An ultra-long track beam for wind tunnel testing and a high-precision installation method thereof

Through the combination of segmented assembly and leveling device, the problem of difficulty and high precision in the installation of ultra-long track beams is solved, and the installation of ultra-long track beams with high precision and high pull-out resistance is achieved, which is suitable for applications such as wind tunnel testing.

CN115198576BActive Publication Date: 2024-10-29CHINA CONSTR EIGHT ENG DIV CORP LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202210635498.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-06-07
Publication Date
2024-10-29
Estimated Expiration
2042-06-07

AI Technical Summary

Technical Problem

Existing prefabricated steel structure track beams are difficult to design when installing ultra-long track beams, and require high accuracy, resulting in troublesome installation problems.

Method used

The ultra-long track beam design is assembled in segments, and high-precision installation of the track beam is achieved through anchor bolts and leveling devices. The segmented connection of the anchor bolts and the adjustment function of the leveling device are used to ensure the parallelism of the track beams. and accuracy, and through the cooperation of the resisting rod and the limiting ring block, the pull-out resistance and stability are improved.

Benefits of technology

It achieves high-precision installation of ultra-long track beams, simplifies the installation process, improves the pull-out resistance and load-bearing capacity of the track beams, and ensures the parallelism and accuracy of the track beams.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115198576B_ABST
    Figure CN115198576B_ABST
Patent Text Reader

Abstract

The present invention provides an extra-long track beam for wind tunnel test and a high-precision installation method thereof, comprising a track beam, wherein the track beam is composed of several combinations to form an extra-long track beam, cavities are arranged on both sides of the track beam, reinforcing ribs are arranged at both ends of the extra-long track beam formed by the combination of several track beams, anchor bolts are arranged at the bottom of the cavity, a leveling device is connected to the top of the track beam, jacks are arranged on both sides of the leveling device, a cross beam is arranged on the top of the jack, and a support rod is arranged at the bottom of the cross beam. The anchor bolts arranged in the device and the segmented track beam are first installed, and then several track beams are spliced, so that the track beams can be conveniently adjusted after being combined into the extra-long track beam, so as to ensure the length of the track beam and also ensure its accuracy, so that when the extra-long track beam is constructed by prefabricated steel structure track beams, its accuracy can be more conveniently ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of track beams, and in particular to an ultra-long track beam for wind tunnel testing and a high-precision installation method thereof. Background Art

[0002] At the current stage, track beams are generally concrete track beams, and the accuracy requirements of track beams are not high. They are not suitable for use in wind tunnel tests and large-scale scientific research and transportation equipment. The existing prefabricated steel structure foundations are adjustable, have a long service life, and the foundation can be prefabricated in the factory to reduce the construction period. However, because prefabricated steel structure track beams, especially super-long track beams with a length greater than 50m, are difficult to design and require high installation accuracy, only a small number of super-long test track beams in my country currently use prefabricated steel structure track beams. Therefore, super-long track beams used in wind tunnel tests and other scientific research are generally cast-in-place concrete track beams. Summary of the invention

[0003] The purpose of the present invention is to provide an extra-long track beam for wind tunnel testing and a high-precision installation method thereof, so as to solve the problem that the design difficulty of installing extra-long track beams through prefabricated steel structure track beams is too great and the higher precision requirements lead to the trouble of installing prefabricated steel structure track beams.

[0004] The embodiments of the present invention are implemented by the following technical solutions:

[0005] The present invention provides an extra-long track beam for a wind tunnel test, comprising a track beam, wherein the track beam is composed of several combinations to form an extra-long track beam, cavities are arranged on both sides of the track beam, reinforcing ribs are arranged at both ends of the extra-long track beam formed by the combination of several track beams, anchor bolts are arranged at the bottom of the cavity, a leveling device is connected to the top of the track beam, jacks are arranged on both sides of the leveling device, a cross beam is arranged on the top of the jack, a support rod is arranged at the bottom of the cross beam, the support rod is arranged in an "L" shape, and the bottom part of the support rod is fitted on the top of the cavity.

[0006] Through the leveling device described above, the height of the track beams can be leveled after they are spliced, hoisted and placed together, so that several track beams can remain parallel. Moreover, through the segmented splicing after assembly in the above content, it can be adjusted manually to ensure the accuracy of the track beams.

[0007] Preferably, the support rod is hingedly connected to the crossbeam via a circular axis.

[0008] Preferably, the cavity is also provided with a limiting groove, an engaging groove, a displacement groove, a limiting ring block, a limiting shaft and a limiting ring groove. The limiting groove is a rectangular groove in the middle of the cavity, the engaging groove is a rectangular groove on both sides of the bottom of the limiting groove, the displacement groove is a cylindrical groove on both sides of the engaging groove, the limiting ring block is a semicircular ring block near one end of the displacement groove, the limiting shaft is a circular shaft whose two ends are partially engaged and connected in the displacement groove, and the limiting ring groove is a circular ring groove near both ends of the limiting shaft.

[0009] Preferably, the inner wall of the displacement groove matches the thread of the side wall surface of the limiting shaft.

[0010] Preferably, the cross section of the limiting ring block is set in a trapezoidal shape, and the limiting ring block is connected to the circular groove on the inner wall of the displacement groove through a spring, and the limiting ring block cooperates with the limiting ring groove.

[0011] Preferably, the push rod includes a fitting groove and an engaging block, the fitting groove is a rectangular groove at the bottom of the push rod, the engaging block is a rectangular protrusion at the middle bottom end of the fitting groove, and the engaging block protrusion cooperates with the limiting groove, a groove with a width matching the diameter of the limiting shaft is provided in the middle of the engaging block, and the inner wall of the groove in the middle of the engaging block cooperates with the thread of the limiting shaft.

[0012] Preferably, the anchor bolt also includes a threaded rod, a nut and a fixed base, the threaded rod is a threaded groove on the side wall surface of the top part of the anchor bolt, the nut is threadedly connected to the side wall of the protruding cavity part of the threaded rod, and a fixed base is arranged at the bottom of the anchor bolt.

[0013] Connecting the track beams by the anchor bolts described above can effectively improve the pull-out resistance of the track beams after installation.

[0014] Preferably, the track beam is arranged in an "I" shape as a whole, and the bottom end of the track beam is wider than the top end.

[0015] By setting the track beam in such a shape as described above, it can be more effectively connected with the anchor bolts, thereby improving the pull-out resistance of the anchor bolts.

[0016] Preferably, a high-precision installation method for an ultra-long track beam for a wind tunnel test comprises the following steps;

[0017] Step 1: insert the threaded rod of the anchor bolt into the cavity, and then fix it with a nut, clamp and fix it with the baffle plate at the bottom of the cavity that fits the anchor bolt, and connect it to the track beam;

[0018] Step 2: After the track beam is connected to the anchor bolts, it is transported and moved to the reserved holes and grooves by hoisting equipment, and then the track beam is connected to the anchor bolts and hoisted and spliced ​​together in turn;

[0019] Step 2: After several track beams are connected to the anchor bolts in sequence to complete the hoisting and splicing, a leveling device is set on the ground on both sides of the track beams, and the spliced ​​track beams are leveled by the leveling device to adjust them to the same height;

[0020] Step 3: After the leveling is completed, grouting is performed between the track beam and the reserved groove, so that the track beam is completely fixedly connected in the reserved groove, and the bearing capacity of the track beam is improved;

[0021] In step two, when the track beam is leveled by the leveling device, when the abutment rod is abutted against the cavity of the track beam for connection, the engaging block in the fitting groove on the abutment rod will be engaged in the limiting groove, and at the same time, the engaging block in the fitting groove will drive the limiting shaft to move along the displacement groove, and the abutment connection of the abutment rod will be limited by the displacement limitation of the limiting shaft.

[0022] The technical solution of the embodiment of the present invention has at least the following advantages and beneficial effects:

[0023] 1. After the anchor bolts and segmented track beams are installed in the device, several track beams are spliced ​​together, so that the track beams can be easily adjusted after being combined into super-long track beams, so as to ensure the length of the track beams and their accuracy. When the super-long track beams are constructed by prefabricated steel structure track beams, their accuracy can be more conveniently ensured. At the same time, the anchor bolts can also improve the pull-out resistance of the track beams after pouring.

[0024] 2. The device is also provided with a leveling device, which is used to level several segmented track beams separately, so that the super-long track beam composed of several track beams can be adjusted to maintain parallel accuracy.

[0025] 3. The leveling device is also provided with an engaging block. Through the cooperation between the engaging block on the supporting rod and the limiting groove in the cavity, the supporting rod can ensure the supporting state when it is against the track beam for force leveling, and the hinged part will not be deflected due to excessive force, thereby affecting the leveling. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0027] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0028] Figure 2 It is a schematic diagram of the overall structure of the leveling device of the present invention;

[0029] Figure 3 For the present invention Figure 2 A schematic diagram of the enlarged structure at A in the middle;

[0030] Figure 4 It is a schematic diagram of a partial side cross-sectional structure of a track beam of the present invention;

[0031] Figure 5 For the present invention Figure 4 Schematic diagram of the enlarged structure at B in the middle

[0032] Figure 6 A schematic diagram of the side cross-sectional structure of the limiting groove of the present invention

[0033] Icons: track beam 1, reinforcing rib 101, cavity 102, limiting groove 103, fitting groove 1031, displacement groove 10311, limiting ring block 10312, limiting shaft 1032, limiting ring groove 10321, anchor bolt 2, threaded rod 201, nut 202, fixed base 203, leveling device 3, jack 301, cross beam 302, support rod 303, fitting groove 3031, fitting block 3032. DETAILED DESCRIPTION

[0034] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0035] Combine the following Figures 1 to 6 The present invention is described in detail.

[0036] An extra-long track beam for wind tunnel testing comprises a track beam 1, wherein the track beam 1 is composed of several tracks arranged in combination to form an extra-long track beam, wherein cavities 102 are arranged on both sides of the track beam 1, and reinforcing ribs 101 are arranged at both ends of the extra-long track beam formed by the combination of several track beams 1, and anchor bolts 2 are arranged at the bottom of the cavity 102, and a leveling device 3 is connected to the top of the track beam 1, and jacks 301 are arranged on both sides of the leveling device 3, a cross beam 302 is arranged on the top of the jack 301, and a support rod 303 is arranged at the bottom of the cross beam 302, and the support rod 303 is arranged in an "L" shape, and the bottom part of the support rod 303 fits the top of the cavity 102.

[0037] Furthermore, the support rod 303 is hingedly connected to the crossbeam 302 via a circular axis.

[0038] Furthermore, the cavity 102 is also provided with a limiting groove 103, an engaging groove 1031, a displacement groove 10311, a limiting ring block 10312, a limiting shaft 1032 and a limiting ring groove 10321. The limiting groove 103 is a rectangular groove in the middle of the cavity 102, the engaging groove 1031 is a rectangular groove on both sides of the bottom of the limiting groove 103, the displacement groove 10311 is a cylindrical groove on both sides of the engaging groove 1031, the limiting ring block 10312 is a semicircular ring block near one end of the displacement groove 10311, the limiting shaft 1032 is a circular shaft whose two ends are partially engaged and connected in the displacement groove 10311, and the limiting ring groove 10321 is a circular ring groove near both ends of the limiting shaft 1032.

[0039] Furthermore, the inner wall of the displacement groove 10311 is threadedly matched with the side wall surface of the limiting shaft 1032 .

[0040] Furthermore, the cross section of the limiting ring block 10312 is set to be trapezoidal in shape, and the limiting ring block 10312 is connected to the circular groove on the inner wall of the displacement groove 10311 through a spring, and the limiting ring block 10312 cooperates with the limiting ring groove 10321.

[0041] Furthermore, the support rod 303 includes a fitting groove 3031 and an engaging block 3032. The fitting groove 3031 is a rectangular groove at the bottom of the support rod 303. The engaging block 3032 is a rectangular protrusion at the middle bottom end of the fitting groove 3031. The protrusion of the engaging block 3032 cooperates with the limiting groove 103. A groove with a width that matches the diameter of the limiting shaft 1032 is provided in the middle of the engaging block 3032. The inner wall of the groove in the middle of the engaging block 3032 is threadedly engaged with the limiting shaft 1032.

[0042] Furthermore, the anchor bolt 2 also includes a threaded rod 201, a nut 202 and a fixed base 203. The threaded rod 201 is a threaded groove on the side wall surface of the top part of the anchor bolt 2, and the nut 202 is threadedly connected to the side wall of the protruding cavity 102 part of the threaded rod 201. A fixed base 203 is arranged at the bottom of the anchor bolt 2.

[0043] Furthermore, the bottom width of the track beam 1 is larger than the top width.

[0044] Further, a high-precision installation method for an ultra-long track beam for wind tunnel testing comprises the following steps;

[0045] Step 1: insert the threaded rod 201 of the anchor bolt 2 into the cavity 102, and then fix it with the nut 202 to clamp and fix the anchor bolt 2 to the baffle at the bottom of the cavity 102, and connect it to the track beam 1;

[0046] Step 2: After the track beam 1 is connected to the anchor bolt 2, it is transported and moved to the reserved holes and grooves by hoisting equipment, and then the track beam 1 is connected to the anchor bolt 2 in sequence and hoisted and spliced ​​together;

[0047] Step 2: After several track beams 1 are connected to the anchor bolts 2 in sequence to complete the hoisting and splicing, the leveling device 3 is set on the ground on both sides of the track beam 1, and the spliced ​​track beams 1 are leveled by the leveling device 3 to adjust them to the same height;

[0048] Step 3: After the leveling is completed, grouting is performed between the track beam 1 and the reserved groove, so that the track beam 1 is completely fixedly connected in the reserved groove, and the bearing capacity of the track beam 1 is improved;

[0049] In step two, when the track beam 1 is leveled by the leveling device 3, when the abutment rod 303 is abutted against the cavity 102 of the track beam 1 for connection, the engaging block 2032 in the fitting groove 3031 on the abutment rod 303 will be engaged in the limiting groove 103, and at the same time, the engaging block 3032 in the fitting groove 3031 will drive the limiting shaft 1032 to move along the displacement groove 10311, and the abutment connection of the abutment rod 303 is limited by the displacement limitation of the limiting shaft 1032.

[0050] The following is a specific implementation process of the present invention. First, the threaded rod 201 on the anchor bolt 2 is penetrated into the bottom of the cavity 102 of the track beam 1, and then the nut 202 is used to tighten the threaded rod 201 so that it is fixed and clamped with the circular baffle on the anchor bolt 2, so that the anchor bolt 2 and the track beam 1 are connected together, and then the track beam 1 with the anchor bolt 2 is moved to the reserved opening and groove by the lifting equipment for placement, and then the track beams 1 with other anchor bolts 2 are spliced ​​in sections one by one, and the extra-long track beam is built on one side, and at the same time Because its segmented connection can be easily adjusted to ensure the accuracy of its extra-long track beam, and the anchor bolts 2 can also increase the pull-out resistance of its track beam 1 after the pouring is completed, and the reinforcing ribs 101 set at both ends of the extra-long track beam composed of several track beams 1 increase its width and the position of the opening, so as to increase the lateral stability of the extra-long track beam after the combination is completed. After the track beam 1 and the anchor bolts 2 are connected and placed and spliced ​​in turn, the support rod 303 of the leveling device 3 is moved to the top of the cavity 102 for fitting and abutment, and then the lifting and lowering of the jack 301 is driven The crossbeam 302 connected to the supporting rod 303 is raised and lowered to drive the track beam 1 to adjust its height to a certain extent, so that each track beam 1 can maintain its height parallel adjustment to ensure the accuracy of the track beam 1. When the supporting rod 303 moves to the top of the cavity 102, the engaging block 3032 on the fitting groove 3031 in the supporting rod 303 will be engaged with the limiting groove 103, and then the groove in the engaging block 3032 will be threadedly engaged with the limiting shaft 1032, so that when the engaging block 3032 enters the limiting groove 103, it will drive the limiting shaft 1032 to rotate. When rotating, it will be displaced to one side of the displacement groove 10311 through the thread. When the limiting shaft 1032 is displaced a certain distance, the limiting ring groove 10321 will move to the connection limiting ring block 10312, and the limiting ring block 10312 will lose its resistance through the groove of the limiting ring groove 10321, and then the spring elastic pop-up part will be embedded in the limiting ring groove 10321 for embedding connection, so that the support rod 303 does not only rely on the force of the support to apply pressure to the track beam 1, but prevents the support rod 303 from tilting to a certain extent during the process of applying pressure against the track beam 1, thereby affecting the leveling of the track beam 1.

[0051] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. An extra-long track beam for wind tunnel testing, comprising a track beam (1), wherein the track beam (1) is composed of a plurality of combined extra-long track beams, and cavities (102) are provided on both sides of the track beam (1). It is characterized in that Both ends of the super-long track beam formed by combining the plurality of track beams (1) are provided with reinforcing ribs (101); the bottom of the cavity (102) is provided with anchor bolts (2); the top of the track beam (1) is connected with a leveling device (3); jacks (301) are provided on both sides of the leveling device (3); a crossbeam (302) is provided on the top of the jack (301); a support rod (303) is provided at the bottom of the crossbeam (302); the support rod (303) is provided in an "L" shape, and the bottom portion of the support rod (303) is attached to the top of the cavity (102); The support rod (303) is hingedly connected to the crossbeam (302) via a circular shaft; The cavity (102) is further provided with a limiting groove (103), an engaging groove (1031), a displacement groove (10311), a limiting ring block (10312), a limiting shaft (1032) and a limiting ring groove (10321); the limiting groove (103) is a rectangular groove in the middle of the cavity (102); the engaging groove (1031) is a rectangular groove on both sides of the bottom of the limiting groove (103); the displacement groove (10311) is a cylindrical groove on both sides of the engaging groove (1031); the limiting ring block (10312) is a semicircular ring block near one end of the displacement groove (10311); the limiting shaft (1032) is a circular shaft with two ends partially engaged and connected in the displacement groove (10311); and the limiting ring groove (10321) is a circular ring groove near both ends of the limiting shaft (1032); The inner wall of the displacement groove (10311) is thread-matched with the surface of the side wall of the limiting shaft (1032); The cross section of the limiting ring block (10312) is set in a trapezoidal shape, and the limiting ring block (10312) is connected to the circular groove on the inner wall of the displacement groove (10311) through a spring, and the limiting ring block (10312) cooperates with the limiting ring groove (10321); The push rod (303) comprises a fitting groove (3031) and a fitting block (3032), wherein the fitting groove (3031) is a rectangular groove at the bottom of the push rod (303), and the fitting block (3032) is a rectangular protrusion at the bottom of the middle part of the fitting groove (3031), and the protrusion of the fitting block (3032) matches with the limiting groove (103), and the middle part of the fitting block (3032) is provided with a groove whose width matches with the diameter of the limiting shaft (1032), and the inner wall of the groove in the middle part of the fitting block (3032) is threadedly matched with the limiting shaft (1032); The track beam (1) is arranged in an "I" shape as a whole, and the bottom end of the track beam (1) is wider than the top end.

2. The super-long track beam for wind tunnel testing according to claim 1, It is characterized in that The anchor bolt (2) further comprises a threaded rod (201), a nut (202) and a fixed base (203); the threaded rod (201) is a thread groove on the surface of the side wall of the top portion of the anchor bolt (2); the nut (202) is threadedly connected to the side wall of the threaded rod (201) protruding from the cavity (102); and the fixed base (203) is provided at the bottom of the anchor bolt (2).

3. A high-precision installation method for an ultra-long track beam for wind tunnel testing according to any one of claims 1-2, wherein the steps are as follows; Step 1: insert the threaded rod (201) of the anchor bolt (2) into the cavity (102), and then fix it with a nut (202) to clamp and fix the anchor bolt (2) to the baffle plate at the bottom of the cavity (102), and connect it to the track beam (1); Step 2: After the track beam (1) is connected to the anchor bolt (2), it is transported and moved to the reserved holes and grooves by means of lifting equipment, and then the track beam (1) is connected to the anchor bolt (2) in sequence and hoisted and spliced ​​together; Step 2: After the plurality of track beams (1) are connected to the anchor bolts (2) in sequence to complete the hoisting and splicing, the leveling device (3) is set on the ground on both sides of the track beam (1), and the spliced ​​track beams (1) are leveled by the leveling device (3) to adjust them to the same height; Step three, after the leveling is completed, grouting is performed between the track beam (1) and the reserved groove, so that the track beam (1) is completely fixedly connected in the reserved groove, and the bearing capacity of the track beam (1) is increased; In step 2, when the track beam (1) is leveled by the leveling device (3), when the abutting rod (303) abuts against the cavity (102) of the track beam (1) for abutment connection, the engaging block (2032) in the fitting groove (3031) on the abutting rod (303) will be engaged in the limiting groove (103), and at the same time, the engaging block (3032) in the fitting groove (3031) will drive the limiting shaft (1032) to move along the displacement groove (10311), and the abutment connection of the abutting rod (303) is limited by the displacement limitation of the limiting shaft (1032).