Load center grid structure and load transfer optimization method, system, medium and terminal considering voltage stability
By screening key substation clusters and weak voltage stability zones, establishing an optimization model, optimizing the load center grid structure and load transfer plan, the problem of insufficient transient voltage stability of the load center grid was solved, and the load capacity and load capacity of the generator set were improved. Transient stability.
Patent Information
- Application Number
- CN202210941719.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-08-08
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2042-08-08
AI Technical Summary
The existing technology has insufficient transient voltage stability in the load center power grid, resulting in the need for the generator set to reserve rotating reserve capacity, which limits the load capacity, and lacks effective optimization methods to improve the transient voltage stability level.
By screening key substation clusters and weak voltage stability zones, an optimization model is established to optimize the load center grid structure and load transfer plan, reduce transient impacts, and improve the load capacity of the generator set.
It effectively reduces the transient impact of AC faults, improves the transient stability of the load center, increases the load capacity of the generator set, and quickly identifies weak voltage stability zones, reducing the spinning reserve capacity of the generator set.
Smart Images

Figure CN115207916B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of voltage stability of electric power systems, and in particular to a load center grid structure taking voltage stability into consideration and a load transfer optimization method, system, medium and terminal. Background Art
[0002] The main grid of the load center of the power system is tight, the short-circuit impact is large, and the operation mode of zoning and segmentation is adopted, which makes the voltage stability support ability weak. Especially after the ultra-high voltage direct current is fed into the load-intensive areas, the voltage stability problem is further prominent. In order to maintain the transient voltage stability of the load center, conventional generator sets need to reserve a certain amount of rotating reserve capacity to enhance the dynamic reactive power support capacity of the unit, but this limits the load-carrying capacity of the unit and reduces the power supply capacity. Therefore, how to improve the stability level of the transient voltage in the load center is of great practical significance.
[0003] At present, the transient voltage stability level of the load center is improved mainly by adding dynamic reactive power equipment and optimizing the operation mode of the unit. In the existing technology, there is no good technical means to improve the transient voltage stability of the load center from the perspective of optimizing the grid structure and load transfer of the load center. Summary of the invention
[0004] The present invention provides a load center grid structure and load transfer optimization method, system, medium and terminal taking voltage stability into consideration, which reduces the transient impact of AC faults, improves the transient stability of the load center power grid and improves the load capacity of the load center generator set by optimizing the load center grid structure and the load transfer mode of the voltage stability weak zone.
[0005] In a first aspect, the present invention provides a load center grid structure and a load transfer optimization method taking voltage stability into consideration, comprising:
[0006] S1: Based on the short-circuit current of the main grid busbar of the load center, a critical substation set is screened and formed; after a three-phase short-circuit fault occurs in the AC line connected to each substation in the critical substation set, the partition with the longest transient voltage stability recovery time and its recovery time are obtained; the transient voltage stability AC fault set and the load center voltage stability weak partition are obtained according to the transient voltage stability recovery time and the proportion of power received outside the partition;
[0007] S2: Taking the deviation between the spinning reserve capacity of the generator set and the expected value of the spinning reserve capacity of the generator set and the load transfer amount of the weak voltage stability zone as the minimum target, and taking the transient voltage stability and static safety of the system as the constraint conditions, an optimization model of the load center grid structure and load transfer is established;
[0008] S3: Based on the key substation set, an optimization plan for AC line shutdown or out-of-station operation is formed, and the relationship between the load transfer volume and transient voltage stability in the weak voltage stability zone is obtained by combining the optimization model, and the optimal plan for the main grid structure of the load center and the load transfer in the weak voltage stability zone is obtained to achieve voltage stability.
[0009] Furthermore, the process of obtaining the key substation set is as follows:
[0010] Arrange the short-circuit current of the main grid busbar of the load center in descending order, and form a key substation set with substations that meet the screening conditions. The screening conditions are:
[0011]
[0012] Among them, I si I is the short-circuit current of the receiving-end power grid; smax is the maximum node short-circuit current of the receiving-end power grid; It is the ratio of the main grid bus short-circuit current at the load center to its maximum bus short-circuit current.
[0013] Furthermore, the acquisition of the transient voltage stability AC fault set specifically includes:
[0014] The three-phase short-circuit faults of the AC lines connected to each substation in the key substation set are taken as the transient stability fault set in turn; the maximum value of the partition voltage recovery time of each fault in the transient stability fault set is obtained by using the time domain simulation method, and the maximum value of the partition voltage recovery time of each fault is arranged in order from large to small to form a transient voltage stability AC fault set H = [H1, H2, ..., H m ], where H1 represents the fault with the longest voltage recovery time among the fault concentration.
[0015] Furthermore, the process of obtaining the load center voltage stability weak zone is specifically as follows:
[0016] According to the transient voltage stability AC fault concentration fault concentration voltage recovery time longest fault H1 and its partition voltage recovery time T i , calculate the external power supply ratio R of the partition i , R i It is expressed as:
[0017] R i =(P li -P gi ) / P li
[0018] Among them, P li is the active power of the maximum load in the ith partition, P gi is the active power of the generator set in the i-th partition;
[0019] Sort the voltage recovery time and external power proportion of each partition in descending order, and calculate the comprehensive ranking d of each partition i , d i It is expressed as:
[0020] d i =(ε1d ti +ε2d ri ) / 2
[0021] Among them, d ti is the voltage recovery time sorting of the i-th partition, d ri is the ranking of the external power supply ratio of the i-th partition, ε1 and ε2 are weighted coefficients, and ε1+ε2=1;
[0022] The partition with the smallest comprehensive ranking is taken as the voltage stability weak partition σ.
[0023] Furthermore, the objective function of the optimization model of the load center grid structure and load transfer is:
[0024] min[λ1(P gr -P gref ) 2 +λ2(P l -P l0 ) 2 ]
[0025] Among them, P gr is the spinning reserve capacity of the generator set, P gref is the expected value of the spinning reserve capacity of the generator set; P l For voltage stability weak zone load, P l0 is the initial value of the load in the weak voltage stability partition; λ1 is the weighted coefficient of the deviation between the spinning reserve capacity of the generator set and the expected value of the spinning reserve capacity of the generator set; λ2 is the weighted coefficient of the load transfer amount in the weak voltage stability partition.
[0026] Furthermore, the constraints of system transient voltage stability and static safety include:
[0027] Taking the system transient voltage stability criterion, the voltage stability weak zone load transfer requirement, the generator set spinning reserve capacity, and the AC line active power as the constraints, it is specifically expressed as:
[0028] V l (t k )≥0.8pu,t k ≥10s
[0029] 0≤P gr ≤P grmax
[0030] 0≤ΔP l ≤ΔP lmax
[0031] P linemin ≤P line ≤P linemax
[0032] Among them, V l is the load node voltage; t k P is the time after the system fault is cleared; gr P is the spinning reserve capacity of the generator set; grmax is the maximum value of the rotating reserve capacity of the generator set; ΔP l The load transfer amount for the weak voltage stability zone; ΔP lmax The maximum value of the load transferred from the weak voltage stability zone to other zones; P linemin is the minimum value of the active power of the AC line; P line is the active power of the AC line; P linemax It is the maximum value of the AC line active power.
[0033] Furthermore, the step S3 specifically includes:
[0034] S31: disconnect the AC lines connected to the key substations in the key substation set in sequence to form a plan A1, and then sequentially operate the AC lines in the key substations in series to form a plan A2, and combine the optimization plans A1 and A2 to form an initial optimization plan set A for the load center main power grid;
[0035] S32: Test each solution in the optimization solution set A. When the AC line active power of the solution meets the constraint condition, the solution is included in the solution set A. opt .
[0036] S33: When the constraints of the transient voltage stability criterion of the system are met, the set A is obtained by time domain simulation opt The spinning reserve capacity P of the generator sets in each scheme grj ; Sequential comparison scheme set A opt Solution A optj Spinning reserve capacity P of the generator set grj and the expected value of the spinning reserve capacity of the generator set P gref , when P grj Satisfy P grj -P gref ≤0, plan A optj Included in solution set A c , go to step S35, if solution set A opt None of the solutions in P grj -P gref≤0, then proceed to step S34; wherein, A optj Represents the solution set A opt The jth solution in
[0037] S34: Based on the optimization model, time domain simulation is used to obtain solution A optj The relationship matrix R between the load transfer amount of the voltage stability weak zone and the rotating reserve capacity of the generator set is obtained based on the relationship matrix R to satisfy P grj -P gref ≤0; when the load transfer amount of the weak voltage stability partition meets the constraint conditions, plan A optj Included in solution set A c If not satisfied, then plan A optj Not included in solution set A c ;
[0038] S35: Select solution set A c The scheme with the minimum load transfer in the medium voltage stability weak zone is used as the optimization scheme for the main grid structure and load transfer of the load center.
[0039] In a second aspect, the present invention provides a load center grid structure and a load transfer optimization system taking voltage stability into consideration, including a data acquisition and processing module, an optimization model establishment module, and an optimization solution acquisition module;
[0040] Data acquisition and processing module: used to screen and form a key substation set Ω0 based on the short-circuit current of the main power grid busbar of the load center; after a three-phase short-circuit fault occurs in the AC line connected to each substation in Ω0, the partition with the longest transient voltage stability recovery time and its recovery time are obtained; the transient voltage stability AC fault set H and the load center steady-state voltage weak partition σ are obtained according to the transient voltage stability recovery time and the proportion of power received outside the partition;
[0041] Optimization model building module: It is used to establish the optimization model of load center grid structure and load transfer by taking the deviation between the rotating reserve capacity of the generator set and the expected value of the rotating reserve capacity of the generator set and the load transfer amount of the weak voltage stability zone as the goal, and taking the transient voltage stability and static safety of the system as the constraint conditions;
[0042] Optimization scheme acquisition module: It is used to form an optimization scheme for AC line shutdown or in-station out-of-service operation based on a set of key substations, and combine the optimization model to obtain the relationship between the load transfer amount in the weak voltage stability partition and the transient voltage stability, and obtain the optimal scheme for the main grid structure of the load center and the load transfer in the weak voltage stability partition.
[0043] In a third aspect, the present invention provides a computer-readable storage medium storing a computer program, wherein the computer program is suitable for being loaded by a processor and executing the voltage stabilization optimization method as described above.
[0044] In a fourth aspect, the present invention provides a terminal, comprising a processor and a memory, wherein the memory stores a computer program, and the processor calls the computer program to execute: the steps of the method described above.
[0045] Beneficial Effects
[0046] The present invention proposes a load center grid structure and load transfer optimization method, system, medium and terminal taking into account voltage stability, which have the following advantages: First, by only optimizing the connection mode of the key substations in the load center and the load transfer amount of the voltage stability weak partition, the transient impact of AC faults is reduced, the transient stability of the load center is improved, and the load-carrying capacity of the generator set is improved, which has good promotion and application value. Secondly, by using the partition voltage recovery time and the proportion of external power supply, the voltage stability weak partitions of the load center are quickly and accurately identified, thereby improving the processing efficiency of the entire load center. Finally, by using the key substation set of the load center, an optimization plan for the load center power grid structure is quickly formed and then the optimal plan is obtained, thereby reducing the rotating standby capacity of the generator set. BRIEF DESCRIPTION OF THE DRAWINGS
[0047] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0048] Figure 1 It is a flow chart of a load center grid structure and a load transfer optimization method and system taking voltage stability into consideration provided by the present invention;
[0049] Figure 2 It is a schematic diagram of a load center power grid in Example 1 provided by the present invention;
[0050] Figure 3 This is a wiring diagram of a key substation in Example 1 provided by the present invention;
[0051] Figure 4 It is a voltage response comparison diagram of Strategy 1 and Strategy 2 in Example 1 provided by the present invention. DETAILED DESCRIPTION
[0052] To make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be described in detail below. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other implementation methods obtained by ordinary technicians in this field without creative work belong to the scope of protection of the present invention.
[0053] The present invention provides a load center grid structure and load transfer optimization method taking voltage stability into consideration. The method is based on a load center transient voltage stability key substation set and weak partitions, establishes a load center grid structure and load transfer optimization model, and obtains the load center main grid structure and the optimal load transfer solution for the voltage stability weak partition. The present invention is further described below in conjunction with specific embodiments.
[0054] Example 1
[0055] like Figure 1-4 As shown, the present invention provides a load center grid structure and a load transfer optimization method taking voltage stability into account, comprising the following steps:
[0056] S1: Based on the short-circuit current of the main grid busbar of the load center, the key substation set Ω0 is screened and formed; after a three-phase short-circuit fault occurs in the AC line connected to each substation in Ω0, the partition with the longest transient voltage stability recovery time and its recovery time are obtained; the transient voltage stability AC fault set H and the load center steady-state voltage weak partition σ are obtained according to the transient voltage stability recovery time and the proportion of power received outside the partition;
[0057] S2: Taking the deviation between the spinning reserve capacity of the generator set and the expected value of the spinning reserve capacity of the generator set and the load transfer amount of the weak voltage stability zone as the minimum target, and taking the transient voltage stability and static safety of the system as the constraint conditions, an optimization model of the load center grid structure and load transfer is established;
[0058] S3: Based on the key substation set, an optimization plan for AC line shutdown or out-of-station operation is formed, and the relationship between the load transfer volume and transient voltage stability in the voltage stability weak zone is obtained by combining the optimization model, so as to obtain the optimal plan for the main grid structure of the load center and the load transfer in the voltage stability weak zone.
[0059] Furthermore, the process of obtaining the key substation set is as follows:
[0060] Arrange the short-circuit current of the main grid busbar of the load center in descending order, and select the substations with large short-circuit current according to formula (1) to form a key substation set.
[0061]
[0062] Among them, Isi I is the short-circuit current of the receiving-end power grid; smax is the maximum node short-circuit current of the receiving-end power grid; It is the ratio of the main grid bus short-circuit current at the load center to the maximum main grid bus short-circuit current at the load center.
[0063] Further, after a three-phase short circuit fault occurs in the AC line connected to each substation in Ω0, obtaining the partition with the longest transient voltage stability recovery time in the load center and its recovery time specifically includes:
[0064] In the key substation set Ω0, the three-phase short-circuit faults of the AC lines connected to each substation in Ω0 are taken as the transient stability fault set in turn; the maximum value of the partition voltage recovery time of each fault in the transient stability fault set is obtained by using the time domain simulation method, and the maximum value of the partition voltage recovery time of each fault is arranged in order from large to small to form a transient voltage stability AC fault set H = [H1, H2, ..., H m ]; where H1 represents the fault with the longest concentrated voltage recovery time among transient voltage stable AC faults; the partition voltage recovery time refers to the average time required for the voltage of all nodes in each partition of the load center to recover to 0.8pu for the first time after the fault is normally removed.
[0065] Furthermore, the process of obtaining the load center voltage stability weak zone is specifically as follows:
[0066] Define the voltage recovery time of each partition in fault H1 in the transient voltage stability AC fault set H as T i , use formula (2) to calculate the external power supply ratio R of the partition i ,
[0067] R i =(P li -P gi ) / P li (2)
[0068] Among them, P li is the active power of the maximum load in the ith partition, P gi is the active power of the generator set in the i-th partition;
[0069] Using formula (3), the voltage recovery time and external power proportion of each partition are sorted in ascending order to obtain the comprehensive ranking d of each partition. i :
[0070] d i =(ε1d ti +ε2d ri ) / twenty three)
[0071] Among them, d tiis the voltage recovery time sorting of the i-th partition, d ri is the ranking of the external power supply ratio of the i-th partition, ε1 and ε2 are both weighted coefficients, and ε1+ε2=1.
[0072] In order to reduce the fault impact of the AC power grid in the load center, the key substations with large bus short-circuit current in the load center are first screened, and the AC fault set and the weak partition of the load center are formed. The key substation set is screened by the bus short-circuit current of the load center, and a method for obtaining the weak partition of voltage stability in the load center based on the partition voltage recovery time and the proportion of external power supply is invented. This lays the foundation for optimizing the grid structure of the load center and the load transfer mode of the weak partition of voltage stability.
[0073] Furthermore, the optimization model of the load center grid structure and load transfer is based on the deviation of the rotating reserve capacity of the generator set from the expected value, the load transfer amount ΔP of the voltage stability weak zone, and the load transfer capacity of the voltage stability weak zone. l Minimum target (ΔP l =P l -P l0 ), the objective function is established as:
[0074] min[λ1(P gr -P gref ) 2 +λ2(P l -P l0 ) 2 ] (4)
[0075] Among them, P gr is the spinning reserve capacity of the generator set, P gref is the expected value of the spinning reserve capacity of the generator set; P l For voltage stability weak zone load, P l0 is the initial value of the load in the weak voltage stability partition; λ1 is the weighted coefficient of the deviation between the rotating reserve capacity of the generator set and the expected value of the rotating reserve capacity of the generator set; λ2 is the weighted coefficient of the load transfer amount in the weak voltage stability partition.
[0076] Furthermore, the constraints of system transient voltage stability and static safety include system transient voltage stability criteria, voltage stability weak zone load transfer requirements, generator set spinning reserve capacity, and AC line active power, which are specifically expressed as:
[0077] V l (t k )≥0.8pu,t k ≥10s (5)
[0078] 0≤P gr ≤P grmax (6)
[0079] 0≤ΔP l ≤ΔP lmax (7)
[0080] P linemin ≤P line ≤P linemax (8)
[0081] Among them, V l is the load node voltage; t k P is the time after the system fault is cleared; gr P is the spinning reserve capacity of the generator set; grmax is the maximum value of the rotating reserve capacity of the generator set; ΔP l The load transfer amount for the weak voltage stability zone; ΔP lmax The maximum value of the load transferred from the weak voltage stability zone to other zones; P linemin is the minimum value of the AC line active power, P line is the AC line active power, P linemax It is the maximum value of the AC line active power.
[0082] Then, based on the established objective function and constraints, the load center grid structure and load transfer optimization model are established, namely, equations (4)-(8).
[0083] In order to reduce the transient impact of the AC system, a load center grid structure and load transfer optimization model is established. The model of the present invention aims at minimizing the deviation between the rotating reserve capacity of the generator set and the expected value of the rotating reserve capacity of the generator set and the load transfer amount of the weak voltage stability partition. By optimizing the connection mode of the key substations in the load center and the load transfer amount of the weak voltage stability partition, the transient impact of the AC system can be reduced and the transient voltage stability level of the load center can be improved.
[0084] Furthermore, the step S3 specifically includes:
[0085] S31: disconnect the AC lines connected to the key substations in the key substation set Ω0 in turn to form a plan A1, and then sequentially operate the AC lines in the key substations in series to form a plan A2, and merge the optimization plans A1 and A2 to form an initial optimization plan set A for the load center main power grid;
[0086] S32: Test each solution in the optimization solution set A. When the AC line active power of each solution satisfies formula (8), it is included in the solution set A. opt .
[0087] S33: When the constraint condition (5) of the transient voltage stability criterion of the system is met, the set A is obtained by time domain simulation optThe spinning reserve capacity P of the generator sets in each scheme grj ; Sequential comparison scheme set A opt Solution A optj Generator set spinning reserve capacity P grj and the expected value of the spinning reserve capacity of the generator set P gref , when P grj Satisfy P grj -P gref ≤0, plan A optj Included in solution set A c , go to step S35; if solution set A opt None of the solutions in P grj -P gref ≤0, then jump to step S34; where A optj Represents the solution set A opt The jth solution in .
[0088] S34: Based on the optimization model, use time domain simulation to obtain solution A optj The relationship matrix R between the load transfer amount of the voltage stability weak zone and the rotating reserve capacity of the generator set is obtained based on the relationship matrix R to satisfy P grj -P gref ≤0 voltage stability weak zone load transfer quantity ΔP li , when the voltage stability is weak, the load transfer volume of the partition ΔP lk When the constraint condition (7) is satisfied, plan A optj Included in solution set A c ; Among them, the relationship matrix R is expressed as follows:
[0089]
[0090] Among them, the relationship matrix R is a 2×M matrix, the first row represents the load transfer amount of the voltage stability weak zone, and the second row represents the rotating reserve capacity of the generator set; P gr1 , P grk , P grM are the load transfer amounts ΔPl1 and ΔP in the weak voltage stability partitions respectively. lk , ΔP lM The corresponding rotating reserve capacity of the generator set; ΔP lk Expressed as
[0091] ΔP lk =ΔP l1 +(k-1)·(ΔP lM -ΔP l1 ) / (M-1)
[0092] Further explanation of S34: Using time domain simulation to obtain solution A optjThe relationship between the voltage stability weak partition conforming to the transfer quantity and the rotating reserve capacity of the generator set is obtained; according to the relationship, the voltage stability weak partition conforming to the transfer quantity is adjusted within the preset range to obtain the adjusted relationship matrix R; the rotating reserve capacity of the generator set in the relationship matrix R is sequentially determined, and when the rotating reserve capacity of the generator set satisfies P grj -P gref ≤0, then determine the current voltage stability weak zone load transfer quantity ΔP lk Whether the constraint condition (7) is satisfied, if it is satisfied, plan A opti Included in solution set A c If the order comparison is not satisfied, then plan A optj Not included in solution set A c For example, when the generator set spinning reserve capacity P gr1 Does not meet the condition P grj -P gref ≤0, then continue to select P gr2 Make judgments, and so on, until P grk Satisfy the condition P grj -P gref ≤0, for P grk The corresponding voltage stability weak zone load transfer quantity ΔP lk Whether the constraint condition (7) is satisfied is judged. If satisfied, the solution is included in the solution set A. c If it is not satisfied, it will not be included in the solution set A c .
[0093] S35: Select solution set A c The scheme with the minimum load transfer in the medium voltage stability weak zone is used as the optimization scheme for the main grid structure and load transfer of the load center.
[0094] After forming the load center grid structure and load transfer optimization model, the load center main grid structure and load transfer quantity scheme that meet the constraint conditions are finally obtained. The present invention is characterized in that the load transfer quantity of the voltage stability weak partition, the line active power and other constraints are comprehensively considered, and the rotating standby capacity of the generator set is reduced by optimizing the load center main grid structure and minimizing the load transfer quantity of the voltage stability weak partition.
[0095] The main power grid structure diagram of an actual load center is as follows: Figure 2 As shown. The load center is divided into 5 zones, namely [AW, S, H, DXL, YG]. The rated voltage of the DC system is 800kV and the rated power is 8000MW. The UHV DC active power P d0=5500MW, in order to maintain the transient voltage stability of the receiving power grid, the total rotating reserve capacity of the load center thermal power units is about 2000MW. The expected value of the total rotating reserve capacity of the load center thermal power units is 1500MW. Voltage stability weak zone load transfer ΔP li Not exceeding 200MW.
[0096] By calculating the short-circuit current of each busbar in the main grid of the load center and using formula (1), we can get The key substation set Ω0 = [S, D, A] is obtained. The three-phase short-circuit grounding fault of the AC line connected to the set Ω0 is a transient stability fault set, that is, [SD, SX, SF, DL, DX, DW, AF, AH, AW].
[0097] Through the time domain simulation method, the maximum value of the partition voltage recovery time of each fault in the transient stability fault set is obtained, and they are sorted in order from large to small to form the transient voltage stability AC fault set H = [SD, DX, SX, AW, DW, AH, DL, SF, AF], among which the fault with the longest recovery time H1 = SD.
[0098] The load center is divided into 5 zones: AW, S, H, DXL, YG, and the external power supply ratio is R i They are 0.7, 0.4, 0.5, 1, and 0.15 respectively. Under fault SD, the voltage recovery time of the five partitions is 3.2s, 3s, 2.7s, 4.5s, and 2.3s respectively. Using formula (3), it can be obtained that the voltage stability weak partition σ is the DXL partition.
[0099] Based on the key substation set Ω0, the AC lines connected to the key substations are disconnected in sequence to form a scheme A1 = [SD, DX, SX, AW, DW, AH, DL, SF, AF], and the AC lines are operated in series to form a scheme A2 = [FSD, HAW, HAF]. In schemes A1 and A2, after checking whether the active power of the AC lines of each scheme satisfies equation (8), the optimal scheme set A is formed. opt =[AW,DW,FSD,HAW,HAF].
[0100] Using time domain simulation to obtain the set A opt The generator spinning reserve capacity P of each scheme gr =[1800MW, 1650MW, 1550MW, 1900MW, 1920MW]. gri -P gref ≤0 and formula (5), the final optimization solution A c=[FSD,DW], that is, AC lines SF and SD are connected in series at substation S to form AC line FSD, or AC line DW is disconnected. In order to meet the requirement that the total rotating reserve capacity of thermal power units in the load center does not exceed 1500MW, the voltage stability weak zone DXL zone in the optimization scheme FSD needs to transfer 80MW of load, and the voltage stability weak zone DXL zone in the DW scheme needs to transfer 190MW of load.
[0101] In order to compare the advantages of the method of the present invention, the following two optimization schemes are selected:
[0102] Strategy 1: AC lines SF and SD are connected in series at substation S to form AC line FSD, and the voltage stability weak zone DXL transfers 80MW of load;
[0103] Strategy 2: Disconnect the AC line DW and transfer the load of 80MW to the voltage stability weak zone DXL.
[0104] Under the above two strategies, while keeping the total rotating reserve capacity of the load center thermal power units at 1500MW, the bus voltage change curve is as follows: Figure 4 As shown. Figure 4 It can be seen that the bus voltage of the load center can be restored to above 0.8pu in strategy 1, but the bus voltage of the load center cannot be restored in strategy 2. Therefore, the method of the present invention can effectively improve the voltage stability level of the load center and improve the load carrying capacity of the generator set.
[0105] Example 2
[0106] like Figure 1 As shown, the present invention provides a load center grid structure and load transfer optimization system taking voltage stability into consideration, including a data acquisition and processing module, an optimization model establishment module, and an optimization solution acquisition module;
[0107] Data acquisition and processing module: used to screen and form a key substation set Ω0 based on the short-circuit current of the main power grid busbar of the load center; after a three-phase short-circuit fault occurs in the AC line connected to each substation in Ω0, the partition with the longest transient voltage stability recovery time and its recovery time are obtained; the transient voltage stability AC fault set H and the load center steady-state voltage weak partition σ are obtained according to the transient voltage stability recovery time and the proportion of power received outside the partition;
[0108] Optimization model building module: It is used to establish the optimization model of load center grid structure and load transfer by taking the deviation of rotating reserve capacity of generator sets from expected value and the load transfer amount of weak voltage stability zones as the minimum, and taking transient voltage stability and static safety of the system as the constraint conditions;
[0109] Optimization scheme acquisition module: It is used to form an optimization scheme for AC line shutdown or in-station out-of-service operation based on a set of key substations, and to obtain the relationship between the load transfer amount in the weak voltage stability partition and the transient voltage stability by combining the optimization model, so as to obtain the optimal scheme for the grid structure and the load transfer in the weak voltage stability partition.
[0110] Example 3
[0111] This embodiment provides a computer-readable storage medium storing a computer program, wherein the computer program is suitable for being loaded by a processor and executing the load center grid structure and load transfer optimization method taking into account voltage stability as described above.
[0112] It should be understood that in the embodiments of the present invention, the processor may be a central processing unit (CPU), and the processor may also be other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or the processor may also be any conventional processor, etc. The memory may include a read-only memory and a random access memory, and provide instructions and data to the processor. A portion of the memory may also include a non-volatile random access memory. For example, the memory may also store information about the type of device.
[0113] The readable storage medium is a computer-readable storage medium, which may be an internal storage unit of the controller described in any of the foregoing embodiments, such as a hard disk or memory of the controller. The readable storage medium may also be an external storage device of the controller, such as a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), etc. equipped on the controller. Furthermore, the readable storage medium may also include both an internal storage unit of the controller and an external storage device. The readable storage medium is used to store the computer program and other programs and data required by the controller. The readable storage medium may also be used to temporarily store data that has been output or is to be output.
[0114] Based on this understanding, the technical solution of the present invention, in essence or in other words, the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, which is stored in a storage medium and includes several instructions for enabling a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned readable storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, etc., various media that can store program codes.
[0115] Example 4
[0116] The present invention provides a terminal, including a processor and a memory, wherein the memory stores a computer program, and the processor calls the computer program to execute: the steps of the load center grid structure and load transfer optimization method taking into account voltage stability as described above.
[0117] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A load center grid structure and load transfer optimization method taking voltage stability into account, characterized in that: include, S1: Based on the short-circuit current of the main grid busbar of the load center, a critical substation set is screened and formed; after a three-phase short-circuit fault occurs in the AC line connected to each substation in the critical substation set, the partition with the longest transient voltage stability recovery time and its recovery time are obtained; the transient voltage stability AC fault set and the load center voltage stability weak partition are obtained according to the transient voltage stability recovery time and the proportion of power received outside the partition; S2: Taking the deviation between the spinning reserve capacity of the generator set and the expected value of the spinning reserve capacity of the generator set and the load transfer amount of the weak voltage stability zone as the minimum target, and taking the transient voltage stability and static safety of the system as the constraint conditions, an optimization model of the load center grid structure and load transfer is established; S3: Based on the key substation set, an optimization plan for AC line shutdown or out-of-station operation is formed, and the relationship between the load transfer volume and transient voltage stability in the weak voltage stability partition is obtained by combining the optimization model, and the optimal plan for the main grid structure of the load center and the load transfer in the weak voltage stability partition is obtained to achieve voltage stability; The process of obtaining the key substation set is as follows: Arrange the short-circuit current of the main grid busbar of the load center in descending order, and form a key substation set with substations that meet the screening conditions. The screening conditions are: Among them, I si I is the short-circuit current of the receiving-end power grid; smax is the maximum node short-circuit current of the receiving-end power grid; It is the ratio of the main grid bus short-circuit current at the load center to its maximum bus short-circuit current; The acquisition of the transient voltage stability AC fault set specifically includes: The three-phase short-circuit faults of the AC lines connected to each substation in the key substation set are taken as the transient stability fault set in turn; the maximum value of the partition voltage recovery time of each fault in the transient stability fault set is obtained by using the time domain simulation method, and the maximum value of the partition voltage recovery time of each fault is arranged in order from large to small to form a transient voltage stability AC fault set H = [H1, H2, ..., H m ], where H1 represents the fault with the longest voltage recovery time in the fault concentration; The specific process of obtaining the voltage stability weak partition of the load center is as follows: According to the transient voltage stability, the AC fault concentrated voltage recovery time is the longest fault H1 and its partition voltage recovery time T i , calculate the external power supply ratio R of the partition i , R i It is expressed as: R i =(P li -P gi ) / P li Among them, P li is the active power of the maximum load in the ith partition, P gi is the active power of the generator set in the i-th partition; Sort the voltage recovery time and external power proportion of each partition in descending order, and calculate the comprehensive ranking d of each partition i , d i It is expressed as: d i =(ε1d ti +ε2d ri ) / 2 Among them, d ti is the voltage recovery time sorting of the i-th partition, d ri is the ranking of the external power supply ratio of the i-th partition, ε1 and ε2 are weighted coefficients, and ε1+ε2=1; The partition with the smallest comprehensive ranking is taken as the voltage stability weak partition σ.
2. The load center grid structure and load transfer optimization method considering voltage stability according to claim 1 is characterized in that: The objective function of the optimization model of the load center grid structure and load transfer is: min[λ1(P gr -P gref ) 2 +λ2(P l -P l0 ) 2 ] Among them, P gr is the spinning reserve capacity of the generator set, P gref is the expected value of the spinning reserve capacity of the generator set; P l For voltage stability weak zone load, P l0 is the initial value of the load in the weak voltage stability partition; λ1 is the weighted coefficient of the deviation between the spinning reserve capacity of the generator set and the expected value of the spinning reserve capacity of the generator set; λ2 is the weighted coefficient of the load transfer amount in the weak voltage stability partition.
3. The load center grid structure and load transfer optimization method considering voltage stability according to claim 1, characterized in that: The constraints of system transient voltage stability and static safety include: Taking the system transient voltage stability criterion, the voltage stability weak zone load transfer requirement, the generator set spinning reserve capacity, and the AC line active power as the constraints, it is specifically expressed as: V l (t k )≥0.8pu,t k ≥10s 0≤P gr ≤P grmax 0≤ΔP l ≤ΔP lmax P linemin ≤P line ≤P linemax Among them, V l is the load node voltage; t k P is the time after the system fault is cleared; gr P is the spinning reserve capacity of the generator set; grmax is the maximum value of the rotating reserve capacity of the generator set; ΔP l The load transfer amount for the weak voltage stability zone; ΔP lmax The maximum value of the load transferred from the weak voltage stability zone to other zones; P linemin is the minimum value of the active power of the AC line; P line is the active power of the AC line; P linemax It is the maximum value of the AC line active power.
4. The load center grid structure and load transfer optimization method considering voltage stability according to claim 3 is characterized in that: The step S3 specifically includes: S31: disconnect the AC lines connected to the key substations in the key substation set in sequence to form a plan A1, and then sequentially operate the AC lines in the key substations in series to form a plan A2, and combine the optimization plans A1 and A2 to form an initial optimization plan set A for the load center main power grid; S32: Test each solution in the optimization solution set A. When the AC line active power of the solution meets the constraint condition, the solution is included in the solution set A. opt ; S33: When the constraints of the transient voltage stability criterion of the system are met, the set A is obtained by time domain simulation opt The spinning reserve capacity P of the generator sets in each scheme grj ; Sequential comparison scheme set A opt Solution A optj Generator set spinning reserve capacity P grj and the expected value of the spinning reserve capacity of the generator set P gref , when P grj Satisfy P grj -P gref ≤0, plan A optj Included in solution set A c , go to step S35, if solution set A opt None of the solutions in P grj -P gref ≤0, then proceed to step S34; wherein, A optj Represents the solution set A opt The jth solution in S34: Based on the optimization model, use time domain simulation to obtain solution A optj The relationship matrix R between the load transfer amount of the voltage stability weak zone and the rotating reserve capacity of the generator set is obtained based on the relationship matrix R to satisfy P grj -P gref ≤0 voltage stability weak zone load transfer quantity ΔP lk ; When the load transfer quantity of the weak voltage stability zone meets the constraint conditions, plan A optj Included in solution set A c If not satisfied, then plan A optj Not included in solution set A c ; S35: Select solution set A c The scheme with the minimum load transfer in the medium voltage stability weak zone is used as the optimization scheme for the main grid structure and load transfer of the load center.
5. A load center grid structure and load transfer optimization system taking voltage stability into consideration, characterized in that: Including data acquisition and processing module, optimization model building module, optimization solution acquisition module; Data acquisition and processing module: used to screen and form a key substation set based on the short-circuit current of the main power grid busbar of the load center; after a three-phase short-circuit fault occurs in the AC line connected to each substation in the key substation set, the partition with the longest transient voltage stability recovery time and its recovery time are obtained in the load center; the transient voltage stability AC fault set and the weak steady-state voltage partition of the load center are obtained according to the transient voltage stability recovery time and the proportion of power received outside the partition; The process of obtaining the key substation set is as follows: Arrange the short-circuit current of the main grid busbar of the load center in descending order, and form a key substation set with substations that meet the screening conditions. The screening conditions are: Among them, I si I is the short-circuit current of the receiving-end power grid; smax is the maximum node short-circuit current of the receiving-end power grid; It is the ratio of the main grid bus short-circuit current at the load center to its maximum bus short-circuit current; The acquisition of the transient voltage stability AC fault set specifically includes: The three-phase short-circuit faults of the AC lines connected to each substation in the key substation set are taken as the transient stability fault set in turn; the maximum value of the partition voltage recovery time of each fault in the transient stability fault set is obtained by using the time domain simulation method, and the maximum value of the partition voltage recovery time of each fault is arranged in order from large to small to form a transient voltage stability AC fault set H = [H1, H2, ..., H m ], where H1 represents the fault with the longest voltage recovery time in the fault concentration; The specific process of obtaining the voltage stability weak partition of the load center is as follows: According to the transient voltage stability, the AC fault concentrated voltage recovery time is the longest fault H1 and its partition voltage recovery time T i , calculate the external power supply ratio R of the partition i , R i It is expressed as: R i =(P li -P gi ) / P li Among them, P li is the active power of the maximum load in the ith partition, P gi is the active power of the generator set in the i-th partition; Sort the voltage recovery time and external power proportion of each partition in descending order, and calculate the comprehensive ranking d of each partition i , d i It is expressed as: d i =(ε1d ti +ε2d ri ) / 2 Among them, d ti is the voltage recovery time sorting of the i-th partition, d ri is the ranking of the external power supply ratio of the i-th partition, ε1 and ε2 are weighted coefficients, and ε1+ε2=1; The partition with the smallest comprehensive ranking is taken as the weak voltage stability partition σ Optimization model building module: It is used to establish the optimization model of load center grid structure and load transfer by taking the deviation between the rotating reserve capacity of the generator set and the expected value of the rotating reserve capacity of the generator set and the load transfer amount of the weak voltage stability zone as the goal, and taking the transient voltage stability and static safety of the system as the constraint conditions; Optimization scheme acquisition module: It is used to form an optimization scheme for AC line shutdown or in-station out-of-service operation based on a set of key substations, and combine the optimization model to obtain the relationship between the load transfer amount in the weak voltage stability partition and the transient voltage stability, and obtain the optimal scheme for the main grid structure of the load center and the load transfer in the weak voltage stability partition.
6. A computer-readable storage medium storing a computer program, characterized in that: The computer program is suitable for being loaded by a processor and executing the steps of the load center grid structure and load transfer optimization method taking into account voltage stability as described in any one of claims 1 to 4.
7. A terminal, characterized in that: It comprises a processor and a memory, wherein the memory stores a computer program, and the processor calls the computer program to execute: the steps of the load center grid structure and load transfer optimization method taking into account voltage stability as described in any one of claims 1-4.