A structure and construction method of aluminum plate ball curtain
By using a combined structure of curved steel trusses and aluminum plates in the dome structure, combined with the precise positioning and tie rod system of BIM technology, the problem of precise control of the dome ceiling and aluminum plate tie system in the high-altitude three-dimensional space is solved, improving construction efficiency. Quality and safety, reducing welding damage to the main steel structure and reducing project costs.
Patent Information
- Application Number
- CN202211549512.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-12-05
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2042-12-05
AI Technical Summary
In a high-altitude three-dimensional space, it is difficult to control the dome ceiling and aluminum plate tie system accurately, resulting in flatness errors that affect the viewing experience. In addition, traditional welding methods cause damage to the main steel structure and pose safety risks.
A structure composed of the main steel structure, arc-shaped steel trusses and aluminum plates is adopted. The arc-shaped steel trusses are fixed through a hoop and tie rod system. BIM technology is used to accurately position and adjust the height and angle of the aluminum plates to avoid welding damage and enhance structural stability.
It realizes the flatness adjustment of the aluminum plate surface in high-altitude three-dimensional space, improves the construction quality and safety, reduces the damage of welding to the main steel structure, and reduces the project cost and steel consumption.
Smart Images

Figure CN115596087B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building construction, in particular to a structure and a construction method of an aluminum plate ball curtain. Background Art
[0002] With the progress of human civilization and the continuous improvement of construction technology, more and more spherical buildings are emerging. It is extremely difficult to construct a spherical screen in a high-altitude three-dimensional space. The traditional construction method is to weld a steel frame on the main steel structure and then fix the aluminum plate on the steel frame. Unlike a flat or simple curved ceiling, the size of the spherical screen ceiling and the aluminum plate tie system, and the positioning of the high-altitude three-dimensional space are difficult to accurately control, and the flatness error of the spherical screen surface will affect the projection effect and the audience's viewing experience; the aluminum plate tie system is suspended under the main steel structure, and its load is large, which is a major safety hazard during construction or use; at the same time, welding will also damage the coating of the main steel structure and burn the steel, reducing its bearing capacity. Summary of the invention
[0003] The object of the present invention is to provide a structure and construction method of an aluminum plate ball curtain to solve the problems raised in the above background technology.
[0004] To achieve the above object, the present invention provides the following technical solutions:
[0005] The invention discloses an aluminum plate ball curtain structure, comprising a three-layer structure from outside to inside, wherein the three-layer structure from outside to inside is a main steel structure, a curved steel truss and an aluminum plate in sequence; the main steel structure is externally connected and fixed to the curved steel truss through a connecting piece, the curved steel truss is installed with an aluminum plate connecting plate through a tension rod, and the aluminum plate is installed on the aluminum plate connecting plate.
[0006] Preferably, the main steel structure comprises three main steel structure pipes arranged in an inverted triangle shape in cross-section; the main steel structure is a hemisphere.
[0007] Preferably, the connecting piece is a clamp, which is shaped like two semicircular rings and is locked on both sides with double high-strength bolts; the clamp is sleeved on the outside of the bottom pipe of the main steel structure, and a rubber pad is attached to the inside of the clamp; one end of the clamp is fixedly connected to the vertical arc steel truss.
[0008] Preferably, the tie rod includes a normal tie rod and an oblique tie rod, which are rigid components, and the ends of which are spiral screw structures with a certain length, which cooperate with the fastening bolts at the bottom of the arc-shaped steel truss, and the length can be adjusted by adjusting the position of the fastening bolts; the normal tie rod and the oblique tie rod are connected to the bottom of the arc-shaped steel truss, and the other ends of the normal tie rod and the oblique tie rod are welded and fixed to the aluminum plate connecting plate.
[0009] Preferably, the arc-shaped steel truss comprises an upper chord, a lower chord, vertical bars and diagonal webs, and the vertical bars and diagonal webs are alternately installed between the upper chord and the lower chord; the upper chord, the lower chord and the vertical bars are made of hot-dip galvanized square tubes, and the diagonal webs are made of hot-dip galvanized square tubes.
[0010] Preferably, the arc-shaped steel truss is welded on site, and the component dimensions of the arc-shaped steel truss are subjected to force calculation to meet the load requirements.
[0011] A construction method of an aluminum plate ball curtain comprises the following steps:
[0012] S1: Erection of the main steel structure: There are twelve main steel structures in the entire dome, and the main steel structures are erected in sequence;
[0013] S2: Scaffolding: Use disc-type scaffolding with a maximum height of 35 meters; divide the spherical space at the installation location into four fan-shaped areas, and set up the scaffolding twice, with two symmetrical fan-shaped areas set up each time; reserve a work area to facilitate material transportation;
[0014] S3: Divide the construction sections of the curved steel trusses: Divide the dome into twelve construction sections according to the twelve frames of the main steel structure; each construction section includes a plurality of vertical curved steel trusses and a plurality of horizontal curved steel trusses;
[0015] S4: Determine the installation position of the curved steel truss: BIM technology is a digital expression of the entity and functional characteristics of the project facilities, which is used for the three-dimensional design and construction management of the project; layout the dome based on BIM technology, and determine the installation position of the curved steel truss according to the dome layout; make the curved steel truss;
[0016] S5: Installation of clamp: Use a clamp with a diameter of 225mm to fix it on the bottom pipe of the main steel structure; the inner diameter of the clamp should be adapted to the bottom pipe of the main steel structure;
[0017] S6: Hoisting the curved steel trusses: hoist the curved steel trusses from top to bottom in sequence, and the hoisted curved steel trusses form a complete hemispherical steel lattice shell structure; the vertical curved steel trusses located below the bottom pipe fittings of the main steel structure are connected with the hoop;
[0018] S7: Install the tie rod and the aluminum plate connecting plate: weld the normal tie rod and the diagonal tie rod at the bottom of the arc-shaped steel truss; weld the aluminum plate connecting plate at the bottom of the normal tie rod and the bottom of the diagonal tie rod; a connecting piece is provided at the connection between the diagonal tie rod and the aluminum plate connecting plate;
[0019] S8: Install aluminum plates: Install the aluminum plates on the aluminum plate connecting plates. To reduce the collision of aluminum plates caused by noise and vibration in the theater, bolts are used to fix the aluminum plates and the aluminum plate connecting plates. Adjacent aluminum plates are connected by tight seams, and thick shockproof rubber pads are added between adjacent aluminum plates.
[0020] S9: Measure the height of the aluminum plate: Use BIM technology to build a three-dimensional model of the ball screen, divide the ground at the installation location into grids with a spacing of two meters, calculate the height of the ball screen from the ground corresponding to each position of the grid according to the BIM model, use a laser plumb line to set up at a certain point of the ground grid, and mark the red dot where the plumb line laser hits the aluminum plate; use a high-precision laser rangefinder to set up at the ground grid and align it with the mark on the aluminum plate to measure the height of the aluminum plate; adjust the height of the aluminum plate accordingly; if the measured data is greater than the data in the BIM model, it means that the height of the aluminum plate is too large and needs to be lowered, otherwise the height of the aluminum plate should be raised; the influence of the ground height should be considered during measurement;
[0021] S10: Adjustment of the height and angle of the aluminum plate surface: By adjusting the bolts, the length of the normal tie rod and the diagonal tie rod can be adjusted to achieve the height adjustment of the four corners of the aluminum plate connecting plate, so that the aluminum plate conforms to the curvature of the dome, and the purpose of adjusting the height and angle of the aluminum plate surface is achieved; by adjusting the tie rod, the flatness of the joint between the arc-shaped steel truss and the hoop at the position below the main steel structure is adjusted, and its accuracy is allowed to have a certain error;
[0022] S11: Compare and adjust the original standard BIM model: After all the aluminum plates are installed, use a 3D scanner to build a model, compare it with the original standard BIM model and make local fine adjustments to eliminate the aluminum plate installation errors. After all adjustments are completed, all scaffolding will be removed.
[0023] Preferably, in step S4, within the allowable load range, the number of arc-shaped steel trusses in each construction section is less than or equal to nine, while ensuring that the spacing between them can meet the installation requirements of subsequent components.
[0024] Preferably, in step S10, by adjusting the tie rod, the position of the fastening bolt on the screw rod is adjusted, thereby adjusting the length and angle of the normal tie rod and the oblique tie rod, thereby adjusting the height of the four corners of the aluminum plate connecting plate to make the aluminum plate conform to the curvature of the dome.
[0025] In summary, the present invention has the following beneficial technical effects:
[0026] 1. The curved steel truss is hoisted under the main steel structure through the hoop to form a complete spherical steel truss structure. The curved steel truss itself bears part of the load, making the ceiling of the entire dome and the aluminum plate tie system more stable;
[0027] 2. The aluminum plate is fixed under the arc-shaped steel truss through tie rods and aluminum plate connectors. During the construction process, the length of the normal tie rod and the diagonal tie rod can be adjusted at any time by adjusting the bolts according to the measurement data, so as to adjust the height of the four corners of the aluminum plate connecting plate so that the aluminum plate conforms to the curvature of the dome, solving the problem of difficult adjustment of components in high-altitude three-dimensional space, timely and conveniently eliminating the flatness error of the dome surface, and improving the construction quality and progress.
[0028] 3. The clamp is fixed on the bottom pipe of the main steel structure, avoiding damage to the main steel structure and coating during welding; the clamp is fixed by high-strength bolts, and the position and angle can be adjusted at any time, reducing the workload of measurement and positioning and improving work efficiency;
[0029] 4. Project management informatization based on BIM application can accurately control the size of the ceiling of the dome and the tie system of the aluminum plate, and the positioning of the high-altitude three-dimensional space, which can effectively improve the project production efficiency and shorten the construction period;
[0030] 5. The rods of the curved steel truss adopt the structure of hot-dip galvanized square tubes, which greatly reduces the amount of steel used, reduces the structural load, improves safety, and reduces the project cost while ensuring the stability and reliability of the structure.
[0031] 6. When erecting the scaffolding, erect two symmetrical fan-shaped areas twice, which can not only ensure sufficient working surface, but also ensure symmetrical distribution of construction loads during construction, ensure safety and reduce structural deformation;
[0032] 7. All nodes installed and fixed during the entire construction process are removable to facilitate later maintenance. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 It is a construction flow chart of the present invention;
[0034] Figure 2 It is a structural diagram of the main steel structure;
[0035] Figure 3 This is a top view of the curved steel truss of a construction section;
[0036] Figure 4 It is a side section view of the aluminum plate tie system;
[0037] Figure 5 It is the front section view of the aluminum plate tie system;
[0038] Figure 6 It is a schematic diagram of the connection between the normal tie rod, the diagonal tie rod and the arc steel truss;
[0039] Figure 7 yes Figure 4 Enlarged view of point A in the middle;
[0040] Figure numerals: 1. Arc steel truss; 2. Main steel structure; 3. Hoop; 4. Rubber pad; 5. Normal tie rod; 6. Diagonal tie rod; 7. Aluminum plate connecting plate; 8. Aluminum plate; 9. Double high-strength bolts; 10. Bolts; 11. Upper chord; 12. Lower chord; 13. Vertical rod; 14. Diagonal web rod; 15. Screw rod; 16. Shockproof rubber pad; 17. Fastening bolts. DETAILED DESCRIPTION
[0041] The following is combined with Figure 1-6 The present invention is described in further detail.
[0042] A structure of an aluminum plate ball curtain, such as Figure 4 , Figure 5 As shown, it includes a three-layer structure from the outside to the inside, and the three-layer structure from the outside to the inside is respectively a main steel structure 2, a curved steel truss 1 and an aluminum plate 8; the main steel structure 2 is externally fixed to the curved steel truss 1 through a connecting piece, and the curved steel truss 1 is installed with an aluminum plate connecting plate 7 through a pull rod, and the aluminum plate 8 is installed on the aluminum plate connecting plate 7.
[0043] like Figure 2 As shown, the main steel structure 2 includes three main steel structure pipes arranged in an inverted triangle shape in cross section; the main steel structure 2 is a hemisphere.
[0044] like Figure 5 As shown, the connecting piece is a clamp 3, which is in the shape of two semicircular rings and is locked with double high-strength bolts 9 on both sides; the clamp 3 is sleeved on the outside of the bottom pipe of the main steel structure 2, and a rubber pad 4 is attached to the inside of the clamp 3; one end of the clamp 3 is fixedly connected to the vertical arc steel truss 1.
[0045] like Figure 6 As shown, the tie rod includes a normal tie rod 5 and an oblique tie rod 6, and the normal tie rod 5 and the oblique tie rod 6 are rigid components, and the ends are structured with a spiral screw rod 15 of a certain length, which cooperates with the fastening bolts 17 at the bottom of the arc-shaped steel truss 1, and the length can be adjusted by adjusting the position of the fastening bolts 17; the normal tie rod 5 and the oblique tie rod 6 are connected to the bottom of the arc-shaped steel truss 1, and the other ends of the normal tie rod 5 and the oblique tie rod 6 are welded and fixed to the aluminum plate connecting plate 7.
[0046] like Figure 4 As shown, the arc steel truss 1 includes an upper chord 11, a lower chord 12, a vertical bar 13 and a diagonal web 14, and the vertical bar 13 and the diagonal web 14 are alternately installed between the upper chord 11 and the lower chord 12; the upper chord 11, the lower chord 12 and the vertical bar 13 are made of 50*30*3 hot-dip galvanized square tubes, and the diagonal web 14 is made of 30*30*3 hot-dip galvanized square tubes.
[0047] The arc-shaped steel truss 1 is welded on site, and the component size of the arc-shaped steel truss 1 has been subjected to force calculation and meets the load requirements.
[0048] A construction method of an aluminum plate ball curtain, such as Figure 1-6 As shown, the following steps are included:
[0049] S1: erection of the main steel structure 2: there are twelve main steel structures 2 of the entire dome, and the main steel structures 2 are erected in sequence;
[0050] S2: Scaffolding: Use disc-type scaffolding with a maximum height of 35 meters; divide the spherical space at the installation location into four fan-shaped areas, and set up the scaffolding twice, with two symmetrical fan-shaped areas set up each time; reserve a work area to facilitate material transportation;
[0051] S3: Divide the construction sections of the curved steel truss 1: Divide the dome into twelve construction sections according to the twelve trusses of the main steel structure 2; Figure 3 As shown, each construction section includes a plurality of vertical curved steel trusses 1 and a plurality of horizontal curved steel trusses 1;
[0052] S4: Determine the installation position of the curved steel truss 1: BIM technology is a digital expression of the entity and functional characteristics of the project facilities, and is used for the three-dimensional design and construction management of the project; layout the dome based on BIM technology, and determine the installation position of the curved steel truss 1 according to the dome layout; make the curved steel truss 1;
[0053] S5: Installation of clamp 3: Figure 5 As shown, a clamp 3 with a diameter of 225 mm is sleeved and fixed on the bottom pipe fitting of the main steel structure 2; the inner diameter of the clamp 3 is adapted to the bottom pipe fitting of the main steel structure 2;
[0054] S6: Lifting curved steel truss 1: Figure 5 As shown, the arc steel trusses 1 are hoisted from top to bottom in sequence, and the hoisted arc steel trusses 1 form a complete hemispherical steel lattice shell structure; the vertical arc steel trusses 1 located below the bottom pipe of the main steel structure 2 are connected to the clamps 3; the arc steel trusses are hoisted below the main steel structure to form a complete spherical steel truss structure, and the arc steel trusses themselves bear part of the load, making the ceiling of the entire dome and the tie system of the aluminum plate more stable.
[0055] S7: Install the tie rod and aluminum plate connecting plate 7: Figure 4 , Figure 7 As shown, a normal tie rod 5 and an oblique tie rod 6 are welded at the bottom of the arc-shaped steel truss 1; an aluminum plate connecting plate 7 is welded at the bottom of the normal tie rod 5 and the bottom of the oblique tie rod 6; and a connecting piece is provided at the connection between the oblique tie rod and the aluminum plate connecting plate 7;
[0056] S8: Install aluminum plate 8: Figure 4 , Figure 7 As shown, the aluminum plate 8 is installed on the aluminum plate connecting plate 7; in order to reduce the collision of the aluminum plates 8 caused by noise and vibration in the theater, the aluminum plate 8 and the aluminum plate connecting plate 7 are fixed with bolts 10, and the adjacent aluminum plates 8 are connected with a tight seam, and a 3mm thick shockproof rubber pad 16 is added between the adjacent aluminum plates 8;
[0057] S9: Measure the height of the aluminum plate 8: Use BIM technology to build a three-dimensional model of the ball screen, divide the ground at the installation location into grids with a spacing of two meters, calculate the height of the ball screen from the ground corresponding to each position of the grid according to the BIM model, use a laser plumb line to set up at a certain point of the ground grid, and mark the red dot where the plumb line laser hits the aluminum plate 8; use a high-precision laser rangefinder to set up at the ground grid and align it with the mark on the aluminum plate 8 to measure the height of the aluminum plate 8; adjust the height of the aluminum plate accordingly; if the measured data is greater than the data in the BIM model, it means that the height of the aluminum plate is too large and needs to be lowered, otherwise the height of the aluminum plate should be raised; the influence of the ground height should be considered during measurement;
[0058] S10: Adjustment of the height and angle of the aluminum plate 8 surface: Figure 4 , Figure 6 As shown, by adjusting 10, the length of the normal tie rod 5 and the diagonal tie rod 6 can be adjusted to achieve the height adjustment of the four corners of the aluminum plate connecting plate 7, so that the aluminum plate 8 conforms to the curvature of the ball screen, and the purpose of adjusting the height and angle of the aluminum plate surface is achieved; by adjusting the tie rod, the flatness of the connection between the arc-shaped steel truss 1 and the hoop 3 at the position below the main steel structure 2 is adjusted, and its accuracy allows a certain error;
[0059] S11: Compare and adjust the original standard BIM model: After the aluminum plate 8 is fully installed, use a 3D scanner to build a model, compare it with the original standard BIM model and make local fine adjustments to eliminate the aluminum plate installation error. After all adjustments are completed, all scaffoldings are removed.
[0060] like Figure 3 As shown, in step S4, within the allowable load range, the number of arc-shaped steel trusses 1 in each construction section is made less than or equal to nine, while ensuring that the spacing between them can meet the installation of subsequent components.
[0061] like Figure 6 , Figure 7 As shown, in step S10, by adjusting the tie rod, the position of the fastening bolt 17 on the screw rod 15 is adjusted, thereby adjusting the length and angle of the normal tie rod 5 and the oblique tie rod 6, thereby adjusting the height of the four corners of the aluminum plate connecting plate 7, so that the aluminum plate 8 conforms to the curvature of the dome.
[0062] Working principle: The spherical screen is laid out through BIM technology, and the position of the arc steel truss 1 in each area and the length of the normal tie rod 5 and the diagonal tie rod 6 are determined according to the layout. The hoop 3 is connected to the main spherical steel structure 2 as the main force point, the top of the arc steel truss 1 is connected to the hoop 3, and the bottom of the arc steel truss 1 is connected to the rigid normal tie rod 5 and the diagonal tie rod 6. The aluminum plate 8 is connected to the normal tie rod 5 and the diagonal tie rod 6 through the aluminum plate connector 7. By adjusting the fastening position of the spiral screw 15 and the bolt 10, the length of the normal tie rod 5 and the diagonal tie rod 6 can be adjusted, and the height adjustment of the four corners of the aluminum plate connector 7 can be achieved, so as to achieve the purpose of adjusting the surface height and angle of the aluminum plate 8.
[0063] The above are all preferred embodiments of the present invention, and are not intended to limit the protection scope of the present invention. Therefore, any equivalent changes made based on the structure, shape, and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A structure of an aluminum plate ball curtain, characterized in that: The invention comprises a three-layer structure from outside to inside, wherein the three-layer structure from outside to inside is a main steel structure (2), a curved steel truss (1) and an aluminum plate (8) in sequence; the main steel structure (2) is externally fixed to the curved steel truss (1) via a connecting piece, the curved steel truss (1) is installed with an aluminum plate connecting plate (7) via a tension rod, and the aluminum plate (8) is installed on the aluminum plate connecting plate (7); The main steel structure (2) comprises three main steel structure pipes arranged in an inverted triangle shape in cross section; the main steel structure (2) is a hemispherical body; The connecting piece is a clamp (3), which is in the shape of two semicircular rings and is locked on both sides by double high-strength bolts (9); the clamp (3) is sleeved on the outside of the bottom pipe of the main steel structure (2), and a rubber pad (4) is attached to the inside of the clamp (3); one end of the clamp (3) is fixedly connected to the vertical arc-shaped steel truss (1); The tie rods include a normal tie rod (5) and an oblique tie rod (6). The normal tie rod (5) and the oblique tie rod (6) are rigid components, and the ends are spiral screw rods (15) of a certain length, which cooperate with the fastening bolts (17) at the bottom of the arc-shaped steel truss (1). The normal tie rod (5) and the oblique tie rod (6) are connected to the bottom of the arc-shaped steel truss (1), and the other ends of the normal tie rod (5) and the oblique tie rod (6) are welded and fixed to the aluminum plate connecting plate (7).
2. The structure of an aluminum plate ball curtain according to claim 1, characterized in that: The arc-shaped steel truss (1) comprises an upper chord (11), a lower chord (12), a vertical bar (13) and a diagonal web bar (14), wherein the vertical bar (13) and the diagonal web bar (14) are alternately installed between the upper chord (11) and the lower chord (12); the upper chord (11), the lower chord (12) and the vertical bar (13) are made of hot-dip galvanized square tubes, and the diagonal web bar (14) is made of hot-dip galvanized square tubes.
3. A construction method of an aluminum plate ball curtain, characterized in that: The construction of the aluminum plate ball curtain structure according to claim 1 comprises the following steps: S1: erection of the main steel structure (2): there are twelve main steel structures (2) of the entire dome, and the main steel structures (2) are erected in sequence; S2: Scaffolding: Use a disc-type scaffolding; divide the spherical space at the installation location into four fan-shaped areas, and set up the scaffolding twice, setting up two symmetrical fan-shaped areas each time; S3: Dividing the construction sections of the curved steel trusses: dividing the spherical screen into twelve construction sections according to the twelve frames of the main steel structure (2); each construction section includes a plurality of vertical curved steel trusses (1) and a plurality of horizontal curved steel trusses (1); S4: Determine the installation position of the curved steel truss: layout the dome screen based on BIM technology, and determine the installation position of the curved steel truss (1) according to the layout of the dome screen; and manufacture the curved steel truss (1); S5: Installation of the clamp (3): The clamp (3) is sleeved and fixed on the bottom pipe fitting of the main steel structure (2); the inner diameter of the clamp (3) is adapted to the bottom pipe fitting of the main steel structure (2); S6: hoisting the curved steel trusses (1): hoisting the curved steel trusses (1) in sequence from top to bottom, the hoisted curved steel trusses (1) forming a complete hemispherical steel lattice shell structure; the vertical curved steel trusses (1) located below the bottom pipe fittings of the main steel structure (2) are connected to the clamps (3); S7: Install the tie rod and the aluminum plate connecting plate (7): weld the normal tie rod (5) and the diagonal tie rod (6) at the bottom of the arc-shaped steel truss (1); weld the aluminum plate connecting plate (7) at the bottom of the normal tie rod (5) and the bottom of the diagonal tie rod (6); a connecting piece is provided at the connection between the diagonal tie rod and the aluminum plate connecting plate (7); S8: Installing the aluminum plate (8): installing the aluminum plate (8) on the aluminum plate connecting plate (7); the aluminum plate (8) and the aluminum plate connecting plate (7) are fixed with bolts (10), adjacent aluminum plates (8) are connected with a tight seam, and thick shockproof rubber pads (16) are added between adjacent aluminum plates (8); S9: Measure the height of the aluminum plate (8): Use BIM technology to build a three-dimensional model of the ball screen, divide the ground at the installation location into grids with a spacing of two meters, calculate the height of the ball screen from the ground corresponding to each position of the grid according to the BIM model, use a laser plumb line to set up at a certain point of the ground grid, and mark the red dot on the aluminum plate (8) where the plumb line laser hits; use a high-precision laser rangefinder to set up at the ground grid and align it with the mark on the aluminum plate (8) to measure the height of the aluminum plate (8); the influence of the ground height should be considered during measurement; S10: Adjustment of the height and angle of the aluminum plate surface: by adjusting the tie rod, the aluminum plate (8) is made to conform to the curvature of the dome; by adjusting the tie rod, the flatness of the connection between the arc-shaped steel truss (1) and the clamp (3) below the main steel structure (2) is adjusted, and a certain error is allowed in its accuracy; S11: Adjustment by comparing with the original standard BIM model: After all the aluminum plates (8) are installed, a 3D scanner is used to build a model, compare it with the original standard BIM model and make local fine adjustments. After all the adjustments are completed, all scaffoldings are removed.
4. The construction method of an aluminum plate ball curtain according to claim 3 is characterized in that: In step S4, within the load allowable range, the number of arc-shaped steel trusses (1) in each construction section is made less than or equal to nine, while ensuring that the spacing between them can meet the installation requirements of subsequent components.
5. The construction method of an aluminum plate ball curtain according to claim 3 is characterized in that: In step S10, by adjusting the tie rod, the position of the fastening bolt (17) on the screw rod (15) is adjusted, thereby adjusting the length and angle of the normal tie rod (5) and the diagonal tie rod (6), thereby adjusting the height of the four corners of the aluminum plate connecting plate (7) so that the aluminum plate (8) conforms to the curvature of the dome.