A simulation device and test method for the combination of unit support and pier column along the gob retaining lane

By designing a combined simulation device for the unit bracket and pier column along the airway, the problem of insufficient research on the coupling effect of the in-lane and by-lane support and pressure relief in the existing technology is solved, and the switching of the supporting and non-supporting states of the tunnel is achieved. and pressure monitoring, providing physical simulation testing equipment suitable for indoor testing.

CN115306459BActive Publication Date: 2024-11-29SHANDONG UNIV
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202210703792.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-06-21
Publication Date
2024-11-29
Estimated Expiration
2042-06-21

AI Technical Summary

Technical Problem

In the existing technology of retaining lanes along the air, there are few researches on the coupling effect of in-lane and by-lane support and pressure relief, and there is a lack of physical simulation test devices suitable for indoor tests.

Method used

A combined simulation device for unit bracket and pier column along the airway is designed, including pier column simulation mechanism, unit bracket simulation mechanism and pipeline connection and testing mechanism. The hydraulic chamber and oil passage are connected to the tunnel roof. Switch between the unsupported state and monitor the pressure changes in real time through the pressure detection element.

Benefits of technology

This simulation device can truly simulate the working process of brackets and pier columns in the tunnel, and provides a basis for physical simulation and testing equipment to study the synergistic mechanism of support in the tunnel and by the tunnel.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115306459B_ABST
    Figure CN115306459B_ABST
Patent Text Reader

Abstract

The present invention relates to a simulation device and a test method for a unit support and pier combination along a goaf-retaining lane, comprising a pier simulation mechanism, a unit support simulation mechanism and a pipeline connection and testing mechanism, wherein the pipeline connection and testing mechanism comprises a valve block, a plurality of oil passages are arranged in the valve block, a pressure detection element is installed in the oil passage, one end of the oil passage is connected to a pressurized oil source via a switch valve, the pier simulation mechanism and the unit support simulation mechanism both comprise a base, a plurality of hydraulic chambers are arranged in the base, a piston is arranged in the hydraulic chamber, the piston is connected to a top plate located above the base via a piston rod, and the hydraulic chamber space below the piston is connected to the other end of the corresponding oil passage via an oil pipe, and the simulation device and the test method of the present invention can realize the simulation of the coupling effect of in-lane support, laneside support and pressure relief of goaf-retaining lane.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of mining engineering tests, and in particular to a gob-side lane retaining unit support and pier column combination simulation device and a test method. Background Art

[0002] The statements herein merely provide background information related to the present invention and do not necessarily constitute prior art.

[0003] At present, most mines are still using the traditional method of coal pillars to protect the lanes, resulting in a large loss of coal resources. Gob-side lane retention refers to a technical method of retaining the recovery lanes behind the coal mining face along the edge of the gob area by strengthening support and other technical means to serve the next section of the working face. Gob-side lane retention technology eliminates coal pillars, improves the recovery rate of the mine, and extends the service life of the mine. However, the gob-side lane retention has been affected by mining on two working faces, and the roof and two sides of the lane are severely deformed, and accompanied by bottom bulging, making the maintenance of the lane extremely difficult.

[0004] Many scholars have conducted in-depth research on the technology of goaf-retaining tunnels in theory, and have formed anchor bolt and cable support in the tunnel, and high water or paste material filling support beside the tunnel. However, the existing goaf-retaining tunnel technology still has many disadvantages, such as slow tunnel retention speed and large deformation of surrounding rock. Based on the above problems, Tiandi Technology Co., Ltd. disclosed a goaf-retaining tunnel and construction method of a "support-unload" combined goaf-retaining tunnel in a mining face in a patent application number of 201910306429.6. The main content is to arrange the goaf-retaining tunnel along the direction of the tunnel behind the end support of the mining face, close to the side of the goaf. Gangue-retaining hydraulic supports are installed, concrete piers are set on the inner side of the tunnel near the goaf, and hydraulic pressure relief holes are arranged on the roof. This method has achieved good results in practical projects. Zhang Xiao's doctoral thesis "Mechanism and Technology of Surrounding Rock Control Along the Goaf of Support and Unloading Combined Goaf-Retaining Lanes in Shallow Coal Seams" published in March 2021 developed a "support-unloading" combination goaf-retaining lane control technology, including hydraulic fracturing pressure relief technology, high-strength anchor rod and cable support in the lane, concrete pillar support beside the lane, and unit support reinforcement support in the lane. The technology was also tested underground in the Hejia Tower Coal Mine, with basically no bottom drum and good lane retention effect.

[0005] However, the inventors found that there are few studies on the synergistic effect of the "support-pressure relief" system along the gob-retained tunnel in existing research. There are few literatures studying the coupling mechanism of in-tunnel support, side-tunnel support and pressure relief along the gob-retained tunnel. There are few studies on the synergistic mechanism of in-tunnel and side-tunnel support. The rock retaining hydraulic supports and concrete pillars used in construction projects cannot be applied to indoor tests, and there are no physical simulation test devices for such research. Summary of the invention

[0006] The purpose of the present invention is to overcome the shortcomings of the prior art and provide a simulation device for the combination of unit supports and piers along the gob-retaining lane, so as to realize the study of the coupling mechanism of the support inside the gob-retaining lane, the support beside the lane and the pressure relief by experimental means.

[0007] To achieve the above object, the present invention adopts the following technical solution:

[0008] In the first aspect, an embodiment of the present invention provides a combined simulation device of a unit support and a pier column along an air-retaining lane, comprising a pier column simulation mechanism, a unit support simulation mechanism and a pipeline connection and testing mechanism, the pipeline connection and testing mechanism comprising a valve block, a plurality of oil passages are arranged in the valve block, a pressure detection element is installed in the oil passage, one end of the oil passage is connected to a pressurized oil source via a switch valve, the pier column simulation mechanism and the unit support simulation mechanism both comprise a base, a plurality of hydraulic chambers are arranged in the base, a piston is arranged in the hydraulic chamber, the piston is connected to a top plate located above the base via a piston rod, and the hydraulic chamber space below the piston is connected to the other end of the corresponding oil passage via an oil pipe.

[0009] Optionally, the oil passage is a three-way oil passage having three ports, one of which is connected to a pressurized oil source via a switch valve, another port is connected to a hydraulic chamber via an oil pipe, and a pressure detection element is installed at the third port.

[0010] Optionally, at least one sealing ring is provided between the piston and the inner cavity surface of the hydraulic cavity.

[0011] Optionally, a hydraulic oil channel is provided in the base portion below the hydraulic chamber, one end of the hydraulic oil channel is connected to the hydraulic chamber space below the piston, and the other end extends to the side of the base, and a plurality of first ferrules are fixed to the side of the base, each first ferrule corresponds to a hydraulic oil channel, and an intermediate channel is provided in the first ferrule, one end of the intermediate channel is connected to the hydraulic oil channel, and an oil pipe is inserted into the other end.

[0012] Optionally, a plurality of second ferrules are fixed to the side of the valve block, and an intermediate oil channel is also provided in the second ferrule, one end of the intermediate channel is connected to the oil outlet end of the oil channel, and the other end is inserted into the oil pipe.

[0013] Optionally, the top of the hydraulic chamber extends to the upper surface of the base, and a limit piece is provided at the corresponding position of the hydraulic chamber on the upper surface of the base. The piston rod passes through the limit piece through an opening provided by the limit piece. The diameter of the opening is smaller than the diameter of the piston so that the piston cannot be pushed out of the hydraulic chamber by the hydraulic oil.

[0014] Optionally, the top plate of the pier simulation mechanism is a circular top plate, the top plate of the unit support simulation mechanism is a rectangular top plate, and the number of hydraulic chambers of the pier simulation mechanism is greater than the number of hydraulic chambers of the unit support simulation mechanism.

[0015] Optionally, the oil pipe is a capillary copper tube with an outer diameter of 1.8mm-2.2mm and a wall thickness of 0.4mm-0.6mm.

[0016] In a second aspect, an embodiment of the present invention provides a test method for a gob-side lane retaining unit support and pier combination simulation device, comprising the following steps:

[0017] Putting the pier column simulation mechanism and the unit support simulation mechanism with the roof in a falling state adjacent to each other into the tunnel of the model, wherein the pier column simulation mechanism is arranged close to the first mining working face;

[0018] Coal seam mining is carried out on the first mining working face of the model. As the coal seam is mined, the top plate of the unit support simulation mechanism is raised in sequence, contacted with the model's tunnel roof and a set initial support force is applied to the model's tunnel roof, and the change of the pressure value detected by the pressure detection element corresponding to the unit support simulation mechanism is recorded;

[0019] After the coal seam of the first mining working face is mined for a set distance, as the coal seam is mined, the top plate of the pier simulation mechanism is sequentially raised and contacts the top plate of the model roadway without initial support force. As the top plate of the pier simulation mechanism is raised, the top plate of the unit support simulation mechanism at the corresponding position of the pier simulation mechanism with the raised top plate is dropped, and the pressure value change detected by the pressure detection element corresponding to the pier simulation mechanism is recorded;

[0020] After the first coal seam mining is completed, the unit support simulation mechanism is taken out to carry out the mining of the second coal seam until all mining is completed, and the changes in the pressure values ​​detected by the pressure detection elements corresponding to the pier simulation mechanism are recorded.

[0021] Optionally, mining of the coal seam is carried out manually or using experimental coal mining equipment.

[0022] Beneficial effects of the present invention:

[0023] 1. In the simulation device of the present invention, the hydraulic chambers of the pier simulation mechanism and the unit support simulation mechanism are connected to the corresponding oil channels and can work independently. Through the principle of overall design and single-path control, the lifting and lowering of the top plates of the pier simulation mechanism and the unit support simulation mechanism at the corresponding positions can be controlled according to the advancement of the working surface, thereby realizing the switching of the supporting and non-supporting states of the top plate of the model tunnel. At the same time, the pressure detection element can be used to monitor the pressure changes in real time to realize the real simulation of the real working process of the supports and piers in the tunnel, providing a physical simulation test equipment foundation for the research on the synergistic mechanism of the support in and beside the tunnel.

[0024] 2. In the simulation device of the present invention, multiple hydraulic chambers of the pier simulation mechanism and the unit bracket simulation mechanism are integrated into a base, and an integrated design is adopted, which is convenient for erection and dismantling in the narrow tunnel of the model. At the same time, each hydraulic chamber is independently connected to the pipeline through an oil pipe and connected to the oil channel in the test mechanism, realizing single-channel control. The oil inlet and outlet of the hydraulic chamber adopt a single-hole design, which simplifies the structure of the unit bracket simulation mechanism and the pier simulation mechanism, reduces the number of hydraulic oil pipes used in the simulation test, and makes it easy to operate in a small space.

[0025] 3. In the simulation device of the present invention, a plurality of independent oil passages are arranged in the valve block, and each oil passage is controlled separately, which facilitates the operation of the pressure increase and reduction process. At the same time, the oil pipe is a capillary copper tube, which saves the use space and prevents the inability to fully simulate the unit bracket and pier due to the limited space in the model test. Moreover, the copper tube has good bending and shaping properties, which is convenient for line laying. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] The drawings in the specification, which constitute a part of the present application, are used to provide a further understanding of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute a limitation on the present application.

[0027] Figure 1 This is a schematic diagram of the application state of the simulation device in Example 1 of the present invention;

[0028] Figure 2 This is a schematic diagram of the overall structure of Embodiment 1 of the present invention;

[0029] Figure 3 This is a schematic diagram of a unit support simulation mechanism according to Example 1 of the present invention;

[0030] Figure 4 This is a schematic diagram of a pier simulation mechanism according to Example 1 of the present invention;

[0031] Figure 5 This is a schematic diagram of the pipeline connection and testing mechanism of Example 1 of the present invention;

[0032] Figure 6 This is a schematic elevation diagram of the application state of the simulation device of Example 2 of the present invention;

[0033] Among them, 1. Pier simulation mechanism, 2. Unit support simulation mechanism, 3. Pipeline connection and testing mechanism;

[0034] 1-1. Second top plate, 1-2. Limiting flange, 1-3. Second piston rod, 1-4. Second sealing ring, 1-5. Hydraulic oil channel, 1-6. Second base, 1-7. First ferrule;

[0035] 2-1. First top plate, 2-2. Limiting flange, 2-3. First piston rod, 2-4. First sealing ring, 2-5. Hydraulic oil channel, 2-6. First base, 2-7. First ferrule;

[0036] 3-1. Oil pressure sensor, 3-2. Needle valve, 3-3. Second ferrule, 3-4. Valve block, 3-5. First port, 3-6. Second port, 3-7. Third port, 3-8. Oil pipe. DETAILED DESCRIPTION

[0037] Example 1

[0038] This embodiment provides a simulation device for combining unit supports and piers along the gob retaining lane. Figure 1-Figure 2 As shown, it is used for model testing, including a unit support simulation mechanism 2, a pier simulation mechanism 1 and a pipeline connection and testing mechanism 3 used in conjunction with each other.

[0039] The pipeline connection and testing mechanism 3 cooperates with the pressurizing device to drive the unit support simulation mechanism 2 and the pier simulation mechanism 1 to work, so as to simulate the erection and removal of the unit support and the pier.

[0040] like Figure 3 As shown, the unit bracket simulation mechanism 2 includes a first base 2-6. The first base 2-6 is a rectangular mechanism, and a plurality of first hydraulic chambers are arranged inside it. In this embodiment, three first hydraulic chambers are arranged inside the first base according to the model size, and the top of the first hydraulic chamber extends to the upper surface of the first base.

[0041] The first hydraulic chamber is a cylindrical chamber structure, in which a first piston is arranged. The first piston can move up and down along the axis direction of the first hydraulic chamber.

[0042] The first piston is fixedly connected to the bottom end of the first piston rod 2-3, and the top end of the first piston rod 2-3 extends above the first base 2-6 and is connected to the first top plate 2-1.

[0043] The first top plate 2 - 1 in this embodiment is used to simulate a unit bracket, and the first top plate 2 - 1 is a rectangular plate.

[0044] At least one first sealing ring 2-4 is arranged between the first piston and the inner cavity surface of the first hydraulic cavity. In this embodiment, two first sealing rings 2-4 are arranged, and the two first sealing rings 2-4 are arranged along the axial direction of the hydraulic cavity.

[0045] The first hydraulic chamber is divided into a rod chamber above the first piston and a rodless chamber below the first piston by the first piston and the first sealing ring 2-4. A hydraulic oil channel 2-5 is provided at the base portion below the first hydraulic chamber, one end of the hydraulic oil channel 2-5 extends to the rodless chamber and communicates with the rodless chamber, and the other end extends to the side of the first base 2-6.

[0046] Hydraulic oil channel 2-5 is used as a channel for hydraulic oil to enter and exit the rodless chamber of the first hydraulic chamber. The first hydraulic chamber uses this hydraulic oil channel for both oil inlet and outlet. The design of a single hydraulic oil channel simplifies the structure of the unit bracket simulation mechanism, reduces the number of hydraulic oil pipes used during the simulation test, and makes it easy to operate in a small space.

[0047] Three first ferrules 2-7 are arranged on the side of the first base, each of which corresponds to a hydraulic oil channel. An intermediate channel is arranged in the first ferrule 2-7, one end of which is connected to the end of the hydraulic oil channel 2-5 extending to the side of the first base 2-6, and the other end is used to insert the oil pipe 3-8.

[0048] Since the top of the first hydraulic chamber extends to the upper surface of the first base 2-6, in order to prevent the hydraulic oil from pushing the first piston out of the first hydraulic chamber, a limiter is provided at the position of the upper surface of the first base corresponding to the first hydraulic chamber. The limiter adopts a limit flange 2-2. An opening is provided at the center of the limit flange 2-2. The first piston rod 2-3 passes through the limit flange 2-2 through the opening. The diameter of the opening is smaller than the diameter of the first piston, which limits the upward movement of the first piston.

[0049] like Figure 4 As shown, the pier column simulation mechanism includes a second base 1-6. The second base 1-6 adopts a rectangular structure. A plurality of second hydraulic chambers are arranged inside the second base 1-6. The second hydraulic chambers adopt a cylindrical chamber structure. In this embodiment, ten second hydraulic chambers are arranged.

[0050] A second piston is provided in the second hydraulic chamber. The second piston can move up and down along the axial direction of the second hydraulic chamber. The second piston is fixed to the bottom end of the second piston rod 1-3. The top end of the second piston rod 1-3 extends above the second base and is fixedly connected to the second top plate 1-1. The second top plate 1-1 is used to simulate a concrete pier. Therefore, the second top plate 1-1 adopts a circular plate.

[0051] At least one second sealing ring 1-4 is arranged between the second piston and the inner cavity surface of the second hydraulic cavity. In this embodiment, two second sealing rings 1-4 are arranged along the axial direction of the second hydraulic cavity.

[0052] The second piston and the second sealing ring 1-4 separate the second hydraulic chamber into a rod chamber above the second piston and a rodless chamber below the second piston.

[0053] A hydraulic oil channel 1-5 is provided in the second base portion below the second hydraulic chamber, one end of the hydraulic oil channel 1-5 is connected to the rodless chamber, and the other end extends to the side of the second base 1-6. The hydraulic oil channel 1-5 serves as a channel for hydraulic oil to enter and exit the second hydraulic chamber.

[0054] The second hydraulic chamber uses hydraulic oil channels for oil inlet and outlet. The design of a single hydraulic oil channel simplifies the structure of the pier simulation mechanism, reduces the number of hydraulic oil pipes used during the simulation test, and makes it easy to operate in a small space.

[0055] Ten first ferrules 1-7 are arranged on the side of the second base, each of which corresponds to a second hydraulic oil channel. The first ferrule is provided with an intermediate channel, one end of which is connected to the second hydraulic oil channel, and the other end is used for inserting the oil pipe 3-8.

[0056] In this embodiment, the second hydraulic chamber extends to the top surface of the second base. In order to prevent the hydraulic oil from pushing the second piston out of the second hydraulic chamber, a limit member is fixed on the upper surface of the second base at a position corresponding to the second hydraulic chamber. The limit member adopts a limit flange 1-2. An opening is arranged in the middle of the limit flange. The second piston rod passes through the limit flange 1-2 through the opening and extends to the top of the second base. The diameter of the opening is smaller than the diameter of the second piston, so that the limit flange 1-2 can limit the second piston and prevent the second piston from detaching from the second hydraulic chamber.

[0057] In this embodiment, multiple hydraulic chambers of the pier simulation mechanism and the unit bracket simulation mechanism are integrated on a base, adopting an integrated design to facilitate installation and dismantling in the narrow tunnel of the model.

[0058] like Figure 5 As shown, the pipeline connection and testing mechanism includes a valve block 3-4. The valve block 3-4 adopts a rectangular structure. A plurality of oil channels are arranged inside the valve block 3-4. The plurality of oil channels are equally spaced and parallelly distributed. The total number of the oil channels is the sum of the number of the first hydraulic chamber and the second hydraulic chamber. Therefore, in this embodiment, the total number of the oil channels is thirteen, and each of the first hydraulic chamber and the second hydraulic chamber corresponds to one oil channel.

[0059] The oil passage in this embodiment adopts a three-way oil passage with three ports, two of which are respectively located on two side surfaces of the valve block, and the third port is arranged on the top surface of the valve block.

[0060] A switch valve is installed at one of the first ports 3-5 on the side of the valve block. This end of the oil channel is connected to the pressurized oil source through the switch valve. The switch valve in this embodiment adopts a needle valve 3-2, and the pressurized oil source can adopt existing oil supply equipment, including an oil pump, an oil tank, etc.

[0061] A second ferrule 3-3 is provided at the second port 3-6 on the other side of the oil channel, and an intermediate channel is provided in the second ferrule 3-3. One end of the intermediate channel is connected to the oil channel, and one end of an oil pipe 3-8 is inserted into the other end. The other end of the oil pipe 3-8 is inserted into the intermediate channel of the first ferrule corresponding to the oil channel, thereby realizing the connection between the first hydraulic chamber of the unit bracket simulation mechanism and the second hydraulic chamber of the pier simulation mechanism and the oil channel through the oil pipe.

[0062] The oil channel is arranged at the third port 3-7 on the top surface of the valve block and is equipped with a pressure detection element. The pressure detection element adopts an oil pressure sensor 3-1, which is used to detect the change value of the oil pressure in the oil channel. Multiple oil pressure sensors 3-1 are connected to the data acquisition device, which can transmit the collected oil pressure data to the data acquisition device. The data acquisition device is connected to the monitoring system, and transmits the collected oil pressure data to the monitoring system for display and recording.

[0063] In this embodiment, since the first hydraulic chamber and the second hydraulic chamber each independently correspond to an oil channel, single-channel control is achieved, which can truly simulate the actual working process of the support and pier in the tunnel.

[0064] The oil pipe 3-8 adopts a capillary copper tube with an outer diameter of 1.8mm-2.2mm and a wall thickness of 0.4mm-0.6mm. The outer diameter of the oil pipe in this embodiment is 2mm and the wall thickness is 0.5mm, which saves space and prevents the inability to fully simulate unit brackets and piers due to limited space in model tests. The copper tube has good bending and shaping properties, which facilitates line laying.

[0065] The base, top plate, piston, piston rod, ferrule and other components of the unit bracket simulation mechanism and pier simulation mechanism are all made of Q345 pure steel, which is not easily crushed. After the test is completed, they can be taken out and reused, saving the test cost.

[0066] Embodiment 2:

[0067] This embodiment provides a test method for the combined simulation device of the unit support and pier column along the gob retaining lane described in Embodiment 1, such as Figure 6 As shown, the following steps are included:

[0068] Step 1: Pre-make the model.

[0069] In this embodiment, the model is cast using similar materials and then hollowed out to simulate a tunnel, or the model is made using the method disclosed in patent CN202110461385.1 "A pre-supported precise pressure relief sensing coal seam mining simulation test device and method".

[0070] The manufactured model has a tunnel roof, a tunnel floor, a reserved tunnel (transport tunnel) and a first mining working face and a second working face located on both sides of the reserved tunnel.

[0071] Step 2: Place the unit support simulation mechanism 2 and the pier simulation mechanism 1 into the tunnel of the model. The unit support simulation mechanism 2 and the pier simulation mechanism 1 are placed adjacent to each other along the length direction of the tunnel, and the pier simulation mechanism 1 is close to the first mining working face of the model. After the unit support simulation mechanism 2 and the pier simulation mechanism 1 are placed into the tunnel of the model, the middle channel of the first ferrule is connected to the pipeline through the oil pipe 3-8 and the oil channel corresponding to the testing mechanism 3. The unit support simulation mechanism and the pier simulation mechanism are both in a pressure relief state, and the needle valves 3-2 installed on the valve block 3-4 are all in a closed state.

[0072] The multiple first roofs of the unit support simulation mechanism 2 along the mining direction are defined as first roof No. 1, first roof No. 2 and first roof No. 3.

[0073] The multiple first roofs of the pier simulation mechanism 1 along the mining direction are defined as the No. 1 second roof, the No. 2 second roof, the No. 3 second roof ... the No. 10 second roof.

[0074] Step 3: Mining the coal seam of the first mining working face of the model, starting the pressurized oil source, opening the needle valve 3-2 corresponding to the No. 1 first top plate, so that the hydraulic oil is injected into the first hydraulic cavity corresponding to the No. 1 first top plate through the middle channel and the hydraulic oil channel, and the first piston lifts the No. 1 first top plate through the first piston rod 2-3, so that the rectangular No. 1 first top plate contacts the model roadway top plate, and gives the model roadway top plate a set initial support force, and then closes the needle valve 3-2 corresponding to the No. 1 first top plate, and records the pressure change corresponding to the oil pressure sensor 3-1 corresponding to the first top plate;

[0075] As the coal seam is mined, the No. 2 first roof and the No. 3 first roof are lifted in turn using the same method and initial support force is applied to the model's tunnel roof, and the corresponding oil pressure sensor 3-1 is used to record pressure changes.

[0076] According to the actual situation of coal seam mining that needs to be simulated, after the coal seam mining of the first mining working face has been set at a distance, the needle valve 3-2 corresponding to the second top plate No. 1 of the pier simulation mechanism is opened, so that the hydraulic oil is injected into the second hydraulic chamber, and the second piston rod drives the circular second top plate No. 1 to rise, so that the second top plate No. 1 just contacts with the top plate of the model's tunnel, and then the corresponding needle valve 3-2 is closed.

[0077] As the coal seam is mined, multiple second roof plates are raised in sequence and just come into contact with the model's tunnel roof plate.

[0078] When the second top plate 1-1 is raised, the first top plate 2-1 at the corresponding position will be lowered. For example, after the second top plates No. 1, 2, and 3 are all raised, the first top plate No. 1 will be lowered; after the second top plates No. 5, 6, and 7 are all raised, the first top plate No. 2 will be lowered; after the second top plates No. 8, 9, and 10 are raised, the first top plate No. 3 will be lowered.

[0079] The needle valve 3 - 2 corresponding to the first top plate 2 - 1 is opened to relieve the pressure on the first top plate 2 - 1 .

[0080] In the above process, the pressure change detected by the oil pressure sensor 3-2 corresponding to the second top plate 1-1 of the pier simulation mechanism is recorded until all the coal seams in the first mining working face are mined.

[0081] Step 3: After the first coal seam mining is completed, all the first hydraulic chambers of the unit support simulation mechanism 2 are depressurized, and then the unit support simulation mechanism 2 is taken out. At this time, the second top plate 1-1 of the pier simulation mechanism 1 is fully lifted and just in contact with the model's tunnel top plate, and then the coal seam of the second working face is mined, and at the same time, the pressure changes detected by the oil pressure sensor 3-1 corresponding to the pier simulation mechanism 1 are recorded.

[0082] The mining of the coal seam at the first working face is carried out manually or by using experimental coal mining equipment. The experimental coal mining equipment can be an automated micro coal mining system suitable for model testing disclosed in patent CN102996130B.

[0083] The device of this embodiment is used to simulate the coupling effects of the support inside the gob-side tunnel, the support beside the tunnel and the pressure relief, and provides a physical simulation test equipment foundation for the study of the synergistic mechanism of the support inside and beside the tunnel.

[0084] Although the above describes the specific implementation mode of the present invention in conjunction with the accompanying drawings, it is not intended to limit the scope of protection of the present invention. Those skilled in the art should understand that various modifications or variations that can be made by those skilled in the art on the basis of the technical solution of the present invention without creative work are still within the scope of protection of the present invention.

Claims

1. A test method for a combined simulation device of a unit support and a pier column along a gob-side entry retention, characterized in that: The simulation device comprises a pier column simulation mechanism, a unit bracket simulation mechanism and a pipeline connection and testing mechanism, the pipeline connection and testing mechanism comprises a valve block, a plurality of oil passages are arranged in the valve block, a pressure detection element is installed in the oil passage, one end of the oil passage is connected to a pressurized oil source through a switch valve, the pier column simulation mechanism and the unit bracket simulation mechanism both comprise a base, a plurality of hydraulic chambers are arranged in the base, a piston is arranged in the hydraulic chamber, the piston is connected to a top plate located above the base through a piston rod, and the hydraulic chamber space below the piston is connected to the other end of the corresponding oil passage through an oil pipe; The multiple hydraulic chambers of the pier column simulation mechanism are integrated on one base, and the multiple hydraulic chambers of the unit support simulation mechanism are integrated on another base; A plurality of first hydraulic chambers are arranged inside the unit support simulation mechanism, and a plurality of second hydraulic chambers are arranged inside the pier column simulation mechanism. The total number of the oil passages is the sum of the number of the first hydraulic chambers and the second hydraulic chambers. Each of the first hydraulic chambers and the second hydraulic chamber corresponds to an oil passage, and the oil inlet and outlet use the same oil passage. The oil passage is a three-way oil passage having three ports, one of which is connected to a pressurized oil source via a switch valve, another port is connected to a hydraulic chamber via an oil pipe, and a pressure detection element is installed at the third port; The test method of the gob-side lane retaining unit support and pier column combination simulation device comprises the following steps: Putting the pier column simulation mechanism and the unit support simulation mechanism with the roof in a falling state adjacent to each other into the tunnel of the model, wherein the pier column simulation mechanism is arranged close to the first mining working face; Coal seam mining is carried out on the first mining working face of the model. As the coal seam is mined, the top plate of the unit support simulation mechanism is raised in sequence, contacted with the model's tunnel roof and a set initial support force is applied to the model's tunnel roof, and the change of the pressure value detected by the pressure detection element corresponding to the unit support simulation mechanism is recorded; After the coal seam of the first mining working face is mined for a set distance, as the coal seam is mined, the top plate of the pier simulation mechanism is sequentially raised and contacts the top plate of the model roadway without initial support force. As the top plate of the pier simulation mechanism is raised, the top plate of the unit support simulation mechanism at the corresponding position of the pier simulation mechanism with the raised top plate is dropped, and the pressure value change detected by the pressure detection element corresponding to the pier simulation mechanism is recorded; After the first coal seam mining is completed, the unit support simulation mechanism is taken out to carry out the mining of the second coal seam until all mining is completed, and the changes in the pressure values ​​detected by the pressure detection elements corresponding to the pier simulation mechanism are recorded.

2. The test method of the gob-side entry retaining unit support and pier column combination simulation device according to claim 1, characterized in that: A hydraulic oil channel is provided in the base portion below the hydraulic chamber, one end of the hydraulic oil channel is connected to the hydraulic chamber space below the piston, and the other end extends to the side of the base, and a plurality of first ferrules are fixed to the side of the base, each first ferrule corresponds to a hydraulic oil channel, and an intermediate channel is provided in the first ferrule, one end of the intermediate channel is connected to the hydraulic oil channel, and an oil pipe is inserted into the other end.

3. The test method of the gob-side entry retaining unit support and pier column combination simulation device according to claim 1, characterized in that: A plurality of second ferrules are fixed on the side of the valve block, and an intermediate oil channel is also arranged in the second ferrule. One end of the intermediate channel is connected with the oil outlet end of the oil channel, and an oil pipe is inserted into the other end.

4. The test method of the gob-side entry retaining unit support and pier column combination simulation device according to claim 1, characterized in that: The top of the hydraulic chamber extends to the upper surface of the base, and a limit piece is provided at the corresponding position of the hydraulic chamber on the upper surface of the base. The piston rod passes through the limit piece through an opening provided by the limit piece. The diameter of the opening is smaller than the diameter of the piston so that the piston cannot be pushed out of the hydraulic chamber by the hydraulic oil. At least one sealing ring is provided between the piston and the inner surface of the hydraulic chamber.

5. The test method of the gob-side entry retaining unit support and pier column combination simulation device according to claim 1, characterized in that: The top plate of the pier column simulation mechanism is a circular top plate, the top plate of the unit support simulation mechanism is a rectangular top plate, and the number of hydraulic chambers of the pier column simulation mechanism is greater than the number of hydraulic chambers of the unit support simulation mechanism.

6. The test method of the gob-side entry retaining unit support and pier column combination simulation device according to claim 1, characterized in that: The oil pipe is a capillary copper tube with an outer diameter of 1.8mm-2.2mm and a wall thickness of 0.4mm-0.6mm.

Citation Information

Patent Citations

  • Automatic micro-coal extraction system suitable for model test

    CN102996130B

  • Pre-supporting accurate pressure relief sensing coal seam stoping simulation test device and method

    CN113188908A

  • Top board support similar simulation experiment system

    CN106228887A

  • Stoping working face supporting-relief combined gob-side entry retaining roadway and construction method

    CN110847912A