Testing device and method for the mechanical performance of subway tunnels under complex load conditions

By designing a test device for stress performance in subway tunnels under complex load conditions, using electromagnet loading and current testing systems to simulate periodic train loads and wind pressure, the problem of difficulty in simulating complex loads in the existing technology is solved, and the stress performance of subway tunnels is achieved comprehensive testing, especially the interaction between soil pressure load and train and wind pressure load.

CN115343154BActive Publication Date: 2024-11-22NINGBO UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210857970.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-07-20
Publication Date
2024-11-22
Estimated Expiration
2042-07-20

AI Technical Summary

Technical Problem

The existing subway tunnel stress performance test device is difficult to simulate the periodic train load and uneven or asymmetric wind pressure in subway tunnels under complex load conditions, and it is impossible to simultaneously test the interaction between the external soil pressure load of the tunnel and the internal train and wind pressure load of the tunnel. .

Method used

A test device for stress performance of subway tunnels under complex load conditions was designed, including device box system, soil, pipe sheet system, soil monitoring system, armature fixing system, reaction force balance system, current testing system and loading system, using The electromagnet loading method simulates periodic train load and wind pressure, realizes the effect of uneven or asymmetric wind pressure, and simulates the interaction between soil pressure load and load through liftable ropes and retaining systems.

Benefits of technology

The force performance test of subway tunnels under complex load conditions is realized, which can simulate the interaction between periodic train load and wind pressure, which is simple and easy to operate, convenient to operate, low cost and short cycle, and can test soil pressure load and train and wind at the same time. The effect of pressurized load.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115343154B_ABST
    Figure CN115343154B_ABST
Patent Text Reader

Abstract

A testing device for the mechanical performance of a subway tunnel under complex load conditions includes a device box system, soil, a segment system, a soil monitoring system, a retaining system, an armature fixing system, a reaction force balance system, a current testing system and a loading system. The segment system is located in the device box system, the segment system is connected to the armature fixing system, the cavity of the device box system outside the segment system is filled with soil, a soil monitoring system is provided in the soil area, the reaction force balance system is located inside the segment system, and both ends are fixed to both sides of the device box by bolts, the reaction force balance system is connected to the segment system through the retaining system, the current testing system is installed inside the reaction force balance system, both sides of the reaction force balance system are provided with lifting ropes, and the reaction force balance system is connected to the loading system. A testing method for the mechanical performance of a subway tunnel under complex load conditions is provided. The invention is simple and easy to operate, has low cost and short cycle.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of tunnel engineering, and relates to a testing device and method for the stress performance of a subway tunnel under complex load conditions, which is suitable for testing the internal force and deformation of the inner wall of the tunnel. Background Art

[0002] Subway tunnels are affected by various loads, including soil pressure, trains, wind pressure, etc. The loads acting on the outside of the tunnel are mainly soil pressure, and the loads acting on the inside of the tunnel are mainly train and wind pressure. Asymmetric or different working conditions of train loads and wind pressure loads will have an adverse effect on the tunnel, and may cause serious damage to the segments. The existing test device is mainly used to simulate the soil pressure outside the tunnel, and cannot test the effect of internal loads on the tunnel segments; the loading method is often carried out through hydraulic symmetry, which is difficult to simulate periodic or asymmetric train or wind pressure loads and the different interactive working conditions of the two. Therefore, the existing test device still has the following deficiencies:

[0003] 1) The traditional subway tunnel stress performance test device uses hydraulic loading, which makes it difficult to simulate periodic train loads or wind pressure;

[0004] 2) Due to the complexity of wind pressure, it is difficult for existing devices to achieve the effect of uneven or asymmetric wind pressure;

[0005] 3) It is difficult to test the mechanical performance of subway tunnels under complex load conditions, especially the simultaneous effects of earth pressure loads outside the tunnel and train and wind pressure loads inside the tunnel;

[0006] 4) It is difficult to simulate various working conditions of the interactive effects of train load and wind pressure. Summary of the invention

[0007] In order to overcome the shortcomings of existing subway tunnel stress performance testing devices that are difficult to simulate periodic loads, cannot realize the effects of uneven or asymmetric wind pressures, and are difficult to test the stress performance of subway tunnels under complex load conditions, the present invention provides a subway tunnel stress performance testing device and method under complex load conditions, which can not only realize the simulation of periodic train loads or wind pressures and interactive simulation of multiple working conditions, but also realize the effects of uneven or asymmetric wind pressures and the simultaneous effects of earth pressure loads outside the tunnel and train and wind pressure loads inside the tunnel, and is simple, easy to operate, low in cost, and short in cycle.

[0008] The technical solution adopted by the present invention to solve its technical problem is:

[0009] A testing device for the stress performance of a subway tunnel under complex load conditions, the testing device comprising a device box system, soil, a segment system, a soil monitoring system, a retaining system, an armature fixing system, a reaction force balance system, a current testing system and a loading system, the segment system being located in the device box system, the segment system being connected to the armature fixing system, the cavity of the device box system outside the segment system being filled with soil, a soil monitoring system being provided in the soil area, the reaction force balance system being located inside the segment system, and both ends being fixed to both sides of the device box by bolts, the reaction force balance system being connected to the segment system through the retaining system, the current testing system being installed inside the reaction force balance system, both sides of the reaction force balance system being provided with liftable ropes, and the reaction force balance system being connected to the loading system.

[0010] Furthermore, the device box system includes a device box frame, a top plate, a left removable plate, a right removable plate, a top plate fixing bolts, a reaction frame fixing bolts, and a removable plate fixing bolts. The top plate is installed on the top of the device box through the top plate fixing bolts, and the left removable plate and the right removable plate are installed on both sides of the device box through the removable plate fixing bolts. The reaction frame fixing bolts are used to connect the cylindrical reaction frame and the device box.

[0011] Preferably, the pipe segment system includes a pipe segment, an external strain gauge, an internal strain gauge, a slot, and an infrared rangefinder. The external strain gauge is arranged on the outer wall of the pipe segment, the internal strain gauge is arranged on the inner wall of the pipe segment, four groups of slots are arranged on the inner wall of the pipe segment, and the infrared rangefinder is located on both sides of the pipe segment.

[0012] The soil monitoring system comprises a soil pressure box and a settlement mark, wherein the soil pressure box and the settlement mark are located in the middle of each soil layer.

[0013] Furthermore, the armature fixing system includes an annular armature fixing system and a columnar armature fixing system. The annular armature fixing system further includes an annular armature, a magnetic telescopic rod, an armature fixing plate, and a rotating shaft. A groove is provided inside the annular armature. The magnetic telescopic rod is fixed to one side of the groove. The other side of the groove is connected to the armature fixing plate through a rotating shaft. The armature fixing plate and the magnetic telescopic rod can be contacted by magnetic force. The annular armature fixing system is fixed to the slot on the inner wall of the pipe segment; the columnar armature fixing system further includes a columnar armature, a columnar armature fixing bolt, and an L-shaped fixing plate. The columnar armature is installed on the bottom inner wall of the pipe segment through the L-shaped fixing plate and the fixing bolts.

[0014] Furthermore, the reaction force balancing system includes a cylindrical reaction frame and slide rails. The cylindrical reaction frame is provided with four sets of slide rails for installing the wind pressure loading system. The liftable rope is arranged on both sides of the cylindrical reaction frame, and the other end thereof is connected to the top of the device box frame.

[0015] Furthermore, the loading system includes a wind pressure loading system and a train load loading system. The wind pressure loading system includes a wind pressure soft iron shell, a wind pressure soft iron, a wind pressure energized solenoid, a soft iron fixing rod, a telescopic column, a wind pressure energized solenoid protective shell and a slider. The wind pressure soft iron is installed in the soft iron shell, one end of the soft iron fixing rod is connected to the wind pressure soft iron, the wind pressure energized solenoid is covered with a protective shell and installed inside the soft iron fixing rod, and the other end of the fixing rod is connected to the slider to form a wind pressure loading system. The wind pressure loading system adjusts the tightness through the telescopic column to achieve sliding and fixation in the slide rail; the train load loading system includes a train energized solenoid and a train soft iron. The train soft iron is installed at the bottom of the reaction force balance system through the train energized solenoid, at the corresponding position to the columnar armature.

[0016] Furthermore, the retaining system includes a retaining fan, an outer track of the retaining fan, an outer support of the retaining fan, an inner track of the retaining fan and an inner support of the retaining fan, wherein the outer support of the retaining fan is installed in the outer track, and the inner support of the retaining fan is installed in the inner track of the retaining fan at a corresponding position of the reaction force balance system. A closed system is formed along the corresponding tracks by the inner and outer supports, so that the internal loading system is isolated from the external soil.

[0017] Furthermore, the current testing system includes a storage unit, a display unit, a microprocessor, a data transmission line, a wind pressure ammeter, a train load ammeter and a wire. The train load ammeter and the wind pressure ammeter are connected in sequence through the data transmission line. The ammeter is connected to the storage unit, the display unit and the microprocessor through a wire. The storage unit, the display unit and the microprocessor are fixed on the left inner wall of the current testing system, and the ammeter is connected to the slide rail through a wire.

[0018] A method for testing the mechanical properties of a subway tunnel under complex load conditions comprises the following steps:

[0019] Step 1, determining the similarity ratio of the test device according to the relationship between the tunnel diameter, tunnel thickness, soil layer thickness, and device box size;

[0020] Step 2: Determine the size and material of the segment system and reaction balance system to be used according to the characteristics of the segment on site;

[0021] Step 3: Determine the soil layer required for the test based on the geological survey report and the buried depth of the tunnel, and determine the thickness and distribution of the soil layer;

[0022] Step 4: Determine the train load and wind pressure load according to the engineering requirements, and obtain the correlation between load and current through calculation;

[0023] Step 5, installing a test device for the stress performance of a subway tunnel under complex load conditions, the test device comprising a device box system, soil, a segment system, a soil monitoring system, a retaining system, an armature fixing system, a reaction force balance system, a current testing system and a loading system, the segment system is located in the device box system, the segment system is connected to the armature fixing system, the cavity of the device box system outside the segment system is filled with soil, a soil monitoring system is provided in the soil area, the reaction force balance system is located inside the segment system, and both ends are fixed to both sides of the device box by bolts, the reaction force balance system is connected to the segment system through the retaining system, the current testing system is installed inside the reaction force balance system, both sides of the reaction force balance system are provided with lifting ropes, and the reaction force balance system is connected to the loading system;

[0024] Step 6: Determine the current parameters of wind pressure and train load, and calculate the train load current and wind pressure current values ​​based on the train load, wind pressure and related equations determined in step 4;

[0025] Step 7, start the test and collect data: before the test starts, record the initial data of each sensor, pass a forward current into the train load system, adjust the microprocessor of the current test system to control the current size of each loop of the train load system, when the current of each loop reaches the test size of step 6 and remains constant, record the corresponding test data at every set time period, and stop the test when the data of the test point reaches stability;

[0026] Step 8, wind pressure test, reverse current is introduced into the wind pressure loading system, and the microprocessor of the current test system is adjusted to control the current size of each ring of the wind pressure loading system. When the current of each ring reaches the test size of step 6 and remains constant, the corresponding test data is recorded at every set time period. When the data of the test point reaches stability, the test is stopped;

[0027] Step 9, adjust the test parameters of the train load in step 6, repeat step 7, and implement the test of the train load under different working conditions;

[0028] Step 10, adjusting the test parameters of the wind pressure load in step 6, and repeating step 8 to implement the wind pressure test under different working conditions;

[0029] Step 11, adjusting the test parameters of the train load and wind pressure load in step 6, and starting steps 7 and 8 at the same time, to achieve the test of the combined effect of train load and wind pressure under different working conditions;

[0030] Step 12: End the test, remove the soil, and dismantle the device.

[0031] Furthermore, in step 7 and step 8, the time period is set to five minutes.

[0032] The beneficial effects of the present invention are mainly manifested in: being able to realize the performance test of subway tunnels under complex load conditions, and having the following advantages: (1) adopting the electromagnet loading method, the simulation of periodic train load or wind pressure can be easily realized. (2) being able to realize the effect of uneven or asymmetric wind pressure; (3) being able to realize the simultaneous effect of earth pressure load outside the tunnel and train and wind pressure load inside the tunnel; (4) being able to simulate various working conditions of interactive effect of train load and wind pressure; (5) being able to control the loading direction by controlling the current direction; (6) being easy to operate, the device is detachable, easy to assemble, low cost, and short cycle. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Figure 1 Schematic diagram of the device box, wherein (a) is a top view, (b) is a side view, and (c) is a front view.

[0034] Figure 2 It is a schematic diagram of the structure of the testing device for the stress performance of subway tunnels under complex load conditions.

[0035] Figure 3 yes Figure 2 AA cross-section diagram.

[0036] Figure 4 yes Figure 2 BB cross-section diagram.

[0037] Figure 5 yes Figure 2 CC cross-section diagram.

[0038] Figure 6 Schematic diagram of a ring-shaped armature fixing system, wherein (a) is a front view and (b) is a side view.

[0039] Figure 7 This is the main view of the wind pressure loading system.

[0040] Figure 8 It is the side view of the wind pressure loading system.

[0041] Fig. 9 Schematic diagram of a cylindrical armature fixing system, wherein (a) is a front view and (b) is a side view.

[0042] The reference numerals are: 1. device box system, 1-1. device box frame; 1-2. top plate; 1-3. left removable plate; 1-4. right removable plate; 1-5. top plate fixing bolt; 1-6. reaction frame fixing bolt; 1-7. left removable plate fixing bolt; 1-8. right removable plate fixing bolt; 2. soil, 2-1. gravel fill; 2-2. plain fill; 2-3. silty soil; 2-4. silty clay; 2-5. sandy soil; 3-6. .Segment system, 3-1. Segment; 3-2. External strain gauge of segment; 3-3. Internal strain gauge of segment; 3-4. Slot; 3-5. Infrared rangefinder; 4. Soil monitoring system, 4-1. Soil pressure box; 4-2. Settlement mark; 5. Retaining system, 5-1. Retaining fan; 5-2. External track of retaining fan; 5-3. External support of retaining fan; 5-4. Internal track of retaining fan; 5-5. Internal support of retaining fan; 6. Ring armature fixing system, 6-1. Annular armature; 6-2. Magnetic telescopic rod; 6-3. Armature fixing plate; 6-4. Rotating shaft; 7. Wind pressure loading system, 7-1. Wind pressure soft iron shell; 7-2. Wind pressure soft iron; 7-3. Wind pressure energized solenoid; 7-4. Soft iron fixing rod; 7-5. Telescopic column; 7-6. Wind pressure energized solenoid protective shell; 7-7. Sliding block; 8. Reaction force balancing system, 8-1. Cylindrical reaction frame; 8-2. Slide rail; 8-3. Liftable rope; 9. Electric Flow test system, 9-1. Storage unit; 9-2. Display unit; 9-3. Microprocessor; 9-4. Data transmission line; 9-5. Wind pressure ammeter; 9-6. Train load ammeter; 9-7. Wire; 10. Columnar armature fixing system, 10-1. Columnar armature; 10-2. Columnar armature fixing bolt; 10-3. L-shaped fixing plate; 11. Train load loading system, 11-1. Train energized solenoid; 11-2. Train soft iron. DETAILED DESCRIPTION

[0043] The present invention will be further described below in conjunction with the accompanying drawings.

[0044] Reference Figures 1 to 9, a testing device for the stress performance of a subway tunnel under complex load conditions, the testing device comprising a device box system 1, soil 2, a segment system 3, a soil monitoring system 4, a retaining system 5, an armature fixing system, a reaction force balance system 8, a current testing system 9 and a loading system, the segment system 3 is located in the device box system 1, the segment system 3 is connected to the armature fixing system, the device box system cavity outside the segment system 3 is filled with soil 2, a soil monitoring system 4 is provided in the soil area, the reaction force balance system 8 is located inside the segment system 3, and both ends are fixed to both sides of the device box system 1 by bolts, the reaction force balance system 8 is connected to the segment system 3 through the retaining system 5, the current testing system 9 is installed inside the reaction force balance system 8, both sides of the reaction force balance system 8 are provided with liftable ropes 8-3, and the reaction force balance system 8 is connected to the loading system.

[0045] Furthermore, the device box system 1 includes a device box frame 1-1, a top plate 1-2, a left removable plate 1-3, a right removable plate 1-4, a top plate fixing bolt 1-5, a reaction frame fixing bolt 1-6, a left removable plate fixing bolt 1-7 and a right removable plate fixing bolt 1-8. The top plate is installed on the top of the device box through the top plate fixing bolts, and the left removable plate and the right removable plate are installed on both sides of the device box through the left removable plate fixing bolts and the right removable plate fixing bolts. The reaction frame fixing bolts are used to connect the cylindrical reaction frame and the device box.

[0046] Preferably, the pipe segment system 3 includes a pipe segment 3-1, an external strain gauge 3-2, an internal strain gauge 3-3, a slot 3-4 and an infrared rangefinder 3-5. The external strain gauge is arranged on the outer wall of the pipe segment, the internal strain gauge is arranged on the inner wall of the pipe segment, four groups of slots are arranged on the inner wall of the pipe segment, and the infrared rangefinder is located on both sides of the pipe segment.

[0047] The soil monitoring system 4 includes a soil pressure box 4-1 and a settlement mark 4-2, and the soil pressure box and the settlement mark are located in the middle of each soil layer. A set of soil monitoring systems includes a soil pressure box and a settlement mark, and each set of soil monitoring systems is located in the middle of each soil layer, with a vertical spacing of no more than 0.4m, and there is at least one set in each layer. In this embodiment, five sets of the device box system 1 are arranged in both the length and width directions.

[0048] Furthermore, the armature fixing system includes an annular armature fixing system 6 and a columnar armature fixing system 10, the annular armature fixing system 6 further includes an annular armature 6-1, a magnetic telescopic rod 6-2, an armature fixing plate 6-3 and a rotating shaft 6-4, a groove is provided inside the annular armature, the magnetic telescopic rod is fixed on one side of the groove, and the other side of the groove is connected to the armature fixing plate through a rotating shaft, the armature fixing plate and the magnetic telescopic rod can be in contact with each other through magnetic force, and the annular armature fixing system is fixed to the slot on the inner wall of the pipe segment; the columnar armature fixing system 10 further includes a columnar armature 10-1, a columnar armature fixing bolt 10-2 and an L-shaped fixing plate 10-3, and the columnar armature is installed on the bottom inner wall of the pipe segment through the L-shaped fixing plate and the fixing bolt.

[0049] Furthermore, the reaction force balancing system 8 includes a cylindrical reaction frame 8-1 and a slide rail 8-2. The cylindrical reaction frame is provided with four sets of slide rails for installing the wind pressure loading system. The liftable rope 8-3 is provided on both sides of the cylindrical reaction frame, and the other end thereof is connected to the top of the device box frame.

[0050] Furthermore, the loading system includes a wind pressure loading system 7 and a train load loading system 11. The wind pressure loading system 7 includes a wind pressure soft iron shell 7-1, a wind pressure soft iron 7-2, a wind pressure energized solenoid 7-3, a soft iron fixing rod 7-4, a telescopic column 7-5, a wind pressure energized solenoid protective shell 7-6 and a slider 7-7. The wind pressure soft iron is installed in the soft iron shell, one end of the soft iron fixing rod is connected to the wind pressure soft iron, the wind pressure energized solenoid is covered with a protective shell and installed inside the soft iron fixing rod, and the other end of the fixing rod is connected to the slider to form a wind pressure loading system. The wind pressure loading system adjusts the tightness through the telescopic column to achieve sliding and fixation in the slide rail; the train load loading system 11 includes a train energized solenoid 11-1 and a train soft iron 11-2. The train soft iron is installed at the bottom of the reaction force balance system through the train energized solenoid, at the corresponding position of the columnar armature.

[0051] Furthermore, the retaining system 5 includes a retaining fan 5-1, an outer retaining fan track 5-2, an outer retaining fan support 5-3, an inner retaining fan track 5-4 and an inner retaining fan support 5-5. The outer retaining fan support is installed in the outer track, and the inner retaining fan support is installed in the inner retaining fan track at the corresponding position of the reaction balance system. A closed system is formed along the corresponding track by the inner and outer supports to isolate the internal loading system from the external soil.

[0052] Furthermore, the current testing system 9 includes a storage unit 9-1, a display unit 9-2, a microprocessor 9-3, a data transmission line 9-4, a wind pressure ammeter 9-5, a train load ammeter 9-6 and a wire 9-7. The train load ammeter and the wind pressure ammeter are connected in sequence through the data transmission line, and the ammeter is connected to the storage unit, the display unit and the microprocessor through wires. The storage unit, the display unit and the microprocessor are fixed on the inner wall on the left side of the current testing system, and the wind pressure ammeter is connected to the slide rail through a wire.

[0053] A method for testing the mechanical properties of a subway tunnel under complex load conditions comprises the following steps:

[0054] Step 1, determining the similarity ratio of the test device according to the relationship between the tunnel diameter, tunnel thickness, soil layer thickness, and device box size;

[0055] Step 2: Determine the size and material of the segment system and reaction balance system to be used according to the characteristics of the segment on site;

[0056] Step 3: Determine the soil layer required for the test based on the geological survey report and the buried depth of the tunnel, and determine the thickness and distribution of the soil layer;

[0057] Step 4: Determine the train load and wind pressure load according to the engineering requirements, and obtain the correlation between load and current through calculation;

[0058] Step 5, installing a test device for the stress performance of a subway tunnel under complex load conditions, the test device comprising a device box system 1, soil 2, a segment system 3, a soil monitoring system 4, a retaining system 5, an armature fixing system, a reaction force balance system 8, a current testing system 9 and a loading system, the segment system 3 is located in the device box system 1, the segment system 3 is connected to the armature fixing system, the device box system cavity outside the segment system 3 is filled with soil 2, a soil monitoring system 4 is provided in the soil area, the reaction force balance system 8 is located inside the segment system 3, and both ends are fixed to both sides of the device box system 1 by bolts, the reaction force balance system 8 is connected to the segment system 3 through the retaining system 5, the current testing system 9 is installed inside the reaction force balance system 8, both sides of the reaction force balance system 8 are provided with liftable ropes 8-3, and the reaction force balance system 8 is connected to the loading system;

[0059] Step 6: Determine the current parameters of wind pressure and train load, and calculate the train load current and wind pressure current values ​​based on the train load, wind pressure and related equations determined in step 4;

[0060] Step 7, start the test and collect data: before the test starts, record the initial data of each sensor, pass a forward current into the train load system, adjust the microprocessor of the current test system to control the current size of each loop of the train load system, when the current of each loop reaches the test size of step 6 and remains constant, record the corresponding test data at every set time period, and stop the test when the data of the test point reaches stability;

[0061] Step 8, wind pressure test, reverse current is introduced into the wind pressure loading system, and the microprocessor of the current test system is adjusted to control the current size of each ring of the wind pressure loading system. When the current of each ring reaches the test size of step 6 and remains constant, the corresponding test data is recorded at every set time period. When the data of the test point reaches stability, the test is stopped;

[0062] Step 9, adjust the test parameters of the train load in step 6, repeat step 7, and implement the test of the train load under different working conditions;

[0063] Step 10, adjusting the test parameters of the wind pressure load in step 6, and repeating step 8 to implement the wind pressure test under different working conditions;

[0064] Step 11, adjusting the test parameters of the train load and wind pressure load in step 6, and starting steps 7 and 8 at the same time, to achieve the test of the combined effect of train load and wind pressure under different working conditions;

[0065] Step 12: End the test, remove the soil, and dismantle the device.

[0066] Furthermore, in step 7 and step 8, the time period is set to five minutes.

[0067] The diameter of the subway line 4 tunnel in a certain city is 6m, the segment thickness is 0.35m, and the buried depth is 15m. In order to test the stress performance of the subway tunnel under the conditions of asymmetric vehicle load and wind pressure load, the test device and operation method of the stress performance of the subway tunnel under complex load conditions provided by the present invention are used to test the influence of uneven vehicle load and asymmetric wind pressure load on the stress performance of the subway tunnel.

[0068] According to the on-site geological survey report, the soil layers from top to bottom are gravel fill, plain fill, silty soil, silty clay, and sandy soil, of which the thicknesses of gravel fill, plain fill, silty soil, silty clay, and sandy soil are 2m, 5m, 5m, 5m, and 10m respectively. The length, width, and height of the internal dimensions of this simulation device box are 1.5m, 1.5m, and 2m respectively. The box material is plexiglass, and the test device from outside to inside is the device box system, soil system, segment system, reaction force balance system, and current monitoring system.

[0069] The implementation process of this implementation is:

[0070] 1) Determination of the similarity ratio of the simulation device. According to the relationship between the tunnel diameter, tunnel thickness, soil thickness, and device box size, the similarity ratio of the simulation device is determined to be 10:1; according to the similarity ratio theory, from the geometric similarity ratio, it can be known that the similarity ratio of the load size is 100:1.

[0071] 2) Determine the material and size of the segment system 3 and the reaction balance system 8. The segment system 3 is made of concrete. The similarity ratio shows that the segment length is 1.2m, the diameter is 0.6m, and the thickness is 35mm. The cylindrical reaction frame 8-1 is made of stainless steel and is fixed to the side panels 1-3 and 1-4 on both sides of the model box by twelve sets of reaction frame fixing bolts 1-6. The side panels 1-3 and 1-4 on both sides are detachable side panels. The reaction balance system 8 runs through the entire device box and is 1.2 meters long.

[0072] 1.5m, thickness is 35mm.

[0073] 3) Determine the thickness and distribution of the soil 2. Determine the soil layer required for the simulation based on the geological survey report and the tunnel burial depth. In this embodiment, the soil layers are gravel fill 2-1, plain fill 2-2, silty soil 2-3, silty clay 2-4, and sand 2-5 from top to bottom. The similarity ratio in step 1 can determine that the thickness of the soil layers in the device box are 0.2m, 0.5m, 0.5m, 0.5m, and 0.3m, respectively.

[0074] 4) Determine the train load and wind pressure load according to the project requirements. According to the actual project, the train uniaxial load is determined to be 160kN~200kN, and the tunnel dynamic wind pressure is 100Pa~160

[0075] Pa. From steps 1 and 4, it can be determined that the train load in this test is 1.6 kN to 2.0

[0076] kN.

[0077] 5) Calculate the current value based on the train uniaxial load determined in step 4 and the correlation between load and current. The relationship between train load and current is: 车

[0078] =Σ'S*I*a 车 , where F 车 is the train load size; Σ' is the train coefficient, which is 1.32;

[0079] S 车 is the magnetized area of ​​the train core, 144 cm 2 ;I 车 is the train current; a 车 is the ratio of the number of turns of the train coil to 2500, which is 2. Based on the train uniaxial load determined in step 4, the current is determined to be 4.21A to 5.26A.

[0080] 6) The current value is calculated based on the dynamic wind pressure of the tunnel determined in step 4 and the correlation between wind pressure and current. The relationship between wind pressure and current is: 风 =ΣS*I*a 风 ;

[0081] Where F 风 is the wind pressure load; Σ is the wind pressure coefficient, which is taken as 1.32; S 风 is the magnetized area of ​​the wind pressure iron core, take 144cm 2 ;I 风 is the wind pressure current; a 风 is the ratio of the number of turns of the wind pressure coil to 2500, which is 0.2. Based on the tunnel dynamic wind pressure determined in step 4, the current is determined to be 0.062A to 0.102A.

[0082] 7) Install the side panels and top panel of the device box. Fix the device box frame 1-1 on the horizontal ground, fix the removable panels 1-3 and 1-4 on both sides of the device box frame 1-1 with eight sets of fixing bolts 1-7 and 1-8, and then fix the top panel 1-2 to the device box with eight sets of fixing bolts 1-5.

[0083] 8) Fill the soil layer below the bottom of the segment in the device box in layers, and bury the corresponding sensors in the corresponding soil layers. Open the removable side panel 1-2 on the left side of the device box, adopt the layered filling mode, first lay 0.3m thick sand 2-5 at the bottom of the device box, and then lay 0.2m thick silty clay 2-4 and compact it in layers. In the process of laying the soil layer, the pressure box 4-1 and the settlement mark 4-2 are buried simultaneously. The vertical spacing of the sensors is not more than 0.4m, and there is at least one group in each layer. In this embodiment, five groups are arranged in both the length and width directions of the device box. 9) Assemble the annular armature and install it on the inner wall of the segment. Fix the magnetic telescopic rod 6-2 to the left side of the notch in the annular armature 6-1, and after the rotating shaft 6-4 is connected to the right side of the notch in the annular armature 6-1, install the armature fixing plate 6-3 on the rotating shaft 6-4 to complete the assembly of the annular armature.

[0084] 10) Install the cylindrical armature on the inner wall of the tube segment. Connect the cylindrical armature 10-1 to the inner wall of the tube segment through the fixing bolts 10-2 and the L-shaped fixing plate 10-3. The assembled cylindrical armatures are alternately installed between the annular armatures, forming a cross arrangement of the annular armature and the cylindrical armature.

[0085] 11) Install the infrared distance meter 3-5 and the strain gauges inside and outside the pipe segment. Install the infrared distance meter 3-5 in the grooves on both sides of the pipe segment 3-1.

[0086] The strain gauges 3-2 and 3-3 are glued together. At this point, the assembly of the pipe segment system 3 is completed.

[0087] 12) The segment system 3 is placed in the middle of the device box. Open the right removable side panel 1-4, place the segment system 3 assembled in steps 9, 10, and 11 above the bottom soil layer of the device box, and adjust the position so that it is in the middle.

[0088] 13) Assemble the current test system. Connect five sets of train load ammeters 9-6 and four sets of wind pressure ammeters 9-5 through data transmission line 9-4, connect the ammeters with storage unit 9-1, display unit 9-2, and microprocessor 9-3 through wire 9-7, fix the storage unit, display unit, and microprocessor on the left inner wall of the current test system 9, and connect the ammeters to the slide rail 8-2 through wire 9-7.

[0089] 14) Assemble the train load loading system and install it on the reaction frame 8-1. Assemble the train energized solenoid 11-1 and the train soft iron 11-2 through wires to form the train load loading system 11, and install it on the cylindrical reaction frame through the preset small holes on the reaction frame 8-1.

[0090] 15) Assemble the wind pressure loading system and install it on the reaction frame 8-1. Install the wind pressure soft iron 7-2 into the soft iron shell 7-1, connect one end of the soft iron fixing rod 7-4 to the wind pressure soft iron 7-2, put the wind pressure energized solenoid 7-3 into a protective shell and install it inside the soft iron fixing rod 7-4, and connect the other end of the fixing rod to the slider 7-7 to form the wind pressure loading system 7. Alternately arrange the assembled train load loading system 11 and the wind pressure loading system 7 from right to left, and adjust the tightness of the wind pressure loading system 7 through the telescopic column 7-5 to achieve sliding and fixing in the slide rail 8-2. When arranging, it corresponds one by one to the armature position in step 10, forming a cross arrangement of the train load loading system 11 and the wind pressure loading system 7. At this point, the assembly of the reaction force balance system 8 is completed.

[0091] 16) Install the reaction force balance system in the pipe segment 3-1. Place the reaction force balance system 8 assembled in steps 13, 14, and 15 into the middle of the pipe segment 3-1 along the left side plate direction, and control it to remain horizontal by the lifting rope 8-3. Use the fixing bolts 1-7 and 1-8 to fix the left side plate, and fix the reaction force balance system 8 by twelve sets of reaction frame fixing bolts 1-6.

[0092] 17) Install the retaining system. Install the outer support 5-2 in the outer track 5-1 of the retaining fan 5-5, and install the inner support 5-4 in the inner track 5-3 of the retaining fan at the corresponding position of the reaction force balance system 8. The inner and outer supports form a closed system along the corresponding tracks to isolate the internal loading system from the external soil 2.

[0093] 18) Bury sensors in soil layers 2-4, 2-3, 2-2, and 2-1. According to the thickness of the soil 2 and the location requirements of the test indicators, bury the soil pressure box 4-1 and the settlement mark 4-2 in the soil layer. The burial of the sensors is carried out simultaneously with the filling of the internal soil layers 2-4, 2-3, 2-2, and 2-1. The soil monitoring system 4 is buried in the middle of each layer of soil, with a vertical spacing of no more than 0.4m. After the filling is completed, the top plate 1-1 is closed by eight sets of top fixing bolts 1-4.

[0094] 19) Determine the train load test parameters according to the project requirements. In this embodiment, since the engineering train load is uneven, the single-axle loads of the five-ring train are 1.6 kN, 1.7

[0095] kN, 1.8kN, 1.9kN, 2.0kN. According to step 5, the current required for each train loading system is 4.21A, 4.47A, 4.74A, 5.00A, 5.26A respectively.

[0096] 20) Determine the test parameters of wind pressure according to the project needs. In this embodiment, since the wind pressure of the project is uneven, the wind pressure of the four rings is 100Pa, 120Pa, 140Pa, 160Pa, respectively.

[0097] Pa, according to step 6, the current required for each ring of wind pressure loading system is 0.062A, 0.076A, 0.089A, and 0.102A respectively.

[0098] 21) Train load test: a forward current is passed through the train load loading system 11, and the microprocessor 9-3 of the current test system 9 is adjusted to control the current size of each loop of the train load loading system 11. When the current of each loop reaches the test size of step 19 and remains constant, the corresponding test data is recorded every five minutes. When the data of the test point becomes stable, the test is stopped.

[0099] 22) Wind pressure test: Pass reverse current into the wind pressure loading system 7, and adjust the microprocessor 9-3 of the current testing system 9 to control the current of each ring of the wind pressure loading system 7. When the current of each ring reaches the test value of step 20 and remains constant, record the corresponding test data every five minutes. When the data of the test point becomes stable, stop the test.

[0100] 23) Adjust the test parameters of the train load in step 19 and repeat step 21 to test the train load under different working conditions.

[0101] 24) Adjust the test parameters of the wind pressure load in step 20 and repeat step 22 to achieve wind pressure testing under different working conditions.

[0102] 25) Adjusting the test parameters of the train load in step 19 and the wind pressure load in step 20, and starting steps 23 and 24 at the same time, the test of the combined effect of train load and wind pressure under different working conditions can be realized.

[0103] 26) End the test, clear the soil, and dismantle the device. Turn off the test instrument, first open the top plate 1-1, the removable side plates 1-2 and 1-3 on both sides, then clean the soil 2 above the bottom of the segment system 3, remove the lifting rope 8-3 and the retaining system 5, and remove the reaction balance system 8 and the segment system 3 in order, clean the remaining soil 2, and complete the test.

[0104] The contents described in the embodiments of this specification are merely enumerations of implementation forms of the inventive concept and are for illustrative purposes only. The protection scope of the present invention should not be considered to be limited to the specific forms described in this embodiment, and the protection scope of the present invention also extends to equivalent technical means that can be thought of by ordinary technicians in this field based on the inventive concept.

Claims

1. A testing device for the mechanical performance of a subway tunnel under complex load conditions, characterized in that: The test device includes a device box system, soil, a segment system, a soil monitoring system, a retaining system, an armature fixing system, a reaction force balance system, a current testing system and a loading system. The segment system is located in the device box system, the segment system is connected to the armature fixing system, the cavity of the device box system outside the segment system is filled with soil, a soil monitoring system is provided in the soil area, the reaction force balance system is located inside the segment system, and both ends are fixed to both sides of the device box by bolts, the reaction force balance system is connected to the segment system through the retaining system, the current testing system is installed inside the reaction force balance system, both sides of the reaction force balance system are provided with liftable ropes, and the reaction force balance system is connected to the loading system; The device box system includes a device box frame, a top plate, a left detachable plate, a right detachable plate, a top plate fixing bolt, a reaction frame fixing bolt, and a detachable plate fixing bolt. The top plate is installed on the top of the device box through the top plate fixing bolts, and the left detachable plate and the right detachable plate are installed on both sides of the device box through the detachable plate fixing bolts. The reaction frame fixing bolts are used to connect the cylindrical reaction frame and the device box. The pipe segment system includes a pipe segment, an external strain gauge of the pipe segment, an internal strain gauge of the pipe segment, a slot, and an infrared rangefinder. The external strain gauge of the pipe segment is arranged on the outer wall of the pipe segment, the internal strain gauge of the pipe segment is arranged on the inner wall of the pipe segment, the inner wall of the pipe segment is provided with four groups of slots, and the infrared rangefinder is located on both sides of the pipe segment; The soil monitoring system includes an earth pressure box and a settlement mark, wherein the earth pressure box and the settlement mark are located in the middle of each layer of soil; The armature fixing system includes an annular armature fixing system and a cylindrical armature fixing system. The annular armature fixing system further includes an annular armature, a magnetic telescopic rod, an armature fixing plate, and a rotating shaft. A groove is provided inside the annular armature. The magnetic telescopic rod is fixed to one side of the groove. The other side of the groove is connected to the armature fixing plate through a rotating shaft. The armature fixing plate is in contact with the magnetic telescopic rod through magnetic force. The annular armature fixing system is fixed to the slot on the inner wall of the pipe segment. The cylindrical armature fixing system further includes a cylindrical armature, a cylindrical armature fixing bolt, and an L-shaped fixing plate. The cylindrical armature is installed on the inner wall of the bottom of the pipe segment through the L-shaped fixing plate and the fixing bolt. The reaction force balancing system includes a cylindrical reaction force frame and a slide rail. The cylindrical reaction force frame is provided with four sets of slide rails for installing the wind pressure loading system. The lifting rope is provided on both sides of the cylindrical reaction force frame, and the other end thereof is connected to the top of the device box frame. The loading system includes a wind pressure loading system and a train load loading system. The wind pressure loading system includes a wind pressure soft iron shell, a wind pressure soft iron, a wind pressure energized solenoid, a soft iron fixing rod, a telescopic column, a wind pressure energized solenoid protective shell and a slider. The wind pressure soft iron is installed in the soft iron shell, one end of the soft iron fixing rod is connected to the wind pressure soft iron, the wind pressure energized solenoid is sleeved with a protective shell and installed inside the soft iron fixing rod, and the other end of the fixing rod is connected to the slider to form a wind pressure loading system. The wind pressure loading system adjusts the tightness through the telescopic column to achieve sliding and fixing in the slide rail; the train load loading system includes a train energized solenoid and a train soft iron. The train soft iron is installed at the bottom of the reaction force balance system through the train energized solenoid, at a position corresponding to the columnar armature; The retaining system comprises a retaining fan, an outer track of the retaining fan, an outer support of the retaining fan, an inner track of the retaining fan and an inner support of the retaining fan. The outer support of the retaining fan is installed in the outer track. The inner support of the retaining fan is installed in the inner track of the retaining fan at a corresponding position of the reaction force balance system. A closed system is formed along the corresponding track by the inner and outer supports to isolate the internal loading system from the external soil. The current testing system includes a storage unit, a display unit, a microprocessor, a data transmission line, a wind pressure ammeter, a train load ammeter and a wire. The train load ammeter and the wind pressure ammeter are connected in sequence through the data transmission line. The ammeter is connected to the storage unit, the display unit and the microprocessor through a wire. The storage unit, the display unit and the microprocessor are fixed on the left inner wall of the current testing system, and the ammeter is connected to the slide rail through a wire.

2. A method for testing the mechanical performance of a subway tunnel under complex load conditions as claimed in claim 1, characterized in that: The method comprises the following steps: Step 1, determining the similarity ratio of the test device according to the relationship between the tunnel diameter, tunnel thickness, soil layer thickness, and device box size; Step 2: Determine the size and material of the segment system and reaction balance system to be used according to the characteristics of the segment on site; Step 3: Determine the soil layer required for the test based on the geological survey report and the buried depth of the tunnel, and determine the thickness and distribution of the soil layer; Step 4: Determine the train load and wind pressure load according to the engineering requirements, and obtain the correlation between load and current through calculation; Step 5, installing a test device for the stress performance of a subway tunnel under complex load conditions, the test device comprising a device box system, soil, a segment system, a soil monitoring system, a retaining system, an armature fixing system, a reaction force balance system, a current test system and a loading system, the segment system is located in the device box system, the segment system is connected to the armature fixing system, the cavity of the device box system outside the segment system is filled with soil, a soil monitoring system is provided in the soil area, the reaction force balance system is located inside the segment system, and both ends are fixed to both sides of the device box by bolts, the reaction force balance system is connected to the segment system through the retaining system, the current test system is installed inside the reaction force balance system, both sides of the reaction force balance system are provided with liftable ropes, and the reaction force balance system is connected to the loading system; Step 6: Determine the current parameters of wind pressure and train load, and calculate the train load current and wind pressure current values ​​based on the train load, wind pressure and related equations determined in step 4; Step 7, start the test and collect data: before the test starts, record the initial data of each sensor, pass a forward current into the train load system, adjust the microprocessor of the current test system to control the current size of each loop of the train load system, when the current of each loop reaches the test size of step 6 and remains constant, record the corresponding test data at every set time period, and stop the test when the data of the test point reaches stability; Step 8, wind pressure test, reverse current is introduced into the wind pressure loading system, and the microprocessor of the current test system is adjusted to control the current size of each ring of the wind pressure loading system. When the current of each ring reaches the test size of step 6 and remains constant, the corresponding test data is recorded at every set time period. When the data of the test point reaches stability, the test is stopped; Step 9, adjust the test parameters of the train load in step 6, repeat step 7, and implement the test of the train load under different working conditions; Step 10, adjusting the test parameters of the wind pressure load in step 6, and repeating step 8 to implement the wind pressure test under different working conditions; Step 11, adjusting the test parameters of the train load and wind pressure load in step 6, and starting steps 7 and 8 at the same time, to achieve the test of the combined effect of train load and wind pressure under different working conditions; Step 12: End the test, remove the soil, and dismantle the device.