A coal mine production method eliminating underground coal bunker

By using gravity sensors, vibration motors, quantitative transfer pumps and other equipment in coal mine production, the power and transportation efficiency of coal mining equipment are dynamically adjusted, which solves the problem of backlog and water accumulation in underground coal bunkers, reduces costs and safety hazards, and improves efficiency. Coal quality and coal mining efficiency, enabling more optimized coal mine production methods.

CN115535657BActive Publication Date: 2024-10-22吴光淮
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211359661.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-11-01
Publication Date
2024-10-22
Estimated Expiration
2042-11-01

AI Technical Summary

Technical Problem

In existing coal mine production methods, the larger the underground coal bunker, the more safety equipment is required, which is prone to backlog and water accumulation, leading to equipment damage and affecting coal quality and cost.

Method used

Adopting a method of eliminating underground coal bunkers, by using gravity sensors, vibration motors, displacement sensors and quantitative transfer pumps in coal mining equipment and the first conveyor belt equipment, the power and transportation efficiency of coal mining equipment are dynamically adjusted according to surface needs. Avoid backlog and water accumulation.

Benefits of technology

It reduces the construction cost and safety hazards of underground coal bunkers, improves coal quality and mining efficiency, reduces equipment startup costs, and optimizes the coal mine production process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115535657B_ABST
    Figure CN115535657B_ABST
Patent Text Reader

Abstract

The present invention discloses a coal mine production method that eliminates underground coal bunkers, and involves coal mining equipment and a first conveyor belt equipment as well as a design method and a production process. The first conveyor belt equipment includes a gravity sensor, a vibration motor, a displacement sensor and a quantitative delivery pump. Through the management concept of production-based sales and production-sales integration, the traditional link of underground coal bunkers is eliminated. In the present invention, the cost of starting coal mining equipment with a smaller volume is relatively high due to cost reasons, and the high-power coal mining equipment can be directly started with a larger volume. In this way, the problem of coal backlog is solved, and the construction cost of the underground coal bunker is reduced. It is not easy to have water accumulation problems caused by long time, and the safety hazards are reduced. According to the selective starting power size, the equipment startup cost is controlled, the underground coal bunker is eliminated, and the influence of the underground coal bunker on the coal quality and even the entire coal mining process is reduced, which increases efficiency and reduces costs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of coal mine production, and in particular relates to a coal mine production method which eliminates an underground coal bunker. Background Art

[0002] The higher the production capacity of existing coal mines, the larger the scale of underground coal bunkers, the more safety equipment they need to be equipped with, and the larger the scale of underground coal bunkers, the more likely it is that there will be a large backlog for a long time, which will greatly occupy costs and pose safety hazards. The backlog is prone to water accumulation, causing water to backflow into the conveyor belt at the moment of opening, affecting the equipment. During the entire coal production process, the underground coal bunker greatly affects the quality of coal produced by the entire coal mine, and also greatly increases costs. Summary of the invention

[0003] The purpose of the present invention is to provide a coal mine production method that eliminates underground coal bunkers, so as to solve the existing coal mine production process of mining coal at the working face and transporting it to the underground coal bunker. The coal bunker transports the coal stored in the underground coal bunker to the ground according to the sales demand on the ground. The higher the coal mine production capacity, the larger the scale of the underground coal bunker, the more safety equipment needs to be equipped, and the larger the volume of the underground coal bunker, the more likely it is that there will be a large amount of long-term backlogs, which greatly occupies costs and also poses safety hazards. The backlog is prone to water accumulation, resulting in water backflowing into the conveyor belt at the moment of opening, affecting the equipment. The underground coal bunker greatly affects the quality of coal produced by the entire coal mine during the entire coal production process, and also greatly increases the cost.

[0004] To achieve the above object, the present invention provides the following technical solutions: A coal mine production method that eliminates underground coal bunkers, involving coal mining equipment and a first conveyor belt device, wherein the first conveyor belt device includes a gravity sensor, a vibration motor, a displacement sensor, and a quantitative delivery pump, and the specific steps are as follows:

[0005] Step 1: Data detection and entry:

[0006] (1) Material leveling and positioning: by starting the vibration motor, the first conveyor belt device is vibrated as a whole, and the material inside the first conveyor belt device is leveled by the vibration, and then the displacement value detected by the displacement sensor is adjusted;

[0007] (2) Density and volume calculation: The shape and volume of the first conveyor belt device are fixed, and the weight obtained in the above-mentioned coal mining equipment and the position distance of the displacement sensor are used to calculate the volume of the material inside the first conveyor belt device of a fixed size. The density value of the material in the first conveyor belt device can be calculated using the weight and volume. The density calculation formula is:

[0008] ρ=m / V

[0009] Wherein ρ is the density of the material inside the first conveyor belt device, m is the mass of the material inside the first conveyor belt device, and V is the volume of the material inside the first conveyor belt device;

[0010] Step 2: Demand quality input. According to the needs of the ground platform, a value that can satisfy the material inside the first conveyor belt device is set according to the first conveyor belt device. When it is greater than the value, the coal mining equipment is started. When it is less than the value, the quantitative delivery pump can be started to use the first conveyor belt device to supply goods. At this time, the staff can input the value into the central processor;

[0011] Step 3: Start the device. According to the value entered in the CPU in step 2, start the corresponding device:

[0012] (1) When the value is less than the set value, the quality of the remaining material in the first conveyor belt device is queried at the same time. If it can be supplied, the volume can be obtained according to the density obtained in step 1 and the mass of the input requirement. Then, the volume is used to control the start-up time of the quantitative delivery pump, and the material inside the first conveyor belt device is output to the ground platform for supply. If the supply cannot be met, it is directly converted to an operation greater than the set value;

[0013] (2) When the value is greater than the set value, the coal mining equipment can be started to carry out on-site coal mining work, and at the same time, the quantitative delivery pump is started to use the first conveyor belt equipment to transport materials. The volume of the required quantity is calculated using the same principle, and then the start time of the coal mining equipment is controlled according to the internal quality of the first conveyor belt equipment, the coal output efficiency of the second conveyor belt equipment and the coal mining equipment;

[0014] S1: The ground coal bunker has a certain amount of storage capacity, the underground coal transportation equipment has a greater transportation capacity than the working face coal mining capacity, and the coal transportation efficiency can be adjusted;

[0015] S2: According to the coal sales situation and the inventory of ground coal warehouse, formulate the coal mining plan for the working face and start the coal mining process in time;

[0016] S3: According to the coal mining efficiency, the corresponding coal transportation efficiency is adopted and brought into the original steps 2 and 3;

[0017] Step 4: Final data update. After the supply is completed, repeat the work in step 1 and transfer the new data to the central processor to complete the data update.

[0018] Step 5: Shutdown is complete, turn off all devices and stop working.

[0019] The technical effects and advantages of the present invention are as follows: based on the excellent coal mining and transportation capabilities of the existing coal industry, it is creatively proposed that the traditional link of underground coal bunkers can be eliminated, and the power and coal transportation efficiency of the coal mining equipment can be selectively started according to production and sales needs. The power startup size is calculated by the above step one, so that the cost of starting coal mining equipment with a smaller volume is higher due to cost reasons, and high-power coal mining equipment with a larger volume can be directly started. This solves the problem of coal backlog and reduces the construction cost of underground coal bunkers. It is also less likely to have water accumulation problems caused by a long time, reducing safety hazards. According to the selective startup power size, the equipment startup cost is controlled, the underground coal bunker is eliminated, and the impact of the underground coal bunker on coal quality and the entire coal mining process is reduced, thereby increasing efficiency and reducing costs. By improving the capacity of coal mine production equipment and optimizing the production process, the traditional link of underground coal bunkers can be eliminated, and a more optimized coal mine production method can be achieved. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 is a flow chart of the present invention;

[0021] Figure 2 It is a flowchart of the present invention.

[0022] In the figure: 1. Coal mining equipment; 2. First conveyor belt equipment; 3. Ground platform. DETAILED DESCRIPTION

[0023] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0024] The present invention provides a coal mine production method for eliminating underground coal bunkers, as shown in the figure 1, involving coal mining equipment 1 and a first conveyor belt equipment 2, wherein the first conveyor belt equipment 2 includes a gravity sensor, a vibration motor, a displacement sensor and a quantitative conveying pump, and the specific steps are as follows:

[0025] Step 1: Data detection and entry:

[0026] (1) Material leveling and positioning: The vibration motor is started to generate vibration on the first conveyor belt device as a whole, and the material inside the first conveyor belt device 2 is leveled by vibration, and then the displacement value detected by the displacement sensor is adjusted;

[0027] (2) Density and volume calculation: The shape and volume of the first conveyor belt device 2 are fixed, and the weight obtained in the above-mentioned coal mining equipment 1 and the position distance of the displacement sensor are used to calculate the volume of the material inside the first conveyor belt device 2 of a fixed size. The density value of the material in the first conveyor belt device 2 can be calculated using the weight and volume. The density calculation formula is:

[0028] ρ=m / V

[0029] Wherein ρ is the density of the material inside the first conveyor belt device 2, m is the mass of the material inside the first conveyor belt device 2, and V is the volume of the material inside the first conveyor belt device 2;

[0030] Step 2: Demand quality input. According to the needs of the ground platform, a value that can satisfy the internal material of the first conveyor belt device 2 is set according to the first conveyor belt device 2. When it is greater than the value, the coal mining equipment is started. When it is less than the value, the quantitative delivery pump can be started to supply the first conveyor belt device 2. At this time, the staff can input the value into the central processor;

[0031] Step 3: Start the device. According to the value entered in the CPU in step 2, start the corresponding device:

[0032] (1) When the value is less than the set value, the quality of the remaining material in the first conveyor belt device 2 is queried at the same time. If it can be supplied, the volume can be obtained according to the density obtained in step 1 and the quality of the input requirement. Then, the volume is used to control the start-up time of the quantitative delivery pump, and the material inside the first conveyor belt device 2 is output to the ground platform for supply. If the supply cannot be met, it is directly converted to an operation greater than the set value;

[0033] (2) When the value is greater than the set value, the coal mining equipment 1 can be started to carry out on-site coal mining, and at the same time, the quantitative delivery pump is started to use the first conveyor belt device 2 to transport materials. The volume of the required amount is calculated using the same principle, and then the start time of the coal mining equipment 1 is controlled according to the internal quality of the first conveyor belt device 2, the coal output efficiency of the second conveyor belt device and the coal mining equipment 1;

[0034] S1: The ground coal bunker has a certain amount of storage capacity, the underground coal transportation equipment has a greater transportation capacity than the working face coal mining capacity, and the coal transportation efficiency can be adjusted;

[0035] S2: According to the coal sales situation and the inventory of ground coal warehouse, formulate the coal mining plan for the working face and start the coal mining process in time;

[0036] S3: According to the coal mining efficiency, the corresponding coal transportation efficiency is adopted and brought into the original steps 2 and 3;

[0037] Step 4: Final data update. After the supply is completed, repeat the work in step 1 and transfer the new data to the central processor to complete the data update.

[0038] Step 5: Shutdown is complete, shut down all devices and stop working;

[0039] The present invention as a whole solves the problem that the existing underground coal bunkers are large in size in order to continuously provide materials, but the frequency of the ground platform outlet is unstable, which leads to the accumulation of coal inside the underground coal bunker. Over time, the quality of the internal coal is affected, and long-term storage may cause some emergencies due to weather reasons. The present invention can selectively start the power of the coal mining equipment according to demand. The power startup size is calculated by the above step one. A smaller power is started for a smaller volume, and a second conveying equipment with a smaller transportation volume is started. A high-power coal mining equipment is directly started for a larger volume. This solves the problem of coal backlog and reduces the construction cost of the underground coal bunker. It is also less likely to have water accumulation problems caused by a long time, reducing safety hazards. According to the selective startup power size, the equipment startup cost is controlled, the underground coal bunker is eliminated, and the influence of the underground coal bunker on the coal quality and even the entire coal mining process is reduced, thereby increasing efficiency and reducing costs.

[0040] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A coal mine production method for eliminating underground coal bunkers, involving coal mining equipment (1) and a first conveyor belt equipment (2), wherein the first conveyor belt equipment (2) comprises a gravity sensor, a vibration motor, a displacement sensor and a quantitative delivery pump, and the specific steps are as follows: Step 1: Data detection and entry: (1) leveling and positioning the material, by starting the vibration motor to generate vibration on the first conveyor belt device (2) as a whole, using the vibration to level the material inside the first conveyor belt device (2), and then allowing the displacement sensor to detect the displacement value; (2) Density and volume calculation: the shape and volume of the material conveyed by the first conveyor belt device (2) are fixed, and the weight is obtained in the above-mentioned coal mining equipment (1), and the volume of the material inside the first conveyor belt device (2) of a fixed size is calculated by the position distance of the displacement sensor. The density value of the material in the first conveyor belt device (2) can be calculated using the weight and volume. The density calculation formula is: ρ=m / V Wherein ρ is the density of the material inside the first conveyor belt device (2), m is the mass of the material inside the first conveyor belt device (2), and V is the volume of the material inside the first conveyor belt device (2); Step 2: Demand quality input, based on the demand of the ground platform and the inventory of the ground coal warehouse, if the inventory of the ground coal warehouse meets the sales demand, the coal mining process will not be started; if the storage capacity of the ground coal warehouse is insufficient, the coal mining and transportation process will be started to meet the sales demand; in the implementation, a value that can meet the internal material of the first conveyor belt device (2) is set according to the first conveyor belt device (2); when it is greater than the value, the coal mining device is started; when it is less than the value, the quantitative delivery pump can be started to use the first conveyor belt device (2) to supply goods. At this time, the staff can input the value into the central processor; Step 3: Start the device. According to the value entered in the CPU in step 2, start the corresponding device: (1) When the value is less than the set value, the quality of the remaining material in the first conveyor belt device (2) is queried at the same time. If the material can be supplied, the volume can be obtained based on the density obtained in step 1 and the mass of the input requirement. The volume is then used to control the start-up time of the quantitative delivery pump, and the material inside the first conveyor belt device (2) is output to the ground platform for supply. If the supply cannot be met, the operation is directly switched to an operation greater than the set value. (2) When the value is greater than the set value, the coal mining equipment (1) can be started to carry out on-site coal mining work, and at the same time, the quantitative delivery pump is started to use the first conveyor belt device 2 to transport materials. The volume of the required amount is calculated using the same principle, and then the start time of the coal mining equipment (1) is controlled according to the internal quality of the first conveyor belt device 2, the coal output efficiency of the second conveyor belt device and the coal mining equipment (1); The power of the coal mining equipment can be selectively started according to the demand. The power start-up size is calculated by the above step 1. The smaller the volume, the lower the power is started, and the second conveying equipment with a smaller transportation volume is started. The larger the volume, the higher the power of the coal mining equipment is directly started. Step 4: Final data update. After the supply is completed, repeat the work in step 1 and transfer the new data to the central processor to complete the data update. Step 5: Shutdown is complete, turn off all devices and stop working.