A horizontal directional drilling rig construction process simulation evaluation system and method

Through simulated drilling system and simulated interference system, real-time data acquisition is used to use MEMS sensors to solve the problems of large trajectory deviation and measurement errors in horizontal directional drilling rig construction, and quantitative evaluation of drilling trajectory, drill bit damage and environmental impact is realized, reducing the Economic losses and ecological damage.

CN115822552BActive Publication Date: 2024-12-03CHINA RAILWAY 16TH BUREAU GRP ROAD & BRIDGE ENG CO LTD +3
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211314582.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-10-25
Publication Date
2024-12-03
Estimated Expiration
2042-10-25

AI Technical Summary

Technical Problem

When the existing horizontal directional drilling rig construction technology passes through complex formations, the drilling trajectory deviates from the design trajectory, resulting in economic losses and ecological damage, and lacks effective construction process evaluation systems and methods, resulting in large measurement errors and low data acquisition frequency.

Method used

Using a system including simulated drilling system, simulated interference system and simulated evaluation unit, the MEMS three-axis accelerometer and gyroscope are used for real-time data acquisition and transmission, and the drilling process is simulated through the simulated interference system to perform drilling trajectory and drill bit damage. Quantitative evaluation of efficiency and environmental impact.

Benefits of technology

It significantly improves the frequency and accuracy of data acquisition, reduces drilling trajectory deviation and drill bit damage, reduces economic losses, and provides optimization solutions for actual engineering, reducing damage to the ecological environment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115822552B_ABST
    Figure CN115822552B_ABST
Patent Text Reader

Abstract

The present invention is a horizontal directional drilling rig construction process simulation evaluation system and method, including a simulated drilling system, a simulated interference system, and a simulated evaluation unit. The simulated drilling system includes a drill bit, a drill rod, an inertial sensor unit group, a data acquisition box, and a data analysis device. The simulated interference system includes an inlet non-interference section, an external magnetic field interference section, a rock formation interference section, a water pressure interference section, a composite interference section, and an outlet non-interference section. The simulated evaluation unit includes a simulated drill bit damage evaluation unit, a simulated drilling trajectory deviation evaluation unit, a simulated drilling efficiency evaluation unit, and a simulated drilling environmental impact evaluation unit. The construction process of the horizontal directional drilling rig is evaluated by the interference system and the evaluation system, providing a reliable evaluation system for evaluating the construction effect of the horizontal directional drilling rig.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a construction process simulation evaluation system and method, and in particular to a construction process simulation evaluation system and method for a horizontal directional drilling rig. Background Art

[0002] At present, horizontal directional drilling is generally used for drilling construction of various municipal pipelines under roads, railways, bridges and rivers. Although this drilling construction technology continues to break records in terms of crossing length and crossing complex strata, it is affected by terrain, landforms and special geological conditions of rivers, especially when crossing pebbles and gravel strata for long distances and some irregular drilling trajectories, due to factors such as stratum anisotropy and the ability of deflection tools, the actual drilling trajectory often cannot move along the designed trajectory. Once the trajectory deviates from the designed trajectory, it not only causes huge economic losses, but also causes irreparable ecological damage to the surface. At home and abroad, the drilling trajectory is mainly guided and positioned by installing magnetic needles, accelerometer sensors and dipole emission sources in the drill bit in combination with positioning trackers. In order to make the drill bit reach the target point more accurately, the drilling system must be evaluated. The current analysis and evaluation of the actual drilling trajectory (such as patent documents CN112364510A, CN 105335983A and CN 106437677A) involves many parameters, and the data acquisition frequency is not high, resulting in large trajectory measurement errors. At present, there is almost no evaluation system and method for the construction process of horizontal directional drilling rigs. If the on-site construction process evaluation method is adopted, it will not only consume a lot of manpower, material resources and economy, but also cause a certain degree of damage to the ecological environment, which will have an adverse impact on the horizontal directional drilling construction in actual projects.

[0003] Micro-Electro-Mechanical System (MEMS), also known as micro-electro-mechanical system, microsystem, micro-machine, etc., refers to high-tech devices with a size of several millimeters or even smaller. The internal structure of a MEMS is generally in the micron or even nanometer level, and it is an independent intelligent system. MEMS can well solve the problem of low acquisition frequency. Summary of the invention

[0004] Aiming at the technical problems that the current drilling trajectory and quality evaluation involve many parameters, low data acquisition frequency, large measurement errors and lack of horizontal directional drilling rig construction process simulation evaluation system and method, a horizontal directional drilling rig construction process simulation evaluation system and method are proposed, specifically:

[0005] A horizontal directional drilling rig construction process simulation evaluation system, comprising a simulated drilling system, a simulated interference system, and a simulated evaluation unit. The simulated drilling system comprises a drill bit, a drill rod, an inertial sensor unit group, a data acquisition box, and a data analysis device. The simulated interference system comprises an entrance non-interference section, an external magnetic field interference section, a rock formation interference section, a water pressure interference section, a composite interference section, and an exit non-interference section. The simulated evaluation unit comprises a simulated drill bit damage evaluation unit, a simulated drilling trajectory deviation evaluation unit, a simulated drilling efficiency evaluation unit, and a simulated drilling environmental impact evaluation unit. The data acquisition box is connected to the data acquisition unit. According to the analysis equipment connection; the simulated drilling system performs simulated drilling in the simulated interference system, and the simulation evaluation unit evaluates the construction process after drilling; the simulated drill bit damage evaluation unit performs quantitative evaluation by measuring the degree of wear on the drill bit surface and the crack distribution, the simulated drilling trajectory deviation evaluation unit performs quantitative evaluation after comparing the actual drilling trajectory with the designed trajectory, the simulated drilling efficiency evaluation unit performs quantitative evaluation by the completion time per unit length of the drilling trajectory, and the simulated drilling environmental impact evaluation unit performs quantitative evaluation by the engineering geological surface vibration and mud discharge during the drilling process.

[0006] Furthermore, each inertial sensor unit in each inertial sensor unit group is connected by wires, and each inertial sensor unit includes a MEMS three-axis accelerometer, a MEMS three-axis gyroscope and a packaging carrier, wherein the MEMS three-axis accelerometer and the MEMS three-axis gyroscope are both located in the packaging carrier, and the MEMS three-axis accelerometer is used to measure the three coordinate components (G x ,G y ,G z ), where the positive direction of the X-axis is consistent with the drilling direction, and the coordinate system is a left-handed coordinate system; the MEMS three-axis gyroscope is used to measure the three components of the geomagnetic field at the location (M x ,M y ,M z ), where the positive direction of the X-axis is consistent with the drilling direction, and the coordinate system is a right-hand coordinate system.

[0007] Furthermore, the entrance non-interference section and the exit non-interference section in the simulated interference system are respectively consistent with the initial section and the end section of the drilling trajectory design; the external magnetic field interference section is consistent with the initial section extension section of the drilling trajectory design; the rock formation interference section sets the corresponding engineering geological environment according to the actual engineering geological conditions; the water pressure interference section is the underground water pressure interference section; the composite interference section is a composite interference section of the external magnetic field, rock formation interference and water pressure interference.

[0008] A method for simulating and evaluating a construction process of a horizontal directional drilling rig, the method comprising the following steps:

[0009] S1. Make the entrance non-interference section and the exit non-interference section in the simulated interference system according to the trajectory design curve, set the external magnetic field interference section, rock formation interference section, water pressure interference section and composite interference section in the simulated interference system according to the engineering geological conditions and construction process evaluation requirements, and arrange the vibration detector in the simulated interference system;

[0010] S2. Place the drill bit into the simulated interference system for drilling and start timing. The timing ends when the drill bit drills out of the exit interference section. The simulated drilling trajectory length divided by the timing time is the simulated drilling efficiency.

[0011] S3. The three components of the geomagnetic field at the drill bit location measured by the MEMS triaxial accelerometer (M x ,M y ,M z ), and calculate the pitch angle (θ) between the drill bit and the horizontal ground and the heading angle (φ) between the drill bit and the drilling direction through data analysis equipment;

[0012] S4. According to the three components measured by the MEMS three-axis gyroscope (M x ,M y ,M z ), the MEMS three-axis gyroscope is subjected to non-horizontal correction by a data analysis device to obtain a corrected heading angle (ψ);

[0013] S5. Steps S3 and S4 are the calculation method for a single measurement point. As the drilling goes deeper, the number of measurement points increases continuously. The section near the drilling rig is set as the zero point, the end of the drill bit is set as the tail, the vertical ground upward is the Z axis, the predetermined drilling direction is the X axis, and the Y axis is perpendicular to the Z axis and the X axis. The serial number of each measurement point increases continuously as the drilling trajectory extends, and each measurement replaces the previous measurement point.

[0014] S6. In the measurement of step S5, multiple data of coordinate values ​​of fixed positions on the drilling trajectory are averaged for each measurement to obtain the final coordinates of each point on the drilling trajectory;

[0015] S7. According to the final coordinates of each point on the trajectory obtained in step S6, a real-time simulated drilling trajectory curve is drawn by a data analysis device;

[0016] S8. Calculate the standard deviation of the coordinates of each point on the real-time simulated drilling trajectory curve obtained in step S7 and the designed drilling trajectory curve, draw a standard deviation distribution diagram, and use the sum of the standard deviations of different interference segments as a quantitative indicator for evaluating the deviation of the drilling trajectory of the interference segment;

[0017] S9. taking the absolute values ​​of the vibration velocity and acceleration collected by the vibration detector during the drilling process and summing them up respectively, and taking the summation result and the total mud discharge mass as the simulated drilling environmental impact assessment index;

[0018] S10. After cleaning and drying the drill bit after drilling, measure its mass and subtract the mass before drilling. The mass difference is the wear of the drill bit. The mass loss of the drill bit, the number of new cracks, the new crack width, the new crack length and the new crack depth are used as drill bit damage evaluation indicators.

[0019] Furthermore, the calculation formulas for the pitch angle (θ) and heading angle (φ) measured by the MEMS three-axis accelerometer are: and

[0020] Where: G x ,G y ,G z They represent the acceleration of the three-axis accelerometer in the x, y, and z directions respectively.

[0021] Further, according to the data of the MEMS three-axis gyroscope, through the formula:

[0022] M' x =M x cosθ+M z sinθ

[0023] M' y =M y cosφ+M x sinθsinφ-M z cosθsinφ

[0024] M' z =-M x sinθcosφ+M z cosθcosφ+M y sinφ

[0025] The MEMS three-axis gyroscope is non-horizontally corrected to obtain the corrected geomagnetic field component (M' x ,M' y ,M' z ), and according to the formula:

[0026]

[0027] Get the corrected heading angle (ψ).

[0028] Where: M' x ,M' y ,M' z They represent the components of the Earth's magnetic field in the x, y, and z directions respectively.

[0029] Further, according to the formula:

[0030] x n+1 =xn +L n+1 cosθ n+1 cosψ n+1

[0031] y n+1 =y n +L n+1 cosθ n+1 sinψ n+1

[0032] z n+1 =z n +L n+1 sinθ n+1

[0033] Calculate the coordinates of each point on the trajectory.

[0034] Where: x n+1 ,y n+1 、z n+1 are the three-dimensional coordinates of the sensor installation position in the (n+1)th section of drill pipe; L is the length of a single section of drill pipe.

[0035] Further, according to the formula:

[0036]

[0037]

[0038]

[0039] The final coordinates of each point on the trajectory are calculated.

[0040] Furthermore, the track measurement points are spaced at intervals of 1 meter.

[0041] The present invention arranges a MEMS triaxial accelerometer and a MEMS triaxial gyroscope in the drill rod to realize data collection and transmission of each point on the real-time trajectory of drilling, and greatly improves the frequency, accuracy and efficiency of data collection, providing data support for the evaluation of deviation of the simulated drilling trajectory. The traditional measurement method measures the coordinates of each point by arranging sensors on the drill bit, and the measurement results of the previous few times are required when calculating the trajectory, which leads to a large cumulative error. The method used in the present invention is to calculate the trajectory by collecting data from each node in real time, which has the advantage of no error accumulation and high calculation accuracy. At the same time, the present invention provides a horizontal directional drilling rig construction process simulation evaluation system and method, which can not only quantitatively evaluate the simulated drilling trajectory, but also realize quantitative simulation evaluation of the damage of the drill bit, quantitative simulation evaluation of the drilling efficiency, and quantitative simulation evaluation of the drilling environmental impact. By evaluating the drilling rig equipment and the influencing factors in the drilling process, data support is provided for the optimization of the actual engineering drilling plan, and at the same time, the economic losses caused by the failure of drilling in the actual engineering due to the failure to evaluate the construction process of the drilling rig are significantly reduced. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0043] Figure 1 The present invention is a schematic diagram of the structure of a horizontal directional drilling rig construction process simulation evaluation system and method.

[0044] Figure 2 The present invention is a schematic diagram of the structure of a drilling system in a horizontal directional drilling rig construction process simulation evaluation system and method.

[0045] Figure 3 The present invention is a structural schematic diagram of an interference system in a horizontal directional drilling rig construction process simulation evaluation system and method.

[0046] Figure 4 It is a structural schematic diagram of the pitch angle in the drilling system in a horizontal directional drilling rig construction process simulation evaluation system and method.

[0047] Figure 5 The present invention is a structural schematic diagram of a heading angle in a drilling system in a horizontal directional drilling rig construction process simulation evaluation system and method.

[0048] Figure 6 The present invention is a schematic diagram of the layout of an inertial sensor unit group in a real-time dynamic monitoring system and method for a horizontal directional drilling trajectory.

[0049] Figure 7 The present invention is a schematic diagram of the structure of an inertial sensor unit in a real-time dynamic monitoring system and method for horizontal directional drilling trajectory.

[0050] Figure 8 The present invention is a schematic diagram of the arrangement of an array structure of inertial sensor units in a real-time dynamic monitoring system and method for horizontal directional drilling trajectories.

[0051] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0052] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0053] like Figures 1 to 3 As shown, a horizontal directional drilling rig construction process simulation evaluation system includes a simulation drilling system 1, a simulation interference system 2, and a simulation evaluation unit 3. The simulation drilling system 1 includes a drill bit 4, a drill rod 5, an inertial sensor unit group 6, a data acquisition box 7 and a data analysis device 8. The simulation interference system 2 includes an entrance non-interference section 9, an external magnetic field interference section 10, a rock formation interference section 11, a water pressure interference section 12, a composite interference section 13 and an exit non-interference section 14. The simulation evaluation unit includes a simulation drill bit damage evaluation unit, a simulation drilling trajectory deviation evaluation unit, a simulation drilling efficiency evaluation unit and a simulation drilling environmental impact evaluation unit. ; The data acquisition box is connected to the data analysis equipment; the simulated drilling system performs simulated drilling in the simulated interference system, and the simulated evaluation unit evaluates the construction process after drilling; the simulated drill bit damage evaluation unit performs quantitative evaluation by measuring the degree of wear on the drill bit surface and the crack distribution, the simulated drilling trajectory deviation evaluation unit performs quantitative evaluation after comparing the actual drilling trajectory with the designed trajectory, the simulated drilling efficiency evaluation unit performs quantitative evaluation through the completion time per unit length of the drilling trajectory, and the simulated drilling environmental impact evaluation unit performs quantitative evaluation through the vibration of the engineering geological surface and the mud discharge during the drilling process.

[0054] The evaluation system of the present invention performs quantitative simulation evaluation on drill bit damage, drilling trajectory deviation, drilling efficiency, and drilling environmental impact. By evaluating the drilling rig equipment and the influencing factors in the drilling process, data support is provided for the optimization of drilling plans for actual projects, while significantly reducing the economic losses caused by drilling failures in actual projects due to failure to conduct construction process evaluation on the drilling rig.

[0055] The specific evaluation process of the simulated drill bit damage evaluation unit is as follows: before the drill bit is installed, the drill bit is cleaned and dried, the drill bit mass is weighed (recorded as m1), and the number (N1), width (B1), length (L1) and depth (D1) of cracks on the drill bit surface are recorded; after the drill bit is drilled out of the non-interference section of the outlet, it is cleaned and dried, and then the drill bit mass is weighed (recorded as m2), and the number (N2), width (B2), length (L2) and depth (D2) of cracks on the drill bit surface are recorded. The drill bit mass loss (m), the number of new cracks (N), the new crack width (B), and the new crack length (L2) are calculated. z ) and the additional crack depth (D) (m = m2-m1, N = N2-N1; B = B2-B1, L z =L2-L1, D=D2-D1), and use it as a quantitative indicator for drill bit loss evaluation. The smaller the value, the less damage to the drill bit.

[0056] The specific evaluation process of the simulated drilling trajectory deviation evaluation unit is as follows: the drilling trajectory S1 in the simulated drilling process is measured by the inertial sensor unit group installed in the drill rod, and the three-dimensional coordinate displacement deviation X1, Y1, Z1 and angle deviation θ between the simulated drilling trajectory S1 and the actual designed drilling trajectory S0 are calculated through the three-dimensional coordinate system. x ,θ y ,θ z , the displacement deviation and angle deviation are used as quantitative evaluation indicators of the simulated drilling trajectory deviation. The smaller the value, the smaller the deviation of the simulated drilling trajectory.

[0057] The specific evaluation process of the simulated drilling efficiency evaluation unit is as follows: put the drill bit into the simulated interference system to drill, and start timing. The timing ends when the drill bit drills out of the exit interference section. The time used is recorded as t, and the length of the simulated drilling trajectory during this period is recorded as L s , simulated drilling trajectory length L s Divided by the time t, the simulated drilling efficiency ρ (ρ = L s / t), the unit is m / h. The larger the value, the higher the drilling efficiency.

[0058] The specific evaluation process of the simulated drilling environmental impact assessment unit is as follows: the absolute values ​​of the vibration velocity v and acceleration ɑ collected by the vibration detector during the drilling process are taken and summed up respectively and recorded as Σ. The summation result Σ and the total mud discharge mass M are used as quantitative evaluation indicators of the simulated drilling environmental impact. The larger the value, the greater the impact of the drilling on the environment.

[0059] like Figure 4 As shown in the figure, the angle between the drill pipe and the horizontal ground is the pitch angle θ. Figure 5 As shown in , the angle between the drill pipe and the direction of the borehole is the heading angle ψ. Figure 6 As shown, the inertial sensor unit group is a regular tetrahedron structure composed of five inertial sensor units, and the five inertial sensor units are respectively located at the vertices and the center of the regular tetrahedron. The positive direction of the inertial sensor unit coordinate axis in the inertial sensor unit group is as follows Figure 6 shown.

[0060] The method used in the present invention is to calculate the trajectory by collecting data from each node in real time, which has the advantage of no error accumulation and improves calculation accuracy. Figure 7 As shown, the inertial sensing unit includes a MEMS three-axis accelerometer, a MEMS three-axis gyroscope and a packaging carrier, and the MEMS three-axis accelerometer and the MEMS three-axis gyroscope are located on the outer surface of the packaging carrier. Figure 8 As shown, the inertial sensor unit group is arranged at the upper and lower vertices in the middle of the inner wall of each drill pipe section in the horizontal directional drilling, forming a linear array structure.

[0061] Each inertial sensor unit in each inertial sensor unit group is connected by wires. Each inertial sensor unit includes a MEMS three-axis accelerometer, a MEMS three-axis gyroscope and a packaging carrier. The MEMS three-axis accelerometer and the MEMS three-axis gyroscope are both located in the packaging carrier. The MEMS three-axis accelerometer is used to measure the three coordinate components (G x ,G y ,G z ), where the positive direction of the X-axis is consistent with the drilling direction, and the coordinate system is a left-handed coordinate system; the MEMS three-axis gyroscope is used to measure the three components of the geomagnetic field at the location (M x ,M y ,M z ), where the positive direction of the X-axis is consistent with the drilling direction, and the coordinate system is a right-hand coordinate system.

[0062] The entrance non-interference section and the exit non-interference section in the simulated interference system are respectively consistent with the initial section and the end section of the drilling trajectory design; the external magnetic field interference section is consistent with the extension section of the initial section of the drilling trajectory design; the rock formation interference section sets the corresponding engineering geological environment according to the actual engineering geological conditions; the water pressure interference section is the underground water pressure interference section; the composite interference section is a composite interference section of external magnetic field, rock formation interference and water pressure interference.

[0063] The simulated interference system is not limited to being set to the above-mentioned interference sections, and can be set according to actual conditions to facilitate simulation operations, data collection and related evaluation of the actual conditions of the corresponding project.

[0064] Based on the above simulation evaluation system provided by the embodiment of the present invention, the embodiment of the present invention also provides a horizontal directional drilling rig construction process simulation evaluation method, the simulation evaluation method comprising the following steps:

[0065] S1. Make the entrance non-interference section and the exit non-interference section in the simulated interference system according to the trajectory design curve, set the external magnetic field interference section, rock formation interference section, water pressure interference section and composite interference section in the simulated interference system according to the engineering geological conditions and construction process evaluation requirements, and arrange the vibration detector in the simulated interference system;

[0066] S2. Place the drill bit into the simulated interference system for drilling and start timing. The timing ends when the drill bit drills out of the exit interference section. The simulated drilling trajectory length divided by the timing time is the simulated drilling efficiency.

[0067] S3. The three components of the geomagnetic field at the drill bit location measured by the MEMS triaxial accelerometer (M x ,M y ,M z ), and calculate the pitch angle (θ) between the drill bit and the horizontal ground and the heading angle (φ) between the drill bit and the drilling direction through data analysis equipment;

[0068] S4. According to the three components measured by the MEMS three-axis gyroscope (M x ,M y ,M z ), the MEMS three-axis gyroscope is subjected to non-horizontal correction by a data analysis device to obtain a corrected heading angle (ψ);

[0069] S5. Steps S3 and S4 are the calculation method for a single measurement point. As the drilling goes deeper, the number of measurement points increases continuously. The section near the drilling rig is set as the zero point, the end of the drill bit is set as the tail, the vertical ground upward is the Z axis, the predetermined drilling direction is the X axis, and the Y axis is perpendicular to the Z axis and the X axis. The serial number of each measurement point increases continuously as the drilling trajectory extends, and each measurement replaces the previous measurement point.

[0070] S6. In the measurement of step S5, multiple data of coordinate values ​​of fixed positions on the drilling trajectory are averaged for each measurement to obtain the final coordinates of each point on the drilling trajectory;

[0071] S7. According to the final coordinates of each point on the trajectory obtained in step S6, a real-time simulated drilling trajectory curve is drawn by a data analysis device;

[0072] S8. Calculate the standard deviation of the coordinates of each point on the real-time simulated drilling trajectory curve obtained in step S7 and the designed drilling trajectory curve, draw a standard deviation distribution diagram, and use the sum of the standard deviations of different interference segments as a quantitative indicator for evaluating the deviation of the drilling trajectory of the interference segment;

[0073] S9. taking the absolute values ​​of the vibration velocity, acceleration and displacement values ​​collected by the vibration detector during the drilling process and summing them up respectively, and taking the summation result and the total mud discharge mass as the simulated drilling environmental impact assessment index;

[0074] S10. After cleaning and drying the drill bit after drilling, measure its mass and subtract the mass before drilling. The mass difference is the wear of the drill bit. The mass loss of the drill bit, the number of new cracks, the new crack width, the new crack length and the new crack depth are used as drill bit damage evaluation indicators.

[0075] The calculation formulas for the pitch angle (θ) and heading angle (φ) measured by the MEMS three-axis accelerometer are and

[0076] Where: G x ,G y ,G z They represent the acceleration of the three-axis accelerometer in the x, y, and z directions respectively.

[0077] According to the data of MEMS three-axis gyroscope, through the formula:

[0078] M' x =M x cosθ+M z sinθ

[0079] M' y =M y cosφ+M x sinθsinφ-M z cosθsinφ

[0080] M' z =-M x sinθcosφ+M z cosθcosφ+M y sinφ

[0081] The MEMS three-axis gyroscope is non-horizontally corrected to obtain the corrected geomagnetic field component (M' x ,M' y ,M' z ), and according to the formula:

[0082]

[0083] Get the corrected heading angle (ψ).

[0084] Where: M' x ,M' y ,M' z They represent the components of the Earth's magnetic field in the x, y, and z directions respectively.

[0085] According to the formula:

[0086] x n+1 =x n +L n+1 cosθ n+1 cosψ n+1

[0087] y n+1 =y n +L n+1 cosθ n+1 sinψ n+1

[0088] z n+1 =z n +L n+1 sinθ n+1

[0089] Calculate the coordinates of each point on the trajectory.

[0090] Where: x n+1 ,y n+1 、z n+1 are the three-dimensional coordinates of the sensor installation position in the (n+1)th section of drill pipe; L is the length of a single section of drill pipe.

[0091] According to the formula:

[0092]

[0093]

[0094]

[0095] The final coordinates of each point on the trajectory are calculated.

[0096] The track measurement points are spaced 1 meter apart.

[0097] The method used in the present invention is to calculate the trajectory by collecting data from each node in real time, which has the advantage of no error accumulation and provides calculation accuracy. The present invention provides a horizontal directional drilling rig construction process simulation evaluation system and method, which uses an interference system to simulate various influencing factors at the actual engineering site, and uses an evaluation system to quantitatively evaluate the change in drilling system efficiency caused by the interference system, thereby realizing indoor low-cost simulation of the drilling process and construction process evaluation, and providing a targeted reference for drilling system optimization and drilling construction process evaluation in actual drilling engineering.

[0098] The above is a preferred embodiment of the present invention. It should be pointed out that a person skilled in the art can make several improvements and modifications without departing from the principle of the present invention. These improvements and modifications are also considered to be within the scope of protection of the present invention.

Claims

1. A method for simulating and evaluating the construction process of horizontal directional drilling rigs. It is characterized in that The invention relates to a horizontal directional drilling rig construction process simulation evaluation system, comprising a simulated drilling system, a simulated interference system and a simulated evaluation unit. The simulated drilling system comprises a drill bit, a drill rod, an inertial sensor unit group, a data acquisition box and a data analysis device. The simulated interference system comprises an inlet non-interference section, an external magnetic field interference section, a rock formation interference section, a water pressure interference section, a composite interference section and an outlet non-interference section. The simulated evaluation unit comprises a simulated drill bit damage evaluation unit, a simulated drilling trajectory deviation evaluation unit, a simulated drilling efficiency evaluation unit and a simulated drilling environmental impact evaluation unit. The data acquisition box and the inertial sensor unit group comprise a drill bit, a drill rod, an inertial sensor unit group, a data acquisition box and a data analysis device. The simulated interference system comprises an inlet non-interference section, an external magnetic field interference section, a rock formation interference section, a water pressure interference section, a composite interference section and an outlet non-interference section. The simulated evaluation unit comprises a simulated drill bit damage evaluation unit, a simulated drilling trajectory deviation evaluation unit, a simulated drilling efficiency evaluation unit and a simulated drilling environmental impact evaluation unit. The data analysis equipment is connected; the simulated drilling system simulates drilling in the simulated interference system, and the simulated evaluation unit evaluates the construction process after drilling; the simulated drill bit damage evaluation unit performs quantitative evaluation by measuring the wear degree and crack distribution of the drill bit surface, the simulated drilling trajectory deviation evaluation unit performs quantitative evaluation by comparing the actual drilling trajectory with the designed trajectory, the simulated drilling efficiency evaluation unit performs quantitative evaluation by the completion time per unit length of the drilling trajectory, and the simulated drilling environmental impact evaluation unit performs quantitative evaluation by the vibration of the engineering geological surface and the amount of mud discharged during the drilling process; Each inertial sensor unit in each inertial sensor unit group is connected by wires. Each inertial sensor unit includes a MEMS three-axis accelerometer, a MEMS three-axis gyroscope and a packaging carrier. The MEMS three-axis accelerometer and the MEMS three-axis gyroscope are both located in the packaging carrier. The MEMS three-axis accelerometer is used to measure the three coordinate components (G x ,G y ,G z ), where the positive direction of the X-axis is consistent with the drilling direction, and the coordinate system is a left-handed coordinate system; the MEMS three-axis gyroscope is used to measure the three components of the geomagnetic field at the location (M x ,M y ,M z ), where the positive direction of the X-axis is consistent with the drilling direction, and the coordinate system is a right-hand coordinate system; The entrance non-interference section and the exit non-interference section in the simulated interference system are respectively consistent with the initial section and the end section of the drilling trajectory design; the external magnetic field interference section is consistent with the extension section of the initial section of the drilling trajectory design; the rock formation interference section sets the corresponding engineering geological environment according to the actual engineering geological conditions; the water pressure interference section is the underground water pressure interference section; the composite interference section is the composite interference section of the external magnetic field, rock formation interference and water pressure interference; The simulation evaluation method comprises the following steps: S1. Make the entrance non-interference section and the exit non-interference section in the simulated interference system according to the trajectory design curve, set the external magnetic field interference section, rock formation interference section, water pressure interference section and composite interference section in the simulated interference system according to the engineering geological conditions and construction process evaluation requirements, and arrange the vibration detector in the simulated interference system; S2. Place the drill bit into the simulated interference system for drilling and start timing. The timing ends when the drill bit drills out of the exit interference section. The simulated drilling trajectory length divided by the timing time is the simulated drilling efficiency. S3. The three components of the geomagnetic field at the drill bit location measured by the MEMS triaxial accelerometer (M x ,M y ,M z ), and calculate the pitch angle (θ) between the drill bit and the horizontal ground and the heading angle (φ) between the drill bit and the drilling direction through data analysis equipment; S4. According to the three components measured by the MEMS three-axis gyroscope (M x ,M y ,M z ), the MEMS three-axis gyroscope is subjected to non-horizontal correction by a data analysis device to obtain a corrected heading angle (ψ); S5. Steps S3 and S4 are the calculation method for a single measurement point. As the drilling progresses, the measurement points are continuously increased according to the set trajectory measurement point interval. The section near the drilling rig is set as the zero point, the end of the drill bit is set as the tail, the vertical ground upward is the Z axis, the predetermined drilling direction is the X axis, and the Y axis is perpendicular to the Z axis and the X axis. The serial number of each measurement point increases continuously as the drilling trajectory extends, and each measurement replaces the previous measurement point after a measurement. S6. In the measurement of step S5, multiple data of coordinate values ​​of fixed positions on the drilling trajectory are averaged for each measurement to obtain the final coordinates of each point on the drilling trajectory; S7. According to the final coordinates of each point on the trajectory obtained in step S6, a real-time simulated drilling trajectory curve is drawn by a data analysis device; S8. Calculate the standard deviation of the coordinates of each point on the real-time simulated drilling trajectory curve obtained in step S7 and the designed drilling trajectory curve, draw a standard deviation distribution diagram, and use the sum of the standard deviations of different interference segments as a quantitative indicator for evaluating the deviation of the drilling trajectory of the interference segment; S9. taking the absolute values ​​of the vibration velocity and acceleration values ​​collected by the vibration detector during the drilling process and summing them up respectively, and taking the summation result and the total mud discharge mass as the simulated drilling environmental impact assessment index; S10. After cleaning and drying the drill bit after drilling, measure its mass and subtract the mass before drilling. The mass difference is the wear of the drill bit. The mass loss of the drill bit, the number of new cracks, the new crack width, the new crack length and the new crack depth are used as drill bit damage evaluation indicators.

2. A horizontal directional drilling rig construction process simulation evaluation method according to claim 1, It is characterized in that In step S3, the pitch angle (θ) and heading angle (φ) measured by the MEMS three-axis accelerometer are calculated as follows: and Where: G x ,G y ,G z They represent the acceleration of the three-axis accelerometer in the x, y, and z directions respectively.

3. A horizontal directional drilling rig construction process simulation evaluation method according to claim 1, It is characterized in that In step S4, according to the data of the MEMS three-axis gyroscope, the formula is: M' x =M x cosθ+M z sinθ M' y =M y cosφ+M x sinθsinφ-M z cosθsinφ M' z =-M x sinθcosφ+M z cosθcosφ+M y sinφ; The MEMS three-axis gyroscope is non-horizontally corrected to obtain the corrected geomagnetic field component (M' x ,M' y ,M' z ), and according to the formula: Get the corrected heading angle (ψ); Where: M' x 、M' y 、M' z They represent the components of the Earth's magnetic field in the x, y, and z directions respectively.

4. A horizontal directional drilling rig construction process simulation evaluation method according to claim 1, It is characterized in that In step S6, the coordinate value of the fixed position on the drilling trajectory is calculated according to the formula: x n+1 =x n +L n+1 cosθ n+1 cosψ n+1 and n+1 =and n +L n+1 thing n+1 sinψ n+1 With n+1 =from n +L n+1 sinθ n+1 ; Calculate the coordinates of each point on the trajectory; Where: x n+1 ,y n+1 、z n+1 are the three-dimensional coordinates of the sensor installation position in the (n+1)th section of drill pipe; L is the length of a single section of drill pipe.

5. A method for simulating and evaluating construction technology of a horizontal directional drilling rig according to claim 1, It is characterized in that In step S5, the track measurement points are spaced at intervals of 1 meter.