A connection structure and connection method between foundation and column

By using connection channels, steel sleeves and locking devices in the connection structure between the foundation and the columns, quick connection is achieved and performance is enhanced through grouting, which solves the problem of time-consuming and labor-intensive construction in the existing technology and improves connection efficiency and durability.

CN115354755BActive Publication Date: 2024-10-18GUANGZHOU ELECTRIC POWER DESIGN INST
View PDF 12 Cites 0 Cited by

Patent Information

Application Number
CN202210954732.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-08-10
Publication Date
2024-10-18
Estimated Expiration
2042-08-10

AI Technical Summary

Technical Problem

The construction process of the existing foundation and column connection structure is time-consuming and laborious, and there is a lack of efficient connection methods.

Method used

A foundation and column connection structure including a connecting channel, a steel sleeve and a locking device is adopted. The steel sleeve is inserted into the connecting channel and the locking device is used to compress the steel sleeve to achieve quick connection. The grouting channel is combined to enhance the connection performance.

Benefits of technology

It achieves a quick connection between the foundation and the column, reduces construction time and labor intensity, and enhances the connection performance and durability through grouting.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115354755B_ABST
    Figure CN115354755B_ABST
Patent Text Reader

Abstract

The present invention is used in the field of building construction, and particularly relates to a connection structure and a connection method between a foundation and a column. The connection structure between the foundation and the column is provided with a connection channel on the foundation, and the connection channel forms an opening on one side of the foundation. A steel sleeve is provided in the connection channel, and the steel sleeve is higher than the connection channel. The column is inserted into the steel sleeve, and a locking device is provided on the part of the steel sleeve higher than the connection channel, and the locking device presses the steel sleeve against the outer wall of the column. This connection structure can realize a quick connection between the foundation and the column, and the connection process is more time-saving and labor-saving. The connection method between the foundation and the column comprises the following steps: prefabricating the foundation and the column; placing the steel sleeve in the connection channel; putting the locking ring on the column; aligning the column with the connection channel, and inserting the column into the steel sleeve; the steel sleeve expands and squeezes against the inner wall of the connection channel under the action of the column; placing a pressing plate between the locking ring and the steel sleeve, tightening the locking bolt on the locking ring, and pressing the part of the steel sleeve exposed outside the connection channel against the column through the pressing plate.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention is used in the field of building construction, and particularly relates to a connection structure and a connection method between a foundation and a column. Background Art

[0002] The existing structure for connecting the foundation and the column usually involves installing ribs between the foundation and the column, connecting them through the ribs, and then pouring concrete. This connection structure is relatively time-consuming and labor-intensive during construction. Summary of the invention

[0003] The purpose of the present invention is to solve at least one of the technical problems existing in the prior art, and to provide a connection structure and a connection method between a foundation and a column, which can quickly connect the foundation and the column, with higher connection efficiency and a more time-saving and labor-saving connection process.

[0004] In the first aspect, the present invention provides a connection structure between a foundation and a column, comprising a foundation and a column, wherein the foundation is provided with a connection channel, the connection channel forms an opening on one side of the foundation, a steel sleeve is provided in the connection channel, the steel sleeve is higher than the connection channel, the column is inserted into the steel sleeve, and a locking device is provided on the part of the steel sleeve higher than the connection channel, the locking device presses the steel sleeve against the outer wall of the column.

[0005] The connection structure between the foundation and the column in the embodiment of the present invention has at least the following beneficial effects: during the connection process, the column is lifted, the steel sleeve is placed in the connecting channel, and then the column is inserted into the steel sleeve so that the steel sleeve is pressed between the column and the connecting channel, and then the locking device is locked on the steel sleeve so that the locking device presses the steel sleeve on the column. This connection structure can realize a quick connection between the foundation and the column, and the connection process is more time-saving and labor-saving.

[0006] According to the connection structure between the foundation and the column in some other embodiments of the present invention, the diameter of the connection channel gradually increases along the depth direction of the connection channel.

[0007] According to the connection structure of the foundation and the column in some other embodiments of the present invention, the steel sleeve is provided with a contraction segment and an expansion segment, and the diameter of the expansion segment on the steel sleeve gradually decreases along the direction from the contraction segment to the expansion segment.

[0008] According to the connection structure of the foundation and the column in some other embodiments of the present invention, a plurality of contraction grooves are provided on the contraction segment of the steel sleeve, the contraction grooves extend along the axial direction of the steel sleeve, and the contraction grooves are arranged at intervals along the circumference of the steel sleeve.

[0009] According to the connection structure of the foundation and the column in some other embodiments of the present invention, a plurality of opening grooves are provided on the opening segment of the steel sleeve, the opening grooves extend along the axial direction of the steel sleeve, and the opening grooves are arranged at intervals along the circumference of the steel sleeve.

[0010] According to some other embodiments of the connection structure between the foundation and the column of the present invention, the locking device includes a locking ring, a locking bolt and a pressure plate, the locking ring is sleeved on the contraction segment of the steel sleeve, the pressure plate is arranged between the locking ring and the steel sleeve, and the locking bolt is installed on the locking ring and pressed against the pressure plate.

[0011] According to some other embodiments of the connection structure between the foundation and the column of the present invention, a grouting channel is provided inside the foundation, one end of the grouting channel extends to communicate with the connecting channel, and the other end of the grouting channel extends to the side wall of the foundation and forms a grouting port on the side wall of the foundation.

[0012] In a second aspect, the present invention further provides a method for connecting a foundation and a column, comprising the following steps:

[0013] Prefabricate foundations with connecting passages and columns with centering end sections;

[0014] Place the steel sleeve into the connecting channel;

[0015] Put the locking ring on the column and pre-fix it on the column;

[0016] Lift the column and align the centering end of the column with the steel sleeve. The column is inserted into the steel sleeve under its own weight.

[0017] The steel sleeve expands under the action of the pillar and is pressed against the inner wall of the connecting channel;

[0018] A pressure plate is placed between the locking ring and the steel sleeve, and the locking bolts on the locking ring are tightened so that the locking bolts press the portion of the steel sleeve exposed outside the connecting channel onto the column through the pressure plate.

[0019] According to some other embodiments of the method for connecting a foundation and a column of the present invention, grouting is injected into the connecting channel through the grouting channel, so that the slurry penetrates into the gaps between the connecting channel, the steel sleeve and the column.

[0020] According to the foundation and column connection method of other embodiments of the present invention, the exposed interfaces between the foundation and the column are sealed with waterproof mortar. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] The present invention will be further described below in conjunction with the accompanying drawings:

[0022] Figure 1 is a top view of an embodiment of the present invention;

[0023] Figure 2 yes Figure 1 Middle AA section view;

[0024] Figure 3 yes Figure 1 A schematic diagram of the structure of the basis in the illustrated embodiment;

[0025] Figure 4 yes Figure 1 A schematic diagram of the structure of the column in the embodiment shown;

[0026] Figure 5 yes Figure 1 A schematic diagram of the structure of the locking device in the illustrated embodiment;

[0027] Figure 6 yes Figure 1 A schematic structural diagram of a locking ring of a locking device in the illustrated embodiment;

[0028] Figure 7 yes Figure 6 Middle BB section view;

[0029] Figure 8 yes Figure 1 A top view of the steel sleeve of the illustrated embodiment;

[0030] Fig. 9 yes Figure 8 Middle CC section view;

[0031] Fig.10 is a top view of another embodiment of the present invention;

[0032] Fig.11 yes Fig.10 Schematic diagram of the locking device in the illustrated embodiment. DETAILED DESCRIPTION

[0033] This section will describe in detail the specific embodiments of the present invention. The preferred embodiments of the present invention are shown in the accompanying drawings. The purpose of the accompanying drawings is to supplement the description of the text part of the specification with graphics, so that people can intuitively and vividly understand each technical feature and the overall technical solution of the present invention, but it cannot be understood as a limitation on the scope of protection of the present invention.

[0034] In the present invention, if directions (up, down, left, right, front and back) are described, it is only for the convenience of describing the technical solution of the present invention, and does not indicate or imply that the technical features referred to must have a specific orientation, be constructed and operate in a specific orientation. Therefore, it cannot be understood as a limitation of the present invention.

[0035] In the present invention, "several" means one or more, "multiple" means more than two, "greater than", "less than", "exceed" and the like are understood to exclude the number itself; "above", "below", "within" and the like are understood to include the number itself. In the description of the present invention, if there is a description of "first" or "second", it is only used for the purpose of distinguishing technical features, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features or implicitly indicating the order of the indicated technical features.

[0036] In the present invention, unless otherwise clearly defined, the words "set", "install", "connect" and the like should be understood in a broad sense, for example, they can be directly connected or indirectly connected through an intermediate medium; they can be fixedly connected or detachably connected or integrally formed; they can be mechanically connected or electrically connected or able to communicate with each other; they can be the internal connection of two elements or the interaction relationship between two elements. Those skilled in the art can reasonably determine the specific meanings of the above words in the present invention in combination with the specific content of the technical solution.

[0037] The existing structure for connecting the foundation and the column usually involves installing ribs between the foundation and the column, connecting them through the ribs, and then pouring concrete. This connection structure is relatively time-consuming and labor-intensive during construction.

[0038] In order to solve the above technical problems, the present invention provides a connection structure between a foundation and a column.

[0039] See also Figures 1 to 11 The connection structure between the foundation and the column includes a foundation 100 and a column 200. The foundation 100 is provided with a connecting channel 110. The connecting channel 110 forms an opening 111 on one side of the foundation 100. A steel sleeve 300 is provided in the connecting channel 110. The steel sleeve 300 is higher than the connecting channel 110. The column 200 is inserted into the steel sleeve 300. A locking device 400 is provided on the part of the steel sleeve 300 higher than the connecting channel 110. The locking device 400 presses the steel sleeve 300 against the outer wall of the column 200.

[0040] During the connection process, the column 200 is lifted, the steel sleeve 300 is placed in the connecting channel 110, and then the column 200 is inserted into the steel sleeve 300, so that the steel sleeve 300 is pressed between the column 200 and the connecting channel 110, and then the locking device 400 is locked on the steel sleeve 300, so that the locking device 400 presses the steel sleeve 300 on the column 200. This connection structure can realize a quick connection between the foundation 100 and the column 200, and the connection process is more time-saving and labor-saving.

[0041] The foundation 100 is prefabricated with reinforced concrete of grade C40 or above, and its overall structure is a trapezoidal structure.

[0042] The connecting channel 110 is disposed in the middle of the foundation 100 . The connecting channel 110 forms an opening 111 at the top of the foundation 100 . The steel sleeve 300 is placed into the connecting channel 110 through the opening 111 at the top of the foundation 100 .

[0043] The specific structure of the connecting channel 110 can be a circular channel or a polygonal channel. In order to adapt to the connecting channel 110, the specific structure of the steel sleeve 300 can be a circular cylindrical structure or a polygonal cylindrical structure, such as Figure 1 In the embodiment shown, the column 200 is a cylindrical structure, the corresponding connecting channel 110 is a circular channel, and the steel sleeve 300 is a circular cylindrical structure. Fig.10 In the illustrated embodiment, the column 200 is a rectangular structure, the corresponding connecting passage 110 is a rectangular passage, and the steel sleeve 300 is a rectangular cylindrical structure.

[0044] The column 200 is prefabricated with reinforced concrete of grade C40 or above. In order to facilitate the accurate insertion of the column 200 into the steel sleeve 300, see Figure 4 In one embodiment, a centering closing section 210 is provided at one end of the column 200 for inserting the steel sleeve 300. Specifically, the centering closing section 210 is a chamfered structure provided at the lower end of the column 200.

[0045] In some embodiments, along the depth direction of the connecting channel 110 , the diameter of the connecting channel 110 gradually increases.

[0046] Specifically, the deeper the connecting channel 110 is, the larger its diameter is, so the connecting channel 110 in the foundation 100 is a tapered channel that is smaller at the top and larger at the bottom.

[0047] In order to facilitate the adaptation of the steel sleeve 300 to the connecting channel 110, in some embodiments, a contraction segment 310 and an expansion segment 320 are provided on the steel sleeve 300, and the diameter of the expansion segment 320 on the steel sleeve 300 gradually decreases along the direction from the contraction segment 310 to the expansion segment 320.

[0048] The contraction segment 310 is provided with a contraction groove 311 , and the expansion segment 320 is provided with an expansion groove 321 . After the steel sleeve 300 is placed in the connecting channel 110 , the expansion segment 320 on the steel sleeve 300 is located inside the connecting channel 110 , and the contraction segment 310 on the steel sleeve 300 is exposed outside the connecting channel 110 .

[0049] Specifically, the upper part of the steel sleeve 300 is a contraction segment 310, and the lower part of the steel sleeve 300 is an opening segment 320. When the steel sleeve 300 is placed in the connecting channel 110, the contraction segment 310 of the upper part of the steel sleeve 300 will be exposed from the top of the foundation 100, and the opening segment 320 of the lower part of the steel sleeve 300 is located inside the connecting channel 110. Along the depth direction of the connecting channel 110, the diameter of the opening segment 320 of the lower part of the steel sleeve 300 gradually decreases. When the column 200 is inserted into the steel sleeve 300, the column 200 The opening segment 320 at the bottom of the steel sleeve 300 will be expanded, and the opening segment 320 fills the gap between the column 200 and the connecting channel 110, making the connection between the column 200 and the connecting channel 110 tighter. Since the contraction segment 310 and the opening segment 320 are both arranged on the steel sleeve 300, when the column 200 expands the bottom of the steel sleeve 300, the contraction segment 310 at the top of the steel sleeve 300 will contract, so that the contraction segment 310 on the steel sleeve 300 shrinks and wraps tightly around the outer wall of the column 200.

[0050] In some embodiments, a plurality of contraction grooves 311 are provided on the contraction segment 310 of the steel sleeve 300, and the contraction grooves 311 extend along the axial direction of the steel sleeve 300, and each contraction groove 311 is arranged at intervals along the circumference of the steel sleeve 300; a plurality of opening grooves 321 are provided on the opening segment 320 of the steel sleeve 300, and the opening grooves 321 extend along the axial direction of the steel sleeve 300, and each opening groove 321 is arranged at intervals along the circumference of the steel sleeve 300.

[0051] Specifically, the opening segment 320 of the steel sleeve 300 is longer than the contraction segment 310, and the upper part of the steel sleeve 300 is provided with a plurality of contraction grooves 311 extending from the side wall of the steel sleeve 300 to the upper edge of the steel sleeve 300, and each contraction groove 311 is arranged at intervals along the circumference of the steel sleeve 300, and the lower part of the steel sleeve 300 is provided with a plurality of opening grooves 321 extending from the side wall of the steel sleeve 300 to the lower edge of the steel sleeve 300, and each opening groove 321 is arranged at intervals along the circumference of the steel sleeve 300. When the column 200 is inserted into the steel sleeve 300, each opening groove 321 will open, and each contraction groove 311 will contract at the same time.

[0052] In some embodiments, the locking device 400 includes a locking ring 410, a locking bolt 420 and a pressure plate 430. The locking ring 410 is sleeved on the contraction segment 310 of the steel sleeve 300, the pressure plate 430 is arranged between the locking ring 410 and the steel sleeve 300, and the locking bolt 420 is installed on the locking ring 410 and pressed against the pressure plate 430.

[0053] Specifically, the locking ring 410 may be an annular structure or a polygonal structure, and its specific structure may be changed accordingly according to the shape of the column 200, such as Figure 1 In the embodiment shown, the locking ring 410 is a circular ring structure. Fig.10In the illustrated embodiment, the locking ring 410 is a rectangular structure.

[0054] A plurality of locking bolts 420 are provided on the locking ring 410, and each locking bolt 420 is arranged circumferentially at intervals on the locking ring 410. After the column 200 is inserted into the steel sleeve 300, a pressure plate 430 is placed between the column 200 and the steel sleeve 300. If the locking ring 410 is an annular structure, the pressure plate 430 is an arc-shaped pressure plate 430. If the locking ring 410 is a polygonal structure, the pressure plate 430 is a flat plate structure. The pressure plate 430 is placed between the steel sleeve 300 and the locking ring 410, and each locking bolt 420 is locked so that the locking bolts 420 press the pressure plate 430 onto the contraction segment 310 of the steel sleeve 300.

[0055] In some embodiments, a grouting channel 120 is provided inside the foundation 100 , one end of the grouting channel 120 extends to the connecting channel 110 , and the other end of the grouting channel 120 extends to the side wall of the foundation 100 and forms a grouting port on the side wall of the foundation 100 .

[0056] Concrete slurry is injected into the connecting channel 110 through the grouting channel 120, so that the gaps between the column 200, the steel sleeve 300 and the connecting channel 110 are filled, thereby further improving the connection performance.

[0057] The present invention also provides a method for connecting a foundation and a column, comprising the following steps:

[0058] Prefabricate a foundation 100 having a connecting passage 110 and a column 200 having a centering closing section 210;

[0059] Put the steel sleeve 300 into the connecting channel 110;

[0060] The locking ring 410 is put on the column 200 and pre-fixed on the column 200;

[0061] Lift the column 200 and align the centering end section 210 of the column 200 with the steel sleeve 300, and insert the column 200 into the steel sleeve 300 under the action of its own weight;

[0062] The steel sleeve 300 expands and is pressed against the inner wall of the connecting channel 110 under the action of the pillar 200;

[0063] A pressing plate 430 is placed between the locking ring 410 and the steel sleeve 300 , and the locking bolts 420 on the locking ring 410 are tightened so that the locking bolts 420 press the portion of the steel sleeve 300 exposed outside the connecting channel 110 onto the column 200 through the pressing plate 430 .

[0064] In some embodiments, grouting is injected into the connecting channel 110 through the grouting channel 120 , so that concrete slurry penetrates into the gaps among the connecting channel 110 , the column 200 , and the steel sleeve 300 .

[0065] During the process of making the foundation 100, a grouting channel 120 is buried inside the foundation 100, and concrete slurry is injected from the grouting port, so that the concrete slurry flows from the grouting channel 120 into the connecting channel 110 and penetrates into the gap between the connecting channel 110, the column 200 and the steel sleeve 300, thereby further improving the connection performance between the column 200 and the foundation 100.

[0066] In some embodiments, the exposed interface between the foundation 100 and the column 200 is sealed with waterproof mortar to play a waterproof and repair-resistant role and improve durability.

[0067] In some embodiments, during the connection and installation process between the foundation 100 and the column 200, lubricant is applied to the inner wall of the steel sleeve 300 to significantly increase the opening force and reduce the installation gap.

[0068] Of course, the present application is not limited to the above-mentioned implementation modes, and technicians familiar with the field may make equivalent modifications or substitutions without violating the spirit of the present invention. These equivalent modifications or substitutions are all included in the scope defined by the claims of the present application.

Claims

1. A connection structure between a foundation and a column, comprising a foundation and a column, characterized in that: The foundation is provided with a connecting channel, the connecting channel forms an opening on one side of the foundation, and the diameter of the connecting channel gradually increases along the depth direction of the connecting channel. A steel sleeve is provided in the connecting channel, the steel sleeve is higher than the connecting channel, the column is inserted into the steel sleeve, and a locking device is provided on the part of the steel sleeve higher than the connecting channel, the locking device presses the steel sleeve against the outer wall of the column, the upper part of the steel sleeve is provided with a contraction segment, the lower part of the steel sleeve is provided with an opening segment, and along the direction from the contraction segment to the opening segment, the The diameter of the expanded segment on the steel sleeve gradually becomes smaller, and a plurality of contraction grooves are provided on the contraction segment of the steel sleeve, and the contraction grooves extend along the axial direction of the steel sleeve, and the contraction grooves are arranged at intervals along the circumference of the steel sleeve. The expanded segment of the steel sleeve is provided with a plurality of expansion grooves, and the expansion grooves extend along the axial direction of the steel sleeve, and the contraction grooves are arranged at intervals along the circumference of the steel sleeve. After the column is inserted into the steel sleeve, the column will expand the expanded segment at the lower part of the steel sleeve, and the expanded segment fills the gap between the column and the connecting channel.

2. The connection structure between the foundation and the column according to claim 1, characterized in that: The locking device includes a locking ring, a locking bolt and a pressure plate. The locking ring is sleeved on the contraction section of the steel sleeve. The pressure plate is arranged between the locking ring and the steel sleeve. The locking bolt is installed on the locking ring and presses against the pressure plate.

3. The connection structure between the foundation and the column according to claim 1, characterized in that: A grouting channel is provided inside the foundation, one end of the grouting channel extends to communicate with the connecting channel, and the other end of the grouting channel extends to the side wall of the foundation and forms a grouting port on the side wall of the foundation.

4. A method for connecting a foundation and a column, characterized in that: The following steps are involved: Prefabricate foundations with connecting passages and columns with centering end sections; Place the steel sleeve into the connecting channel; Put the locking ring on the column and pre-fix it on the column; Lift the column and align the centering end of the column with the steel sleeve. The column is inserted into the steel sleeve under its own weight. The steel sleeve expands under the action of the pillar and is pressed against the inner wall of the connecting channel; A pressure plate is placed between the locking ring and the steel sleeve, and the locking bolts on the locking ring are tightened so that the locking bolts press the portion of the steel sleeve exposed outside the connecting channel onto the column through the pressure plate.

5. The method for connecting a foundation and a column according to claim 4, characterized in that: Grouting is injected into the connecting channel through the grouting channel, so that the slurry penetrates into the gaps between the connecting channel, the steel sleeve and the column.

6. The method for connecting a foundation and a column according to claim 4, characterized in that: The exposed interfaces between the foundation and the columns are sealed with waterproof mortar.

Citation Information

Patent Citations

  • Concrete column high-seismic-resistance fabricated connecting structure

    CN110820546A

  • Anti-corrosion industrial factory building concrete cup opening type prefabricated bearing platform

    CN111764424A

  • Cluster grouting sleeve assembling pier connected with prefabricated bearing platform and construction method

    CN111827093A

  • Connecting structure for prefabricated part, prefabricated part and prefabricated pile combination

    CN112726584A

  • Plastic hinge-replaceable self-resetting prefabricated assembled concrete-filled steel tube pier node connecting structure and method thereof

    CN113585049A