A high earth-rock dam core wall settlement monitoring device and method

By using a combination of flexible inclinometer and electromagnetic settlement ring on high-earth earth and rock dams, a comprehensive and spatial grid monitoring system is formed, which solves the problem that the settlement monitoring technology of the center wall of high-earth earth and rock dams is difficult to adapt to the 300m level dam height, and has achieved the improvement of the comprehensive and three-dimensional monitoring and monitoring technology of the center wall.

CN115290044BActive Publication Date: 2025-03-18CHINA HYDROELECTRIC ENGINEERING CONSULTING GROUP CHENGDU RESEARCH HYDROELECTRIC INVESTIGATION DESIGN AND INSTITUTE
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211055853.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-08-31
Publication Date
2025-03-18
Estimated Expiration
2042-08-31

AI Technical Summary

Technical Problem

The settlement monitoring technology of the center wall of high earth and rock dams is difficult to meet the safety monitoring needs of 300m-level ultra-high earth and rock dams. Traditional instruments have low survival rates and are difficult to monitor the uneven deformation distribution of the Henghe centripetal wall.

Method used

A flexible inclinometer and electromagnetic settlement ring are used to set up an inclinometer and an electromagnetic settlement ring at the cross section of the dam, and a flexible inclinometer in the PE protection tube is buried horizontally along the axis of the core wall dam to form a comprehensive and spatial grid monitoring system.

Benefits of technology

All-round and three-dimensional monitoring of the core wall of high-earth and rock dams has been achieved, breaking through the limitations of point-type and vertical monitoring of the original technical means, improving the monitoring technology level, and improving the instrument survival rate.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115290044B_ABST
    Figure CN115290044B_ABST
Patent Text Reader

Abstract

The present invention provides a high earth-rock dam core wall settlement monitoring device and method, including a dam, a plurality of vertical inclinometer tubes are arranged on the cross-section axis of the dam, a plurality of electromagnetic settlement rings are arranged on the inclinometer tubes, a plurality of horizontal PE protection tubes are arranged along the core wall dam axis of the dam, a plurality of interconnected flexible inclinometers are arranged in the PE protection tubes, and a second electromagnetic settlement ring is arranged at the intersection of the PE protection tubes and the inclinometer tubes. The flexible inclinometer and the electromagnetic settlement rings vertically buried in each monitoring section break through the limitation of the original technical means of point-type and vertical monitoring only, form a full-dimensional and spatial grid monitoring system for the core wall, and fill the blind spot of the settlement distribution and change law of the core wall of domestic high earth-rock dams along the dam axis. From point-type monitoring to linear monitoring, in view of the characteristics of large settlement and deformation of high earth-rock dams, special protection measures are taken for inclinometer tubes and flexible inclinometers to improve the survival rate of the instruments.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of rock dam monitoring, and in particular to a core wall settlement monitoring device and method for a high earth-rock dam. Background Art

[0002] In recent years, the domestic hydropower dam construction technology has developed rapidly. A number of typical earth-rock dam projects represented by hydropower stations such as Lianghekou (dam height 295m), Nuozadu (dam height 261.5m) and Changheba (dam height 240m) have gradually increased the height of gravel earth core wall rockfill dams from 100m to 300m, making the design theory and construction technology of earth-rock dams in my country reach the international advanced level. However, the development and application of earth-rock dam safety monitoring technology obviously lags behind earth-rock dam construction technology. The adaptability of many monitoring instruments still remains at the 100m dam height level. Traditional instruments are still difficult to fully adapt to the safety monitoring requirements of 300m super-high earth-rock dams, resulting in a generally low survival rate of deformation monitoring instruments for high earth-rock dams.

[0003] The settlement and deformation of high earth-rock dams have always been the focus of engineering attention. It is directly related to whether the dam can operate safely and stably, but it has been difficult to find effective technical methods and means for core wall settlement monitoring. At present, the means of core wall settlement monitoring are generally arranged vertically in each monitoring cross section, mainly including beam-type settlement meters, string-type settlement meters, large-range rod-type displacement meters, electromagnetic settlement rings and other monitoring instruments. Beam-type settlement meters and large-range rod-type displacement meters are generally arranged vertically in sections and elevations to meet the needs of large soil settlement deformation monitoring. The core wall cumulative settlement is obtained by monitoring the settlement of each section of the core wall soil. Affected by the extrusion of the core wall soil and its own hanging weight, the cable is easily damaged by the extrusion of the soil, so that some monitoring instruments are damaged during the construction period. At the same time, after water storage, affected by the high earth pressure and water pressure of the core wall, the monitoring data of some instruments jump, resulting in distortion of monitoring data and low survival rate of monitoring instruments. String-type settlement meters are rarely used because of their low measurement accuracy and easy failure due to large soil settlement. Electromagnetic settlement rings are generally used in conjunction with inclinometer tubes, which are generally arranged outside the inclinometer tubes at elevation intervals of 3 to 10 m to monitor the absolute settlement of soil at different elevations. However, many engineering experiences have shown that when the dam height exceeds 160 m, the inclinometer tubes (settlement guide tubes) are prone to extrusion damage, resulting in the scrapping of the settlement rings.

[0004] In addition, considering the economic and necessity, the traditional monitoring instruments of high earth-rock dams are generally arranged in vertical lines, which makes it difficult to monitor the uneven deformation distribution of the cross-river core wall. The settlement deformation law of the contact clay and gravel soil of the concrete cover plate is difficult to achieve with limited traditional monitoring technology. Therefore, the focus of high earth-rock dam deformation has always been the blind spot of earth-rock dam core wall monitoring. Summary of the invention

[0005] The invention provides a core wall settlement monitoring device and method for a high earth-rock dam, proposes adopting a flexible inclinometer plus an electromagnetic settlement ring to realize core wall spatial settlement monitoring, and is suitable for core wall settlement monitoring of earth-rock dams with a height of 30m to 350m.

[0006] In order to solve the above technical problems, the technical solution adopted by the present invention is: a high earth-rock dam core wall settlement monitoring device and method, including a dam, a plurality of vertical inclinometer tubes are provided on the cross-sectional axis of the dam, a plurality of electromagnetic settlement rings are provided on the inclinometer tubes, a plurality of horizontal PE protection tubes are provided along the core wall axis of the dam, a plurality of interconnected flexible inclinometers are provided in the PE protection tubes, and a second electromagnetic settlement ring is provided at the intersection of the PE protection tube and the inclinometer tube.

[0007] In a preferred embodiment, the flexible inclinometer comprises a casing, in which a precision inclinometer and a roughness inclinometer are installed, a connecting end is provided at one end of the casing, a connecting rod is provided at one end of the connecting end, a universal joint is provided at one end of the connecting rod, and the connecting end is connected to the casing by a plurality of bolts;

[0008] A coarse measuring device and a fine measuring wire are connected between two adjacent flexible inclinometers;

[0009] Precision inclinometers are used to measure small displacements and are used for dams with small axial settlements of the core wall;

[0010] The coarseness inclinometer is used to measure large displacements. When the axial settlement of the dam core wall is too large, the fine measurement wire breaks and the spring-loaded coarse measurement wire extends to perform a coarse measurement of the dam settlement.

[0011] In a preferred embodiment, the connecting end includes an end body, a first cavity is provided on the end body, and a precision measuring wire passes through the first cavity and is connected to two adjacent precision inclinometers.

[0012] In a preferred embodiment, a connecting head is provided on the connecting end, and the connecting head includes a shell, one end of the shell is provided with an annular groove, one end of the annular groove is provided with an annular circular groove, and a second cavity penetrating through the middle of the shell is provided.

[0013] In the preferred embodiment, the coarse measurement device includes a coarse measurement wire with a spring-like structure, a plurality of flexible steel wires are arranged on the outside of the coarse measurement wire, the plurality of flexible steel wires are wound around the spring-like coarse measurement wire, rolling balls are arranged at both ends of the flexible steel wire, the two ends of the flexible steel wire rest on the annular groove, the rolling balls rest on the annular circular groove and slide, the two ends of the coarse measurement wire respectively pass through the adjacent second cavity and are connected to the two adjacent coarseness inclinometers, and the excess parts of the two ends of the coarse measurement wire are wound around the inside of the casing.

[0014] In a preferred embodiment, the thick measuring wire includes a battery core located in the center, an insulating layer is provided outside the battery core, and a waterproof layer is provided outside the insulating layer.

[0015] In a preferred embodiment, the connecting rods on two adjacent flexible inclinometers are rotatably connected to the same universal joint, and a plurality of section grooves are provided on the connecting rods.

[0016] In the preferred solution, a plurality of vertical holes are provided in the cross section of the dam, the inclinometer tubes are against the vertical holes, a plurality of grooves are provided on the axis of the dam core wall, and the PE protective pipes are pre-buried in the grooves.

[0017] A method for monitoring the settlement of a core wall of a high earth-rock dam comprises: S1, arranging inclinometer tubes on the dam: a plurality of inclinometer tubes arranged vertically at the axis of the dam cross section are installed in vertical holes, the bottoms of the inclinometer tubes are sealed, and the space between the vertical holes and the tube walls is backfilled with cement mortar to make them dense;

[0018] S2. Arrange electromagnetic settlement rings on the inclinometer tube: Arrange electromagnetic settlement rings outside the inclinometer tube at intervals of 3m~10m in elevation. The inclinometer tube and the inclinometer tube are pre-buried and installed along with the core wall of the dam body;

[0019] S3. At the left and right bank concrete cover plates at 1 / 3, 1 / 2 and 2 / 3 of the dam height, PE protection pipes are buried horizontally along the dam core wall axis. Multiple flexible inclinometers are installed in the PE protection pipes to record the overlapped parts of the PE protection pipes in the middle of the core wall at the same height;

[0020] S4. Install the second electromagnetic settlement ring at the intersection of the PE protection pipe and the inclinometer pipe;

[0021] S5, electromagnetic settlement ring, second electromagnetic settlement ring and flexible inclinometer performance inspection test, the second electromagnetic settlement ring is used for monitoring results comparison and verification, and the trench is backfilled after passing the test;

[0022] S6. The flexible inclinometer buried horizontally along the axis of the dam is used to monitor the settlement distribution of the core wall along the axis of the dam. The electromagnetic settlement ring buried vertically in each monitoring section is used to monitor the vertical settlement distribution of the core wall.

[0023] In the preferred embodiment, the method of installing multiple flexible inclinometers in the PE protective tube in step S3 is:

[0024] A1: Mechanically excavate horizontal trenches along the axis of the dam core wall at 1 / 3, 1 / 2, and 2 / 3 of the dam height, level the trench bed, then backfill contact clay at the bottom of the trench and evenly compact it manually;

[0025] A2: The steel pipes embedded in the core walls of the left and right banks of the dam are used as anchor ends, and the anchor ends are connected to the flexible inclinometer hinge joints at the ends;

[0026] A3: Multiple flexible inclinometers are protected by flexible PE protective tubes. The length of the PE protective tubes is longer than that of the multiple flexible inclinometers. There is no joint in the middle of the PE protective tubes. The inner and outer walls of the PE protective tubes are coated with lubricants such as butter, and the bottom of the tubes are sealed with a cover.

[0027] The beneficial effects of the present invention are as follows: the flexible inclinometer buried horizontally along the dam axis is used to monitor the settlement distribution of the core wall along the dam axis, and the electromagnetic settlement ring buried vertically in each monitoring section is used to monitor the vertical settlement distribution of the core wall. Through this technical solution, that is, the flexible inclinometer is buried horizontally along the dam axis at each typical dam height and the electromagnetic settlement ring is buried vertically in each monitoring section, which breaks through the limitations of the original technical means of point-type and vertical monitoring only, and forms a full-dimensional and spatial grid monitoring system for the core wall, especially it can verify the role of high gravel soil core wall dam using contact clay or high plasticity clay to coordinate the deformation of the dam core wall, filling the blind spot of the settlement distribution and change law of the core wall of domestic high earth-rock dams along the dam axis. From point monitoring to linear monitoring, in particular, many difficult and important problems in core wall settlement monitoring are solved, and the monitoring technology level of earth-rock dams is improved. In addition, in view of the large settlement and deformation characteristics of high earth-rock dams, special protection measures are taken for the inclinometer tube and the flexible inclinometer to improve the survival rate of the instrument.

[0028] When the axial settlement of the dam core wall is small and the precision measuring wire is not broken, the precision inclinometer of the flexible inclinometer can accurately measure the axial settlement of the dam core wall.

[0029] When the axial settlement of the core wall of a high earth-rock dam is too large, exceeding 30~50cm, the connecting rods and fine measuring wires of the two adjacent flexible inclinometers break. Under the action of force, the two adjacent flexible inclinometers pull the flexible steel wire wrapped around the outside of the coarse measuring wire, so that the coarse measuring device stretches from a spring shape to a straight shape. Multiple flexible steel wires are wrapped around the straight coarse measuring wire, so that the overall structure can measure larger settlements.

[0030] When the axial settlement of the core wall of a high earth-rock dam exceeds 50cm, two adjacent flexible inclinometers, under the action of tension, pull the flexible steel wires wrapped around the outside of the coarse measuring wire to straighten the multiple flexible steel wires, so that the coarse measuring wire wrapped in the casing is pulled from the casing to the multiple straightened flexible steel wires, so that the flexible inclinometer can detect a larger deformation, thereby making the full-section detection of the dam core wall more comprehensive.

[0031] In addition to extending the effective measurement distance between two adjacent flexible inclinometers, multiple flexible steel wires can also protect the coarse measuring wire, which can effectively solve the problem of PE protection pipe rupture, dam soil settlement pressure or connecting rod breakage during dam settlement, which may lead to coarse measuring wire breakage. It can effectively avoid the phenomenon of excessive axial settlement of the core wall of high earth-rock dam, coarse measuring wire breakage, and flexible inclinometer failure, and has great promotion value. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] The present invention will be further described below in conjunction with the accompanying drawings and embodiments;

[0033] Figure 1 It is a front cross-sectional schematic diagram of the overall structure of the present invention;

[0034] Figure 2 It is a schematic diagram of connecting two flexible inclinometers of the present invention;

[0035] Figure 3 It is a left side view of the rough measurement device of the present invention;

[0036] Figure 4 It is an axial side view of a small section of the end of the rough measuring device of the present invention;

[0037] Figure 5 is a cross-sectional view of a thick measuring wire of the present invention;

[0038] Figure 6 is an axial side view of the connector of the present invention;

[0039] Figure 7 is a cross-sectional view of a connector of the present invention;

[0040] In the figure: dam 1; vertical hole 101; groove 102; inclinometer tube 2; electromagnetic settlement ring; second electromagnetic settlement ring 4; flexible inclinometer 5; precision inclinometer 501; roughness inclinometer 502; casing 503; connecting end 6; end body 601; first cavity 602; connector 603; shell 6031; second cavity 6032; annular groove 6033; circular groove 6034; connecting rod 7; section groove 701; universal joint 8; rough measurement device 9; rough measurement wire 901; battery cell 9011; insulating layer 9012; waterproof layer 9013; flexible steel wire 902; rolling ball 903; precision measurement wire 10; bolt 11; steel pipe 12; PE protective pipe 13. DETAILED DESCRIPTION

[0041] Embodiment 1:

[0042] like Figure 1-7In the present invention, a high earth-rock dam core wall settlement monitoring device and method are provided. The technical solution adopted by the present invention is: a high earth-rock dam core wall settlement monitoring device and method, comprising a dam 1, a plurality of vertical inclinometer tubes 2 are provided on the cross-section axis of the dam 1, a plurality of electromagnetic settlement rings are provided on the inclinometer tubes 2, a plurality of horizontal PE protection tubes 13 are provided along the core wall dam axis of the dam 1, a plurality of interconnected flexible inclinometers 5 are provided in the PE protection tubes 13, and a second electromagnetic settlement ring 4 is provided at the intersection of the PE protection tubes 13 and the inclinometer tubes 2. With this structure, in a 300m-class high earth-rock dam 1, the maximum installation length of the flexible inclinometer is 400m, and the maximum buried length of a single inclinometer is 200m, which is the first time in China to realize continuous linear settlement monitoring of the entire cross section of the dam core wall. The flexible inclinometer 5 is used to realize the horizontal settlement distribution monitoring of the core wall, and the electromagnetic settlement ring is used to realize the elevation settlement distribution monitoring of the core wall. Thus, a full-dimensional and spatially gridded monitoring system for the core wall is formed, thereby realizing comprehensive three-dimensional monitoring of the core wall. This technical solution breaks through the limitations of the original technical means, upgrading from point monitoring to linear monitoring, especially solving many difficult problems in core wall settlement monitoring, and improving the technical level of earth-rock dam monitoring. In addition, in view of the large settlement and deformation characteristics of high earth-rock dams, special protection measures are taken for the inclinometer tube and flexible inclinometer to improve the survival rate of the instrument.

[0043] In the preferred embodiment, the flexible inclinometer 5 comprises a casing 503, in which a precision inclinometer 501 and a roughness inclinometer 502 are installed, a connecting end 6 is provided at one end of the casing 503, a connecting rod 7 is provided at one end of the connecting end 6, a universal joint 8 is provided at one end of the connecting rod 7, and the connecting end 6 is connected to the casing 503 by a plurality of bolts 11;

[0044] A rough measuring device 9 and a fine measuring wire 10 are connected between two adjacent flexible inclinometers 5;

[0045] Precision inclinometer 501 is used to measure small displacements and is used for dam 1 where the axial settlement of the core wall is small;

[0046] The coarseness inclinometer 502 is used to measure large displacement. When the axial settlement of the core wall of the dam 1 is too large, the fine measurement wire 10 breaks, and the spring-type coarse measurement wire 901 extends to roughly measure the settlement of the dam 1. With this structure, when the axial settlement of the core wall of the dam 1 is small and the settlement of the dam 1 is not enough to break the connecting rod 7 and the fine measurement wire 10 between the flexible inclinometer 5, the flexible inclinometer 5 can accurately measure the axial settlement of the core wall of the dam 1.

[0047] When the axial settlement of the core wall of a high earth-rock dam is too large, exceeding 30 to 50 cm, the connecting rod 7 and the fine measuring wire 10 of the two adjacent flexible inclinometers 5 are broken. At this time, the coarseness inclinometer 502 measures the larger displacement of the core wall of the high earth-rock dam, and the coarse measuring wire 901 is in the shape of a spring. The length of the coarse measuring wire 901 is relatively long, and can adapt to the large displacement of the axial settlement of the core wall of the dam 1. When the settlement of the dam 1 is too large, the two adjacent flexible inclinometers 5 pull the flexible steel wire 902 wrapped around the outside of the coarse measuring wire 901 under the action of tension, so that the coarse measuring device 9 is stretched from a spring shape to a straight shape. At this time, the coarse measuring wire 901 is close to a straight line, and multiple flexible steel wires 902 are wound on the straight coarse measuring wire 901, so that the overall structure can measure a larger settlement of the dam 1.

[0048] When the axial settlement of the core wall of the high earth-rock dam further increases and exceeds 50 cm, the two adjacent flexible inclinometers 5, under the action of tension, pull the flexible steel wire 902 wrapped around the outside of the thick measuring wire 901, so that the rolling ball 903 at the end of the flexible steel wire 902 rolls in the circular groove 6034, so that the multiple flexible steel wires 902 are straightened, so that the thick measuring wire 901 wrapped in the casing 503 is pulled from the casing 503 to the multiple straightened flexible steel wires 902 under the action of force, so that the stretchable deformation of the two adjacent flexible inclinometers 5 is further expanded, so that the flexible inclinometer 5 can detect a larger deformation, so that the full-section detection of the dam core wall is more comprehensive.

[0049] In addition to extending the effective measuring distance between two adjacent flexible inclinometers 5, the multiple flexible steel wires 902 can also protect the coarse measuring wire 901, and can effectively solve the problem that the PE protection tube 13 may rupture during the settlement of the dam 1, the soil settlement pressure of the dam 1, or the connecting rod 7 may break, thereby causing the coarse measuring wire 901 to break. It can effectively avoid the phenomenon that the axial settlement of the core wall of the high earth-rock dam is too large, the coarse measuring wire 901 breaks, and the flexible inclinometer 5 fails.

[0050] In the preferred embodiment, the connection end 6 includes an end body 601, and a first cavity 602 is provided on the end body 601. The precision measuring wire 10 passes through the first cavity 602 and is connected to two adjacent precision inclinometers 501. With this structure, the first cavity 602 is used for the precision measuring wire 10 to pass through. When the settlement of the dam 1 is small, the precision measuring wire 10 is connected to the precision inclinometer 501. The precision inclinometer 501 has higher accuracy and is more suitable for the situation where the deformation of the dam 1 is small.

[0051] In the preferred embodiment, a connector 603 is provided on the connection end 6, and the connector 603 includes a housing 6031, an annular groove 6033 is provided at one end of the housing 6031, an annular circular groove 6034 is provided at one end of the annular groove 6033, and a second cavity 6032 is provided through the middle of the housing 6031. According to this structure, the second cavity 6032 is used for the coarse measuring wire 901 to pass through, the annular groove 6033 is used for the end of the flexible steel wire 902 to slide, and the circular groove 6034 is used for the rolling ball 903 to roll in the annular circular groove 6034, so that when the settlement of the dam 1 is large, the flexible steel wire 902 can rotate under the action of force, so that the axial distance of the flexible steel wire 902 becomes longer.

[0052] In the preferred embodiment, the rough measurement device 9 includes a spring-shaped rough measurement wire 901, a plurality of flexible steel wires 902 are arranged outside the rough measurement wire 901, and the plurality of flexible steel wires 902 are wrapped around the spring-shaped rough measurement wire 901, and rolling balls 903 are arranged at both ends of the flexible steel wire 902, and the two ends of the flexible steel wire 902 abut against the annular groove 6033, and the rolling balls 903 slide against the annular circular groove 6034, and the two ends of the rough measurement wire 901 respectively penetrate the adjacent second cavity 6032 and are connected to the two adjacent roughness inclinometers 502, and the redundant parts at both ends of the rough measurement wire 901 are wrapped inside the sleeve 503. With this structure, the plurality of flexible steel wires 902 have a certain elasticity, and when the rough measurement wire 901 penetrates the plurality of flexible steel wires 902, the flexible steel wires 902 can support the rough measurement wire 901, so that the plurality of flexible steel wires 902 remain in a spring shape.

[0053] When the axial settlement of the core wall of the high earth-rock dam further increases and exceeds 50 cm, the two adjacent flexible inclinometers 5, under the action of tension, pull the flexible steel wire 902 wrapped around the outside of the thick measuring wire 901, so that the rolling ball 903 at the end of the flexible steel wire 902 rolls in the circular groove 6034, so that the multiple flexible steel wires 902 are straightened, so that the thick measuring wire 901 wrapped in the casing 503 is pulled from the casing 503 to the multiple straightened flexible steel wires 902 under the action of force, so that the stretchable deformation of the two adjacent flexible inclinometers 5 is further expanded, so that the flexible inclinometer 5 can detect a larger deformation, so that the full-section detection of the dam core wall is more comprehensive.

[0054] In the preferred embodiment, the coarse measuring wire 901 includes a battery core 9011 located in the center, an insulating layer 9012 is provided outside the battery core 9011, and a waterproof layer 9013 is provided outside the insulating layer 9012. With this structure, the insulating layer 9012 is used to ensure that the signals of two adjacent flexible inclinometers 5 are normal when using the coarse measuring wire 901, and to avoid interference of other factors on the signals of the coarse measuring wire 901. The waterproof layer 9013 is used to isolate the influence of water in the dam 1 on the coarse measuring wire 901.

[0055] In a preferred embodiment, the connecting rods 7 on two adjacent flexible inclinometers 5 are rotatably connected to the same universal joint 8 , and a plurality of section grooves 701 are provided on the connecting rod 7 .

[0056] In the preferred embodiment, a plurality of vertical holes 101 are provided in the cross section of the dam 1 , the inclinometer tube 2 abuts against the vertical holes 101 , a plurality of grooves 102 are provided on the axis of the core wall of the dam 1 , and the PE protective pipe 13 is pre-buried in the groove 102 .

[0057] A method for monitoring the settlement of a core wall of a high earth-rock dam comprises: arranging an inclinometer tube 2 on a dam 1; installing a plurality of inclinometer tubes 2 arranged vertically at the dam axis of the cross section of the dam 1 in a vertical hole 101, sealing the bottom of the inclinometer tube 2, and backfilling the space between the vertical hole 101 and the tube wall with cement mortar;

[0058] Arrange electromagnetic settlement rings on the inclinometer tube 2: Arrange electromagnetic settlement rings outside the inclinometer tube 2 at intervals of 3m~10m in elevation, and the inclinometer tube 2 and the inclinometer tube 2 are pre-buried and installed along with the filling of the dam core wall;

[0059] At the left and right bank concrete cover plates at 11 / 3, 1 / 2 and 2 / 3 of the dam height, a PE protection pipe 13 is horizontally buried along the dam axis of the core wall of the dam 1. A plurality of flexible inclinometers 5 are installed in the PE protection pipe 13 to record the overlapped position of the PE protection pipe 13 in the middle of the core wall at the same height;

[0060] At 11 / 3, 1 / 2 and 2 / 3 of the dam height, mechanically excavate a horizontal trench 102 along the core wall axis of the dam 1, level the trench 102 bed, then backfill contact clay at the bottom of the trench 102 and evenly compact it manually;

[0061] The steel pipe 12 embedded in the core wall of the left and right banks of the dam 1 is an anchoring end, and the anchoring end is connected to the movable hinge joint of the flexible inclinometer 5 at the end;

[0062] The multiple flexible inclinometers 5 are protected by a flexible PE protection tube 13. The length of the PE protection tube 13 is longer than the multiple flexible inclinometers 5. There is no joint in the middle of the PE protection tube 13. The inner and outer walls of the PE protection tube 13 are coated with lubricants such as butter, and the bottom of the tube is sealed with a cover.

[0063] A second electromagnetic settling ring 4 is installed at the intersection of the PE protection tube 13 and the inclinometer tube 2;

[0064] The electromagnetic subsidence ring, the second electromagnetic subsidence ring 4 and the flexible inclinometer 5 are tested for performance. The second electromagnetic subsidence ring 4 is used for monitoring results comparison and verification. After the test is qualified, the trench is backfilled;

[0065] The flexible inclinometer 5 buried horizontally along the axis of the dam 1 is used to monitor the settlement distribution of the core wall along the axis of the dam, and the electromagnetic settlement ring buried vertically in each monitoring section is used to monitor the vertical settlement distribution of the core wall.

[0066] Flexible inclinometers are buried horizontally along the dam axis at various typical dam heights, and electromagnetic settlement rings are buried vertically at each monitoring section. This has broken through the limitations of the original technical means of point-based and vertical monitoring, and formed an all-round, spatially gridded monitoring system for the core wall. In particular, it can confirm the role of contact clay or high-plastic clay in coordinating the deformation of the dam core wall of high gravel core dams, filling the blind spot in the settlement distribution and changing law of the core wall of domestic high earth-rock dams along the dam axis.

[0067] The above embodiments are only preferred technical solutions of the present invention and should not be regarded as limiting the present invention. The protection scope of the present invention shall be the technical solutions recorded in the claims, including equivalent replacement solutions of the technical features in the technical solutions recorded in the claims. That is, equivalent replacement improvements within this scope are also within the protection scope of the present invention.

Claims

1. A high earth-rock dam core wall settlement monitoring device, characterized by: The dam comprises a plurality of vertical inclinometer tubes on the cross-section axis of the dam, the inclinometer tubes are provided with a plurality of electromagnetic settlement rings, the dam is provided with a plurality of horizontal PE protection tubes along the core wall axis, the PE protection tubes are provided with a plurality of interconnected flexible inclinometers, and a second electromagnetic settlement ring is provided at the intersection of the PE protection tube and the inclinometer tube; The flexible inclinometer comprises a casing, in which a precision inclinometer and a roughness inclinometer are installed, a connecting end is provided at one end of the casing, a connecting rod is provided at one end of the connecting end, a universal joint is provided at one end of the connecting rod, and the connecting end is connected to the casing through a plurality of bolts; A coarse measuring device and a fine measuring wire are connected between two adjacent flexible inclinometers; Precision inclinometers are used to measure small displacements; The coarseness inclinometer is used to measure large displacements, fine measurement of wire breakage, and spring-type coarse measurement of wire extension to make coarse measurements of dam settlement; The coarse measuring device includes a coarse measuring wire with a spring-like structure. A plurality of flexible steel wires are arranged on the outside of the coarse measuring wire. The plurality of flexible steel wires are wound around the spring-like coarse measuring wire. Rolling balls are arranged at both ends of the flexible steel wire. The two ends of the flexible steel wire rest on the annular groove. The rolling balls rest on the annular circular groove and slide. The two ends of the coarse measuring wire respectively pass through adjacent second cavities and are connected to two adjacent coarseness inclinometers. The redundant parts of the two ends of the coarse measuring wire are wound around the inside of the casing.

2. According to claim 1, a high earth-rock dam core wall settlement monitoring device is characterized in that: the connection end The device comprises an end body, a first cavity is arranged on the end body, and a precision measuring wire passes through the first cavity and is connected with two adjacent precision inclinometers.

3. According to claim 1, a high earth-rock dam core wall settlement monitoring device is characterized in that: a connecting head is provided on the connecting end, the connecting head includes a shell, one end of the shell is provided with an annular groove, one end of the annular groove is provided with an annular circular groove, and a second cavity is provided through the middle of the shell.

4. The high earth-rock dam core wall settlement monitoring device according to claim 1 is characterized by: The thick measuring conductor comprises a battery core located in the center, an insulating layer is arranged outside the battery core, and a waterproof layer is arranged outside the insulating layer.

5. The high earth-rock dam core wall settlement monitoring device according to claim 1 is characterized by: The connecting rods on two adjacent flexible inclinometers are rotatably connected to the same universal joint, and a plurality of section grooves are arranged on the connecting rods.

6. The high earth-rock dam core wall settlement monitoring device according to claim 1 is characterized by: The cross section of the dam is provided with multiple vertical holes, the inclinometer tubes are against the vertical holes, and multiple grooves are provided on the axis of the dam core wall, and PE protective pipes are pre-buried in the grooves.

7. A monitoring method for a core wall settlement monitoring device of a high earth-rock dam according to any one of claims 1 to 6, wherein the method comprises: S1, arranging inclinometer tubes on the dam: a plurality of inclinometer tubes arranged vertically at the dam axis of the dam cross section are installed in vertical holes, the bottom of the inclinometer tubes is sealed, and the space between the vertical holes and the tube walls is backfilled with cement mortar to make them dense; S2. Arrange electromagnetic settlement rings on the inclinometer tube: Arrange electromagnetic settlement rings outside the inclinometer tube at intervals of 3m~10m in elevation. The inclinometer tube and the inclinometer tube are pre-buried and installed along with the core wall of the dam body; S3. At the left and right bank concrete cover plates at 1 / 3, 1 / 2 and 2 / 3 of the dam height, PE protection pipes are buried horizontally along the dam core wall axis. Multiple flexible inclinometers are installed in the PE protection pipes to record the overlapped parts of the PE protection pipes in the middle of the core wall at the same height; S4. Install the second electromagnetic settlement ring at the intersection of the PE protection pipe and the inclinometer pipe; S5, electromagnetic settlement ring, second electromagnetic settlement ring and flexible inclinometer performance inspection test, the second electromagnetic settlement ring is used for monitoring results comparison and verification, and the trench is backfilled after passing the test; S6. The flexible inclinometer buried horizontally along the axis of the dam is used to monitor the settlement distribution of the core wall along the axis of the dam. The electromagnetic settlement ring buried vertically in each monitoring section is used to monitor the vertical settlement distribution of the core wall.

8. The monitoring method of a high earth-rock dam core wall settlement monitoring device according to claim 7 is characterized by: The method of installing multiple flexible inclinometers in the PE protective pipe in step S3 is: A1: Mechanically excavate horizontal trenches along the axis of the dam core wall at 1 / 3, 1 / 2, and 2 / 3 of the dam height, level the trench bed, then backfill contact clay at the bottom of the trench and evenly compact it manually; A2: The steel pipes embedded in the core walls of the left and right banks of the dam are used as anchor ends, and the anchor ends are connected to the flexible inclinometer hinge joints at the ends; A3: Multiple flexible inclinometers are protected by flexible PE protective tubes. The length of the PE protective tubes is longer than that of the multiple flexible inclinometers. There is no joint in the middle of the PE protective tubes. The inner and outer walls of the PE protective tubes are coated with butter lubricant, and the bottom of the tubes are sealed with a cover.