A fixing system for equipment installation and a construction method using the fixing system

By adopting a fixing system with stacked diamond cover plates and support parts in metallurgical engineering, the base deformation, safety hazards and noise problems are solved, and rapid and safe equipment installation and removal are achieved, reducing construction costs and noise pollution.

CN115182377BActive Publication Date: 2024-11-12MCC TIANGONG GROUP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210615178.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-06-01
Publication Date
2024-11-12
Estimated Expiration
2042-06-01

AI Technical Summary

Technical Problem

In metallurgical engineering upgrade and renovation projects, the unreasonable fixed installation and installation in the existing technology leads to the problems of easy deformation of the base, high safety hazards, high environmental noise, and low installation and disassembly efficiency.

Method used

A fixing system for equipment installation is adopted, including several diamond-shaped cover plates and support parts arranged in overlapping parts. The equipment is fixed to the base plane of the suspension support through embedded parts and suspended rings, and the elastic pads are used to reduce vibration and noise. The support part is composed of a base, a pillar assembly and an elastic pad to achieve a stable and flat mounting surface.

Benefits of technology

It achieves fast construction speed, high accuracy and convenient construction, and the fixed system can be reused, reducing construction costs, reducing vibration and noise, ensuring that the cover plate is firm, simple to operate, stable connection, safe and reliable.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115182377B_ABST
    Figure CN115182377B_ABST
Patent Text Reader

Abstract

The present invention provides a fixing system for equipment installation, comprising: a mounting portion, which is constructed with a plurality of partially stacked cover plates, all of which cooperate with each other to form a base plane for installing equipment; a support portion, which is placed below the mounting portion so that the base plane is suspended at a height suitable for the installation position of the equipment; the mounting portion can be suspended and supported by the support portion when installing the equipment so that the base plane forms a stable and flat installation surface. The present invention also proposes a construction method for equipment installation using the fixing system. The present invention can be modularly produced based on the size of the foundation pit at the construction site, with fast construction speed and high precision, convenient construction and high construction efficiency, saving maintenance time, and the fixing system can also be reused to reduce construction costs. The entire fixing system is simple to operate and has stable connections, and realizes modular construction of the base and equipment. It is safe, reliable and easy to promote.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of metallurgical engineering equipment installation, and in particular relates to a fixing system for equipment installation and a construction method using the fixing system. Background Art

[0002] In metallurgical engineering upgrading and reconstruction projects, the problem of delaying the installation of important equipment due to imperfect foundation setting is often encountered, and it is necessary to wait until the installation conditions are fully met in the future before reinstalling. For example, in the rolling workshops of some steel mills, due to some reasons in the early stage of the plant construction, only one finishing mill was installed, and the position of the roughing mill equipment was reserved; but for normal production, a temporary cover plate needs to be installed on the basis of the roughing equipment, and then a transition roller is installed on the cover plate to ensure the smooth flow of the entire production process.

[0003] For such upgrading and renovation projects, temporary covers are usually made and supported by sandbags. Although this construction method is simple, there is no rigid connection between the covers. When in use, the transition roller is easily impacted by external forces and produces excessive noise. At the same time, the sandbags supporting the temporary covers are also easily deformed after being squeezed by external forces, causing deformation of the temporary covers.

[0004] Another method is to plant steel bars on the ground, then connect the steel bars to the cover plate and cast them into a whole. This method requires a lot of work and is inefficient. Under the cover plate is a pit for the equipment foundation, and scaffolding needs to be built in the pit. There are many uncertainties and safety hazards in the construction of the existing factory building. Tank trucks and pump trucks cannot be used in the factory building, and concrete pouring is difficult. The most important thing is that the rough rolling mill equipment will need to be dismantled in the future, which is labor-intensive and ineffective. Summary of the invention

[0005] The present invention provides a fixing system for equipment installation and a construction method using the fixing system, which is particularly suitable for working conditions of temporary equipment installation, and solves the technical problems in the prior art of easy deformation of the base, potential safety hazards, high environmental noise, and low installation and disassembly efficiency due to unreasonable system design of the fixed installation setting.

[0006] In order to solve at least one of the above technical problems, the technical solution adopted by the present invention is:

[0007] A fixing system for equipment installation, comprising:

[0008] The mounting portion is constructed with a plurality of partially stacked cover plates, all of which cooperate with each other to form a base plane for mounting the device;

[0009] A support part is placed below the mounting part so that the base plane is suspended at a height suitable for the mounting position of the device;

[0010] The mounting portion can be suspended and supported by the supporting portion when installing equipment so that the base plane forms a stable and flat mounting surface.

[0011] Furthermore, the cross-sections of all the cover plates are constructed as a diamond structure, and the inclined surfaces of adjacent cover plates are placed opposite to each other and are stacked and connected by connecting pieces to form the base plane.

[0012] Furthermore, each of the cover plates is also constructed with a plurality of rows of embedded parts arranged in parallel, and the embedded parts on all the cover plates form rollers arranged relatively to fix the equipment on the base plane; the embedded parts are built into the cover plates and are arranged flush with the base plane.

[0013] Furthermore, each of the cover plates is provided with a hanging ring for hanging.

[0014] Furthermore, the support portion is constructed with a base and a plurality of support pillar assemblies fixed on the base for supporting the mounting portion, and an empty foundation pit is formed between the base and the cover plate.

[0015] Furthermore, the area of ​​the base is not less than the area of ​​the cover, and the minimum width and minimum length of the base are respectively greater than the minimum width and minimum length of the cover.

[0016] Furthermore, the support pillar assemblies are constructed to stand upright on the base and are spaced apart on the axis of the cover plate.

[0017] Furthermore, the pillar assembly is constructed with a vertically arranged steel column, and an upper end plate and a lower end plate are respectively constructed at both ends of the steel column, the lower end plate is directly configured on the base, and the size of the upper end plate is smaller than the size of the lower end plate; a triangular wedge block for adjusting the height of the steel column is also provided between the lower end plate and the base.

[0018] Furthermore, it also includes a plurality of elastic pads, which are disposed on each of the upper end plates and are used to connect the upper end plates and the cover plates.

[0019] A construction method for equipment installation, using a fixing system as described in any one of the above, comprising the following steps:

[0020] S1, prefabricating the installation part;

[0021] Determine the length and width of the base plane in the installation part based on the foundation pit area between the installation part and the support part, and determine the position of the embedded parts for fixing the equipment roller in each cover plate; and construct a hanging ring for suspending the cover plate;

[0022] S2, prefabricating the support part;

[0023] Prefabricate the base in the support part; measure the height of the equipment installation position on the basis of the base and calculate the installation position height of the cover plate; then construct the installation position of the pillar assembly on the base based on the position of the embedded parts in the cover plate and the center position of the axis of the cover plate;

[0024] S3, balance installation part;

[0025] An auxiliary support assembly is provided at the end portion of each cover plate, and the upper end surface of the support assembly is leveled using a level;

[0026] S4, installing and connecting all the cover plates to form the base plane;

[0027] Suspending each of the cover plates and installing them on a predetermined pillar assembly, and fixing the cover plates on the pillar assembly through elastic pads; stacking and connecting adjacent cover plates in sequence to form an integrated base plane;

[0028] S5. Install equipment;

[0029] The equipment is then installed on the base plane based on a roller conveyor formed by embedded parts arranged on the cover plate.

[0030] A fixing system for equipment installation designed by the present invention and a construction method using the fixing system can be produced in a modular manner based on the size of the foundation pit at the construction site. The construction speed is fast and the accuracy is high. The construction is convenient and the construction efficiency is high. The maintenance time is saved. The fixing system can also be reused to reduce the construction cost. This system is a prefabricated assembly structure, which is easy to install and dismantle. When the rolling mill is installed in the later stage, the roller equipment and the base can be lifted in an integrated manner to achieve rapid installation and rapid dismantling. It has good vibration and noise reduction effects, can effectively reduce vibration and noise pollution during equipment operation, and ensure that the cover plate is firmly positioned. The entire fixing system is simple to operate and has a stable connection. It realizes modular construction of the base and equipment, is safe, reliable, and easy to promote. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 This is a structural diagram of a fixing system for equipment installation according to an embodiment of the present invention.

[0032] Figure 2 is a matching diagram of adjacent cover plates according to an embodiment of the present invention;

[0033] Figure 3 is a side view of a cover plate along its length direction according to an embodiment of the present invention;

[0034] Figure 4 is a top view of a mounting portion according to an embodiment of the present invention;

[0035] Figure 5 is a schematic structural diagram of a support assembly according to an embodiment of the present invention;

[0036] Figure 6 It is a schematic diagram of the hoisting of an integrated removal device according to an embodiment of the present invention.

[0037] In the figure:

[0038] 10. Mounting part 11. Cover plate 12. Base plane

[0039] 13. Embedded parts 14. Lifting rings 15. Through holes

[0040] 16. Connecting piece 1 17. Connecting piece 2 20. Support part

[0041] 21. Base 22. Main support assembly 221. Steel column

[0042] 222, upper end plate 223, lower end plate 224, connecting piece 3

[0043] 23. Auxiliary support assembly 24. Wedge block 25. Elastic pad

[0044] 30. Foundation pit 40. Equipment DETAILED DESCRIPTION

[0045] The present invention is described in detail below with reference to the accompanying drawings and specific embodiments.

[0046] This embodiment provides a fixing system for equipment installation, such as Figure 1 As shown, it includes a mounting portion 10, a supporting portion 20, and an empty foundation pit 30 with a certain height between the mounting portion 10 and the supporting portion 20, so that the mounting portion 10 is suspended and fixed above the supporting portion 20. The mounting portion 10 is constructed with a plurality of partially stacked cover plates 11, and all the cover plates 11 cooperate with each other to form a base plane 12 for installing the equipment; the supporting portion 20 is placed under the cover plates 11 in the mounting portion 10, so that the base plane 12 is suspended at a height suitable for the installation position of the equipment 40; the mounting portion 10 can be suspended and supported by the supporting portion 20 when installing the equipment 40, so that the base plane 12 forms a stable and flat installation surface.

[0047] Further, such as Figure 2As shown, the cross-sections of all the cover plates 11 are constructed as a diamond structure, the inclined surfaces of adjacent cover plates 11 are placed opposite to each other, and a through hole 15 of a vertical cylindrical structure is provided at the height of the inclined surface of the cover plate 11, and a connecting piece 16 penetrates the through hole 15 so that the upper end surfaces of the stacked cover plates 11 form a flat base plane 12. The connecting piece 16 is a common bolt, and both ends are fixed by nuts. In order to ensure that the upper and lower end surfaces of the stacked cover plates 11 are flat and reduce the damage of the nuts, the through hole 15 at one end of the plane of the cover plate 11 is required to be a concave groove so that the nuts are hidden in the cover plate 11 to protect the strength of the nuts; at the same time, the connecting piece 16 connects the cover plates 11 into a whole to resist vibration together. The special-shaped cover plate 11 with a diamond-shaped end face is composed of a reinforced concrete structure with a diamond-shaped end face. The length and width of the cover plate 11 are determined according to the fixed size of the equipment 40 and the size of the foundation pit 30 below. The special-shaped cover plate 11 can be used to form a supporting surface above the foundation pit 30, and the equipment 40 is installed on the base plane 12 formed by the cover plate 11 for operation. It can also be used as a temporary load-carrying heavy objects and a walkway.

[0048] Further, such as Figure 3 As shown, several rows of embedded parts 13 arranged in parallel are also constructed on each cover plate 11. The embedded parts 13 on all the cover plates 11 form rollers arranged oppositely to fix the equipment 40 on the base plane 12; the embedded parts 13 are all built into the cover plate 11 and are arranged flush with the base plane 12. The embedded parts 13 make a rectangular steel plate, whose elevation is arranged in the same plane as the upper end surface of the cover plate 11 and is arranged flush with the plane. The embedded parts 13 are connected to the cover plate 11 through anchor claws and are jointly supported. The function of the embedded parts 13 is to weld the support of the equipment 40 to the cover plate 11 to form a whole, so that the equipment 40 can be safely and stably arranged on the cover plate 11.

[0049] Furthermore, in order to facilitate the installation of each cover plate 11, a lifting ring 14 for suspension is provided on each cover plate 11. The lifting ring 14 is made of straight threaded steel bars. When making, the anchor claws of the lifting ring 14 should be inside the steel bars of the cover plate 11, so as to form a force-bearing whole. The positions of the two lifting rings 14 are the center of gravity of the cover plate 11. The role of the lifting ring 14 is to serve as the mobile force point of the cover plate 11, which is convenient for lifting and coordination.

[0050] In addition, in order to further improve the stability of the position of all cover plates 11, it is also necessary to set a number of connecting parts 17 on the basis of the base 21 in the support part 20. Among them, the connecting part 17 consists of a screw rod and two nuts. The screw rod is a slender cylindrical structure. Threads are processed at the upper and lower nut positions. Below the lower nut is a steel rod with a smooth surface. The screw rod and the base 21 are connected as a whole with concrete. The nut is a hexagonal structure with threads inside, which is used in conjunction with the screw rod; the screw rod mainly plays a role in transmitting force, and the nut mainly plays a role in tightening; the lower nut is rotated on the screw rod to adjust the height of the cover plate 11 and the force condition of each fulcrum. After the upper nut and the lower nut are tightened at the same time, the cover plate 11 can be fixed.

[0051] Further, such as Figure 4 As shown, the support part 20 is constructed with a base 21 and a plurality of main support assemblies 22 and auxiliary support assemblies 23 fixed on the base 21 for supporting the mounting part 10. Since the length of the cover plate 11 is different, the balance of both ends cannot be guaranteed after only setting the main support assembly 22 at the axial center of the cover plate 11, so it is necessary to add auxiliary support assemblies 23 for support. An empty foundation pit 30 is formed between the base 21 and the cover plate 11. At the same time, for the foundation pit 30 with a larger span, it is necessary to add auxiliary support assemblies 23 to reduce the deflection change in the cover plate 11. The auxiliary support assembly 23 is set on the base 21. After its corresponding position is determined, it is fixed with expansion bolts. First, ensure that the height of the auxiliary support assembly 23 is consistent with that of the main support assembly 22 to ensure the stability of the support. At the position of the upper end plate 221 on the top side of the support assembly, the rubber gasket in the elastic pad 25 is bonded and fixed to the steel plate with glue to ensure its fixed stability.

[0052] Furthermore, the area of ​​the base 21 is not less than the area of ​​the cover 11, and the minimum width and minimum length of the base 21 are respectively greater than the minimum width and minimum length of the cover 11, in order to improve the installation stability of the equipment 40 and to have sufficient supporting area to support the placement and installation of all cover plates 11.

[0053] Further, such as Figure 5As shown, the two pillar assemblies have the same structure, and all the pillar assemblies are constructed to stand upright on the base 21, and are spaced apart from each other on the axis of the cover plate 11. Specifically, the main pillar assembly 22 is constructed with a vertically arranged steel column 221, and an upper end plate 222 and a lower end plate 223 are respectively constructed at the upper and lower ends of the steel column 221. The planes of the upper end plate 222 and the lower end plate 223 are arranged perpendicular to the length of the steel column 221, and the lower end plate 223 is directly fixed to the base 21 through the connecting piece 3 224, that is, the lower end plate 223 is detachably connected to the base 21 through the connecting piece 3 224, and a triangular wedge block 24 for adjusting the height of the steel column 221 is also provided between the lower end plate 223 and the base 21. The wedge block 24 serves to fine-tune the height of the main pillar assembly 22 and the auxiliary pillar assembly 23. After the elevation adjustment is completed, the wedge block 24 and the base 21 are cast into a whole with grouting material.

[0054] In order to ensure the stability of the steel column 221 when placed vertically, the size of the upper end plate 222 is required to be smaller than that of the lower end plate 223, so as to increase the area of ​​the lower end plate 223 and the base 21, and improve the stability of the main pillar assembly 22 when placed vertically; and the upper end plate 222 is a square steel plate, which mainly bears the role of the rubber pad in the elastic pad 25; the lower end plate 223 is also a square steel plate, which is larger than the upper end plate 222, and has four bolt holes at the four corners of the steel plate, and expansion bolts are used as connecting parts 224 to fix the lower end plate 223. Preferably, the steel column 221 is an I-beam, and of course it can also be made of steel columns of other structures. Since this structure requires high strength, the third connector 224 is an expansion bolt, so the steel column 221 mainly plays the role of connecting the upper and lower parts and transmitting force. The height of the steel column 221 is determined according to the depth of the foundation pit 30. The position of the mounting support on the base 21, that is, the lower end surface of the corresponding cover plate 11, is determined according to the height of the foundation pit 30 to determine whether to cancel the setting of the steel column 221.

[0055] Furthermore, the support part 20 also includes a plurality of elastic pads 25, each of which is provided with an elastic pad 25, and the elastic pads 25 are disposed on the upper end plate 222 in each of the support parts, and are used to connect the cover plate 11 in the mounting part 10 and the upper end plate 222 in the support part 20, so as to reduce the vibration of the equipment during operation. The elastic pad 25 is a rubber pad, and its structure is a rectangular plate rubber support. The function of the rubber pad is to diffuse the concentrated reaction force transmitted by the cover plate 11 to the structure of the base 21 below, so as to ensure safe and reliable force. The rubber pad has good elasticity, and can greatly reduce the amplitude transmitted by the operation of the upper equipment.

[0056] A construction method for equipment installation, using the above-mentioned fixing system, comprises the following steps:

[0057] S1. Prefabricated installation part 10.

[0058] Based on the area of ​​the foundation pit 30 between the installation part 10 and the support part 20, the length and width of the base plane 12 in the installation part 10 are determined, and the position of the embedded parts 13 in each cover plate 11 for fixing the roller of the equipment 40 is determined; at the same time, the lifting ring 14 for suspending the cover plate 11 is constructed. Among them, when determining the size of the base plane 12, it is necessary to measure the size of the foundation pit 30 that needs to be covered by the cover plate 11 in advance, determine the length and width of the cover plate 11 according to the size of the foundation pit 30, and then determine the position of the embedded parts 13 in each cover plate 11 according to the support position of the roller in the equipment 30. Before prefabricating the cover plate 11, the position of the lifting ring 14 is calculated according to the length of the cover plate 11. Because the shape of the cross section of the cover plate 11 tends to be rhombus, during the production and concrete curing process, be careful not to bump the edges and corners of the cover plate 11.

[0059] S2. Prefabricate the supporting part 20.

[0060] Prefabricate the base 21 in the support part 20; measure the installation position height of the equipment 30 on the basis of the base 21 and calculate the installation position height of the cover plate 11; then construct the installation position of the pillar assembly 22 on the base 21 based on the position of the embedded parts 13 in the cover plate 11 and the center position of the axis of the cover plate 11. Before prefabrication, first measure the elevation and position of the cover plate 11. If the height is insufficient, set the steel column 221 in the pillar assembly as a force transmission support, then drill holes with a water drill, and implant the anchor bolts of the connector 3 224. After implantation, do not grout first, and wait for the equipment 40 to be installed and fine-tuned later, and then cast uniformly.

[0061] S3. Balance the mounting portion 10.

[0062] An auxiliary support assembly 23 is provided at the end of each cover plate 11, and the upper end surfaces of all the support assemblies are leveled with a level. That is, the elevation of the upper end plates 222 of all the main support assemblies 22 and the auxiliary support assemblies 23 is measured with a level to ensure that the elevations of the cover plates 11 are consistent and on the same axis, which means that the heights of all the main support assemblies 22 and the auxiliary support assemblies 23 are consistent.

[0063] S4. Install and connect all cover plates 11 to form a base plane 12.

[0064] Each cover plate 11 is suspended and installed on the predetermined main support assembly 22 and auxiliary support assembly 23, and the cover plate 11 is fixed on the main support assembly 22 and auxiliary support assembly 23 by elastic pads 25; adjacent cover plates 11 are stacked and connected in sequence to form an integrated base plane 12. In particular, when suspending, a crane is used to lift the cover plate 11 to the predetermined position, and the center line of the cover plate 11 is aligned with the center line of the rubber pad 41, and falls on the bottom nut of the embedded bolt in the embedded part 13, and the nut is rotated on the screw rod to adjust the elevation and level it. Then, the cover plates 11 are placed on the foundation pit 30 in sequence, and fine-tuned. The connecting piece 16 passes through the through hole 15 in the cover plate 11, and then the nut is tightened to connect the cover plate 11 into a whole. After the grouting is completed, the anchor bolts on both sides of the cover plate are tightened to form an integrated and flat base plane 12.

[0065] S5. Install equipment 40.

[0066] The equipment 40 is then installed on the base plane 12 based on the roller conveyor formed by the embedded parts 13 arranged on the cover plate 11. The foundation of the equipment 40 on the roller conveyor and the foundation of the motor equipment are welded to the embedded parts 13 on the cover plate 11. In order to prevent debris from falling into the cover plate 11, a PE caulking rod is used to penetrate into the gap for caulking, and then the upper layer is coated with a polyurethane waterproof leak-proof paste. When the cover plate 11 needs to be removed or the equipment 40 needs to be reinstalled at a later time, the elastic pad 25 is loosened to separate the mounting part 10 from the supporting part 20, that is, the cover plate 11 is separated from the main pillar assembly 22 and the auxiliary pillar assembly 23, so that the mounting part 10 with the equipment 40 installed can be lifted away as a whole by a driving vehicle, as shown in FIG. Figure 6 shown.

[0067] The above-mentioned fixing system can be produced in a modular manner according to the size of the on-site foundation pit 30, with fast construction speed and high precision. It can be made inside or outside the factory, which effectively improves the construction quality and saves maintenance time. The construction template can also be reused to reduce construction costs. At the same time, due to the use of a pre-assembled system, it is easy to dismantle. When the rolling mill is installed later, the equipment 40 and the cover plate 11 can be lifted in an integrated manner to achieve rapid installation and rapid dismantling, high efficiency, safety and stability. In addition, the elastic pad 25 with a rubber structure can reduce vibration and noise. After being fixed with bolts, it can effectively reduce the vibration and noise pollution of the equipment 40 during operation, and ensure the firmness of the cover plate 11. Finally, this set of pre-assembled fixing system is simple to operate and has a stable connection. The cover plate 11 and the equipment 40 as a whole can achieve integrated and modular construction, which is safe, reliable and easy to promote.

[0068] A fixing system for equipment installation designed by the present invention and a construction method using the fixing system can be produced in a modular manner based on the size of the foundation pit at the construction site. The construction speed is fast and the accuracy is high. The construction is convenient and the construction efficiency is high. The maintenance time is saved. The fixing system can also be reused to reduce the construction cost. This system is a prefabricated assembly structure, which is easy to install and dismantle. In the later installation of the rolling mill, the roller equipment and the base can be lifted in an integrated manner to achieve rapid installation and rapid dismantling. The vibration reduction and noise reduction effect is good, which can effectively reduce the vibration and noise pollution during the operation of the equipment and ensure that the cover plate is firmly positioned. The entire fixing system is simple to operate and has a stable connection. It realizes modular construction of the base and equipment. It is safe, reliable and easy to promote.

[0069] The above embodiments of the present invention are described in detail, and the contents are only preferred embodiments of the present invention, and cannot be considered to limit the scope of implementation of the present invention. All equivalent changes and improvements made according to the scope of application of the present invention should still fall within the scope of the patent coverage of the present invention.

Claims

1. A fixing system for equipment installation, characterized in that: include: The mounting portion is constructed with a plurality of partially stacked cover plates, all of which cooperate with each other to form a base plane for mounting the device; A support part is placed below the mounting part so that the base plane is suspended at a height suitable for the mounting position of the device; The mounting portion can be suspended and supported by the supporting portion when installing the equipment so that the base plane forms a stable and flat mounting surface; The cross-sections of all the cover plates are constructed as a diamond structure, and the inclined surfaces of adjacent cover plates are placed opposite to each other and are stacked and connected by connecting pieces to form the base plane; Several rows of embedded parts arranged in parallel are also constructed on each of the cover plates, and the embedded parts on all the cover plates form rollers arranged opposite to each other to fix the equipment on the base plane; the embedded parts are built into the cover plates and are arranged flush with the base plane; The embedded part is connected to the cover plate through an anchor claw; The support part is structured with a base and a plurality of pillar assemblies fixed on the base for supporting the mounting part, and an empty foundation pit is formed between the base and the cover plate; The pillar assembly is constructed with a vertically arranged steel column, and an upper end plate and a lower end plate are respectively constructed at both ends of the steel column, the lower end plate is directly arranged on the base, and the size of the upper end plate is smaller than the size of the lower end plate; a triangular wedge block for adjusting the height of the steel column is also arranged between the lower end plate and the base; A plurality of second connectors are arranged on the basis of the base in the support part; wherein, the second connector consists of a screw rod and two nuts, the screw rod is a slender cylindrical structure, threads are processed at the upper and lower nut positions, a steel rod with a smooth surface is provided below the lower nut, and the screw rod and the base are connected into a whole with concrete; the lower nut is rotated on the screw rod to adjust the height of the cover plate and the stress condition of each fulcrum, and the cover plate is fixed after the upper nut and the lower nut are tightened at the same time.

2. A fixing system for equipment installation according to claim 1, characterized in that: Each of the cover plates is also provided with a hanging ring for hanging.

3. A fixing system for equipment installation according to claim 1 or 2, characterized in that: The area of ​​the base is not less than the area of ​​the cover, and the minimum width and minimum length of the base are respectively greater than the minimum width and minimum length of the cover.

4. A fixing system for equipment installation according to claim 3, characterized in that: The support pillar assemblies are constructed to stand upright on the base and are spaced apart from each other on the axis of the cover plate.

5. A fixing system for equipment installation according to claim 4, characterized in that: It also includes a plurality of elastic pads, which are disposed on each of the upper end plates and are used to connect the upper end plates and the cover plate.

6. A construction method for equipment installation, characterized in that: Using the fixing system according to any one of claims 1 to 5, the steps include: S1, prefabricating the installation part; Determine the length and width of the base plane in the installation part based on the foundation pit area between the installation part and the support part, and determine the position of the embedded parts for fixing the equipment roller in each cover plate; and construct a hanging ring for suspending the cover plate; S2, prefabricating the support part; Prefabricate the base and the pillar assembly in the support part, wherein the pillar assembly includes a main pillar assembly and an auxiliary pillar assembly of the same structure; measure the height of the equipment installation position on the basis of the base and calculate the installation position height of the cover plate; then, based on the position of the embedded parts in the cover plate and the center position of the axis of the cover plate, construct the installation position of the pillar assembly on the base and install the main pillar assembly at the installation position; S3, balance installation part; An auxiliary support assembly is provided at the end portion of each cover plate to ensure that all the auxiliary support assemblies are at the same height as the main support assembly to ensure the stability of the support; and the upper end surfaces of all the main support assemblies and the auxiliary support assemblies are leveled with a level; S4, installing and connecting all the cover plates to form the base plane; Suspending each of the cover plates and installing them on the predetermined main support assembly and the auxiliary support assembly, and fixing the cover plates on the main support assembly and the auxiliary support assembly through elastic pads; stacking and connecting adjacent cover plates in sequence to form an integrated base plane; S5. Install equipment; The equipment is then installed on the base plane based on a roller conveyor formed by embedded parts arranged on the cover plate.