Prefabricated formwork for pedestal and pedestal structure and construction method using the same
Through the prefabricated formwork structure and grouting technology, the problem of on-site wet work during the construction of the cap platform was solved, the effective application of ultra-high performance concrete was realized, the construction efficiency and durability were improved, and the amount of material was reduced.
Patent Information
- Application Number
- CN202211561841.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-12-07
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2042-12-07
AI Technical Summary
There is a large amount of on-site wet work during cap construction that cannot be prefabricated, resulting in extended construction period and increased cost. In particular, the high price and large shrinkage of ultra-high-performance concrete make it unsuitable for on-site pouring.
Adopt a prefabricated formwork structure, including the box-shaped formwork body and partitions, connect the prefabricated columns and pile foundations through grouting and grout outlets, and use ultra-high-performance concrete to pour the integral parts to reduce on-site wet work and realize the prefabrication and pouring of the cap platform. .
It reduces the on-site wet work workload during the construction of the cap platform, improves the construction speed and degree of industrialization, enhances the durability and stress performance of the cap platform, and saves the amount of materials.
Smart Images

Figure CN115946210B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of foundation cap construction, and in particular to a prefabricated formwork for a foundation cap, a foundation cap structure cast by using the prefabricated formwork, and a construction method. Background Art
[0002] The cap is a reinforced concrete platform connected to the top of each pile foundation to bear and distribute the load transmitted by the columns. It is the connecting part between the piles and the columns.
[0003] In the existing technology, the construction of the foundation is mainly based on cast-in-place, which requires a large amount of on-site wet work, seriously affecting the construction period and hindering the development of industrialized structural construction.
[0004] Ultra-high performance concrete is a new type of cement-based structural engineering material with clear performance indicators. Compared with ordinary concrete, ultra-high performance concrete has the characteristics of high strength, high toughness and high durability.
[0005] The application of ultra-high performance concrete in structural engineering can make the structure lighter and increase its service life.
[0006] However, due to the high price of ultra-high performance concrete and its large shrinkage, it is not very suitable for casting on-site components.
[0007] Therefore, how to properly apply ultra-high performance concrete materials to solve the problem that a large number of on-site wet operations cannot be prefabricated during foundation construction while taking into account construction costs has become a technical problem that technical personnel in this field urgently need to solve. Summary of the invention
[0008] In view of the above-mentioned defects of the prior art, the present invention provides a prefabricated formwork for a pedestal and a pedestal structure and a construction method cast using the prefabricated formwork, the purpose of which is to properly apply ultra-high performance concrete materials to solve the problem that a large number of on-site wet operations cannot be prefabricated during pedestal construction while taking into account the construction cost.
[0009] To achieve the above-mentioned purpose, the present invention discloses a prefabricated formwork for a cap, characterized in that it comprises a box-shaped formwork body having an appearance consistent with that of the cap;
[0010] The upper surface of the formwork body corresponding to the top surface of the pedestal is provided with a column connection port for connecting each prefabricated column, at least one grouting port and at least one grouting port, and the lower surface corresponding to the bottom surface of the pedestal is provided with a pile foundation connection port for connecting each prefabricated pile foundation;
[0011] A partition parallel to both the upper surface and the lower surface is provided in the mold shell body;
[0012] Each of the grouting openings and each of the grouting outlets on the upper surface of the partition plate corresponding to the upper surface is provided with a communicating hole coaxially along the vertical direction;
[0013] The formwork body and the partition are both integral parts cast with ultra-high performance concrete.
[0014] Preferably, the thickness of the wall panels of the box-shaped formwork body and the partitions are both 3 cm to 20 cm.
[0015] The present invention also provides a cap structure cast by using the above-mentioned prefabricated formwork, wherein one end of each prefabricated column connected to the formwork body comprises a column reserved boss whose outer dimensions are smaller than the body dimensions of the corresponding prefabricated column and match the corresponding column connection port, and a plurality of column reserved steel bars located around the column reserved boss and extending from the shoulder formed by the connection between the corresponding column reserved boss and the body of the prefabricated column;
[0016] Each of the column reserved bosses and the corresponding plurality of column reserved steel bars are inserted into the formwork body from the corresponding column connection port, and are grouted and solidified in the formwork body;
[0017] One end of each of the prefabricated pile foundations connected to the main body of the formwork shell includes a pile foundation reserved boss whose outer dimensions are smaller than the main body dimensions of the corresponding prefabricated pile foundation and match the corresponding pile foundation connection port, and a plurality of pile foundation reserved steel bars located around the pile foundation reserved boss and extending from the shoulder formed by the connection between the corresponding pile foundation reserved boss and the main body of the prefabricated pile foundation;
[0018] Each of the pile foundation reserved bosses and the corresponding plurality of pile foundation reserved steel bars are inserted into the formwork body from the corresponding pile foundation connection ports and are grouted and solidified in the formwork body.
[0019] Preferably, the surface of each of the reserved bosses for the column and each of the reserved bosses for the pile foundation is roughened.
[0020] Preferably, the material for grouting in the formwork body is concrete, and the length of each of the reserved steel bars for the column and each of the reserved steel bars for the pile foundation that are grouted and consolidated in the formwork body is more than 35 times the diameter.
[0021] Preferably, the material for grouting in the formwork body is high-strength mortar, and the length of each of the reserved steel bars for the column and each of the reserved steel bars for the pile foundation that are grouted and consolidated in the formwork body is more than 15 times the diameter.
[0022] Preferably, the material for grouting in the formwork body is ultra-high performance concrete, and the length of each of the reserved steel bars for the column and each of the reserved steel bars for the pile foundation that are grouted and consolidated in the formwork body is more than 10 times the diameter.
[0023] The present invention also provides a construction method for casting a cap structure using the above-mentioned prefabricated formwork, comprising the following steps:
[0024] Step 1, supporting all the prefabricated columns and all the prefabricated pile foundations, and putting all the prefabricated pile foundations in place;
[0025] Step 2, making the mold shell body;
[0026] Step 3, hoisting the formwork body to all the prefabricated pile foundations in place, and then grouting all the grouting openings until grout overflows from all the communicating holes of the partition;
[0027] Step 4: hoist all the prefabricated columns to the top of the formwork body and continue to grout all the grouting openings until slurry overflows from all the slurry outlets.
[0028] Preferably, step 2 comprises the following steps:
[0029] Step 2.1, making a bottom plate and a side web corresponding to the lower surface of the formwork body, and reserving a pile foundation notch on the bottom plate;
[0030] Step 2.2, making the partition;
[0031] Step 2.3, making a top plate corresponding to the upper surface, and reserving column slots, the grouting port and the grouting outlet on the top plate.
[0032] Preferably, the top plate and the partition corresponding to the upper surface are both prefabricated plates, which are fixed to the side walls of the mold shell body by wet connection to form an integral piece after being manufactured separately.
[0033] Beneficial effects of the present invention:
[0034] The present invention reduces the workload of on-site wet work in foundation construction by prefabricating UHPC permanent formwork with foundation-bearing integration, and improves the industrialization level of foundation-bearing construction.
[0035] In the present invention, the UHPC cap formwork shell participates in the force bearing of the cap, which reduces the size of the cap and saves material consumption.
[0036] Due to the protective effect of the UHPC formwork, the durability of the base member is greatly improved.
[0037] The concept, specific structure and technical effects of the present invention will be further described below in conjunction with the accompanying drawings to fully understand the purpose, characteristics and effects of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] Figure 1 A schematic structural diagram of the upper surface of the mold shell body in one embodiment of the present invention is shown.
[0039] Figure 2 A schematic structural diagram of the lower surface of the mold shell body in one embodiment of the present invention is shown.
[0040] Figure 3 Showing the present invention Figure 1 Schematic diagram of the AA structure.
[0041] Figure 4 Showing the present invention Figure 1 Schematic diagram of the BB structure.
[0042] Figure 5 A schematic structural diagram showing one end of the prefabricated pile foundation connected to the formwork body in one embodiment of the present invention.
[0043] Figure 6 A schematic structural diagram showing one end of a prefabricated column connected to a formwork body in one embodiment of the present invention.
[0044] Figure 7 A schematic structural diagram showing a mold shell body being in place on a prefabricated pile foundation and grouting is performed in one embodiment of the present invention.
[0045] Figure 8 A schematic structural diagram showing a prefabricated column being positioned on a formwork body and grouting is performed in one embodiment of the present invention.
[0046] Fig. 9 A schematic structural diagram of a mold shell body in which a bottom plate and side webs are manufactured is shown in one embodiment of the present invention.
[0047] Fig.10 A schematic structural diagram of a mold shell body for fixing a partition in one embodiment of the present invention is shown.
[0048] Fig.11 A schematic structural diagram of a mold shell body after fabrication in one embodiment of the present invention is shown. DETAILED DESCRIPTION
[0049] Example
[0050] like Figures 1 to 4 and Fig.11 As shown, the prefabricated formwork for the pedestal includes a box-shaped formwork body 12 with the same shape as the pedestal;
[0051] The upper surface of the formwork body 12 corresponding to the top surface of the cap is provided with a column connection port 3 for connecting each prefabricated column 9 and at least one grouting port 1 and at least one grouting port 2, and the lower surface corresponding to the bottom surface of the cap is provided with a pile foundation connection port 4 for connecting each prefabricated pile foundation 6;
[0052] A partition plate 5 is provided in the mold shell body 12 and is parallel to both the upper surface and the lower surface;
[0053] Each grouting port 1 and each grout outlet 2 on the corresponding upper surface of the partition plate 5 is provided with a communicating hole coaxially along the vertical direction;
[0054] The formwork body 12 and the partition 5 are integral parts cast with ultra-high performance concrete.
[0055] The present invention reduces the workload of on-site wet work during the construction of the pedestal, reduces the support of temporary formwork, and conveniently completes the reliable connection between the pedestal, the column and the pile foundation. It can not only improve the construction speed, reduce the workload of on-site wet work, and improve the industrialization level of bridge construction, but also increase the durability of the pedestal, improve the force-bearing performance of the pedestal, and reduce the amount of materials used.
[0056] The structure of the present invention integrates prefabricated UHPC to form a formwork body 12 as a permanent formwork, which can effectively simplify the construction process. It not only effectively avoids the erection of temporary formwork on site and greatly reduces the complexity of construction, but also the UHPC formwork as a permanent formwork can participate in the stress of the structure and effectively utilize the high-strength mechanical properties of UHPC.
[0057] In addition, due to its superior durability, using UHPC as an outsourcing formwork can greatly improve the durability of the structure, especially the components in underground projects. It can also solve the durability problem of the cap below the ground in bridge projects.
[0058] In some embodiments, the thickness of the wall panels and partition panels of the box-shaped formwork body 12 is 3 cm to 20 cm.
[0059] like Figures 1 to 6 and Figure 8 As shown, the present invention also provides a cap structure cast by using the above-mentioned prefabricated formwork, wherein one end of each prefabricated column 9 connected to the formwork body 12 includes a column reserved boss 10 whose outer dimensions are smaller than the body dimensions of the corresponding prefabricated column 9 and match the corresponding column connection port 3, and a plurality of column reserved steel bars 11 located around the column reserved boss 10 and extending from the shoulder formed at the junction of the corresponding column reserved boss 10 and the body of the prefabricated column 9;
[0060] Each column reserved boss 10 and the corresponding plurality of column reserved steel bars 11 are inserted into the formwork body 12 from the corresponding column connection port 3 and are grout-filled 13 to be fixed in the formwork body 12;
[0061] One end of each prefabricated pile foundation 6 connected to the formwork body 12 includes a pile foundation reserved boss 7 whose outer dimensions are smaller than the main body dimensions of the corresponding prefabricated pile foundation 6 and match the corresponding pile foundation connection port 4, and a plurality of pile foundation reserved steel bars 8 located around the pile foundation reserved boss 7 and extending from the shoulder formed by the connection between the corresponding pile foundation reserved boss 7 and the main body of the prefabricated pile foundation 6;
[0062] Each pile foundation reserved boss 7 and the corresponding plurality of pile foundation reserved steel bars 8 are inserted into the formwork body 12 from the corresponding pile foundation connection opening 4 and are solidified in the formwork body 12 by grouting 13 .
[0063] In actual applications, each prefabricated column 9 or each prefabricated pile foundation 6 can be prefabricated in a factory or manufactured on site, and the shape can be a cylinder or various polygons, such as a circle, a square, etc. The shape of the column connection port 3 and the pile foundation connection port 4 can also be a cylinder or various polygons, such as a circle, a square, etc.
[0064] In some embodiments, the surface of each column reserved boss 10 and each pile foundation reserved boss 7 is roughened.
[0065] In some embodiments, the material for grouting 13 in the formwork body 12 is concrete, and the length of each column reserved steel bar 11 and each pile foundation reserved steel bar 8 consolidated by grouting 13 in the formwork body 12 is more than 35 times the diameter.
[0066] In some embodiments, the material of the grouting 13 in the formwork body 12 is high-strength mortar, and the length of each column reserved steel bar 11 and each pile foundation reserved steel bar 8 consolidated by the grouting 13 in the formwork body 12 is more than 15 times the diameter.
[0067] In some embodiments, the material of the grouting 13 in the formwork body 12 is ultra-high performance concrete, and the length of each column reserved steel bar 11 and each pile foundation reserved steel bar 8 consolidated by the grouting 13 in the formwork body 12 is more than 10 times the diameter.
[0068] like Figures 5 to 8 As shown, the present invention also provides a construction method for casting a cap structure using a prefabricated formwork, comprising the following steps:
[0069] Step 1: Support all prefabricated columns 9 and all prefabricated pile foundations 6, and put all prefabricated pile foundations 6 in place;
[0070] Step 2, making the mold shell body 12;
[0071] Step 3, hoist the formwork body 12 to all prefabricated pile foundations 6 in place, and then grout all grouting openings 1 13 until grout overflows from all connecting holes of the partition 5;
[0072] Step 4: hoist all prefabricated columns 9 to the top of the formwork body 12 and continue grouting 13 to all grouting openings 1 until slurry overflows from all slurry outlets 2.
[0073] like Figures 9 to 11 As shown, in some embodiments, step 2 includes the following steps:
[0074] Step 2.1, making a bottom plate and side web corresponding to the lower surface of the formwork body 12, and reserving a pile foundation notch on the bottom plate;
[0075] Step 2.2, making a partition 5;
[0076] Step 2.3, make a top plate corresponding to the upper surface, and reserve column slots, as well as grouting port 1 and grouting port 2 on the top plate.
[0077] In some embodiments, the top plate and the partition plate corresponding to the upper surface are both prefabricated plates, which are fixed to the side walls of the mold shell body 12 by wet connection to form an integral piece after being manufactured separately.
[0078] In practical applications, the above method can reduce the difficulty of supporting the formwork body 12 with an internal cavity, improve construction efficiency and reduce costs.
[0079] The preferred specific embodiments of the present invention are described in detail above. It should be understood that a person skilled in the art can make many modifications and changes based on the concept of the present invention without creative work. Therefore, any technical solution that can be obtained by a person skilled in the art through logical analysis, reasoning or limited experiments based on the concept of the present invention on the basis of the prior art should be within the scope of protection determined by the claims.
Claims
1. A prefabricated formwork for a cap; characterized in that: It comprises a box-shaped formwork body (12) having a shape consistent with that of the support platform; The upper surface of the formwork body (12) corresponding to the top surface of the pedestal is provided with a column connection port (3) for connecting each prefabricated column (9) and at least one grouting port (1) and at least one grouting port (2), and the lower surface corresponding to the bottom surface of the pedestal is provided with a pile foundation connection port (4) for connecting each prefabricated pile foundation (6); A partition plate (5) parallel to both the upper surface and the lower surface is provided in the mold shell body (12); Each of the grouting ports (1) and each of the grouting ports (2) on the upper surface of the partition plate (5) is provided with a communicating hole coaxially arranged in the vertical direction; The formwork body (12) and the partition (5) are both integral parts cast with ultra-high performance concrete.
2. The prefabricated formwork for a cap according to claim 1, characterized in that: The thickness of the wall panels of the box-shaped formwork body (12) and the partition panels are both 3 cm to 20 cm.
3. The prefabricated formwork for a cap according to claim 1, characterized in that: One end of each of the prefabricated columns (9) connected to the formwork body (12) comprises a column reserved boss (10) whose outer dimensions are smaller than the body dimensions of the corresponding prefabricated column (9) and match the corresponding column connection port (3), and a plurality of column reserved steel bars (11) located around the column reserved boss (10) and extending from the shoulder formed at the junction of the corresponding column reserved boss (10) and the body of the prefabricated column (9); Each of the column reserved bosses (10) and the corresponding plurality of column reserved steel bars (11) are inserted into the formwork body (12) from the corresponding column connection opening (3), and are grout-filled (13) and fixed in the formwork body (12); One end of each prefabricated pile foundation (6) connected to the formwork body (12) comprises a pile foundation reserved boss (7) whose outer dimensions are smaller than the body dimensions of the corresponding prefabricated pile foundation (6) and match the corresponding pile foundation connection port (4), and a plurality of pile foundation reserved steel bars (8) located around the pile foundation reserved boss (7) and extending from the shoulder formed at the junction of the corresponding pile foundation reserved boss (7) and the body of the prefabricated pile foundation (6); Each of the pile foundation reserved bosses (7) and the corresponding plurality of pile foundation reserved steel bars (8) are inserted into the formwork body (12) from the corresponding pile foundation connection port (4) and are solidified in the formwork body (12) by grouting (13).
4. The prefabricated formwork for a cap according to claim 3, characterized in that: The surfaces of each of the column reserved bosses (10) and each of the pile foundation reserved bosses (7) are roughened.
5. The prefabricated formwork for a cap according to claim 3, characterized in that: The material for grouting (13) in the formwork body (12) is concrete, and the length of each of the reserved steel bars (11) for the column and each of the reserved steel bars (8) for the pile foundation that are grouting (13) and consolidated in the formwork body (12) is more than 35 times the diameter.
6. The prefabricated formwork for a cap according to claim 3, characterized in that: The material for grouting (13) in the formwork body (12) is high-strength mortar, and the length of each of the column reserved steel bars (11) and each of the pile foundation reserved steel bars (8) that are grouting (13) and consolidated in the formwork body (12) is more than 15 times the diameter.
7. The prefabricated formwork for a cap according to claim 3, characterized in that: The material for grouting (13) in the formwork body (12) is ultra-high performance concrete, and the length of each of the column reserved steel bars (11) and each of the pile foundation reserved steel bars (8) that are grouting (13) and consolidated in the formwork body (12) is more than 10 times the diameter.
8. The construction method of casting the cap structure using the prefabricated formwork as claimed in claim 1 is characterized in that: The steps include: Step 1, supporting all the prefabricated columns (9) and all the prefabricated pile foundations (6), and putting all the prefabricated pile foundations (6) in place; Step 2, making the mold shell body (12); Step 3, hoisting the formwork body (12) onto all the prefabricated pile foundations (6) and then grouting (13) all the grouting openings (1) until grout overflows from all the communicating holes of the partition (5); Step 4: hoist all the prefabricated columns (9) to the top of the formwork body (12), and continue to grout (13) all the grouting openings (1) until slurry overflows from all the slurry outlets (2).
9. The construction method according to claim 8, characterized in that: Step 2 includes the following steps: Step 2.1, making a bottom plate and side web plates corresponding to the lower surface of the formwork body (12), and reserving a pile foundation notch on the bottom plate; Step 2.2, making the partition (5); Step 2.3, making a top plate corresponding to the upper surface, and reserving column slots, as well as the grouting port (1) and the grouting outlet (2) on the top plate.
10. The construction method according to claim 8, characterized in that: The top plate corresponding to the upper surface and the partition plate are both prefabricated plates, which are fixed to the side wall of the mold shell body (12) by wet connection to form an integral part after being manufactured separately.