A support device suitable for asymmetric large deformation tunnel
By designing the arch frame structure and anchor reinforcement device, combining I-steel and reinforcement web, the problem of instability of the support structure of asymmetric large-deformed tunnel is solved, and higher support stability and structural strength are achieved.
Patent Information
- Application Number
- CN202210872173.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-07-22
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2042-07-22
AI Technical Summary
During the construction process, the support structure is unstable due to the concentration of stresses and uneven stresses of the soft and hard interfaces, and there is a lack of suitable complete sets of equipment for rapid and stable installation.
A support device including an arch structure, multiple sets of anchor rods and connecting fixing mechanisms was designed. The stability of the support structure is enhanced through anchor rod reinforcement and arch structure connection, and improved by I-steel and reinforcement web. Support strength.
It improves the support stability of the asymmetric large deformation tunnel, prevents the anchor position from squirting, enhances the stability of the overall support structure, and is suitable for areas with concentrated stresses at the soft and hard interface.
Smart Images

Figure CN115419432B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of tunnel engineering construction, and in particular to a supporting device suitable for an asymmetric large deformation tunnel. Background Art
[0002] During the tunnel excavation process, due to stress redistribution, certain deformation will occur. The relevant specifications also stipulate different reserved deformation amounts for the surrounding rock to accommodate these deformations. The large deformation of the tunnel is relative to the conventional deformation. Generally speaking, when the deformation of the surrounding rock exceeds the normal prescribed amount by more than 1.5 times, the surrounding rock deformation is considered to be large deformation.
[0003] High-stress soft rock tunnels will have a certain degree of large deformation problems. For asymmetric tunnels with uneven hardness and softness, stress concentration will occur at the intersection of the soft-hard interface and the tunnel support structure, leading to premature damage to this part. Due to uneven force, the tunnel will slide along the soft-hard interface, which is not conducive to the force of the tunnel support structure. At present, there is no corresponding complete set of equipment that can more stably, conveniently and quickly install tunnel support, and the low support strength is not conducive to tunnel support. In order to solve the above problems, a support device suitable for asymmetric large deformation tunnels is designed. Summary of the invention
[0004] The purpose of the present invention is to solve the above problems and provide a support device suitable for an asymmetric large deformation tunnel.
[0005] In order to achieve the above object, the present invention provides the following technical solutions:
[0006] A support device suitable for an asymmetric large deformation tunnel of the present invention comprises:
[0007] An arch structure, wherein the arch structure is arranged corresponding to the shape of the tunnel top, the arch structure is arranged in close contact with the tunnel top, and the arch structure comprises at least two sets of arch bodies arranged parallel to each other and a reinforcing connector for reinforcing the connection between the two sets of arch bodies;
[0008] Anchor rods, the number of which is multiple, and the anchor rods are driven into the rock mass at the top of the tunnel to improve the stability of the rock mass at the top of the tunnel. After the multiple groups of anchor rods are driven into the rock mass at the top of the tunnel, one end exposed outside the rock mass is connected to the arch structure;
[0009] And a connecting and fixing mechanism, which is a plurality of groups of the same structure and is arranged one-to-one with the plurality of groups of anchor rods, the connecting and fixing mechanism is detachably arranged on the arch structure, and the end of the anchor rod exposed outside the rock body after being driven into the rock mass at the top of the tunnel is connected to the arch structure through the connecting and fixing mechanism.
[0010] Preferably, the arch body is arranged to correspond to the shape of the tunnel top, and the arch body is arranged to fit the tunnel top.
[0011] Preferably, the reinforcement connector comprises:
[0012] I-beams, the I-beams are connected between the two groups of the arch frame bodies to connect the two groups of the arch frame bodies that are parallel to each other, and multiple groups of the I-beams are arranged between the two groups of the arch frame bodies;
[0013] A support strength reinforcement structure, wherein the support strength reinforcement structure is arranged on the I-beam, and the support strength of the I-beam on the arch frame body is enhanced by the support strength reinforcement structure;
[0014] And an installation connection mechanism, both ends of the I-beam are connected to the arch frame body through the installation connection mechanism.
[0015] Preferably, the support strength enhancement structure comprises:
[0016] The reinforcing web is connected between two cross beams on the I-beam and is arranged parallel to the longitudinal beam connecting the two cross beams on the I-beam.
[0017] Preferably, the mounting connection mechanism comprises:
[0018] A first connecting mechanism, which is arranged on the end surface of the I-beam and fixedly connected between the arch frame body so as to connect the arch frame body and the I-beam;
[0019] The second connecting mechanism is arranged on the arch frame body and is connected to the I-beam through the connection between two groups of cross beams parallel to each other on the I-beam.
[0020] Preferably, the first connecting mechanism comprises:
[0021] An end surface assembly plate, the end surface assembly plate is fixedly connected to the end surface of the I-beam;
[0022] A first assembly hole, the first assembly hole is opened on the end surface assembly plate, and a plurality of the first assembly holes are arranged on the end surface assembly plate;
[0023] A second assembly hole, the second assembly hole is opened on the arch frame body, and the second assembly hole is arranged in a one-to-one correspondence with the first assembly hole;
[0024] and a first fixing bolt, wherein the first fixing bolt is penetrated through the first assembly hole and the second assembly hole to fix the end surface assembly plate and the arch frame body in connection.
[0025] Preferably, the second connecting mechanism comprises:
[0026] A support and limit plate, wherein the support and limit plate is connected to the arch frame body, and the support and limit plate is composed of two groups with the same structure and symmetrically distributed on the upper and lower sides of the I-beam to correspond one to one with the two groups of cross beams parallel to each other of the I-beam. The support and limit plate and the two groups of cross beams parallel to each other of the I-beam are arranged parallel to each other, and a plurality of third assembly holes are opened on the support and limit plate;
[0027] A fourth assembly hole, wherein the fourth assembly hole is provided on the crossbeam of the I-beam, and the number of the fourth assembly holes is plural and the fourth assembly holes are arranged in a one-to-one correspondence with the plurality of the third assembly holes;
[0028] and a second fixing bolt, wherein the second fixing bolt is passed through the third assembly hole and the fourth assembly hole to fix the crossbeam of the I-beam and the corresponding support and limiting plate.
[0029] Preferably, the connection and fixing mechanism comprises:
[0030] An assembly support plate, wherein the assembly support plate and the arch frame body are arranged parallel to each other;
[0031] An anchor rod end connection mechanism, the anchor rod end connection mechanism is arranged on the assembly support plate to fix the end of the anchor rod exposed outside the rock body after being driven into the rock mass at the top of the tunnel and connected to the assembly support plate;
[0032] And a mounting connection mechanism, which is arranged on the side surface of the assembly support plate opposite to the side where the anchor rod end connection mechanism is located, and the assembly support plate is fixedly connected to the arch frame body through the mounting connection mechanism.
[0033] Preferably, the anchor rod end connection mechanism comprises:
[0034] A straight cylindrical sleeve, the straight cylindrical sleeve is connected to the assembly support plate and can accommodate the anchor rod extending therein;
[0035] An arc-shaped pressing plate, the arc-shaped pressing plate is arranged in the straight-cylindrical sleeve, and both ends of the arc-shaped pressing plate extending out of the straight-cylindrical sleeve are provided with limiting rods to prevent the arc-shaped pressing plate from being separated from the straight-cylindrical sleeve;
[0036] a first threaded hole, the first threaded hole being provided on a side surface of the straight cylindrical sleeve;
[0037] And a threaded rod, the threaded rod is inserted into the first threaded hole and threadedly matched with the first threaded hole, and the threaded match between the threaded rod and the first threaded hole is used to push the arc-shaped pressure plate to press on the anchor rod extending into the straight cylindrical sleeve.
[0038] Preferably, the mounting connection mechanism includes:
[0039] A fifth assembly hole, the fifth assembly hole is opened on the assembly support plate, and the number of the fifth assembly holes is multiple;
[0040] A sixth assembly hole, the sixth assembly hole is opened on the arch frame body, the number of the sixth assembly holes is multiple and they are arranged one-to-one correspondingly with the fifth assembly holes;
[0041] and a third fixing bolt, wherein the third fixing bolt is inserted into the fifth assembly hole and the sixth assembly hole to fix the assembly support plate and the arch frame body in connection.
[0042] In the above technical solution, the present invention provides a support device suitable for an asymmetric large deformation tunnel, which has the following beneficial effects:
[0043] The device utilizes asymmetric anchor rods for reinforcement, and connects the anchor rods to the arch structure through a connecting and fixing mechanism. Under the connection of the arch structure, multiple anchor rods driven into the rock mass are connected to each other, making it less likely for position shifting, thereby improving the support stability of asymmetric large deformation tunnels. At the same time, combined with the improvement of the support strength of the reinforced connector in the arch structure, the overall stability of the support structure can be enhanced. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present invention. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.
[0045] Figure 1 A structural schematic diagram of a support device applicable to an asymmetric large deformation tunnel provided by an embodiment of the present invention;
[0046] Figure 2 A top view of an arch frame body of a support device suitable for an asymmetric large deformation tunnel provided by an embodiment of the present invention;
[0047] Figure 3 A schematic structural diagram of a reinforcement connector of a support device applicable to an asymmetric large deformation tunnel provided by an embodiment of the present invention;
[0048] Figure 4A schematic diagram of the structure of a connection and fixing mechanism of a support device applicable to an asymmetric large deformation tunnel provided by an embodiment of the present invention;
[0049] Figure 5 A support device suitable for an asymmetric large deformation tunnel provided in an embodiment of the present invention Figure 1 A partial enlarged view of the .
[0050] Description of reference numerals:
[0051] 1. Arch frame; 2. Anchor rod; 3. I-beam; 4. Reinforced web; 5. End assembly plate; 6. First assembly hole; 7. Second assembly hole; 8. First fixing bolt; 9. Support limit plate; 10. Third assembly hole; 11. Fourth assembly hole; 12. Second fixing bolt; 13. Assembly support plate; 14. Straight sleeve; 15. Arc pressure plate; 16. Limit rod; 17. First threaded hole; 18. Threaded rod; 19. Fifth assembly hole; 20. Sixth assembly hole; 21. Third fixing bolt. DETAILED DESCRIPTION
[0052] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention will be further described in detail below with reference to the accompanying drawings.
[0053] See also Figure 1-5 , a support device suitable for an asymmetric large deformation tunnel, comprising:
[0054] The arch frame structure is arranged corresponding to the shape of the tunnel top, and the arch frame structure is arranged in close contact with the tunnel top. The arch frame structure at least comprises two sets of arch frame bodies 1 arranged parallel to each other and a reinforcing connector for reinforcing the connection between the two sets of arch frame bodies 1; that is, the two sets of arch frame bodies 1 are connected and supported to each other by the reinforcing connector and the two sets of arch frame bodies 1 are kept parallel to each other;
[0055] Anchor rods 2, the number of anchor rods is multiple, and the anchor rods 2 are driven into the rock mass at the top of the tunnel to improve the stability of the rock mass at the top of the tunnel. After the multiple groups of anchor rods 2 are driven into the rock mass at the top of the tunnel, the ends exposed outside the rock mass are connected to the arch structure;
[0056] And a connecting and fixing mechanism, which is a plurality of groups of the same structure and is arranged one-to-one with the plurality of groups of anchor rods 2. The connecting and fixing mechanism is detachably arranged on the arch structure. After the anchor rods 2 are driven into the rock mass at the top of the tunnel, the end exposed outside the rock mass is connected to the arch structure through the connecting and fixing mechanism.
[0057] In summary, the device utilizes the driven asymmetric anchor rod 2 for reinforcement, and connects the anchor rod 2 to the arch structure through a connecting and fixing mechanism. Under the connection of the arch structure, multiple anchor rods 2 driven into the rock mass are connected to each other, making it less likely for position shifting, thereby improving the support stability of the asymmetric large deformation tunnel. At the same time, combined with the improvement of the supporting strength of the reinforced connector in the arch structure, the overall stability of the support structure can be enhanced.
[0058] In another embodiment of the anchor rod 2, the surrounding rock is reinforced by asymmetric anchor rods, and long anchor rods are driven into the softer surrounding rock, and short anchor rods are driven into the harder surrounding rock. The length L is 1D, the circumferential spacing is 1m, and the longitudinal spacing is 1m; the short anchor rods are driven into the harder surrounding rock, the length is 0.5D, the circumferential spacing is 1.5m, and the longitudinal spacing is 1m. The problem of asymmetric large deformation of the tunnel caused by uneven softness and hardness of the surrounding rock can be well controlled.
[0059] Furthermore, the arch frame body 1 is arranged to correspond to the shape of the tunnel top, and the arch frame body 1 is arranged to fit the tunnel top, and then can connect with the end of multiple groups of anchor rods 2 that are exposed outside the rock body after being driven into the rock mass at the top of the tunnel.
[0060] Further, the reinforced connector includes:
[0061] I-beams 3, the I-beams 3 are connected between the two sets of arch frame bodies 1 to connect the two sets of arch frame bodies 1 that are parallel to each other, and multiple sets of I-beams 3 are arranged between the two sets of arch frame bodies 1 to more stably support the two sets of arch frame bodies 1 that are parallel to each other;
[0062] A support strength reinforcement structure, which is arranged on the I-beam 3, and enhances the support strength of the I-beam 3 on the arch frame body 1;
[0063] And an installation connection mechanism, both ends of the I-beam 3 are connected to the arch frame body 1 through the installation connection mechanism.
[0064] Furthermore, the support strength reinforcement structure includes:
[0065] The reinforcing web 4 is connected between the two cross beams on the I-beam 3 and is arranged parallel to the longitudinal beam connecting the two cross beams on the I-beam 3. By adding the reinforcing web 4, the two cross beams on the I-beam 3 are not only supported by the longitudinal beam, which further improves the support strength of the I-beam 3, and then improves the stability of the support of the two sets of arch frame bodies 1 parallel to each other.
[0066] Further, the installation connection mechanism includes:
[0067] A first connecting mechanism, which is arranged on the end surface of the I-beam 3 and is fixedly connected between the arch frame body so as to connect the arch frame body 1 and the I-beam 3;
[0068] The second connecting mechanism is arranged on the arch frame body 1 and is connected to the I-beam 3 by connecting two groups of cross beams parallel to each other on the I-beam 3 to connect the arch frame body 1 and the I-beam 3.
[0069] Further, the first connecting mechanism includes:
[0070] The end surface mounting plate 5 is fixedly connected to the end surface of the I-beam 3 ; that is, the side surface of the end surface mounting plate 5 is fixedly connected to the cross beam and the longitudinal beam on the end surface of the I-beam 3 .
[0071] A first assembly hole 6, the first assembly hole 6 is opened on the end surface assembly plate 5, and a plurality of first assembly holes 6 are arranged on the end surface assembly plate 5;
[0072] A second assembly hole 7, which is provided on the arch frame body 1, and the second assembly hole 7 is arranged in a one-to-one correspondence with the first assembly hole 6;
[0073] And the first fixing bolt 8 is passed through the first assembly hole 6 and the second assembly hole 7 to fix the end surface assembly plate 5 and the arch frame body 1. That is, through the fastening connection of the first fixing bolt 8, the end surface assembly plate 5 and the arch frame body 1 are fixedly connected.
[0074] Further, the second connecting mechanism includes:
[0075] Support limit plates 9, the support limit plates 9 are connected to the arch frame body 1, the support limit plates 9 are two groups of the same structure and are symmetrically distributed on the upper and lower sides of the I-beam 3 to correspond to the two groups of cross beams parallel to each other of the I-beam 3 one by one, the support limit plates 9 and the two groups of cross beams parallel to each other of the I-beam 3 are arranged parallel to each other, and a plurality of third assembly holes 10 are opened on the support limit plates 9;
[0076] A fourth assembly hole 11, which is provided on the crossbeam of the I-beam 3, and the number of the fourth assembly holes 11 is multiple and is arranged one-to-one correspondingly with the multiple third assembly holes 10;
[0077] And the second fixing bolt 12 is passed through the third assembly hole 10 and the fourth assembly hole 11 to fix the crossbeam of the I-beam 3 and the corresponding support and limiting plate 9.
[0078] Specifically, the I-beam 3 is inserted between the two groups of support and limit plates 9, so that the support and limit plates 9 and the two groups of parallel beams of the I-beam 3 are parallel to each other, and then the cross beams of the I-beam 3 are fixedly connected to the corresponding support and limit plates 9 by the second fixing bolts 12. Combined with the first connection mechanism, the I-beam 3 and the arch body 1 are more stably fixedly connected.
[0079] Furthermore, the connection and fixing mechanism includes:
[0080] An assembly support plate 13 is provided, wherein the assembly support plate 13 and the arch frame body 1 are arranged parallel to each other;
[0081] An anchor rod end connection mechanism, which is arranged on the assembly support plate 13 to fix the end of the anchor rod 2 exposed outside the rock body after being driven into the rock mass at the top of the tunnel and connected to the assembly support plate 13;
[0082] And a mounting connection mechanism, which is arranged on the side surface of the assembly support plate 13 opposite to the side where the anchor rod end connection mechanism is located, and the assembly support plate 13 is fixedly connected to the arch frame body 1 through the mounting connection mechanism.
[0083] Furthermore, the anchor rod end connection mechanism comprises:
[0084] A straight sleeve 14, which is connected to the assembly support plate 13 and can accommodate the anchor rod 2 extending therein;
[0085] The arc-shaped pressing plate 15 is arranged in the straight-cylindrical sleeve 14. The two ends of the arc-shaped pressing plate 15 extending out of the straight-cylindrical sleeve 14 are provided with limiting rods 16 to prevent the arc-shaped pressing plate 15 from being separated from the straight-cylindrical sleeve 14;
[0086] A first threaded hole 17, the first threaded hole 17 is provided on the side surface of the straight cylindrical sleeve 14;
[0087] And a threaded rod 18, the threaded rod 18 is inserted into the first threaded hole 17 and threadedly engaged with the first threaded hole 17, and the arc-shaped pressure plate 15 is pushed and pressed against the anchor rod 2 extending into the straight cylindrical sleeve 14 through the threaded engagement between the threaded rod 18 and the first threaded hole 17.
[0088] During specific use, after the anchor rod 2 is driven into the rock mass at the top of the tunnel, the end exposed outside the rock mass is extended into the straight cylindrical sleeve 14, and the arc-shaped pressure plate 15 is pushed and pressed tightly on the anchor rod 2 extended into the straight cylindrical sleeve 14 through the threaded cooperation between the threaded rod 18 and the first threaded hole 17, thereby completing the fixation of the anchor rod 2, that is, the anchor rod 2 is fixedly connected to the arch frame body 1.
[0089] Furthermore, the mounting connection mechanism includes:
[0090] A fifth assembly hole 19, which is provided on the assembly support plate 13, and the number of the fifth assembly holes 19 is multiple;
[0091] A sixth assembly hole 20, the sixth assembly hole 20 is opened on the arch frame body 1, and the number of the sixth assembly holes 20 is multiple and is arranged one-to-one correspondingly with the fifth assembly holes 19;
[0092] And a third fixing bolt 21 , the third fixing bolt 21 is penetrated into the fifth assembly hole 19 and the sixth assembly hole 20 to fix the assembly support plate 13 and the arch frame body 1 together.
[0093] Specifically, the anchor rod 2 is fixedly connected to the arch body 1 by fixing the assembly support plate 13 to the arch body 1 .
[0094] The above description is only by way of illustration of certain exemplary embodiments of the present invention. It is undoubted that those skilled in the art can modify the described embodiments in various ways without departing from the spirit and scope of the present invention. Therefore, the above drawings and descriptions are illustrative in nature and should not be construed as limiting the scope of protection of the claims of the present invention.
Claims
1. A support device suitable for an asymmetric large deformation tunnel, characterized in that: include: An arch structure, wherein the arch structure is arranged corresponding to the shape of the tunnel top, the arch structure is arranged in close contact with the tunnel top, and the arch structure comprises at least two groups of arch bodies (1) arranged parallel to each other and a reinforcing connector for reinforcing the connection between the two groups of arch bodies (1); Anchor rods (2), the number of the anchor rods being multiple groups, the anchor rods (2) being driven into the rock mass at the top of the tunnel to improve the stability of the rock mass at the top of the tunnel, and the ends of the multiple groups of anchor rods (2) exposed outside the rock mass after being driven into the rock mass at the top of the tunnel being connected to the arch structure; and a connecting and fixing mechanism, wherein the connecting and fixing mechanism comprises a plurality of groups of the same structure and is arranged in a one-to-one correspondence with the plurality of groups of the anchor rods (2), the connecting and fixing mechanism being detachably arranged on the arch frame structure, and the end of the anchor rod (2) exposed outside the rock body after being driven into the rock mass at the top of the tunnel is connected to the arch frame structure through the connecting and fixing mechanism; Wherein, the connection and fixing mechanism comprises: An assembly support plate (13), wherein the assembly support plate (13) and the arch frame body (1) are arranged parallel to each other; An anchor rod end connection mechanism, the anchor rod end connection mechanism is arranged on the assembly support plate (13) to enable the end of the anchor rod (2) exposed outside the rock body after being driven into the rock body at the top of the tunnel to be fixedly connected to the assembly support plate (13); and a mounting connection mechanism, the mounting connection mechanism being arranged on a side surface of the assembly support plate (13) opposite to the side where the anchor rod end connection mechanism is located, and the assembly support plate (13) is fixedly connected to the arch frame body (1) through the mounting connection mechanism; Wherein, the anchor rod end connection mechanism comprises: a straight cylindrical sleeve (14), the straight cylindrical sleeve (14) being connected to the assembly support plate (13) and capable of accommodating the anchor rod (2) extending therein; An arc-shaped pressing plate (15), the arc-shaped pressing plate (15) being arranged in the straight-cylindrical sleeve (14), and both ends of the arc-shaped pressing plate (15) extending out of the straight-cylindrical sleeve (14) are provided with limiting rods (16) to prevent the arc-shaped pressing plate (15) from being separated from the straight-cylindrical sleeve (14); a first threaded hole (17), wherein the first threaded hole (17) is formed on a side surface of the straight cylindrical sleeve (14); and a threaded rod (18), wherein the threaded rod (18) is inserted into the first threaded hole (17) and threadedly engaged with the first threaded hole (17), and the threaded engagement between the threaded rod (18) and the first threaded hole (17) is used to push the arc-shaped pressure plate (15) to be pressed against the anchor rod (2) extending into the straight cylindrical sleeve (14).
2. A support device suitable for an asymmetric large deformation tunnel according to claim 1, characterized in that: The arch frame body (1) is arranged corresponding to the shape of the tunnel top, and the arch frame body (1) is arranged to fit the tunnel top.
3. The support device for an asymmetric large deformation tunnel according to claim 1, characterized in that: The reinforced connector comprises: I-beams (3), the I-beams (3) being connected between the two groups of arch frame bodies (1) to connect the two groups of arch frame bodies (1) which are parallel to each other, and a plurality of groups of I-beams (3) being arranged between the two groups of arch frame bodies (1); A support strength reinforcement structure, wherein the support strength reinforcement structure is arranged on the I-beam (3), and the support strength of the I-beam (3) on the arch frame body (1) is enhanced by the support strength reinforcement structure; and an installation connection mechanism, wherein both ends of the I-beam (3) are connected to the arch frame body (1) via the installation connection mechanism.
4. A support device suitable for an asymmetric large deformation tunnel according to claim 3, characterized in that: The support strength enhancement structure comprises: A reinforcing web (4) is connected between two cross beams on the I-beam (3) and is arranged parallel to a longitudinal beam on the I-beam (3) connecting the two cross beams.
5. The support device for an asymmetric large deformation tunnel according to claim 3, characterized in that: The mounting connection mechanism comprises: A first connecting mechanism, the first connecting mechanism being arranged on the end surface of the I-beam (3) and being fixedly connected to the arch frame body so as to connect the arch frame body (1) and the I-beam (3); A second connecting mechanism is arranged on the arch frame body (1) and is connected to the I-beam (3) by connecting two groups of cross beams parallel to each other on the I-beam (3).
6. The support device for asymmetric large deformation tunnels according to claim 5, characterized in that: The first connecting mechanism comprises: An end surface assembly plate (5), the end surface assembly plate (5) being fixedly connected to the end surface of the I-beam (3); A first assembly hole (6), the first assembly hole (6) being opened on the end surface assembly plate (5), and a plurality of the first assembly holes (6) being arranged on the end surface assembly plate (5); A second assembly hole (7), wherein the second assembly hole (7) is provided on the arch frame body (1), and the second assembly hole (7) and the first assembly hole (6) are arranged in a one-to-one correspondence; and a first fixing bolt (8), wherein the first fixing bolt (8) is inserted through the first assembly hole (6) and the second assembly hole (7) to fix the end surface assembly plate (5) and the arch frame body (1) in connection.
7. The support device for an asymmetric large deformation tunnel according to claim 5, characterized in that: The second connecting mechanism comprises: Support and limit plates (9), the support and limit plates (9) are connected to the arch frame body (1), the support and limit plates (9) are two groups of the same structure and are symmetrically distributed on the upper and lower sides of the I-beam (3) to correspond one to one with the two groups of cross beams parallel to each other of the I-beam (3), the support and limit plates (9) are arranged parallel to each other with the two groups of cross beams parallel to each other of the I-beam (3), and a plurality of third assembly holes (10) are opened on the support and limit plates (9); A fourth assembly hole (11), the fourth assembly hole (11) being opened on the crossbeam of the I-beam (3), the fourth assembly hole (11) being provided in a plurality and being arranged in a one-to-one correspondence with the plurality of third assembly holes (10); and a second fixing bolt (12), wherein the second fixing bolt (12) is passed through the third assembly hole (10) and the fourth assembly hole (11) to fix the crossbeam of the I-beam (3) and the corresponding support limit plate (9) in connection.
8. The support device for an asymmetric large deformation tunnel according to claim 1, characterized in that: The mounting connection mechanism comprises: A fifth assembly hole (19), wherein the fifth assembly hole (19) is provided on the assembly support plate (13), and the number of the fifth assembly holes (19) is plural; A sixth assembly hole (20), the sixth assembly hole (20) being opened on the arch frame body (1), the sixth assembly hole (20) being multiple in number and being arranged in a one-to-one correspondence with the fifth assembly holes (19); and a third fixing bolt (21), wherein the third fixing bolt (21) is inserted into the fifth assembly hole (19) and the sixth assembly hole (20) to fix the assembly support plate (13) and the arch frame body (1) in connection.