection between the faucet and the elevator for the neutral axis drilling rig;

[0039] Figure 8 This is a flow chart of the method of lifting a vertical shaft drilling rig using a water tap in Example 3 (the derrick is not shown).

[0040] [Description of Reference Numerals]

[0041] 1: faucet; 11: housing; 111: upper housing; 1111: first groove; 1112: third groove; 112: transition connection housing; 1121: center through hole; 1122: through groove; 1123: second groove; 1124: first positioning groove; 113: lower housing; 1131: fourth groove; 1132: second positioning groove; 12: pipeline assembly; 121: channel; 122: connecting pipe; 123: center pipe; 1231: supporting part; 124: elbow; 13: thrust bearing; 14: angular contact ball bearing; 15: V-shaped sealing ring; 16: adjusting plate; 161: raised part; 17: lifting rod; 18: cylindrical bearing; 19: bearing end cover;

[0042] 2: Active drill pipe;

[0043] 3: Elevator;

[0044] 4: Derrick;

[0045] 5: pulley mechanism; 51: overhead crane pulley block; 52: traveling crane pulley block; 53: wire rope;

[0046] 6: Rings;

[0047] 7: vertical spindle drilling machine; 71: clamping mechanism;

[0048] 8: First drill pipe;

[0049] 9: Second drill pipe. DETAILED DESCRIPTION

[0050] In order to better understand the above technical solution, exemplary embodiments of the present invention will be described in more detail below with reference to the accompanying drawings. Although exemplary embodiments of the present invention are shown in the accompanying drawings, it should be understood that the present invention can be implemented in various forms and should not be limited by the embodiments described herein. On the contrary, these embodiments are provided to enable a clearer and more thorough understanding of the present invention and to fully convey the scope of the present invention to those skilled in the art.

[0051] Embodiment 1

[0052] like Figure 1-2 As shown, this embodiment provides a vertical axis drilling rig faucet, including a housing 11 and a pipe assembly 12 arranged inside the housing 11. The housing 11 includes an upper housing 111, a transition connection housing 112 and a lower housing 113 that are threadedly connected in sequence. The threaded connection facilitates the disassembly and assembly of the housing 11. In order to increase the connection effect between the upper housing 111 and the transition connection housing 112 and between the transition connection housing 112 and the lower housing 113, screws can be added for further fixing. Figure 3As shown, in the actual application process, the top of the transition connection shell 112 is provided with a first positioning groove 1124, the lower part of the upper shell 111 is arranged in the first positioning groove 1124 and is threadedly connected with the transition connection shell 112, the upper end of the lower shell 113 is provided with a second positioning groove 1132, the lower part of the transition connection shell 112 is located in the second positioning groove 1132, and the lower part of the transition connection shell 112 is threadedly connected with the lower shell 113. In addition, the horizontal direction of the transition connection shell 112 is provided with a through groove 1122, the through groove 1122 passes through the axis of the transition connection shell 112, and the bottom end of the shell 11 forms a positioning portion for installing the elevator 3.

[0053] The structure of the pipeline assembly 12 includes a channel 121 opened inside the upper shell 111, a center pipe 123 arranged in the lower shell 113, and a connecting pipe 122 passing through the center through hole 1121 of the transition shell 112 and communicating with the channel 121 and the center pipe 123 respectively. The top end of the connecting pipe 122 is connected to the channel 121, and the bottom end of the connecting pipe 122 is sleeved in the center pipe 123. The channel 121, the connecting pipe 122 and the center pipe 123 are connected to form a mud channel 121. In order to facilitate the connection of the connecting pipe 122 with the channel 121 and the center pipe 123, a stepped through hole is provided in the connecting pipe 122, wherein the diameter of the stepped through hole communicating with the channel 121 is larger than the diameter of the channel 121, and the diameter of the stepped through hole communicating with the center pipe 123 is smaller than the diameter of the through hole in the center pipe 123.

[0054] The center tube 123 is rotatably connected with the lower shell 113 and the center tube 123 extends out of the lower shell 113 for connection with the active drill rod 2. A supporting portion 1231 is provided on the circumference of the center tube 123. A thrust bearing 13 is provided in the lower shell 113. The supporting portion 1231 is arranged on the thrust bearing 13. An angular contact ball bearing 14 is provided in the transition connection shell 112, and the angular contact ball bearing 14 is sleeved on the center tube 123. Since the faucet 1 is provided with a thrust bearing 13 for bearing axial force and an angular contact ball bearing 14 for bearing radial force, the pipeline assembly 12 can be axially loaded and radially supported. In this embodiment, an oil inlet connected to the thrust bearing 13 is provided on the outer wall surface of the lower shell 113, and lubricating oil is added through the oil inlet to lubricate the thrust bearing 13.

[0055] The faucet for a vertical axis drilling rig provided in this embodiment is convenient for replacement and maintenance of the connecting pipe 122 and reduces maintenance costs due to the provision of a connecting pipe 122 and a transition connecting shell 112. At the same time, since the transition connecting shell 112 is provided with a through groove 1122, when mud leaks, it can flow out through the through groove 1122 to prevent the leaked mud from entering between the central pipe 123 and the lower shell 113, thereby increasing the service life of the faucet 1. Since a supporting portion 1231 is provided on the central pipe 123 and a thrust bearing 13 is provided in the lower shell 113, the faucet 1 can withstand heavy loads, thereby enabling continuous feeding of the drill rod, and a positioning portion for installing the elevator 3 is formed at the bottom end of the lower shell 113, so that when the drilling depth is deepened and the drill rod is increased, the low-position unhooking of the elevator 3 can be facilitated, making the operation safe and simple and improving the working efficiency.

[0056] In this embodiment, the liquid outlet of the channel 121 in the upper shell 111 is arranged at the center of the bottom end of the upper shell 111, and the liquid inlet of the channel 121 is arranged on the side wall of the upper shell 111. The bottom of the upper shell 111 is upwardly recessed with a first groove 1111, one end of the connecting pipe 122 is arranged in the first groove 1111, and the top of the connecting pipe 122 is connected to the liquid outlet. In order to ensure the sealing performance of the channel 121 in the upper shell 111 and the connecting pipe 122, the faucet 1 also includes a V-shaped sealing ring 15, which is arranged between the connecting pipe 122 and the inner wall of the first groove 1111.

[0057] like Figure 4 As shown, in order to make the V-shaped sealing ring 15 achieve a better sealing effect, it also includes an adjusting disk 16, which is arranged in the through groove 1122 of the transition connection shell 112 and is sleeved on the connecting pipe 122. The adjusting disk 16 is provided with a protrusion 161, which extends into the first groove 1111 and abuts against the end of the V-shaped sealing ring 15, wherein the adjusting disk 16 is connected to the upper shell 111 through an adjusting screw, and the pre-tightening force of the adjusting disk 16 abutting against the end of the V-shaped sealing ring 15 is adjusted by screwing the adjusting screw, so that the V-shaped sealing ring 15 is compressed to make its sealing performance better, thereby ensuring that there is no leakage during mud circulation.

[0058] Specifically, the bottom end of the transition connection shell 112 is recessed upwardly with a second groove 1123, the angular contact ball bearing 14 is arranged in the second groove 1123, and a positioning step is provided on the supporting portion 1231 of the center tube 123, and the bottom end of the angular contact ball bearing 14 abuts against the positioning step.

[0059] In order to prevent the leaked mud from entering into the bearing and damaging the bearing, the faucet 1 also includes a plurality of sets of sealing rings, which are arranged between the central tube 123 and the transition connection shell 112 .

[0060] In order to facilitate the connection between the faucet 1 and the active drill rod 2, the faucet 1 also includes a lifting rod 17. A third groove 1112 is opened on the top of the upper shell 111. The end of the lifting rod 17 extends into the third groove 1112 and is threadedly connected to the third groove 1112.

[0061] Preferably, it also includes a cylindrical bearing 18 and a bearing end cover 19. The bottom end of the lower shell 113 is upwardly recessed with a fourth groove 1131. The cylindrical bearing 18 is arranged in the fourth groove 1131 and is sleeved on the outer side of the center tube 123. The bearing end cover 19 is covered on the cylindrical bearing 18.

[0062] Since the thrust bearing 13 is an axial load-bearing bearing, it will wobble when the center tube 123 rotates. The cylindrical bearing 18 and the angular contact ball bearing 14 form a certain span to position the center tube 123, thereby avoiding radial wobble of the center tube 123.

[0063] Of course, the faucet 1 further includes an elbow 124 , which is detachably connected to the side wall of the upper shell 111 and is communicated with the liquid inlet.

[0064] Embodiment 2

[0065] like Figure 5-7 As shown, this embodiment provides a vertical axis drilling rig water tap lifting system, including a derrick 4, a pulley mechanism 5, the vertical axis drilling rig water tap in the first embodiment, an elevator 3 and a vertical axis drilling rig 7, the elevator 3 is sleeved on the central tube 123, the top of the elevator 3 is in contact with the positioning part of the lower shell 113, one end of the pulley mechanism 5 is connected to the top of the derrick 4, the other end of the pulley mechanism 5 is connected to the elevator 3 through the lifting ring 6, the bottom end of the central tube 123 is used to connect with the top of the active drill rod 2, the vertical axis drilling rig 7 is used to drive the active drill rod 2 to move horizontally and rotate, and the bottom end of the active drill rod 2 is used to connect with the drill rod in the hole. It should be noted that the pulley mechanism 5 includes a crown block pulley group 51 connected to the derrick 4 and a floating hanging pulley group 52 connected to the lifting ring 6, and the crown block pulley group 51 and the floating hanging pulley group 52 are connected by a wire rope 53.

[0066] The present embodiment provides a faucet lifting system for a vertical axis drilling rig. Since a supporting portion 1231 is provided on the central tube 123 of the faucet 1 and a thrust bearing 13 is provided in the lower shell 113, the faucet 1 can withstand heavy loads, thereby enabling continuous feeding of the drill rod. The lifting card 3 is located on the positioning portion at the bottom end of the faucet 1. When the drilling depth increases and the drill rod is increased, the lifting card 3 can be easily unhooked at a low position, making the operation safe and simple and improving the working efficiency.

[0067] Embodiment 3

[0068] like Figure 8The AI ​​shown is a flow chart of the method of lifting with a faucet for a vertical spindle drilling rig.

[0069] This embodiment provides a method for lifting a vertical shaft drilling rig using a water tap, comprising the following steps:

[0070] S1, the vertical axis drilling rig 7 drives the active drill pipe 2 to rotate, one end of the pulley mechanism 5 is fixed on the derrick 4, and the other end of the pulley mechanism 5 is connected to the elevator 3 through the lifting ring 6. The pulley mechanism 5 drives the elevator 3 to move downward, thereby causing the active drill pipe 2 and the first drill pipe 8 connected to the central pipe 123 in sequence to move downward;

[0071] S2. When the drilling depth increases and the second drill rod 9 is added, the pulley mechanism 5 drives the elevator 3 to move upward, so that the active drill rod 2 and the first drill rod 8 move upward, and the first drill rod 8 is clamped by the clamping mechanism 71 on the ground, and the connection between the active drill rod 2 and the first drill rod 8 is opened;

[0072] S3, the vertical axis drilling machine 7 drives the active drill rod 2 to move in the horizontal direction to make way for the lowering working position of the pulley mechanism 5, and at the same time the pulley mechanism 5 drives the lifting ring 6 to move downward, so that the lifting card 3 connected with the lifting ring 6 moves downward along the active drill rod 2;

[0073] S4. When the pulley mechanism 5 drives the elevator 3 to move to the bottom end of the active drill rod 2, the connection between the elevator 3 and the active drill rod 2 is removed;

[0074] S5, connecting the elevator 3 to the top of the second drill rod 9, and the pulley mechanism 5 drives the elevator 3 to move upward so that the second drill rod 9 is lifted and placed vertically;

[0075] S6, the pulley mechanism 5 drives the elevator 3 to move downward so that the bottom end of the vertically placed second drill rod 9 is docked with the top end of the first drill rod 8;

[0076] S7, the clamping mechanism 71 releases the clamping of the first drill rod 8, and the pulley mechanism 5 drives the elevator 3 to continue to move downward so that the second drill rod 9 and the first drill rod 8 after docking enter the hole;

[0077] S8, remove the elevator 3 on the second drill rod 9, install the elevator 3 on the active drill rod, the vertical axis drilling rig 7 drives the active drill rod 2 to reset horizontally so that the bottom end of the active drill rod 2 is connected to the top end of the second drill rod 9, and the pulley mechanism 5 drives the elevator 3 to move upward, so that the elevator 3 is clamped on the positioning part of the faucet of the vertical axis drilling rig;

[0078] S9. When the vertical axis drilling rig 7 drives the active drill rod 2 to rotate, the pulley mechanism 5 drives the vertical axis drilling rig to use the faucet through the hanging card 3 to gradually move downward, and then drives the active drill rod 2, the second drill rod 9 and the first drill rod 8 connected below the vertical axis drilling rig to gradually move downward.

[0079] It should be noted that a third drill rod, a fourth drill rod, etc. may be added according to actual needs.

[0080] The embodiment provides a method for lifting a vertical axis drilling rig using a faucet, which eliminates the clamping force of the vertical axis drilling rig 7 on the active drill rod 2, avoids the wear of the active drill rod 2, and at the same time continuously feeds the drill rod below through the pulley mechanism 5. When the drilling depth is deepened and the drill rod is increased, the lifting card 3 is in a low position when it is removed, so it is easy to remove the hook of the lifting card 3, making the operation safe and simple and improving the working efficiency.

[0081] In the description of the present invention, it should be understood that the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0082] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0083] In the present invention, unless otherwise clearly specified and limited, when a first feature is “on” or “below” a second feature, it may be that the first and second features are in direct contact, or that the first and second features are in indirect contact through an intermediate medium. Moreover, when a first feature is “above”, “above” or “above” a second feature, it may be that the first feature is directly above or obliquely above the second feature, or it may simply mean that the first feature is higher in level than the second feature. When a first feature is “below”, “below” or “below” a second feature, it may be that the first feature is directly below or obliquely below the second feature, or it may simply mean that the first feature is lower in level than the second feature.

[0084] In the description of this specification, the description of the terms "one embodiment", "some embodiments", "embodiment", "example", "specific example" or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, unless they are contradictory.

[0085] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may alter, modify, replace and modify the above embodiments within the scope of the present invention.

Claims

1. A method for lifting a vertical shaft drilling rig using a faucet, characterized in that: Using faucets, derricks, pulley mechanisms, elevators, and vertical spindle drilling rigs; The faucet comprises a housing and a pipe assembly arranged inside the housing; The housing comprises an upper housing, a transition connection housing and a lower housing which are threadedly connected in sequence; The structure of the pipeline assembly includes a channel opened in the upper shell, a center pipe arranged in the lower shell, and a connecting pipe passing through the central through hole of the transition shell and connected with the channel and the center pipe respectively, wherein the channel, the connecting pipe and the center pipe are connected to form a mud channel; The center tube is rotatably connected to the lower shell and the center tube extends out of the lower shell for connection with an active drill rod. A supporting portion is provided on the circumference of the center tube. A thrust bearing is provided in the lower shell. The supporting portion is arranged on the thrust bearing. An angular contact ball bearing is provided in the transition connection shell, and the angular contact ball bearing is sleeved on the center tube. A through slot is provided in the horizontal direction of the transition connection shell, the through slot passes through the axis of the transition connection shell, and a positioning portion for installing an elevator is formed at the bottom end of the shell; The elevator card is sleeved on the central tube, and the top end of the elevator card abuts against the positioning portion of the lower shell; One end of the pulley mechanism is connected to the top of the derrick, and the other end of the pulley mechanism is connected to the elevator through a lifting ring; The bottom end of the central tube is used to connect with the top end of the active drill rod; The vertical axis drilling machine is used to drive the active drill rod to move horizontally and rotate, and the bottom end of the active drill rod is used to connect with the drill rod in the hole; The faucet lifting method comprises the following steps: S1, the vertical axis drilling rig drives the active drill pipe to rotate, one end of the pulley mechanism is fixed on the derrick, the other end of the pulley mechanism is connected to the elevator through a lifting ring, and the pulley mechanism drives the elevator to move downward, thereby causing the active drill pipe and the first drill pipe connected to the central pipe in sequence to move downward; S2. When the drilling depth increases and a second drill rod is added, the pulley mechanism drives the elevator to move upward, so that the active drill rod and the first drill rod move upward, and the first drill rod is clamped by a clamping mechanism on the ground to open the connection between the active drill rod and the first drill rod; S3, the vertical axis drilling rig drives the active drill rod to move in the horizontal direction to make way for the lowering working position of the pulley mechanism, and at the same time the pulley mechanism drives the lifting ring to move downward, so that the lifting card connected to the lifting ring moves downward along the active drill rod; S4. When the pulley mechanism drives the elevator to move to the bottom end of the active drill rod, the connection between the elevator and the active drill rod is removed; S5, connecting the elevator to the top of the second drill rod, and the pulley mechanism drives the elevator to move upward to lift the second drill rod and place it vertically; S6, the pulley mechanism drives the elevator to move downward so that the bottom end of the second drill rod placed vertically is docked with the top end of the first drill rod; S7, the clamping mechanism releases the clamping of the first drill rod, and the pulley mechanism drives the elevator to continue to move downward so that the second drill rod and the first drill rod after docking enter the hole; S8, remove the elevator from the second drill rod, install the elevator on the active drill rod, the vertical axis drilling rig drives the active drill rod to reset horizontally so that the bottom end of the active drill rod is connected to the top end of the second drill rod, and the pulley mechanism drives the elevator to move upward so that the elevator is connected to the positioning part of the faucet of the vertical axis drilling rig; S9. When the vertical axis drilling rig drives the active drill rod to rotate, the pulley mechanism drives the vertical axis drilling rig to gradually move downward with the water tap through the hanging card, thereby driving the active drill rod, the second drill rod and the first drill rod connected below the water tap of the vertical axis drilling rig to gradually move downward.

2. The method for lifting a vertical shaft drilling machine using a water tap as claimed in claim 1, characterized in that: The faucet also includes a V-shaped sealing ring; The liquid outlet of the channel is arranged at the bottom center of the upper shell, and the liquid inlet of the channel is arranged on the side wall of the upper shell; The bottom of the upper shell is upwardly concavely provided with a first groove, one end of the connecting pipe is arranged in the first groove, and the top end of the connecting pipe is butted against the liquid outlet; The V-shaped sealing ring is arranged between the connecting pipe and the inner wall of the first groove.

3. The method for lifting a vertical shaft drilling machine using a water tap as claimed in claim 2, characterized in that: The faucet also includes an adjustment disk; The adjusting disk is arranged in the through groove and sleeved on the connecting pipe; The adjusting disk is provided with a protrusion, which extends into the first groove and abuts against the end of the V-shaped sealing ring.

4. The method for lifting a vertical shaft drilling machine using a water tap as claimed in claim 1, characterized in that: A second groove is formed upwardly at the bottom end of the transition connection shell, and the angular contact ball bearing is arranged in the second groove; The supporting portion of the central tube is provided with a positioning step, and the bottom end of the angular contact ball bearing abuts against the positioning step.

5. The method for lifting a vertical shaft drilling machine using a water tap as claimed in claim 1, characterized in that: The faucet also includes multiple sets of sealing rings; A plurality of groups of sealing rings are arranged between the central tube and the transition connection shell.

6. The method for lifting a vertical shaft drilling machine using a water tap as claimed in claim 1, characterized in that: The faucet also includes a lifting rod; A third groove is formed on the top of the upper shell body, and the end of the lifting rod extends into the third groove and is threadedly connected with the third groove.

7. The method for lifting a vertical shaft drilling machine using a water tap as claimed in claim 1, characterized in that: The faucet also includes a cylindrical bearing and a bearing end cover; The bottom end of the lower shell is upwardly recessed with a fourth groove, the cylindrical bearing is arranged in the fourth groove and sleeved on the outer side of the central tube, and the bearing end cover is covered on the cylindrical bearing.

8. The method for lifting a vertical shaft drilling machine using a water tap as claimed in claim 2, characterized in that: The faucet also includes an elbow; The bent pipe is detachably connected to the side wall of the upper shell and is communicated with the liquid inlet of the channel.

Citation Information

Patent Citations

  • Tripping method for operation by adopting power swivel and tool

    CN101748978A

  • Drill pipe lifting liquid injection device for core drill

    CN105089522A

  • Rotary drilling rig faucet

    CN109611044A

  • Device for lowering casings by using spinning faucet and method

    CN110939389A

  • Device for carrying out casing pipe installation operation by common faucet, and operation method

    CN111042737A