Method for selecting fixed-points for hierarchical protection of 10kV distribution lines
By calculating the tripping load-shedding probability of each level of protection of the 10kV distribution network line, scientifically selecting fixed points of hierarchical protection solves the problem of relying on experience to select protection positions in the existing technology, improves the reliability and accuracy of selection, and reduces the design of protection devices. and installation, achieving system reliability and cost savings.
Patent Information
- Application Number
- CN202210927996.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-08-03
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2042-08-03
AI Technical Summary
In 10kV distribution network lines, the process of selecting second- and third-level protection depends on the experience of operation and maintenance personnel, resulting in low reliability and accuracy, and the lack of scientific and objective methods.
By obtaining the line parameter data of the 10kV distribution network line, the tripping load-shedding probability of each possible hierarchical protection position is calculated, and the position with the lowest total tripping load-shedding probability of the entire line protection is selected as the final hierarchical protection fixed point, and specific calculation formulas are used to calculate each level The tripping load shedding probability of the protection is used to determine the optimal protection position.
It improves the reliability and accuracy of hierarchical protection selection for 10kV distribution network lines, reduces the design and installation of unnecessary protection devices, improves system reliability and saves costs.
Smart Images

Figure CN115296277B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of electrical automation, and in particular relates to a method for selecting a hierarchical protection fixed point for a 10kV distribution network line. Background Art
[0002] With the development of economy and technology and the improvement of people's living standards, electric energy has been widely used in people's production and life, bringing endless convenience to people's production and life. Therefore, ensuring the stable and reliable supply of electric energy has become one of the most important tasks of the power system.
[0003] 10kV distribution network is an important part of the power system; 10kV distribution network is equipped with multi-level protection, thus ensuring the stable and reliable operation of 10kV distribution network. At present, in the setting calculation principle of 10kV distribution network, the distribution network calculation is uniformly set to three levels (including the substation level), and within the three levels, it can basically ensure that the upper and lower levels are not mismatched.
[0004] However, in actual operation, 10kV distribution lines often have more than two protection circuit breakers (excluding substations); therefore, in actual operation, it is necessary to select from multiple protection circuit breakers to determine which two protection circuit breakers are put into protection to become the second-level protection and third-level protection of the 10kV distribution line. At present, the process of selecting the second-level protection and the third-level protection often relies on the experience of operation and maintenance personnel and experts, which is very dependent on personal experience, and the reliability is not high and the accuracy is also average. Summary of the invention
[0005] The purpose of the present invention is to provide a method for selecting a hierarchical protection fixed point for a 10kV distribution network line which is highly reliable, accurate, objective and scientific.
[0006] The method for selecting a fixed point for hierarchical protection of a 10 kV distribution network line provided by the present invention comprises the following steps:
[0007] S1. Obtain line parameter data information of the target 10kV distribution network line;
[0008] S2. According to the data information obtained in step S1, the probability of tripping and shedding load of the first level protection of the line at each possible hierarchical protection position is calculated;
[0009] S3. According to the data information obtained in step S1, the probability of tripping and shedding load of the second level protection of the line at each possible hierarchical protection position is calculated;
[0010] S4. According to the data information obtained in step S1, the probability of tripping and shedding load of the third-level protection of the line at each possible hierarchical protection position is calculated;
[0011] S5. According to the data information obtained in step S1, the total probability of protection tripping and load shedding of all branch lines is calculated;
[0012] S6. According to the calculation results of steps S2 to S5, the total probability of tripping and shedding load of the full line protection of the target line at each possible hierarchical protection position is calculated;
[0013] S7. Select the hierarchical protection position corresponding to the lowest total probability of tripping and load shedding of the entire line protection in the calculation result of step S6 as the final fixed-point selection result of the hierarchical protection of the 10kV distribution network line.
[0014] The calculation of the probability of tripping and load shedding of the first-level protection of the line at each possible hierarchical protection position in step S2 specifically includes the following steps:
[0015] For each possible first-level hierarchical protection position, the following formula is used to calculate the probability G1% of the line first-level protection tripping and load shedding under the current hierarchical protection position:
[0016] G1%=L1%*100%
[0017] Where L1% is the probability of the first-level protection action due to line fault tripping; 100% represents the ratio of the cut load to the load of the entire line.
[0018] The calculation of the probability of the line second-level protection tripping and load shedding at each possible hierarchical protection position described in step S3 specifically includes the following steps:
[0019] For each possible second-level hierarchical protection position, the following formula is used to calculate the probability G2% of the line second-level protection tripping and load shedding under the current hierarchical protection position:
[0020] G2%=L2%*(P2%+P3%)
[0021] Where L2% is the probability of the second-level protection tripping due to line fault; P2% is the proportion of the line load between the second-level protection and the third-level protection to the total line load; P3% is the proportion of the line load after the third-level protection to the total line load.
[0022] The calculation of the probability of tripping and load shedding of the third-level protection of the line at each possible hierarchical protection position in step S4 specifically includes the following steps:
[0023] For each possible third-level hierarchical protection position, the following formula is used to calculate the load shedding probability G3% of the line third-level protection tripping under the current hierarchical protection position:
[0024] G3%=L3%*P3%
[0025] Where L3% is the probability of the third-level protection tripping due to line fault; P3% is the proportion of the line load after the third-level protection to the total line load.
[0026] The calculation of the total probability of load shedding due to protection tripping of all branch lines described in step S5 specifically includes the following steps:
[0027] The total probability of load shedding due to protection tripping of all branch lines is calculated using the following formula: f %:
[0028]
[0029] Where L fi % is the protection probability of the branch circuit breaker where the i-th branch line fault trips; P fi % is the proportion of the load of the branch where the i-th branch line trips due to fault to the total line load; F is the total number of branch lines.
[0030] The calculation of the total probability of tripping and load shedding of the full line protection of the target line at each possible hierarchical protection position described in step S6 specifically includes the following steps:
[0031] The total probability G% of full line protection tripping and load shedding of the target line at each possible hierarchical protection position is calculated using the following formula:
[0032] G%=G1%+G2%+G3%+G f %
[0033] Where G1% is the probability of the first level protection tripping and load shedding of the line under the current hierarchical protection position; G2% is the probability of the second level protection tripping and load shedding of the line under the current hierarchical protection position; G3% is the probability of the third level protection tripping and load shedding of the line under the current hierarchical protection position; G f % is the total probability of load shedding caused by protection tripping of all branch lines.
[0034] The method for selecting the fixed-points for hierarchical protection of a 10kV distribution network line provided by the present invention is designed and implemented through a completely new calculation method, and the load shedding probabilities when the second-level and third-level protections are put into operation at different positions when the entire line fails are compared, thereby calculating and obtaining the final optimal result of the selection of the fixed-points for hierarchical protection. Therefore, the method of the present invention provides a theoretical calculation method for the design and selection of the installation location of the distribution network line with protection circuit breakers, which has high reliability, good accuracy, and is objective and scientific. Moreover, the method can also be used in the design link of line protection devices. Through the calculation of the present invention, the design and installation of redundant and unnecessary protection devices can be reduced, thereby improving the reliability of the system and achieving the purpose of cost saving. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] Figure 1It is a schematic diagram of the method flow of the present invention.
[0036] Figure 2 This is a schematic diagram of a line in which the line of an embodiment of the present invention has only one-level protection of a substation.
[0037] Figure 3 The figure is a schematic diagram of a circuit including second-level protection according to an embodiment of the present invention.
[0038] Figure 4 This is a schematic diagram of a uniform line in which a distribution network line according to an embodiment of the present invention has only second-level protection and no branch protection.
[0039] Figure 5 This is a second schematic diagram of a uniform line in which a distribution network line has only second-level protection and no branch protection according to an embodiment of the present invention.
[0040] Figure 6 The figure is a schematic diagram of the line topology of the cold hemp line according to an embodiment of the present invention. DETAILED DESCRIPTION
[0041] like Figure 1 The method flow chart of the present invention is shown as follows: the method for selecting the hierarchical protection fixed points of the 10kV distribution network line provided by the present invention comprises the following steps:
[0042] S1. Obtain line parameter data information of the target 10kV distribution network line;
[0043] S2. According to the data information obtained in step S1, the probability of tripping and shedding load of the first-level protection of the line at each possible hierarchical protection position is calculated; specifically comprising the following steps:
[0044] For each possible first-level hierarchical protection position, the following formula is used to calculate the probability G1% of the line first-level protection tripping and load shedding under the current hierarchical protection position:
[0045] G1%=L1%*100%
[0046] Where L1% is the probability of the first level protection action for line fault tripping; 100% represents the ratio of the load cut to the load of the entire line;
[0047] S3. According to the data information obtained in step S1, the probability of tripping and shedding load of the second-level protection of the line at each possible hierarchical protection position is calculated; specifically comprising the following steps:
[0048] For each possible second-level hierarchical protection position, the following formula is used to calculate the probability G2% of the line second-level protection tripping and load shedding under the current hierarchical protection position:
[0049] G2%=L2%*(P2%+P3%)
[0050] Where L2% is the probability of the line fault tripping the second level protection action; P2% is the proportion of the line load between the second level protection and the third level protection to the total line load; P3% is the proportion of the line load after the third level protection to the total line load;
[0051] S4. According to the data information obtained in step S1, the probability of tripping and shedding load of the third-level protection of the line at each possible hierarchical protection position is calculated; specifically comprising the following steps:
[0052] For each possible third-level hierarchical protection position, the following formula is used to calculate the load shedding probability G3% of the line third-level protection tripping under the current hierarchical protection position:
[0053] G3%=L3%*P3%
[0054] Where L3% is the probability of the line fault tripping the third-level protection action; P3% is the proportion of the line load after the third-level protection to the total line load;
[0055] S5. According to the data information obtained in step S1, the total probability of protection tripping and load shedding of all branch lines is calculated; specifically, the steps include:
[0056] The total probability of load shedding due to protection tripping of all branch lines is calculated using the following formula: f %:
[0057]
[0058] Where L fi % is the protection probability of the branch circuit breaker where the i-th branch line fault trips; P fi % is the proportion of the load of the branch where the i-th branch line trips due to fault to the total line load; F is the total number of branch lines;
[0059] S6. According to the calculation results of steps S2 to S5, the total probability of tripping and load shedding of the full line protection of the target line at each possible hierarchical protection position is calculated; specifically, the following steps are included:
[0060] The total probability G% of full line protection tripping and load shedding of the target line at each possible hierarchical protection position is calculated using the following formula:
[0061] G%=G1%+G2%+G3%+G f %
[0062] Where G1% is the probability of the first level protection tripping and load shedding of the line under the current hierarchical protection position; G2% is the probability of the second level protection tripping and load shedding of the line under the current hierarchical protection position; G3% is the probability of the third level protection tripping and load shedding of the line under the current hierarchical protection position; G f% is the total probability of protection tripping and load shedding of all branch lines;
[0063] S7. Select the hierarchical protection position corresponding to the lowest total probability of tripping and load shedding of the entire line protection in the calculation result of step S6 as the final fixed-point selection result of the hierarchical protection of the 10kV distribution network line.
[0064] In the actual calculation of distribution network line hierarchical protection selection, the calculation of the total probability of load shedding of branch protection can be omitted, because: the total probability of load shedding of all branch protections in the entire line is equal, and whether or not to add this probability has no effect on the selection of hierarchical protection. (Note: Whether the branch protection is at the first level or the second level, the probability of load shedding of each branch protection will not change, so the total probability of load shedding of all branch protections remains unchanged).
[0065] The method of the present invention is further described below in conjunction with several embodiments:
[0066] 1. First, use a simple line model to calculate:
[0067] First, a simple line model is designed in which the line lengths between each line section are equal, the poles and towers are equal, the loads and distribution transformers are equal, and the geographical environment is the same. It is assumed that the probability of failure of the same line length is equal. The calculation method of this application is verified using such a simple line model.
[0068] (1) The line only contains the first level protection calculation verification:
[0069] Basic situation of the line: The line has only the first-level protection of the substation, such as Figure 2 As shown;
[0070] Total probability of load shedding due to tripping of the whole line protection = probability of load shedding due to tripping of the first level = probability of fault of the first level line * ratio of the load shedding to the whole line load (hereinafter referred to as the load shedding ratio). That is, G% = G1% = L1% * 100% = 100% * 100% = 100%
[0071] (2) Calculation verification of the line including the second level protection:
[0072] Basic situation of the line: L1% = 1 / 2, L2% = 1 / 2; P1% = 1 / 2, P2% = 1 / 2, such as Figure 3 As shown;
[0073] Total probability of load shedding due to tripping of the whole line protection = probability of load shedding due to tripping of the first level + probability of load shedding due to tripping of the second level = probability of fault of the first level line * ratio of load shedding + probability of fault of the second level line * ratio of load shedding. That is, G% = G1% + G2% = L1% * 100% + L2% * P2% = 1 / 2 * 100% + 1 / 2 * 50% = 75%.
[0074] Summary: Installing second-level protection on the line can effectively reduce the probability of load shedding due to line faults.
[0075] (3) Calculation verification of line including third-level protection:
[0076] Basic situation of the line: L1% = L2% = L3% = 1 / 3, P1% = P2% = P3% = 1 / 3;
[0077] The total probability of tripping and load shedding due to protection of the entire line = L1%*100%+L2%*(P2%+P3%)+L3%*P3%=1 / 3*100%+1 / 3*2 / 3+1 / 3*1 / 3=2 / 3=66.67%.
[0078] Summary: Installing the third-level protection on the line can continue to effectively reduce the probability of load shedding due to line faults.
[0079] (4) Analysis summary:
[0080] The method of using a simple line model to calculate the load shedding probability when the entire line fails is feasible for calculating the line protection configuration scheme. Installing second-level protection and third-level protection on the line can effectively reduce the probability of fault tripping and load shedding.
[0081] 2. Distribution network line only with second-level protection (without branch protection) uniform line calculation and analysis: (Note: uniform line means that the line length and load are evenly distributed)
[0082] (1) Line conditions: L1% = 1 / 2, P1% = 1 / 2, L2% = 1 / 2, P2% = 1 / 2;
[0083] The total probability of tripping and load shedding for the entire line protection = G1% + G2% = L1% * P1% + L2% * P2% = 1 / 2 * 100% + 1 / 2 * 1 / 2 = 13 / 16 = 3 / 4 = 75%.
[0084] (2) Line conditions: L1% = 2 / 3, P1% = 2 / 3, L2% = 1 / 3, P2% = 1 / 3; Figure 4 As shown;
[0085] The total probability of tripping and load shedding of the entire line protection = G1% + G2% = L1% * P1% + L2% * P2% = 2 / 3 * 100% + 1 / 3 * 1 / 3 = 7 / 9 = 77.78%.
[0086] (3) Line conditions: L1% = 1 / 3, P1% = 1 / 3, L2% = 2 / 3, P2% = 2 / 3; Figure 5 As shown;
[0087] The total probability of tripping and load shedding for the entire line protection = G1% + G2% = L1% * P1% + L2% * P2% = 1 / 3 * 100% + 2 / 3 * 2 / 3 = 7 / 9 = 77.78%.
[0088] (4) Line conditions: L1% = 1 / 4, P1% = 1 / 4, L1% = 3 / 4, P1% = 3 / 4;
[0089] The total probability of tripping and load shedding for the entire line protection = G1% + G2% = L1% * P1% + L2% * P2% = 1 / 4*100% + 3 / 4*3 / 4 = 13 / 16 = 81.25%.
[0090] (5) Line conditions: L1% = 3 / 4, P1% = 3 / 4, L1% = 1 / 4, P1% = 1 / 4;
[0091] The total probability of tripping and load shedding due to protection of the entire line = G1% + G2% = L1% * P1% + L2% * P2% = 3 / 4*100% + 1 / 4*1 / 4 = 13 / 16 = 81.25%.
[0092] (6) Analysis summary: For a uniform distribution network (load) line with only secondary protection, the load shedding probability is minimized when the secondary protection is installed in the middle of the line. When the secondary protection is installed at the same ratio at the front and rear ends of the line, the load shedding probability is the same.
[0093] 3. Calculation and analysis of uneven lines for distribution network lines with only second-level protection (without branch protection):
[0094] (1) Line conditions: L1% = 1 / 2, P1% = 1 / 3, L2% = 1 / 2, P2% = 2 / 3:
[0095] The total probability of tripping and load shedding of the entire line protection = G1% + G2% = L1% * P1% + L2% * P2% = 1 / 2*100% + 1 / 2*2 / 3 = 5 / 6 = 83.33%.
[0096] (2) Line conditions: L1% = 1 / 2, P1% = 2 / 3, L2% = 1 / 2, P2% = 1 / 3:
[0097] The total probability of tripping and load shedding due to protection of the entire line = G1% + G2% = L1% * P1% + L2% * P2% = 1 / 2 * 100% + 1 / 2 * 1 / 3 = 2 / 3 = 66.67%.
[0098] (3) Line conditions: L1% = 1 / 2, P1% = 1 / 4, L2% = 1 / 2, P2% = 3 / 4:
[0099] The total probability of tripping and load shedding for the entire line protection = G1% + G2% = L1% * P1% + L2% * P2% = 1 / 2 * 100% + 1 / 2 * 3 / 4 = 7 / 8 = 87.5%.
[0100] (4) Line conditions: L1% = 1 / 2, P1% = 3 / 4, L2% = 1 / 2, P2% = 1 / 4:
[0101] The total probability of tripping and load shedding of the entire line protection = G1% + G2% = L1% * P1% + L2% * P2% = 1 / 2*100% + 1 / 2*1 / 4 = 5 / 8 = 62.5%.
[0102] (5) Line conditions: L1% = 1 / 3, P1% = 1 / 2, L2% = 2 / 3, P2% = 1 / 2:
[0103] The total probability of tripping and load shedding for the entire line protection = G1% + G2% = L1% * P1% + L2% * P2% = 1 / 3 * 100% + 2 / 3 * 1 / 2 = 2 / 3 = 66.67%.
[0104] (6) Line conditions: L1% = 2 / 3, P1% = 1 / 2, L2% = 1 / 3, P2% = 1 / 2:
[0105] The total probability of tripping and load shedding of the entire line protection = G1% + G2% = L1% * P1% + L2% * P2% = 2 / 3 * 100% + 1 / 3 * 1 / 2 = 5 / 6 = 83.33%.
[0106] (7) Line conditions: L1% = 1 / 3, P1% = 2 / 3, L2% = 2 / 3, P2% = 1 / 3:
[0107] The total probability of tripping and load shedding for the entire line protection = G1% + G2% = L1% * P1% + L2% * P2% = 1 / 3 * 100% + 2 / 3 * 1 / 3 = 5 / 9 = 55.56%.
[0108] (8) Line conditions: L1% = 1 / 4, P1% = 3 / 4, L2% = 3 / 4, P2% = 1 / 4:
[0109] The total probability of tripping and load shedding of the entire line protection = G1% + G2% = L1% * P1% + L2% * P2% = 1 / 4 * 100% + 3 / 4 * 1 / 4 = 7 / 16 = 52.1%.
[0110] (9) Summary and analysis: For uneven distribution network (load) lines with only secondary protection, concentrated loads are installed in the first-level lines, and the shorter the first level, the lower the probability of load shedding.
[0111] 4. Calculation and analysis of the branch protection line with the second-level protection belt of the distribution network line:
[0112] (1) Line conditions: L1% = 1 / 3, P1% = 1 / 3, L2% = 1 / 3, P2% = 1 / 3: Lf1% = 1 / 3, Pf1% = 1 / 3 (branch ladder connected to L2)
[0113] The total probability of tripping and load shedding due to protection of the entire line = G1% + G2% + Gf = L1%*100% + L2%*(P2% + Pf1%) + Lf1%*Pf1% = 1 / 3*100% + 1 / 3*(1 / 3+1 / 3) + 1 / 3*1 / 3 = 13 / 16 = 2 / 3 = 66.67%.
[0114] (2) Line conditions: L1% = 1 / 3, P1% = 1 / 3, L2% = 1 / 3, P2% = 1 / 3: Lf1% = 1 / 3, Pf1% = 1 / 3 (branch ladder connected to L1)
[0115] The total probability of tripping and load shedding due to protection of the entire line = G1% + G2% + Gf = L1%*100% + L2%*P2% + Lf1%*Pf1% = 1 / 3*100% + 1 / 3*1 / 3 + 1 / 3*1 / 3 = 5 / 9 = 55.56%.
[0116] (3) Line conditions: L1% = 1 / 3, P1% = 1 / 6, L2% = 1 / 3, P2% = 1 / 3: Lf1% = 1 / 3, Pf1% = 1 / 2 (branch ladder connected to L1)
[0117] The total probability of tripping and load shedding due to protection of the entire line = G1% + G2% + Gf = L1% * 100% + L2% * P2% + Lf1% * Pf1% = 1 / 3 * 100% + 1 / 3 * 1 / 3 + 1 / 3 * 1 / 2 = 11 / 18 = 61.11%.
[0118] (4) Line conditions: L1% = 1 / 2, P1% = 1 / 2, L2% = 1 / 3, P2% = 1 / 3: Lf1% = 1 / 6, Pf1% = 1 / 6 (branch ladder connected to L1)
[0119] The total probability of tripping and load shedding due to protection of the entire line = G1% + G2% + Gf = L1% * 100% + L2% * P2% + Lf1% * Pf1% = 1 / 2 * 100% + 1 / 3 * 1 / 3 + 1 / 6 * 1 / 6 = 23 / 36 = 63.89%.
[0120] (5) Line conditions: L1% = 1 / 6, P1% = 1 / 6, L2% = 1 / 3, P2% = 1 / 3: Lf1% = 1 / 2, Pf1% = 1 / 2 (branch ladder connected to L1)
[0121] The total probability of tripping and load shedding due to protection of the entire line = G1% + G2% + Gf = L1% * 100% + L2% * P2% + Lf1% * Pf1% = 1 / 6 * 100% + 1 / 3 * 1 / 3 + 1 / 2 * 1 / 2 = 19 / 36 = 52.78%.
[0122] (6) Analysis summary: For a uniform distribution network (load) line with only secondary protection, the probability of load shedding is lower when the branch line is connected to the first-level line than when it is connected to the second-level line. If the load is increased without increasing the line length, the probability of load shedding is lower when the load is increased on the main line than when it is increased on the branch line. If the load is increased and the line length needs to be increased by a corresponding proportion, the probability of load shedding is lower when the load is increased on the branch line than when it is increased on the main line. Since the probability of branch line tripping will not change due to the location of the main line to which it is connected, the following analysis does not include branch line protection separately.
[0123] 5. Calculation and analysis of uniform lines of distribution network with second-level and third-level protection (without branch protection):
[0124] (1) Line conditions: L1%=1 / 3, P1%=1 / 3, L2%=1 / 3, P2%=1 / 3, L3%=1 / 3, P3%=1 / 3. Total probability of full line protection tripping and load shedding=G1%+G2%+G3%=L1%*100%+L2%*(P2%+P3%)+L3%*P3%=1 / 3*100%+1 / 3*(1 / 3+1 / 3)+1 / 3*1 / 3=2 / 3=66.67%.
[0125] (2) Line conditions: L1%=1 / 2, P1%=1 / 2, L2%=1 / 3, P2%=1 / 3, L3%=1 / 6, P3%=1 / 6. Total probability of full line protection tripping and load shedding=G1%+G2%+G3%=L1%*100%+L2%*(P2%+P3%)+L3%*P3%=1 / 2*100%+1 / 3*(1 / 3+1 / 6)+1 / 6*1 / 6=25 / 36=69.44%.
[0126] (3) Line conditions: L1%=1 / 6, P1%=1 / 6, L2%=1 / 3, P2%=1 / 3, L3%=1 / 2, P3%=1 / 2. Total probability of full line protection tripping and load shedding=G1%+G2%+G3%=L1%*100%+L2%*(P2%+P3%)+L3%*P3%=1 / 6*100%+1 / 3*(1 / 3+1 / 2)+1 / 2*1 / 2=25 / 36=69.44%.
[0127] (4) Line conditions: L1%=1 / 6, P1%=1 / 6, L2%=1 / 2, P2%=1 / 2, L3%=1 / 3, P3%=1 / 3. Total probability of full line protection tripping and load shedding=G1%+G2%+G3%=L1%*100%+L2%*(P2%+P3%)+L3%*P3%=1 / 6*100%+1 / 2*(1 / 3+1 / 2)+1 / 3*1 / 3=25 / 36=69.44%.
[0128] (5) Analysis summary: When the distribution network line is equipped with second-level and third-level protection (without branch protection) and the line is evenly divided into sections with graded protection, the probability of load shedding is minimal.
[0129] 6. Calculation and analysis of uneven lines of distribution network with second-level and third-level protection (without branch protection):
[0130] (1) Line conditions: L1%=1 / 3, P1%=1 / 3, L2%=1 / 3, P2%=1 / 2, L3%=1 / 3, P3%=1 / 6. Total probability of full line protection tripping and load shedding=G1%+G2%+G3%=L1%*100%+L2%*(P2%+P3%)+L3%*P3%=1 / 3*100%+1 / 3*(1 / 2+1 / 6)+1 / 3*1 / 6=11 / 18=61.11%.
[0131] (2) Line conditions: L1%=1 / 3, P1%=1 / 2, L2%=1 / 3, P2%=1 / 3, L3%=1 / 3, P3%=1 / 6. Total probability of full line protection tripping and load shedding=G1%+G2%+G3%=L1%*100%+L2%*(P2%+P3%)+L3%*P3%=1 / 3*100%+1 / 3*(1 / 3+1 / 6)+1 / 3*1 / 6=5 / 9=55.56%.
[0132] (3) Line conditions: L1% = 1 / 3, P1% = 1 / 6, L2% = 1 / 3, P2% = 1 / 3, L3% = 1 / 3, P3% = 1 / 2. The total probability of the entire line protection tripping and load shedding = G1% + G2% + G3% = L1% * 100% + L2% * (P2% + P3%) + L3% * P3% = 1 / 3 * 100% + 1 / 3 * (1 / 3 + 1 / 2) + 1 / 3 * 1 / 2 = 2 / 3 = 66.66%.
[0133] (4) Analysis summary: For distribution network lines with second-level and third-level protection (without branch protection) and uneven load lines, the closer the load is to the substation, the smaller the probability of load shedding.
[0134] The method of the present invention is further described below in conjunction with an actual circuit:
[0135] The cold hemp line is selected as the actual line, and the line structure is as follows Figure 6 As shown;
[0136] 1. Cold hemp line related parameters:
[0137] 1. Lengjiang transformer Lengma line - Jinyuewan ring main unit: load 50kVA / 1 transformer, a total of 3285 meters / 59 poles.
[0138] 2. Jinyuewan ring main unit - circuit breaker of the middle branch pole No. 028: load 1040kVA / 9 transformers, a total of 3211 / 28+133 / 6+200 / 5+142 / 2+359 / 6+840 / 9+91 / 3=4976 meters / 59 poles.
[0139] 3. Circuit breaker of the middle branch pole No. 028 - Circuit breaker of the middle branch pole No. 070: load 6470kVA / 36 transformers, total (532+1688) / 28+1313 / 22+437 / 9+1340 / 29+770 / 14+971 / 15+467 / 9+442 / 5+2158 / 28+1074 / 25=11192 meters / 184 poles. It does not include the 1400kVA / 10 transformers behind the load switch of pole 01 of Fuyuan branch of pole 050, totaling 374 / 5+5498 / 78+180 / 3+1045 / 19=7097 meters / 105 poles; it does not include the 1415kVA / 9 transformers behind the circuit breaker of Jinping branch of pole 034, totaling 2940 / 44+542 / 10+330 / 6+215 / 6=4027 meters / 66 poles.
[0140] 4. Circuit breaker of the middle branch pole No. 070--circuit breaker of the pole No. 106: load 540kVA / 4 transformers, a total of 2618 / 36+275 / 5+2306 / 28=5199 meters / 69 poles (including global branches).
[0141] 5. Circuit breaker of the middle branch pole No. 106 - terminal pole 158-5: load 1750kVA / 12 transformers, a total of 4537 / 66+1083 / 15=5620 meters / 81 poles.
[0142] 6. Total length of Lengma Line: 3285+4976+11192+7097+4027+5199+5620=41396 meters
[0143] 7. The total number of base rods for the entire cold hemp line: 59+59+184+105+66+69+81=623 base rods.
[0144] 8. The total number of transformers on the entire Lengma Line is: 1+9+36+10+9+4+12=81 transformers.
[0145] 9. Total capacity of cold hemp line load: 50+1040+6470+1400+1415+540+1750=12665kVA.
[0146] 2. Load shedding calculation results:
[0147] 1. Calculation of fault load shedding when the protection is set to Jinyuewan ring main unit 320 and the middle connecting branch 028 pole circuit breaker:
[0148] (1.1) (Lengjiang transformer Lengma line 342--Jinyuewan ring main unit 320) Section fault: Lengjiang transformer Lengma line 342 circuit breaker tripped, load shedding ratio: 100%.
[0149] 1.1.1) Tripping probability due to line conductor fault: 3285 / 41396=7.9355%, load shedding probability: 7.9355%.
[0150] 1.1.2) According to the tripping probability of line pole failure: 59 / 623=9.4703%, the load shedding probability: 9.4703%.
[0151] 1.1.3) According to the tripping probability of line transformer fault: 1 / 81=1.2346%, the load shedding probability: 1.2346%*100%=1.2346%.
[0152] (1.2) Fault in the cold hemp line (Jinyuewan ring main unit 320--middle connecting branch No. 028 pole): Jinyuewan ring main unit 320 circuit breaker tripped, load shedding ratio: 12615 / 12665=99.6052%.
[0153] 1.2.1) According to the tripping probability of line conductor fault: 4976 / 41396=12.0205%, load shedding probability: 11.5857%*99.6052%=11.9730%.
[0154] 1.2.2) According to the tripping probability of line pole failure: 59 / 623=9.4703%, the load shedding probability: 9.4703%*99.6052%=9.4329%.
[0155] 1.2.3) According to the tripping probability of line transformer fault: 9 / 81=11.1111%, the load shedding probability: 11.1111%*99.6052%=11.0672%.
[0156] (1.3) Fault after the circuit breaker of the middle branch pole No. 028: The circuit breaker of the middle branch pole No. 028 tripped, and the load shedding ratio was: 11575 / 12665=91.3936%.
[0157] 1.3.1) According to the tripping probability of line conductor fault: (11192+5199+5620) / 41396=53.1718%, load shedding probability: 53.1718%*91.3936%=48.5956%.
[0158] 1.3.2) According to the tripping probability of line pole fault: (184+69+81) / 623=53.6116%, load shedding probability: 53.6116%*91.3936%=48.9975%.
[0159] 1.3.3) According to the tripping probability of line transformer fault: (36+4+12) / 81=64.1975%, the load shedding probability: 64.1975%*91.3936%=58.6724%.
[0160] (1.4) Total load shedding probability:
[0161] 1.4.1) The probability of load shedding due to conductor fault tripping is: 7.9355%+11.9730%+48.5956%=68.5042%.
[0162] 1.4.2) The probability of load shedding due to tripping due to base pole failure is: 9.4703%+9.4329%+48.9975%=67.9008%.
[0163] 1.4.3) The probability of load shedding due to transformer fault tripping is: 1.2346%+11.0672%+58.6724%=70.9743%.
[0164] 2. Calculation of fault load shedding when the protection is provided with Jinyuewan ring main unit 320 and the middle connecting branch 070 pole circuit breaker:
[0165] (2.1) (Lengjiang transformer Lengma line 342--Jinyuewan ring main unit 320) Section fault: Lengjiang transformer Lengma line 342 circuit breaker tripped, load shedding ratio: 100%.
[0166] 2.1.1) According to the line conductor tripping probability: 3285 / 41396=7.9355%, load shedding probability: 7.9355%.
[0167] 2.1.2) According to the line pole tripping probability: 59 / 623=9.4703%, the load shedding probability: 9.4703%.
[0168] 2.1.3) According to the line transformer tripping probability: 1 / 81=1.2346%, load shedding probability: 1.2346%*100%=1.2346%.
[0169] (2.2) Fault in the cold hemp line (Jinyuewan ring main unit 320--middle connecting branch No. 070 pole): Jinyuewan ring main unit 320 circuit breaker tripped, load shedding ratio: 12615 / 12665=99.6052%.
[0170] 2.2.1) According to the tripping probability of line conductor fault: (4976+11192) / 41396=39.0569%, load shedding probability: 39.0569%*99.6052%=38.9027%.
[0171] 2.2.2) According to the tripping probability of line pole failure: (59+184) / 623=39.0048%, load shedding probability: 39.0048%*99.6052%=38.8508%.
[0172] 2.2.3) According to the tripping probability of line transformer fault: (9+36) / 81=55.5556%, the load shedding probability: 11.1111%*99.6052%=55.3362%.
[0173] (2.3) Fault after the circuit breaker of the middle branch pole No. 070: The circuit breaker of the middle branch pole No. 070 tripped, and the load shedding ratio was: 2290 / 12665=18.0813%.
[0174] 2.3.1) According to the tripping probability of line conductor fault: (5199+5620) / 41396=26.1354%, load shedding probability: 26.1354%*18.0813%=4.7256%.
[0175] 2.3.2) According to the tripping probability of line pole failure: (69+81) / 623=24.0770%, load shedding probability: 24.0770%*18.0813%=4.3534%.
[0176] 2.3.3) According to the tripping probability of line transformer fault: (4+12) / 81=19.7531%, the load shedding probability: 19.7531%*18.0813%=3.5716%.
[0177] (2.4) Total load shedding probability:
[0178] 2.4.1) Probability of load shedding due to conductor fault tripping: 7.9355%+38.9027%+4.7256%=51.5639%.
[0179] 2.4.2) The probability of load shedding due to tripping due to base pole failure is: 9.4703%+38.8508%+4.3534%=52.6746%.
[0180] 2.4.3) The probability of load shedding due to transformer fault tripping is: 1.2346%+55.3362%+3.5716%=601424%.
[0181] 3. Calculation of fault load shedding when the protection is set up with Jinyuewan ring main unit 320 and the middle connecting branch 106 pole circuit breaker:
[0182] (3.1) (Lengjiang transformer Lengma line 342--Jinyuewan ring main unit 320) Section fault: Lengjiang transformer Lengma line 342 circuit breaker tripped, load shedding ratio: 100%.
[0183] 3.1.1) According to the line conductor tripping probability: 3285 / 41396=7.9355%, load shedding probability: 7.9355%.
[0184] 3.1.2) According to the line pole tripping probability: 59 / 623=9.4703%, the load shedding probability: 9.4703%.
[0185] 3.1.3) According to the line transformer tripping probability: 1 / 81=1.2346%, load shedding probability: 1.2346%*100%=1.2346%.
[0186] (3.2) Fault in the cold hemp line (Jinyuewan ring main unit 320--middle connecting branch No. 106 pole): Jinyuewan ring main unit 320 circuit breaker tripped, load shedding ratio: 12615 / 12665=99.6052%.
[0187] 3.2.1) According to the tripping probability of line conductor fault: (4976+11192+5199) / 41396=51.6161%, load shedding probability: 51.6161%*99.6052%=51.4123%.
[0188] 3.2.2) According to the tripping probability of line pole failure: (59+184+69) / 623=50.0803%, load shedding probability: 50.0803%*99.6052%=49.8825%.
[0189] 3.2.3) According to the tripping probability of line transformer fault: (9+36+4) / 81=60.4938%, load shedding probability: 60.4938%*99.6052%=60.2550%.
[0190] (3.3) Fault after the circuit breaker of the middle branch pole No. 106: The circuit breaker of the middle branch pole No. 106 tripped, and the load shedding ratio was: 1750 / 12665=13.8176%.
[0191] 3.3.1) According to the tripping probability of line conductor fault: 5620 / 41396=13.5762%, load shedding probability: 13.5762%*13.8176%=1.8759%.
[0192] 3.3.2) According to the tripping probability of line pole failure: 81 / 623=13.0016%, the load shedding probability: 13.0016%*13.8176%=1.7965%.
[0193] 3.3.3) According to the tripping probability of line transformer fault: 12 / 81=14.8148%, the load shedding probability: 14.8148%*13.8176%=2.0471%.
[0194] (3.4) Total load shedding probability:
[0195] 3.4.1) Tripping probability due to line conductor fault: 7.9355%+51.4123%+1.8759%=61.2237%.
[0196] 3.4.2) The tripping probability due to line pole failure is: 9.4703%+49.8825%+1.7965%=61.1493%.
[0197] 3.4.3) According to the tripping probability of line transformer fault: 1.2346% + 60.2550% + 2.0471% = 63.5367%.
[0198] 4. Calculation of fault load shedding when the circuit breaker of No. 028 and No. 070 poles is connected in the protection cold hemp line:
[0199] (4.1) (Lengjiang substation Lengma line 342--middle branch 028 pole circuit breaker) Section fault: Lengjiang substation Lengma line 342 circuit breaker tripped, load shedding ratio: 100%.
[0200] 4.1.1) According to the line conductor tripping probability: (3285+4976) / 41396=19.9560%, load shedding probability: 19.9560%.
[0201] 4.1.2) According to the line pole tripping probability: (59+59) / 623=18.9406%, the load shedding probability: 18.9406%.
[0202] 4.1.3) According to the line transformer tripping probability: (1+9) / 81=12.3457%, load shedding probability: 12.3457%*100%=12.3457%.
[0203] (4.2) Cold hemp line (middle branch pole No. 028--pole No. 070) section fault: the circuit breaker of the middle branch pole No. 028 tripped, and the load shedding ratio was: 11575 / 12665=91.3936%.
[0204] 4.2.1) Tripping probability due to line conductor fault: 11192 / 41396=27.0364%, load shedding probability: 27.0364%*91.3936%=24.7096%.
[0205] 4.2.2) According to the tripping probability of line pole failure: 184 / 623=29.5345%, load shedding probability: 29.5345%*91.3936%=26.9927%.
[0206] 4.2.3) According to the tripping probability of line transformer fault: 36 / 81=44.4444%, load shedding probability: 44.4444%*91.3936%=40.6194%.
[0207] (4.3) Fault after the circuit breaker of the middle branch pole No. 070: The circuit breaker of the middle branch pole No. 070 tripped, and the load shedding ratio was: 2290 / 12665=18.0813%.
[0208] 4.3.1) According to the tripping probability of line conductor fault: (5199+5620) / 41396=26.1354%, load shedding probability: 26.1354%*18.0813%=4.7256%.
[0209] 4.3.2) According to the tripping probability of line pole failure: (69+81) / 623=24.0770%, load shedding probability: 24.0770%*18.0813%=4.3534%.
[0210] 4.3.3) According to the tripping probability of line transformer fault: (4+12) / 81=19.7531%, the load shedding probability: 19.7531%*18.0813%=3.5736%.
[0211] (4.4) Total load shedding probability:
[0212] 4.4.1) The probability of load shedding due to conductor fault tripping is: 19.5560%+24.7096%+4.7256%=49.3912%.
[0213] 4.4.2) The probability of load shedding due to tripping due to base pole failure is: 18.9406%+26.9927%+4.3534%=50.2867%.
[0214] 4.4.3) The probability of load shedding due to transformer fault tripping is: 12.3457%+40.6194%+3.5716%=56.5367%.
[0215] 5. Calculation of fault load shedding when the circuit breaker of No. 028 and No. 106 poles is connected in the protection cold hemp line:
[0216] (5.1) (Lengjiang substation Lengma line 342--middle branch 028 pole circuit breaker) Section fault: Lengjiang substation Lengma line 342 circuit breaker tripped, load shedding ratio: 100%.
[0217] 5.1.1) According to the line conductor tripping probability: (3285+4976) / 41396=19.9560%, load shedding probability: 19.9560%.
[0218] 5.1.2) According to the line pole tripping probability: (59+59) / 623=18.9406%, the load shedding probability: 18.9406%.
[0219] 5.1.3) According to the line transformer tripping probability: (1+9) / 81=12.3457%, load shedding probability: 12.3457%*100%=12.3457%.
[0220] (5.2) Cold hemp line (middle branch pole No. 028--pole No. 106) section fault: the circuit breaker of the middle branch pole No. 028 tripped, and the load shedding ratio was: 11575 / 12665=91.3936%.
[0221] 5.2.1) Tripping probability due to line conductor fault: (11192+5199) / 41396=39.5956%, load shedding probability: 39.5956%*91.3936%=36.1879%.
[0222] 5.2.2) According to the tripping probability of line pole failure: (184+69) / 623=40.6100%, load shedding probability: 40.6100%*91.3936%=37.1149%.
[0223] 5.2.3) According to the tripping probability of line transformer fault: (36+4) / 81=49.3827%, load shedding probability: 49.3827%*91.3936%=45.1326%.
[0224] (5.3) Fault after the circuit breaker of the middle branch pole No. 106: The circuit breaker of the middle branch pole No. 106 tripped, and the load shedding ratio was: 1750 / 12665=13.8176%.
[0225] 5.3.1) Tripping probability due to line conductor fault: 5620 / 41396=13.5762%, load shedding probability: 13.5762%*13.8176%=1.8759%.
[0226] 5.3.2) According to the tripping probability of line pole failure: 81 / 623=13.0016%, the load shedding probability: 13.0016%*13.8176%=1.7965%.
[0227] 5.3.3) According to the tripping probability of line transformer fault: 12 / 81=14.8148%, the load shedding probability: 14.8148%*13.8176%=2.0471%.
[0228] (5.4) Total load shedding probability:
[0229] 5.4.1) The probability of load shedding due to conductor fault tripping is: 19.9560%+36.1879%+1.8759%=58.0198%.
[0230] 5.4.2) The probability of load shedding due to tripping due to base pole failure is: 18.9406%+37.1149%+1.7965%=57.852%.
[0231] 5.4.3) The probability of load shedding due to transformer fault tripping is: 12.3457%+45.1326%+2.0471%=59.5254%.
[0232] 6. Calculation of load shedding due to fault when the circuit breaker of No. 070 and No. 106 poles is connected in the protection cold hemp line:
[0233] (6.1) (Lengjiang transformer Lengma line 342--middle branch 070 pole circuit breaker) Section fault: Lengjiang transformer Lengma line 342 circuit breaker tripped, load shedding ratio: 100%.
[0234] 6.1.1) According to the line conductor tripping probability: (3285+4976+11192) / 41396=46.5576%, load shedding probability: 46.9925%.
[0235] 6.1.2) According to the line pole tripping probability: (59+59+184) / 623=48.4751%, the load shedding probability: 48.4751%.
[0236] 6.1.3) According to the line transformer tripping probability: (1+9+36) / 81=56.7901%, load shedding probability: 56.7901%*100%=56.7901%.
[0237] (6.2) Cold hemp line (middle branch pole No. 070--pole No. 106) section fault: the circuit breaker of the middle branch pole No. 070 tripped, and the load shedding ratio was: 2290 / 12665=18.0813%.
[0238] 6.2.1) Tripping probability due to line conductor fault: 5199 / 41396=12.5592%, load shedding probability: 12.5592%*18.0813%=2.2709%.
[0239] 6.2.2) According to the tripping probability of line pole failure: 69 / 623=11.0754%, the load shedding probability: 11.0754%*18.0813%=2.0026%.
[0240] 6.2.3) According to the tripping probability of line transformer failure: 4 / 81=4.9383%, the load shedding probability: 4.9383%*18.0813%=0.8929%.
[0241] (6.3) Fault after the circuit breaker of the middle branch pole No. 106: The circuit breaker of the middle branch pole No. 106 tripped, and the load shedding ratio was: 1750 / 12665=13.8176%.
[0242] 6.3.1) Tripping probability due to line conductor fault: 5620 / 41396=13.5762%, load shedding probability: 13.5762%*13.8176%=1.8759%.
[0243] 6.3.2) The tripping probability due to line pole failure is: 81 / 623=13.0016%, and the load shedding probability is: 13.0016%*13.8176%=1.7965%.
[0244] 6.3.3) According to the tripping probability of line transformer fault: 12 / 81=14.8148%, the load shedding probability: 14.8148%*13.8176%=2.0471%.
[0245] (6.4) Total load shedding probability:
[0246] 6.4.1) The probability of load shedding due to conductor fault tripping is: 46.9925%+2.2709%+1.8759%=51.1392%.
[0247] 6.4.2) The probability of load shedding due to tripping due to base pole failure is: 48.4751%+2.0026%+1.7965%=52.2742%.
[0248] 6.4.3) The probability of load shedding due to transformer fault tripping is: 56.7901%+0.8929%+2.0471%=59.7301%.
[0249] Finally, the calculation results of the total probability of load shedding for the second and third level protection of the Lengma line are shown in Table 1 below:
[0250] Table 1 Schematic diagram of the calculation results of the total probability of load shedding for the second and third level protection of the cold hemp line selection line
[0251]
[0252] 3. Load shedding analysis:
[0253] In the above calculations, the probability of load shedding due to fault protection on Jinping branch and Fuyuan branch lines was not counted. The reason is that the probability of load shedding remains unchanged when the protection of Wenshui branch line is actuated, so the total probability of load shedding due to protection actuation of all branches remains unchanged. To simplify the calculation, only the data after the load shedding probability of graded protection is added together is selected as the basis for selecting graded protection.
[0254] Through calculation, analysis and comparison, it is found that when the circuit breakers of the middle connecting branches 028 and 070 are selected as the second and third level protection of the line, the total probability of load shedding due to conductor fault, base pole fault and distribution transformer fault is the lowest.
[0255] 4. Protection configuration fixed point selection scheme
[0256] According to the above calculation and analysis, the second-level protection of the Lengma line distribution network is selected as the circuit breaker of the No. 028 pole in the middle branch of the Lengma line, and the third-level protection is selected as the circuit breaker of the No. 070 pole in the middle branch of the Lengma line.
Claims
1. A method for selecting a fixed point for hierarchical protection of a 10kV distribution network line, comprising the following steps: S1. Obtain line parameter data information of the target 10kV distribution network line; S2. According to the data information obtained in step S1, the probability of tripping and shedding load of the first-level protection of the line at each possible hierarchical protection position is calculated; specifically comprising the following steps: For each possible first-level hierarchical protection position, the following formula is used to calculate the probability G1% of the line first-level protection tripping and load shedding under the current hierarchical protection position: G1%=L1%*100% Where L1% is the probability of the first level protection action for line fault tripping; 100% represents the ratio of the load cut to the load of the entire line; S3. According to the data information obtained in step S1, the probability of tripping and shedding load of the second-level protection of the line at each possible hierarchical protection position is calculated; specifically comprising the following steps: For each possible second-level hierarchical protection position, the following formula is used to calculate the probability G2% of the line second-level protection tripping and load shedding under the current hierarchical protection position: G2%=L2%*(P2%+P3%) Where L2% is the probability of the line fault tripping the second level protection action; P2% is the proportion of the line load between the second level protection and the third level protection to the total line load; P3% is the proportion of the line load after the third level protection to the total line load; S4. According to the data information obtained in step S1, the probability of tripping and shedding load of the third-level protection of the line at each possible hierarchical protection position is calculated; specifically comprising the following steps: For each possible third-level hierarchical protection position, the following formula is used to calculate the load shedding probability G3% of the line third-level protection tripping under the current hierarchical protection position: G3%=L3%*P3% Where L3% is the probability of the line fault tripping the third-level protection action; P3% is the proportion of the line load after the third-level protection to the total line load; S5. According to the data information obtained in step S1, the total probability of protection tripping and load shedding of all branch lines is calculated; specifically, the steps include: The total probability of load shedding due to protection tripping of all branch lines is calculated using the following formula: f %: Where L fi % is the protection probability of the branch circuit breaker where the i-th branch line fault trips; P fi % is the proportion of the load of the branch where the i-th branch line trips due to fault to the total line load; F is the total number of branch lines; S6. According to the calculation results of steps S2 to S5, the total probability of tripping and load shedding of the full line protection of the target line at each possible hierarchical protection position is calculated; specifically, the following steps are included: The total probability G% of full line protection tripping and load shedding of the target line at each possible hierarchical protection position is calculated using the following formula: G%=G1%+G2%+G3%+G f % Where G1% is the probability of the first level protection tripping and load shedding of the line under the current hierarchical protection position; G2% is the probability of the second level protection tripping and load shedding of the line under the current hierarchical protection position; G3% is the probability of the third level protection tripping and load shedding of the line under the current hierarchical protection position; G f % is the total probability of protection tripping and load shedding of all branch lines; S7. Select the hierarchical protection position corresponding to the lowest total probability of tripping and load shedding of the entire line protection in the calculation result of step S6 as the final fixed-point selection result of the hierarchical protection of the 10kV distribution network line.