A bidirectional pump tidal control method applied to the physical model of embankment engineering
By precisely controlling the rotation speed of the bidirectional pump and simulating the tide level and flow rate process in the actual scene, the problem of high water level in the enclosure engineering model is solved, the structure is simplified and the cost is reduced, and stable water level control is achieved.
Patent Information
- Application Number
- CN202211175186.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-09-26
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2042-09-26
AI Technical Summary
In the enclosure coating engineering model test, the two-way pump was unable to effectively prevent the water level from rising, resulting in increased model costs and difficulty in equipment control. The existing technology lacked solutions.
By precisely controlling the rotation speed of the bidirectional pump and adopting the water balance control concept, the pump's operating parameter sequence is adjusted to simulate the tide level and flow rate process in the actual scenario, avoiding high water levels, simplifying the model structure and reducing costs.
Stable control of the water level after enclosure coating can be achieved without the need for a tailgate, which simplifies the model structure, reduces costs, and improves the stability and efficiency of the test.
Smart Images

Figure CN115577650B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a bidirectional pump tide control method applied to a physical model of a tidal enclosure project, belonging to the technical field of estuary and coastal engineering physical model tests. Background Art
[0002] As far as the inventor knows, the physical model of estuary and coastal engineering needs to restore the complex tidal form that is consistent with the actual situation. Among them, the model tidal control system is crucial to the physical model of the engineering. Bidirectional pump flow generation is a common tidal method, but in the model test of the tidal enclosure project, it is not enough to use only a bidirectional pump. This is because after the tidal enclosure project is added to the model, the tidal space inside the model becomes smaller and the water level is high. In reality, even the water level change caused by large-scale tidal enclosure is not obvious. Therefore, in the model test of the tidal enclosure project, the bidirectional pump needs to be used in conjunction with the tail gate to discharge excess water to the outside of the model through the tail gate to ensure that the water level in the model will not be high due to tidal enclosure. However, adding a tail gate will undoubtedly increase the cost of the model, and the control difficulty of the tail gate equipment is large and the stability is poor, and problems are prone to occur in the model that affect the progress of the test. At present, there is no technical solution in the prior art to pay attention to and solve this problem. Therefore, it is urgent to develop a control method that can solve the problem of high water level in the model without using a tail gate and only using a bidirectional pump. Summary of the invention
[0003] The main purpose of the present invention is to solve the problems existing in the prior art and provide a two-way pump tide control method applied to the physical model of the coating engineering. The method cleverly uses the concept of water balance control and can prevent the water level from rising after the coating without the use of a tail gate, thereby simplifying the structure of the physical model of the coating engineering and saving its cost.
[0004] The technical solution of the present invention to solve the technical problem is as follows:
[0005] A two-way pump tide control method applied to a physical model of a damming project, characterized in that it comprises the following steps:
[0006] The first step is to use a bidirectional pump to generate flow before implementing the embankment project in the target physical model; adjust the speed parameter sequence of the bidirectional pump so that the tidal level process and flow rate process of the verification point in the target physical model are consistent with the actual scene simulated by the target physical model. At this time, the speed parameter sequence r of the bidirectional pump before embankment is obtained. n , where r n t n Bidirectional pump speed at time t n The time is any time in a tide cycle T in the target physical model, t n =n, n is an integer and n=0~T; at the same time, the tidal level process and flow velocity process of the verification point in the target physical model obtained at this time are recorded;
[0007] The second step is to set the bidirectional pump to the speed parameter sequence r before coating according to the first step. n Run, so that the target physical model will experience the process of rising and falling tides; in this process, in the predetermined tidal enclosure project area of the target physical model, record the time T when the water level reaches the lowest elevation in the area during the rising tide 1 , and record the time T when the water level drops to the lowest elevation in the area during the ebb tide 2 ; and T 1 <T 2 ;
[0008] Step 3: After the target physical model implements the scheduled enclosing project, the water reduction rate sequence a is calculated. n , where a n t n The water reduction rate at the time, and n = T 1 ~T 2 ; and, α n =S n ′ / S n , where S n Before implementing the enclosing and painting project, n The water area at the moment, S n ' is the time after the enclosing and painting project is implemented. n The water area occupied by the reclamation project at any time;
[0009] Step 4: Use water reduction rate sequence a n As the speed reduction rate of the bidirectional pump; for n = T 1 ~T 2 t n At this moment, the speed parameter sequence of the bidirectional pump after coating is r n ′=α n r n ; For the remaining values of n, the remaining t n At this moment, the speed parameter sequence of the bidirectional pump after coating is r n ′=r n ;
[0010] Step 5: Set the bidirectional pump to the speed parameter sequence r after coating according to the fourth step. n ′Run; check whether the tidal level process and flow rate process of the verification point in the target physical model are consistent with the tidal level process and flow rate process of the verification point in the target physical model obtained in the first step; if there is a difference, adjust the speed of the bidirectional pump at the time of the difference to eliminate the difference.
[0011] This method cleverly uses the concept of water balance control and precisely controls the speed of the bidirectional pump to achieve tide and flow rate processes that conform to the actual scenario. It can prevent the water level from rising after enclosure and embankment without the use of a tail gate, thereby simplifying the physical model structure of the enclosure and embankment project and saving its cost.
[0012] The technical solution further improved by the present invention is as follows:
[0013] Preferably, in the first step, the speed parameter sequence r of the bidirectional pump before coating is obtained. n The specific process is:
[0014] Set the time interval λ, divide T into N time periods according to λ, and the endpoint time of each time period is t λm , where m = 0 ~ N, N is a positive integer and N = T / λ; let the speed parameter sequence of the bidirectional pump be r λm , where r λm t λm Bidirectional pump speed at time; Rated r λm , until the tidal level process and flow velocity process of the verification point in the target physical model are converted according to the model scale and are consistent with the actual scene simulated by the target physical model; the obtained r λm Linear interpolation is performed to obtain the speed parameter sequence r of the bidirectional pump before coating. n .
[0015] More preferably, the controlled end of the bidirectional pump is connected to the control end of the computer via a frequency converter.
[0016] More preferably, t n ,T,λ,t λm The unit is seconds, i.e. s.
[0017] After adopting the above preferred solution, the specific details of the first step can be further optimized. By inputting the speed parameter sequence in the computer to control the speed of the bidirectional pump, and operating according to the above definition, the speed parameter sequence r of the bidirectional pump before coating can be quickly obtained. n .
[0018] Preferably, in the third step, T 1 To T 2 The specific process is as follows:
[0019] Assume m1 and m2, both m1 and m2 belong to m; by λ(m 1 -1)≤T 1 <λm 1 ,λ(m 2 -1)≤T 2 <λm 2 Calculate m1 and m2; determine the endpoint times of each time period after division as follows: T 1,t λm1 ,t λ(m1+1) ,t λ(m1+2) ,......,t λ(m2-2) ,t λ(m2-1) , T 2 , and when the actual values of two or more endpoint moments are the same, these endpoint moments are simplified to the same endpoint moment.
[0020] More preferably, in the third step, the water reduction rate a n The calculation method is:
[0021] In t n At this moment, record the water level h in the target physical model n , converted to the actual water level H according to the model scale n ; In the scene drawing made in advance based on the hydrological data of the actual scene, according to the water level H n Draw the waterside line of the water area and calculate the area of the water area enclosed by the waterside line to obtain S n ; Add the area of the planned enclosure project in the scene drawing, according to the water level H n Draw the water area occupied by the reclamation project and calculate its area to obtain S n '; press α n =S n ′ / S n Calculate to get t n Water reduction rate corresponding to time a n .
[0022] More preferably, in the third step, let n = T 1 ,t λm1 ,t λ(m1+1) ,t λ(m1+2) ,......,t λ(m2-2) ,t λ(m2-1) , T 2 , and calculate the corresponding water reduction rate a according to the above calculation method n , that is, the finite water reduction rate sequence a n1 ; n1 Perform linear interpolation to obtain the water reduction rate sequence a n , n = T 1 ~T 2 .
[0023] More preferably, in the third step, T 1 , T 2 The unit of each is second, that is, s; the scene drawing includes a top view and a longitudinal section view of the scene.
[0024] After adopting the above preferred solution, the specific details of the third step can be further optimized. According to the above definition, the water reduction rate sequence a can be quickly obtained. n .
[0025] Preferably, in the fifth step, when the speed of the bidirectional pump is adjusted at a time when there is a difference, if the tide level of the verification point in the target physical model at that moment is too high or the flow rate is too fast, the speed of the bidirectional pump at that moment is reduced until the difference is eliminated; if the tide level of the verification point in the target physical model at that moment is too low or the flow rate is too slow, the speed of the bidirectional pump at that moment is increased until the difference is eliminated.
[0026] After adopting the above preferred scheme, the adjustment process of the fifth step can be further optimized.
[0027] Preferably, the bidirectional pump tide control method further comprises: step 6, the bidirectional pump running speed parameter sequence r after coating finally obtained in step 5 n ′Control the bidirectional pump of the target physical model.
[0028] After adopting the above preferred scheme, the details of the entire control method can be further optimized.
[0029] Compared with the prior art, the present invention ingeniously uses the concept of water balance control and precisely controls the rotation speed of a two-way pump to achieve a tide level process and a flow rate process that conforms to the actual scenario. It does not require a tail gate to prevent the water level from accumulating after coating, thereby simplifying the physical model structure of the coating project and saving its cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 This is a top view of a scene drawing according to Embodiment 1 of the present invention.
[0031] Figure 2 for Figure 1 AA section view.
[0032] Figure 3 For Example 1 of the present invention, 0 A bird's-eye view of the water conditions at all times.
[0033] Figure 4 For Example 1 of the present invention, 0 Cross-sectional view of the water conditions at all times, based on Figure 2 . DETAILED DESCRIPTION
[0034] In specific implementation, the present invention is applied to the bidirectional pump tide control method of the physical model of the embankment engineering, including the following steps:
[0035] The first step is to use a bidirectional pump to generate flow before implementing the embankment project in the target physical model; adjust the speed parameter sequence of the bidirectional pump so that the tidal level process and flow rate process of the verification point in the target physical model are consistent with the actual scene simulated by the target physical model. At this time, the speed parameter sequence r of the bidirectional pump before embankment is obtained. n , where r n t n Bidirectional pump speed at time t n The time is any time in a tide cycle T in the target physical model, t n =n, n is an integer and n=0~T; at the same time, the tidal level process and flow velocity process of the verification point in the target physical model obtained at this time are recorded.
[0036] The controlled end of the bidirectional pump is connected to the control end of the computer via a frequency converter.
[0037] Get the speed parameter sequence r of the bidirectional pump before coating n The specific process is:
[0038] Set the time interval λ, divide T into N time periods according to λ, and the endpoint time of each time period is t λm , where m = 0 ~ N, N is a positive integer and N = T / λ; let the speed parameter sequence of the bidirectional pump be r λm , where r λm t λm Bidirectional pump speed at time; Rated r λm , until the tidal level process and flow velocity process of the verification point in the target physical model are converted according to the model scale and are consistent with the actual scene simulated by the target physical model; the obtained r λm Linear interpolation is performed to obtain the speed parameter sequence r of the bidirectional pump before coating. n .
[0039] In addition, t n ,T,λ,t λm The unit is seconds, i.e. s.
[0040] The second step is to set the bidirectional pump to the speed parameter sequence r before coating according to the first step. n Run, so that the target physical model will experience the process of rising and falling tides; in this process, in the predetermined tidal enclosure project area of the target physical model, record the time T when the water level reaches the lowest elevation in the area during the rising tide 1 , and record the time T when the water level drops to the lowest elevation in the area during the ebb tide 2 ; and T 1 <T 2 .
[0041] Step 3: After the target physical model implements the scheduled enclosing project, the water reduction rate sequence a is calculated.n , where a n t n The water reduction rate at the time, and n = T 1 ~T 2 ; and, α n =S n ′ / S n , where S n Before implementing the enclosure project for the actual scene, n The water area at the moment, S n ' is the actual scene after the enclosing and painting project is implemented at t n The water area occupied by the reclamation project at all times.
[0042] Among them, T 1 To T 2 The specific process is as follows:
[0043] Assume m1 and m2, both m1 and m2 belong to m; by λ(m 1 -1)≤T 1 <λm 1 ,λ(m 2 -1)≤T 2 <λm 2 Calculate m1 and m2; determine the endpoint times of each time period after division as follows: T 1 ,t λm1 ,t λ(m1+1) ,t λ(m1+2) ,......,t λ(m2-2) ,t λ(m2-1) , T 2 , and when the actual values of two or more endpoint moments are the same, these endpoint moments are simplified to the same endpoint moment.
[0044] Water reduction ratea n The calculation method is:
[0045] In t n At this moment, record the water level h in the target physical model n , converted to the actual water level H according to the model scale n In the scene drawing (including the top view and longitudinal section view of the scene) made in advance based on the hydrological data of the actual scene, the water level H n Draw the waterside line of the water area and calculate the area of the water area enclosed by the waterside line to obtain S n ; Add the area of the planned enclosure project in the scene drawing, according to the water level H n Draw the water area occupied by the reclamation project and calculate its area to obtain S n '; press α n =S n′ / S n Calculate to get t n Water reduction rate corresponding to time a n .
[0046] Let n = T 1 ,t λm1 ,t λ(m1+1) ,t λ(m1+2) ,......,t λ(m2-2) ,t λ(m2-1) , T 2 , and calculate the corresponding water reduction rate a according to the above calculation method n , that is, the finite water reduction rate sequence a n1 ; n1 Perform linear interpolation to obtain the water reduction rate sequence a n , n = T 1 ~T 2 .
[0047] In addition, T 1 , T 2 The unit is seconds, i.e. s.
[0048] Step 4: Use water reduction rate sequence a n As the speed reduction rate of the bidirectional pump; for n = T 1 ~T 2 t n At this moment, the speed parameter sequence of the bidirectional pump after coating is r n ′=α n r n ; For the remaining values of n, the remaining t n At this moment, the speed parameter sequence of the bidirectional pump after coating is r n ′=r n .
[0049] Step 5: Set the bidirectional pump to the speed parameter sequence r after coating according to the fourth step. n ′Run; check whether the tidal level process and flow rate process of the verification point in the target physical model are consistent with the tidal level process and flow rate process of the verification point in the target physical model obtained in the first step; if there is a difference, adjust the speed of the bidirectional pump at the time of the difference to eliminate the difference.
[0050] Among them, when the speed of the bidirectional pump is adjusted at a time when there is a difference, if the tide level of the verification point in the target physical model at that moment is high or the flow rate is fast, the speed of the bidirectional pump at that moment is reduced until the difference is eliminated; if the tide level of the verification point in the target physical model at that moment is low or the flow rate is slow, the speed of the bidirectional pump at that moment is increased until the difference is eliminated.
[0051] Step 6: The speed parameter sequence r of the bidirectional pump after coating is obtained in step 5.n ′Control the bidirectional pump of the target physical model.
[0052] The present invention will be described in further detail below with reference to the accompanying drawings and in combination with embodiments, but the present invention is not limited to the examples given.
[0053] Example 1
[0054] This embodiment is a two-way pump tide control method applied to the physical model of the embankment engineering, and its basic content is the technical solution of the present invention specifically implemented as described above.
[0055] The specific contents of this embodiment are as follows:
[0056] Assume that the actual scenario simulated by the target physical model is as follows Figure 1 As shown in Figure 1, the bay area is 12km×12km, of which the reclamation occurred on the left side of the bay, with an area of 1.8km×12km. The cross-sections along the direction of the tide are consistent in the bay, and the cross-section topography and the highest and lowest water levels of the tide are shown in Figure 1. Figure 2 The cycle of high and low tide is 12 hours, and the amount of water entering (leaving) the bay per unit time is the same during high and low tide.
[0057] The horizontal scale of the target physical model is 600, and the vertical scale is 100. The time scale is 60, and the flow scale is 6×10 5 , model length 20m×20m, tide cycle T=720s.
[0058] S1. In the target physical model, a tide cycle T = 720s is divided into N = 24 time periods according to λ = 30s, m = 0 ~ N, and the bidirectional pump speed r at each endpoint λm For r 0 , r 30 , r 60 ,...,r 720 . Rating r 0 , r 30 , r 60 ...r 720 , until the tidal level process and flow velocity process of the verification point in the target physical model are consistent with the actual scene after conversion according to the model scale; r n (n=0,1,2,...,720) by r 0 , r 30 , r 60 ,...,.r 720 Linear interpolation is used to obtain the speed parameter sequence r of the pump before coating. n (n=0,1,2,...,720).
[0059] S2, press the two-way pump nRun, so that the target physical model will experience the process of rising and falling tides; in this process, in the predetermined tidal enclosure project area of the target physical model, record the time T when the water level reaches the lowest elevation in the area during the rising tide 1 , and record the time T when the water level drops to the lowest elevation in the area during the ebb tide 2 ; and T 1 <T 2 In this embodiment, the lowest position of the enclosure is below the lowest water level, so T 1 = 0s; Since the tides are symmetrical, T 2 =720s.
[0060] S3, let m1 and m2, according to 30(m 1 -1)≤0<30m 1 , 30(m 2 -1)≤720<30m 2 , calculate m 1 =1,m 2 =25. 1 To T 2 The time period is divided into: [T 1 , t 30 ]、[t 30 , t 60 ]、[t 60 , t 90 ], ..., [t 690 , T 2 ], which is the water reduction time interval. The endpoint times of each time period are: T 1 ,t 30 ,t 60 ,t 90 ,...,t 690 , T 2 .
[0061] Let n = T 1 ,t 30 ,t 60 ,t 90 ,...,t 690 , T 2 , calculate the corresponding water reduction rate a n The parameters and results involved in the calculation are shown in the table below. The reduction percentage in the table is the water reduction rate a n .
[0062]
[0063]
[0064] With α 0 The calculation process for example is as follows:
[0065] The corresponding time is t 0 At that moment, the water level h 0 =-5cm, converted to the actual water level H according to the model scale 0 = -5m. In the scene drawing, according to the water level H 0 Draw the water edge of a water area (see Figure 3 , Figure 4 ), calculate the water area S enclosed by the water edge 0 =10.2×12=122.4km 2 ; Add the area of the planned enclosure project in the scene drawing, according to the water level H 0 Draw the water area occupied by the reclamation project and calculate its area S 0 ′=0.9×12=10.8km 2 , α 0 =S 0 ′ / S 0 ×100%=8.82%.
[0066] From the above table, we can get the limited water reduction rate sequence a n1 ; n1 Perform linear interpolation to obtain the water reduction rate sequence a n , n = T 1 ~T 2 =0~720, n is an integer, that is, n=0, 1, 2, ..., 719, 720.
[0067] S4, using water reduction rate sequence a n As the speed reduction rate of the bidirectional pump. 1 ~T 2 The time period is actually the time period from 0 to T. Therefore, for t n At this moment, the speed parameter sequence of the bidirectional pump after coating is r n ′=α n r n , n=0,1,2,...,719,720.
[0068] S5, press the two-way pump n ′Run; check whether the tidal level process and flow rate process of the verification point in the target physical model are consistent with the tidal level process and flow rate process of the verification point in the target physical model obtained in the first step; if there is a difference, adjust the speed of the bidirectional pump at the time of the difference to eliminate the difference.
[0069] S6, thereafter, according to the final obtained speed parameter sequence r of the bidirectional pump after coating n 'Just control the bidirectional pump of the target physical model.
[0070] In addition to the above embodiments, the present invention may also have other implementation modes. Any technical solution formed by equivalent replacement or equivalent transformation falls within the protection scope required by the present invention.
Claims
1. A two-way pump tide control method applied to the physical model of the embankment engineering, characterized in that: The following steps are involved: The first step is to use a bidirectional pump to generate flow before implementing the embankment project in the target physical model; adjust the speed parameter sequence of the bidirectional pump so that the tidal level process and flow rate process of the verification point in the target physical model are consistent with the actual scene simulated by the target physical model. At this time, the speed parameter sequence r of the bidirectional pump before embankment is obtained. n , where r n t n Bidirectional pump speed at time t n The time is any time in a tide cycle T in the target physical model, t n =n, n is an integer and n=0~T; at the same time, the tidal level process and flow velocity process of the verification point in the target physical model obtained at this time are recorded; The second step is to set the bidirectional pump to the speed parameter sequence r before coating according to the first step. n Run, so that the target physical model will experience the process of rising and falling tides; in this process, in the predetermined tidal enclosure project area of the target physical model, record the time T1 when the water level reaches the lowest elevation in the area during the rising tide, and record the time T2 when the water level drops to the lowest elevation in the area during the falling tide; and T1 <T2; Step 3: After the target physical model implements the scheduled enclosing project, the water reduction rate sequence a is calculated. n , where a n t n The water reduction rate at the moment, and n = T1 ~ T2; and, α n =S n ′ / S n , where S n Before implementing the enclosing and painting project, n The water area at the moment, S n ' is the time after the enclosing and painting project is implemented. n The water area occupied by the reclamation project at any time; Step 4: Use water reduction rate sequence a n As the speed reduction rate of the bidirectional pump; for n = T1 ~ T2 t n At this moment, the speed parameter sequence of the bidirectional pump after coating is r n ′=α n r n ; For the remaining values of n, the remaining t n At this moment, the speed parameter sequence of the bidirectional pump after coating is r n ′=r n ; Step 5: Set the bidirectional pump to the speed parameter sequence r after coating according to the fourth step. n ′Run; check whether the tidal level process and flow rate process of the verification point in the target physical model are consistent with the tidal level process and flow rate process of the verification point in the target physical model obtained in the first step; if there is a difference, adjust the speed of the bidirectional pump at the time of the difference to eliminate the difference.
2. According to the method for controlling the tidal current of a bidirectional pump applied to the physical model of the coating project in claim 1, the method is characterized in that, in the first step, a sequence of the speed parameters of the bidirectional pump before coating is obtained: n The specific process is: Set the time interval λ, divide T into N time periods according to λ, and the endpoint time of each time period is t λm ,in, m=0~N, N is a positive integer and N=T / λ; let the speed parameter sequence of the bidirectional pump be r λm , where r λm t λm Bidirectional pump speed at time; Rated r λm , until the tidal level process and flow velocity process of the verification point in the target physical model are converted according to the model scale and are consistent with the actual scene simulated by the target physical model; the obtained r λm Linear interpolation is performed to obtain the speed parameter sequence r of the bidirectional pump before coating. n .
3. A two-way pump tide control method applied to a physical model of a damming project according to claim 2, characterized in that: The controlled end of the bidirectional pump is connected to the control end of the computer via a frequency converter.
4. According to claim 2, a two-way pump tide control method applied to the physical model of the embankment engineering is characterized in that: t n ,T,λ,t λm The unit is seconds, i.e. s.
5. According to claim 2, a two-way pump tide control method applied to the physical model of the embankment engineering is characterized in that: In the third step, the time period from T1 to T2 is divided. The specific process is as follows: Assume that m1 and m2 both belong to m; calculate m1 and m2 by λ(m1-1)≤T1<λm1,λ(m2-1)≤T2<λm2; thus, the endpoint times of each time period after division are determined as follows: T1, t λm1 ,t λ(m1+1) ,t λ(m1+2) ,......,t λ(m2-2) ,t λ(m2-1) , T2, and when the actual values of two or more endpoint times are the same, these endpoint times are simplified to the same endpoint time.
6. The bidirectional pump tide control method for the physical model of the embankment engineering according to claim 5 is characterized in that the third step In the water reduction rate a n The calculation method is: In t n At this moment, record the water level h in the target physical model n , converted to the actual water level H according to the model scale n ; In the scene drawing made in advance based on the hydrological data of the actual scene, according to the water level H n Draw the waterside line of the water area and calculate the area of the water area enclosed by the waterside line to obtain S n ; Add the area of the planned enclosure project in the scene drawing, according to the water level H n Draw the water area occupied by the reclamation project and calculate its area to obtain S n '; press α n =S n ′ / S n Calculate to get t n Water reduction rate corresponding to time a n .
7. A two-way pump tide control method applied to a physical model of a damming project according to claim 6, characterized in that: In the third step, let n = T1, t λm1 ,t λ(m1+1) ,t λ(m1+2) ,......,t λ(m2-2) ,t λ(m2-1) , T2, and calculate the corresponding water reduction rate a according to the above calculation method n , that is, the finite water reduction rate sequence a n1 ; n1 Perform linear interpolation to obtain the water reduction rate sequence a n , n=T1~T2.
8. A two-way pump tide control method applied to the physical model of the embankment engineering according to claim 7, characterized in that: In the third step, the units of T1 and T2 are both seconds, that is, s; the scene drawing includes a top view and a longitudinal cross-sectional view of the scene.
9. A two-way pump tide control method applied to a physical model of a damming project according to any one of claims 1 to 8, characterized in that: In the fifth step, when the speed of the bidirectional pump is adjusted at the time when there is a difference, if the tide level of the verification point in the target physical model at that moment is too high or the flow rate is too fast, the speed of the bidirectional pump at that moment is reduced until the difference is eliminated; if the tide level of the verification point in the target physical model at that moment is too low or the flow rate is too slow, the speed of the bidirectional pump at that moment is increased until the difference is eliminated.
10. A two-way pump tide control method applied to a physical model of a damming project according to any one of claims 1 to 8, characterized in that: The bidirectional pump tide control method also includes: a sixth step, according to the fifth step after the end of the bidirectional pump running speed parameter sequence r n ′Control the bidirectional pump of the target physical model.
