A method for standardized formwork construction of reserved openings for structural beams
By using a supporting molding method of fixed internal molds and additional steel bars on building structural beams, the problem of difficult to ensure the accuracy and quality of reserved holes in confined spaces is solved, and a high-quality hole molding and monitoring solution is achieved. Ensure that the opening position and size meet the design requirements.
Patent Information
- Application Number
- CN202211501595.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-11-28
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2042-11-28
AI Technical Summary
In confined spaces, when building structural beams are provided with reserved openings, the construction accuracy and quality are difficult to guarantee, which may lead to damage to the main structure.
The construction method of fixed-solidized branch molds is adopted, including the production of fixed-solidized inner molds and support parts, the design of additional steel bars, the establishment of BIM model for simulation and analysis, the strict positioning and binding of steel bars, and the use of fixed-solidized inner molds during the concrete pouring process and plastic pads to ensure accuracy of opening position and size.
The molding quality of the reserved opening of the structural beam under the confined space is effectively improved, ensuring that the opening is formed at one time, and the opening position and dimensions meet the design requirements through multiple measurements and monitoring.
Smart Images

Figure CN115898014B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of concrete beam structure engineering, and in particular relates to a structural beam reserved opening standardized formwork construction method. Background Art
[0002] With the development of my country's economy and the improvement of its comprehensive national strength, the forms of building structures are becoming more and more diverse. In order to better express architectural creativity and realize some special architectural functions, many architectural forms are constantly innovating, which limits the building space to a certain extent. At the same time, the building environment is also receiving more and more attention. The installation of various heating, ventilation, air conditioning, purification and other equipment requires the building to provide more space for pipeline layout.
[0003] Since the building height is limited by regulations and designs, there are often problems with pipelines and main structure load-bearing components that conflict and cannot be arranged. In actual construction, there is a lack of experience in reserving openings in load-bearing structures, and blind changes may even cause damage to the main structure. Therefore, how to reserve openings on the load-bearing structure to meet the building space requirements and equipment pipeline layout requirements without damaging the building structure is an urgent problem to be solved. Summary of the invention
[0004] In view of the deficiencies in the prior art, the present invention provides a standardized formwork construction method for reserved openings in structural beams, which solves the problem that it is difficult to ensure the accuracy and quality of the construction of reserved openings in structural beams in confined spaces.
[0005] The present invention achieves the above technical objectives through the following technical means.
[0006] A method for forming a structural beam reserved opening by forming a formwork, comprising the following steps:
[0007] Step 1: Make a fixed inner mold and support parts for the reserved hole;
[0008] Step 2: Design additional reinforcement for reserved openings;
[0009] Step 3: Based on the design drawings and the design of additional reinforcement, a structural beam BIM model is established to conduct construction simulation analysis to ensure that the additional reinforcement does not conflict with the standardized inner mold. At the same time, the BIM model is used to select some characteristic points of the structural beam reinforcement as the positioning reference points for the additional reinforcement;
[0010] Step 4: Strictly refer to the design drawings and BIM models to position and tie the structural beam reinforcement and additional reinforcement;
[0011] Step 5: Carry out the formwork of the structural beam, and then place the plastic pads and the finalized inner mold at the reserved opening. After ensuring that the position of the finalized inner mold meets the requirements, that is, the position of the reserved opening is accurate, take out the finalized inner mold;
[0012] Step 6: Pour the structural beam concrete in layers. When the concrete is poured to the reserved opening and vibrated to make it dense, put in the standardized inner mold, and ensure that the structural beam side molds are exposed on both sides of the standardized inner mold, and fix the support parts inside the standardized inner mold. Then continue to pour the structural beam concrete and vibrate to make it dense. After the concrete is formed, take out the standardized inner mold.
[0013] Furthermore, during the process of binding the reinforcement of the structural beam, the process of supporting the formwork of the structural beam, the process of pouring concrete, after placing the standardized inner formwork, and after the structural beam is formed, a total station is used to measure the position of the reserved hole multiple times, and compare the position and size of the reserved hole in the design drawings in real time to ensure that the position and size of the reserved hole meet the design requirements.
[0014] Furthermore, the standardized inner mold material adopts 4mm thick Q235 steel pipe, the outer boundary size of the standardized inner mold is consistent with the reserved opening size, and the width of the standardized inner mold exceeds the design width of the structural beam and the width of the structural beam after formwork.
[0015] Furthermore, the support member is a support steel pipe, and a steel plate is welded at both ends of the support steel pipe. Bolt holes are opened on the steel plate, and the support steel pipe is fixed inside the finalized inner mold by bolts.
[0016] Furthermore, in step 2, the additional reinforcement is designed as follows:
[0017] Add four D20 steel bars as additional hangers at the reserved opening;
[0018] Add reinforcing longitudinal reinforcements at the upper and lower parts of the reserved openings, where the size and type of the reinforcing longitudinal reinforcements at the upper part of the reserved openings are the same as the longitudinal reinforcements at the top of the structural beams, and the size and type of the reinforcing longitudinal reinforcements at the lower part of the reserved openings are the same as the longitudinal reinforcements at the bottom of the structural beams;
[0019] Add upper and lower stirrups at the upper and lower parts of the reserved openings, respectively. The diameters of the upper and lower stirrups are 2mm larger than the diameters of the structural beam stirrups, the spacing is 100mm, and the number of limbs is the same as that of the structural beam stirrups.
[0020] Add stirrups on the side of the reserved opening. The diameter of the stirrups is 2mm larger than that of the structural beam stirrups, the spacing is 50mm, and the number of stirrups is the same as that of the structural beam stirrups.
[0021] Furthermore, the specific process of step 4 is as follows:
[0022] Referring to the design drawings and BIM models, the structural beam reinforcement is first positioned and tied. Then, based on the tied structural beam reinforcement, the additional reinforcement is positioned and tied. Subsequently, the standardized inner mold is placed. After ensuring that the position of the standardized inner mold meets the requirements, that is, the reserved opening position is accurate, the standardized inner mold is taken out.
[0023] Furthermore, the top of the plastic pad is flat and a groove is provided at the bottom. The plastic pad is installed on the steel bar below the reserved hole through the buckling of the bottom groove, and the standardized inner mold is placed on the top of the plastic pad. On the one hand, the plastic pad is used to prevent the standardized inner mold from contacting the steel bar during the subsequent concrete pouring, causing the concrete protective layer at the reserved hole to fail to meet the requirements. On the other hand, the position of the standardized inner mold can be adjusted through the size design of the plastic pad.
[0024] The present invention has the following beneficial effects:
[0025] The present invention aims to solve the problem that it is difficult to ensure the accuracy and quality of the construction of reserved openings for structural beams in confined spaces. By adopting a standardized inner mold and steel pipe support when supporting the reserved openings and adding additional steel bars at the openings, the forming quality of the reserved openings for structural beams in confined spaces is effectively improved. At the same time, a reasonable and effective monitoring plan is formulated for the possible deformation and displacement during actual construction to ensure that the reserved openings can be formed in one go. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 This is a schematic diagram of the arrangement of additional reinforcement bars for the reserved openings of the present invention;
[0027] Figure 2 This is a schematic diagram of the installation of the standardized inner mold and supporting steel pipe described in the present invention.
[0028] In the figure: 1-formed inner mold; 2-supporting steel pipe; 3-steel plate; 4-additional hanger bars; 5-reinforcement longitudinal bars; 6-upper stirrups at the opening; 7-lower stirrups at the opening; 8-side stirrups at the opening; 9-plastic pads. DETAILED DESCRIPTION
[0029] The present invention is further described below in conjunction with the accompanying drawings and specific embodiments, but the protection scope of the present invention is not limited thereto.
[0030] This embodiment takes the three-layer structural beam of the main stadium of the Kunshan Football Stadium project as an example to illustrate the solution, wherein the cross-sectional size of the structural beam is 500mm×1000mm, 4 D32 (D refers to the diameter) steel bars are arranged on the top of the beam, and two rows of D25 steel bars are arranged at the bottom of the beam, with 6 longitudinal bars in the upper row and 8 longitudinal bars in the lower row; the stirrups of the structural beam are D12 steel bars, with a spacing of 200mm in the dense area and 100mm in the non-densified area, and four-limb stirrups; a total of 4 D32 steel bars are arranged on both sides of the beam as torsional longitudinal steel bars, with 2 bars on each side.
[0031] The method for forming a pre-reserved opening of a structural beam according to the present invention comprises the following steps:
[0032] Step 1: Prepare the reserved hole and finalize the inner mold 1;
[0033] Prefabricate the reserved opening standardized inner formwork 1 according to the design drawings. The material of the standardized inner formwork 1 is 4mm thick Q235 steel pipe. The outer boundary size of the standardized inner formwork 1 is consistent with the size of the reserved opening. The width of the standardized inner formwork 1 should exceed the design width of the structural beam and the width of the structural beam after formwork support to avoid leakage during subsequent concrete pouring;
[0034] At the same time, make the supporting steel pipe 2, such as Figure 2 As shown, a steel plate 3 is welded to both ends of the supporting steel pipe 2, and bolt holes are opened on the steel plate 3 for subsequent fixing.
[0035] Step 2: Design additional reinforcement for reserved openings;
[0036] like Figure 1 As shown ( Figure 1 Where d represents the diameter of the additional hanger bar 4), four cross-arranged D20 steel bars are added at the reserved opening as additional hanger bars 4;
[0037] like Figure 1 As shown, additional reinforcing longitudinal bars 5 are provided at the upper and lower parts of the reserved opening, wherein the size and type of the reinforcing longitudinal bars 5 at the upper part of the reserved opening are the same as the longitudinal bars at the top of the structural beam, and the size and type of the reinforcing longitudinal bars 5 at the lower part of the reserved opening are the same as the longitudinal bars at the bottom of the structural beam;
[0038] like Figure 1 As shown, upper stirrups 6 and lower stirrups 7 are respectively added at the upper and lower parts of the reserved openings, wherein the upper stirrups 6 and lower stirrups 7 are both made of D14 steel bars, with a spacing of 100 mm, and the number of limbs is the same as that of the structural beam stirrups, both of which are four-limb stirrups;
[0039] like Figure 1 As shown, hole side stirrups 8 are added on the side of the reserved hole opening. The hole side stirrups 8 are made of D14 steel bars with a spacing of 50mm. The number of stirrups is the same as that of the structural beam stirrups, and they are four-legged stirrups.
[0040] Step 3: Establish BIM model;
[0041] Based on the design drawings and the additional reinforcement design in step 2, the Revit software is used to establish a BIM model of the structural beam, and a construction simulation analysis is performed on the reinforcement binding and formwork construction to ensure that the additional reinforcement does not conflict with the standardized inner form 1 of the reserved opening; at the same time, the BIM model is used to select some characteristic points of the structural beam reinforcement as positioning reference points for the additional reinforcement of the reserved opening.
[0042] Step 4: Tie up the steel bars of the structural beams and reserved openings;
[0043] Strictly refer to the design drawings and BIM models, first locate and tie the structural beam reinforcement, then use the tied structural beam reinforcement as a basis, locate the additional reinforcement and complete the binding, then put in the standardized inner mold 1 made in step 1, and ensure that the two ends of the standardized inner mold 1 can expose the structural beam side mold, and after ensuring that the position of the standardized inner mold 1 meets the requirements (that is, the reserved opening position is accurate), take out the standardized inner mold 1.
[0044] Step 5: Formwork for structural beams and reserved openings;
[0045] First, the structural beam formwork is completed (the lower part of the structural beam formwork is supported by a top support and other structures), and then the plastic pad 9 and the finalized inner mold 1 are placed at the reserved opening, and the two ends of the finalized inner mold 1 are ensured to expose the structural beam side mold, and then after ensuring that the position of the finalized inner mold 1 meets the requirements (that is, the reserved opening position is accurate), the finalized inner mold 1 is taken out;
[0046] Among them, Figure 2 As shown, the top of the plastic pad 9 is flat and a groove is provided at the bottom. The plastic pad 9 is installed on the steel bar below the reserved hole through the buckle connection of the bottom groove, and the finalized inner mold 1 is placed on the top of the plastic pad 9; the plastic pad 9 mainly plays two roles. One is to prevent the finalized inner mold 1 from contacting with the steel bar during the subsequent concrete pouring, causing the concrete protective layer at the reserved hole to fail to meet the requirements; the other is that the position of the finalized inner mold 1 can be adjusted by the size of the plastic pad 9.
[0047] Step 6: pouring concrete of structural beams;
[0048] Pour the structural beam concrete in layers. Use a 25mm diameter vibrating rod to vibrate the concrete near the reserved opening to ensure that the concrete is poured densely. When the concrete is poured to the reserved opening and vibrated densely, Figure 2 As shown, the finalized inner mold 1 is placed on the plastic pad 9 with the reserved hole, and it is ensured that the structural beam side molds are exposed on both sides of the finalized inner mold 1 (so that there will be no leakage when pouring concrete), and the supporting steel pipe 2 is fixed to the inside of the finalized inner mold 1 with bolts, and then the structural beam concrete is continued to be poured and vibrated with a 25mm diameter vibrating rod; after the concrete is formed, the finalized inner mold 1 is taken out.
[0049] In the above steps, during the process of binding the reinforcement of the structural beam, the process of supporting the formwork of the structural beam, the process of pouring concrete, after placing the standardized inner form 1, and after the structural beam is formed, a total station is used to conduct multiple measurements and monitoring of the reserved hole positions, and compare them in real time with the reserved hole positions and sizes in the design drawings to ensure that the positions and sizes of the reserved holes meet the design requirements.
[0050] The embodiments are preferred implementations of the present invention, but the present invention is not limited to the above-mentioned implementations. Any obvious improvements, substitutions or modifications that can be made by those skilled in the art without departing from the essential content of the present invention belong to the protection scope of the present invention.
Claims
1. A method for standardized formwork construction of reserved openings for structural beams. It is characterized in that The steps include: Step 1: Making a predetermined hole-shaped inner mold (1) and a support member; Step 2: Design additional reinforcement for reserved openings; Step 3: Based on the design drawings and the design of the additional reinforcement, a BIM model of the structural beam is established, and a construction simulation analysis is performed to ensure that the additional reinforcement does not conflict with the standardized inner mold (1). At the same time, the BIM model is used to select some characteristic points of the structural beam reinforcement as reference points for positioning the additional reinforcement; Step 4: Refer to the design drawings and BIM models to position and tie the structural beam reinforcement and additional reinforcement; Step 5: Forming the structural beam, then placing a plastic pad (9) and a shaped inner mold (1) at the reserved opening, and after ensuring that the position of the shaped inner mold (1) meets the requirements, that is, the position of the reserved opening is accurate, taking out the shaped inner mold (1); Step 6: pouring the structural beam concrete in layers. When the concrete is poured to the reserved opening position and vibrated to be dense, the standardized inner mold (1) is placed, and both sides of the standardized inner mold (1) are ensured to be exposed to the structural beam side mold, and the support is fixed inside the standardized inner mold (1), and then the structural beam concrete is continued to be poured and vibrated to be dense; after the concrete is formed, the standardized inner mold (1) is taken out; The support member is a support steel pipe (2), and a steel plate (3) is welded to both ends of the support steel pipe (2). Bolt holes are provided on the steel plate (3), and the support steel pipe (2) is fixed inside the finalized inner mold (1) by bolts. The specific process of step 4 is as follows: Referring to the design drawings and the BIM model, the structural beam reinforcement is first positioned and tied, and then based on the tied structural beam reinforcement, the additional reinforcement is positioned and tied, and then the standardized inner mold (1) is placed. After ensuring that the position of the standardized inner mold (1) meets the requirements, that is, the reserved opening position is accurate, the standardized inner mold (1) is taken out.
2. The method for forming a pre-reserved opening for a structural beam according to claim 1, It is characterized in that During the process of tying the reinforcement bars of the structural beam, supporting the formwork of the structural beam, pouring the concrete, placing the standardized inner form (1), and forming the structural beam, a total station is used to measure the position of the reserved opening multiple times, and the position and size of the reserved opening are compared in real time with the design drawings to ensure that the position and size of the reserved opening meet the design requirements.
3. The method for forming a pre-reserved opening for a structural beam according to claim 1, It is characterized in that The material of the standardized inner mold (1) is a 4 mm thick Q235 steel pipe. The outer boundary size of the standardized inner mold (1) is consistent with the size of the reserved opening. The width of the standardized inner mold (1) exceeds the design width of the structural beam and the width of the structural beam after formwork.
4. The method for forming a pre-reserved hole in a structural beam according to claim 1, It is characterized in that In step 2, the additional reinforcement is designed as follows: Four D20 steel bars are added at the reserved opening as additional hanger bars (4); Additional reinforcing longitudinal bars (5) are provided at the upper and lower parts of the reserved opening, wherein the size and type of the reinforcing longitudinal bars (5) at the upper part of the reserved opening are the same as the longitudinal bars at the top of the structural beam, and the size and type of the reinforcing longitudinal bars (5) at the lower part of the reserved opening are the same as the longitudinal bars at the bottom of the structural beam; Upper stirrups (6) and lower stirrups (7) are respectively provided at the upper and lower parts of the reserved openings, wherein the diameters of the upper stirrups (6) and lower stirrups (7) are 2 mm larger than the diameters of the structural beam stirrups, the spacings are 100 mm, and the number of stirrups is the same as that of the structural beam stirrups; Hole side stirrups (8) are additionally provided on the side of the reserved hole opening. The diameter of the hole side stirrups (8) is 2 mm larger than the diameter of the structural beam stirrups, the spacing is 50 mm, and the number of limbs is the same as that of the structural beam stirrups.
5. According to the method for forming the pre-reserved opening of the structural beam according to claim 1, It is characterized in that The top of the plastic pad (9) is flat, and a groove is provided at the bottom. The plastic pad (9) is mounted on the steel bar below the reserved opening by buckling through the bottom groove, and the finalized inner mold (1) is placed on the top of the plastic pad (9).