Power management method, device, equipment, storage medium and program product
By distinguishing between power modules that require maintenance and those that do not in blade servers, and determining whether to cut off power based on power demand, the problem of power module maintenance affecting equipment performance is solved, and stable operation of the equipment is achieved.
Patent Information
- Application Number
- CN202211732788.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-12-30
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2042-12-30
AI Technical Summary
When maintaining the power module of a blade server, existing technology requires powering off, which affects the performance of the computer equipment.
By identifying the first power module that requires maintenance and the second power module that does not require maintenance in the power supply modules of the computer equipment, and based on the power they provide, it is detected whether the power supply meets the power demand. If it does, power-off maintenance of the first power module is prohibited.
When meeting power demand, avoid power outages for power module maintenance to ensure continuous normal operation of computer equipment and improve the stability and performance of the power supply system.
Smart Images

Figure CN115981439B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of power management technology, and in particular to a power management method, device, equipment, storage medium and program product. Background Art
[0002] Blade servers are increasingly used in large computer equipment to provide greater computing power due to their small size and high reliability. Blade servers are usually equipped with corresponding power modules to power the equipment during the computing process.
[0003] At present, in order to save the space occupied by blade servers, power modules are mostly implemented by board-level power modules. Board-level power means that the power module is also set on the circuit board of the blade server, so that the power module is located inside the blade server, thereby achieving the purpose of reducing the space occupied by the blade server. Generally, a computer device includes multiple blade servers and multiple power modules. When a power module fails, the blade server needs to be powered off before the power module can be maintained.
[0004] However, the maintenance method in the above technology will affect the performance of the blade server in the computer equipment. Summary of the invention
[0005] Based on this, it is necessary to provide a power management method, device, equipment, storage medium and program product that can maintain the power module of the blade server without affecting the performance of the blade server in order to solve the above technical problems.
[0006] In a first aspect, the present application provides a power management method, the method comprising:
[0007] Determine a first power module and a second power module among candidate power modules of the computer device; the first power module is a power module that needs maintenance, and the second power module is a candidate power module among the candidate power modules except the first power module;
[0008] Determining the power supply that the computer device can provide according to the power that the first power module and the second power module can each provide;
[0009] Check whether the supplied power meets the preset power demand. If yes, power-off maintenance of the first power module is prohibited.
[0010] In this embodiment, by first determining the power modules that need maintenance and the power modules that do not need maintenance, and determining the power supply energy of the computer device accordingly, when the power demand is met, the power modules that need maintenance do not need to be powered off for maintenance. In this way, the computer device can operate normally without powering off, thereby ensuring the working performance of the computer device.
[0011] In one embodiment, the determining of the first power module and the second power module among the candidate power modules of the computer device includes:
[0012] Determine a first target result and a second target result corresponding to each candidate power module; the first target result is used to characterize whether the candidate power module is faulty, and the second target result is used to characterize whether the output of the candidate power module is normal;
[0013] According to the first target result and the second target result of each candidate power module, each candidate power module is divided into a first power module and a second power module.
[0014] In this embodiment, the power modules are divided according to multiple indicators such as whether a fault occurs and whether the output is normal, so that the divided power modules can be more accurate and subsequent maintenance can be more precise, thereby avoiding some unnecessary maintenance and further improving the working performance of the blade server.
[0015] In one embodiment, each of the candidate power modules includes at least one submodule, and the determining of the first target result and the second target result corresponding to each candidate power module includes:
[0016] For the same candidate power module, obtain the first signal result and the second signal result corresponding to each submodule; the first signal result is used to indicate whether the submodule fails, and the second signal result is used to indicate whether the output of the submodule is normal;
[0017] According to the first signal results and the second signal results corresponding to each submodule, the first target result and the second target result of the candidate power module are determined, and the first target result and the second target result of each candidate power module are obtained.
[0018] In this embodiment, the overall target result of the power module is determined by the signal results of each submodule, which can refine the whole process of determining the target result of the power module, so that the obtained target result is more accurate.
[0019] In one embodiment, determining the first target result and the second target result of the candidate power module according to the first signal result and the second signal result corresponding to each submodule includes:
[0020] Counting a first number of first signal results indicating a fault, a second number of second signal results indicating an abnormal output, and a third number of second signal results indicating a normal output;
[0021] According to the first quantity, the second quantity and the third quantity of the candidate power modules, a first target result and a second target result corresponding to the candidate power modules are determined.
[0022] In this embodiment, the target result of the power module is determined by the number of faults, the number of abnormal outputs, and the number of normal outputs in each submodule. This process is simple and intuitive, and thus can further improve the accuracy and efficiency of determining the target result of the power module.
[0023] In one embodiment, determining the first target result and the second target result corresponding to the candidate power modules according to the first quantity, the second quantity, and the third quantity of the candidate power modules includes:
[0024] If the first number of candidate power modules is greater than or equal to a first threshold, determining that a first target result of the candidate power modules is a failure;
[0025] If the second number of the candidate power modules is greater than or equal to the second threshold, determining that the second target result of the candidate power modules is output abnormality;
[0026] If the third number of candidate power modules is greater than or equal to the third threshold, the second target result of the candidate power modules is determined to be normal output; the third threshold is greater than or equal to the second threshold and less than the number of each submodule.
[0027] In this embodiment, different target results of the power module are determined by different quantities, which can further improve the accuracy and efficiency of determining the target result of the power module.
[0028] In one embodiment, dividing the plurality of candidate power modules into the first power module and the second power module according to the first target result and the second target result of each candidate power module includes:
[0029] If the first target result of the candidate power module is a fault, and the second target result of the candidate power module is a normal output, the candidate power module is determined as the first power module;
[0030] All candidate power modules except the first power module among the candidate power modules are used as second power modules.
[0031] In this embodiment, by targeting a power module with a faulty output and normal output as the power module that needs maintenance, each candidate power module is divided into two categories of power modules. This makes it easy to quickly distinguish whether the power module needs to be powered off for maintenance, so as to maximize the working performance of the blade server.
[0032] In one embodiment, the method further comprises:
[0033] If the supplied power meets the power demand, it is determined that the first power module has full load capacity and a prompt message is output;
[0034] The prompt message is used to instruct to power off the first power module for maintenance during an idle period of the computer device.
[0035] In this embodiment, by performing maintenance on the power supply module during an idle period, the normal operation of the blade server may not be affected, thereby improving the operating performance of the blade server.
[0036] In a second aspect, the present application further provides a power management device, the device comprising:
[0037] A power supply determination module, used to determine a first power supply module and a second power supply module among candidate power supply modules of the computer device; the first power supply module is a power supply module that needs maintenance, and the second power supply module is a candidate power supply module among the candidate power supply modules except the first power supply module;
[0038] A power supply determination module, used to determine the power supply that can be provided by the computer device according to the power that can be provided by the first power module and the second power module respectively;
[0039] The power management module is used to detect whether the supplied power meets the preset power demand. If so, power-off maintenance of the first power module is prohibited.
[0040] In a third aspect, the present application further provides a computer device, the computer device comprising a memory and a processor, the memory storing a computer program, and the processor implementing the following steps when executing the computer program:
[0041] Determine a first power module and a second power module among candidate power modules of the computer device; the first power module is a power module that needs maintenance, and the second power module is a candidate power module among the candidate power modules except the first power module;
[0042] Determining the power supply that the computer device can provide according to the power that the first power module and the second power module can each provide;
[0043] Check whether the supplied power meets the preset power demand. If yes, power-off maintenance of the first power module is prohibited.
[0044] In a fourth aspect, the present application further provides a computer-readable storage medium, on which a computer program is stored, and when the computer program is executed by a processor, the following steps are implemented:
[0045] Determine a first power module and a second power module among candidate power modules of the computer device; the first power module is a power module that needs maintenance, and the second power module is a candidate power module among the candidate power modules except the first power module;
[0046] Determining the power supply that the computer device can provide according to the power that the first power module and the second power module can each provide;
[0047] Check whether the supplied power meets the preset power demand. If yes, power-off maintenance of the first power module is prohibited.
[0048] In a fifth aspect, the present application further provides a computer program product, the computer program product comprising a computer program, and when the computer program is executed by a processor, the following steps are implemented:
[0049] Determine a first power module and a second power module among candidate power modules of the computer device; the first power module is a power module that needs maintenance, and the second power module is a candidate power module among the candidate power modules except the first power module;
[0050] Determining the power supply that the computer device can provide according to the power that the first power module and the second power module can each provide;
[0051] Check whether the supplied power meets the preset power demand. If yes, power-off maintenance of the first power module is prohibited.
[0052] The above-mentioned power management method, device, equipment, storage medium and program product, by determining the first power module that needs to be maintained and the second power module other than the first power module among the candidate power modules of the computer device, and according to the power that the first power module and the second power module can provide respectively, determine the supply power that the computer device can provide, detect whether the supply power meets the power demand, and if it does, prohibit the power module that needs maintenance from being immediately powered off for maintenance. In this method, since the supply power of the computer device can be determined by the power modules that need to be maintained and the power modules that do not need to be maintained, the power modules that need to be maintained will not be powered off for maintenance when the power demand is met, so that the computer device can be temporarily powered off and continue to work normally, avoiding the problem that the power outage affects the performance of the computer device, thereby ensuring that the performance of the computer device is not affected, and improving the stability of the power supply system where the blade server is located. BRIEF DESCRIPTION OF THE DRAWINGS
[0053] Figure 1 A diagram of an application environment of a power management method in an embodiment;
[0054] Figure 2is a flowchart of a power management method in one embodiment;
[0055] Figure 3 is a flow chart of a power management method in another embodiment;
[0056] Figure 4 is a flow chart of a power management method in another embodiment;
[0057] Figure 5 is an internal structure diagram of a blade server in another embodiment;
[0058] Figure 6 is a processing logic diagram of each submodule in another embodiment;
[0059] Figure 7 is a flow chart of a power management method in another embodiment;
[0060] Figure 8 is a structural block diagram of a power management device in one embodiment;
[0061] Fig. 9 FIG. 4 is a diagram showing the internal structure of a computer device in one embodiment. DETAILED DESCRIPTION
[0062] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0063] With the upgrade of the new computing network system integrating data centers, cloud computing, and big data, the operating speed of core chips such as CPU and DCU of high-performance computer equipment is getting higher and higher. Computer equipment generally includes thousands of blade servers, so the power consumption and density of blade servers are also increasing. In order to support the total computing power requirements of high-performance computer rooms, thousands of high-density blade servers are required to work at full load for a long time without interruption and stability, and even overclock. However, blade servers have high power density, small size, difficult heat dissipation, and high reliability, which poses a huge challenge to the overall power supply system of blade servers. The CRPS power supply component of general servers has redundancy and monitoring functions, and provides status light indication signals. The CRPS power supply is a hot-swappable component, which is also convenient for maintenance in case of failure. However, due to its structural size limitations, it cannot be adapted for use with high-density blade servers.
[0064] At present, the power board with a parallel structure of high-voltage direct current power modules HVDC POWER MODULE, i.e., board-level power modules, in which the input of 380V DC high voltage can not only greatly reduce the loss of the busbar, but also multiple power modules have the advantages of high efficiency, good dynamic performance, high reliability, easy expansion of output power, and flexible structural size design. Therefore, it has been widely used in the power supply system of high-power blade servers. However, the use of board-level power modules also has some defects. This is because there are thousands of blade servers running calculations at the same time in the computer room, and the blade server structure is in a closed state, so it is not easy to monitor the status of the sub-modules of the power module. When maintaining the power module, the blade server must be powered off, which may cause unnecessary loss to the total computing power of the computer room and affect the performance of the blade server.
[0065] Based on this, the embodiments of the present application provide a power management method, apparatus, device, storage medium and program product, which can solve the above technical problems.
[0066] The power management method provided in the embodiment of the present application can be applied to a computer device, which may include multiple blade servers, one of which may be used as a master control server 104, and other blade servers 102 may communicate with the master control server 104, and send their data to the master control server 104 for processing and receive control instructions sent by the master control server 104. Each blade server may be implemented in an independent or clustered form.
[0067] In one embodiment, Figure 2 As shown, a power management method is provided, which is applied to Figure 1 Taking the computer device in the example (specifically, it can be a master control server) as an example, the method can include the following steps:
[0068] S202, determining a first power module and a second power module among candidate power modules of a computer device; the first power module is a power module that needs maintenance, and the second power module is a candidate power module among the candidate power modules except the first power module.
[0069] In this step, the general computer equipment includes multiple blade servers, each of which can be powered by one or more power modules, each of which can include multiple power sub-modules, and multiple power sub-modules can be connected in parallel to form a power module.
[0070] In the process of each candidate power module supplying power to the blade server, the state of each candidate power module can be determined by detecting whether each candidate power module fails, or whether the output of each candidate power module is normal, or whether the electrical signals such as voltage / current during the operation of each candidate power module are normal, etc., that is, whether each candidate power module needs maintenance. For example, if any of the above problems occur in the power module or the power submodule in the power module, it can be considered that the power module is a power module that needs maintenance, or if all of the above problems occur in the power module or the power submodule in the power module, it can be considered that the power module is a power module that needs maintenance, or it can be other situations. In short, it can be determined that the power module needs maintenance.
[0071] After the power module that needs maintenance is determined as above, it can be recorded as the first power module. Then, the power modules other than the power module that needs maintenance among the candidate power modules can be determined and recorded as the second power modules; the number of the first power modules and the second power modules can each be one or more.
[0072] S204: Determine the power supply that can be provided by the computer device according to the power that can be provided by the first power module and the second power module respectively.
[0073] Among them, each power module is the same, and the number of power submodules included in each is also equal. Generally, the full load capacity of each candidate power module under normal working conditions is also the same, that is, it can provide the same full load power. In addition, each power module can also include a redundant power submodule to enable the power module to have power redundancy, so that when a power submodule fails, the power module can still have full load capacity and provide full load power. Of course, when a power module cannot work normally, it cannot meet the full load capacity and cannot provide full load power.
[0074] After obtaining the first power module and the second power module, the computer device can also obtain whether the first power module and the second power module can provide full-load power. Here, the power that the power module can provide is divided into two situations, one is that it provides full-load power, and the other is that the power provided is 0. Then, the power that the first power module can provide and the power that the second power module can provide can be summed, and the sum obtained is the supply power that the computer device can provide.
[0075] S206, detecting whether the supplied power meets the preset power demand, and if so, prohibiting power-off maintenance of the first power module.
[0076] In this step, during the actual power supply process, the power supply of the computer equipment at each moment can be obtained in real time, and the actual power demand of the user can also be obtained in real time, so that the power supply and actual power demand at the same moment can be compared to obtain a comparison result.
[0077] In a possible embodiment, if the supplied electric energy is greater than or equal to the actual power demand, it can be considered that the supplied electric energy meets the actual power demand, and the normal power supply of the blade server will not be affected if the power module is not maintained at this time. In order to avoid the problem of affecting the performance of the blade server due to the need to power off the blade server when maintaining the power module, the power module that needs to be maintained can be temporarily not maintained, that is, it is necessary to prohibit the immediate power-off maintenance of the first power module, and the immediate power-off maintenance here can be power-off maintenance at the current moment. In addition, as an optional embodiment, in this case, if the supplied electric energy meets the power demand, it can also be determined that the first power module has full load capacity, and a prompt message is output; wherein, the prompt message is used to indicate that the first power module is powered off for maintenance during the idle period of the computer device; in this way, the maintenance of the power module during the idle period will not affect the normal operation of the blade server and improve the working performance of the blade server.
[0078] In another possible embodiment, if the supplied power is less than the actual power demand, it can be considered that the supplied power does not meet the actual power demand. At this time, it means that the normal power supply of the blade server is seriously affected, and the blade server needs to be powered off to maintain the problematic power module so that the blade server can be powered normally subsequently.
[0079] In the above power management method, the first power module that needs to be maintained and the second power module other than the first power module among the candidate power modules of the computer device are determined, and the supply power that the computer device can provide is determined based on the power that the first power module and the second power module can provide respectively, and it is detected whether the supply power meets the power demand. If it does, it is forbidden to immediately power off the power module that needs maintenance for maintenance. In this method, since the supply power of the computer device can be determined by the power modules that need maintenance and the power modules that do not need maintenance, the power modules that need maintenance are not powered off for maintenance when the power demand is met. In this way, the computer device can be temporarily powered off and continue to work normally, avoiding the problem that the power outage affects the performance of the computer device. Therefore, the performance of the computer device can be guaranteed not to be affected, and the stability of the power supply system where the blade server is located can be improved.
[0080] From the above background, it can be known that there are many power modules in the computer device that supply power to the blade server, which are multiple power modules, which are recorded as multiple candidate power modules here. In the actual operation of the blade server, in order to facilitate maintenance, the power module that needs to be maintained and other power modules can be determined from the multiple candidate power modules. The following embodiment will explain the determination process in detail.
[0081] In another embodiment, another power management method is provided, such as Figure 3 As shown, based on the above embodiment, the above S202 may include the following steps:
[0082] S302, determining a first target result and a second target result corresponding to each candidate power module; the first target result is used to characterize whether the candidate power module is faulty, and the second target result is used to characterize whether the output of the candidate power module is normal.
[0083] In this step, the first target result of each candidate power module can be obtained by detecting whether each candidate power module has a fault. The fault here can be a fault inside the candidate power module, such as a line error.
[0084] At the same time, it is also possible to detect whether the output of each candidate power module is normal, and obtain the second target result of each candidate power module. Whether the output is normal here can be the power-on signal fed back by the mainboard to each candidate power module. If an abnormality occurs, the candidate power module will not start the circuit to supply power, and if it is normal, the candidate power module will start the circuit to supply power; it is reflected on each candidate power module, that is, whether the output of each candidate power module is normal.
[0085] S304: Divide the plurality of candidate power modules into first power modules and second power modules according to the first target result and the second target result of each candidate power module.
[0086] In this step, the first target result has two situations: fault and no fault, and the second target result has two situations: normal output and abnormal output. Then these four situations can be combined into four combinations: fault + normal output, fault + abnormal output, no fault + normal output, no fault + abnormal output. Here, it can be set in advance whether the power module corresponding to each combination needs maintenance according to these four combinations.
[0087] Then, after obtaining the first target result and the second target result of each candidate power module, taking a candidate power module as an example, it is possible to determine whether the corresponding power module needs to be repaired from four combinations according to the combination of the first target result and the second target result of the candidate power module. If repair is required, the corresponding candidate power module can be classified as a first power module, otherwise it can be classified as a second power module. In this way, multiple candidate power modules can be classified into a first power module and a second power module.
[0088] In this embodiment, by determining the first target result of whether each candidate power module has a fault and the second target result of whether the output is normal, and based on this, multiple candidate power modules are divided into first power modules and second power modules. In this way, the power modules are divided according to multiple indicators such as whether a fault occurs and whether the output is normal. The divided power modules can be more accurate, and subsequent maintenance can be more precise, thereby avoiding some unnecessary maintenance and further improving the working performance of the blade server.
[0089] The above embodiment mentions the first target result of determining whether each candidate power module is faulty and the second target result of determining whether the output is normal. In fact, each candidate power module includes at least one sub-module. Based on this, how to determine the target result of the candidate power module through the signal results of each sub-module of each candidate power module. The following embodiment mainly describes the process in detail.
[0090] In another embodiment, another power management method is provided, such as Figure 4 As shown, based on the above embodiment, the above S302 may include the following steps:
[0091] S402, for the same candidate power module, obtain the first signal result and the second signal result corresponding to each submodule; the first signal result is used to indicate whether the submodule fails, and the second signal result is used to indicate whether the output of the submodule is normal.
[0092] In this step, as mentioned above, each candidate power module includes a plurality of power submodules connected in parallel, and each power submodule can be referred to as a submodule. A first signal and a second signal can be set in advance for each submodule, and both the first signal and the second signal can be realized by assigning different functions to different pins of the chip where the submodule is located; wherein the first signal can be a FAULT error signal, which is used to indicate whether a fault occurs inside the submodule; and the second signal can be a PWOK power normal signal, which is used to indicate whether the output of the submodule is normal. By monitoring the two signals of each submodule in real time, the corresponding first signal result and second signal result of the submodule can be obtained, that is, each submodule has a first signal result and a second signal result, which can facilitate real-time monitoring of the power supply status information of each submodule in the candidate power module.
[0093] Here we take the specific structure of the power module inside a blade server as an example. Figure 5 The framework diagram shown. A blade server may include a candidate power module, which may include N+1 submodules, each of which may be a HVDC POWER MODULE high-voltage direct current power module. The candidate power module mainly uses N (N is an integer greater than 0) power modules in parallel to supply power, which can meet the full load current requirement; according to the reliability level requirements, it can be expanded to N+1 modules in parallel, even if one of the submodules fails, the remaining submodules can still support the full load current, thereby improving the stability and reliability of power supply to the blade server.
[0094] exist Figure 5 In the example, each submodule can be recorded as HVDC POWER MODULE1, 2, ..., N, N+1, and each submodule is connected in parallel. The positive and negative voltages are HVDC VIN+ and HVDC VIN-, respectively. The two signals of the first submodule can be recorded as FAULT1 and PWOK1, respectively; the two signals of the second submodule can be recorded as FAULT2 and PWOK2, respectively; and so on. The two signals of each submodule can be input into the MCU microcontroller unit in the blade server, and after being processed by the MCU, the first target result and the second target result corresponding to the candidate power module are obtained, and then input into the subsequent computer equipment for processing.
[0095] S404, determining the first target result and the second target result of the candidate power module according to the first signal result and the second signal result corresponding to each submodule, and obtaining the first target result and the second target result of each candidate power module.
[0096] In this step, after the first signal result and the second signal result corresponding to each submodule are obtained, the first signal result includes two situations: a fault occurs or there is no fault, and the second signal result includes two situations: a normal output or an abnormal output.
[0097] As an optional embodiment, the first number of first signal results that are faults, the second number of second signal results that are abnormal outputs, and the third number of second signal results that are normal outputs can be counted; based on the first number, second number, and third number of candidate power modules, the first target result and the second target result corresponding to the candidate power modules can be determined.
[0098] For example, if the FAULT signal output of a submodule is high, it is considered that the first signal result of the submodule is not faulty, and if the FAULT signal output is low, it is considered that the first signal result of the submodule is faulty; for another example, if the PWOK signal output of a submodule is high, it is considered that the second signal result of the submodule is normal output, and if the PWOK signal output is low, it is considered that the second signal result of the submodule is abnormal output.
[0099] In the above manner, the number of high and low FAULT signals, and the number of high and low PWOK signals in each sub-module of a candidate power module can be counted; and the number of low FAULT signals is taken as the first number, the number of low PWOK signals is taken as the second number, and the number of high PWOK signals is taken as the third number.
[0100] After obtaining the first number, the second number, and the third number of candidate power modules, the first target result and the second target result of the candidate power modules can be obtained through logical judgment. Figure 6 As shown in the logic representation example diagram, if the first number of candidate power modules is greater than or equal to the first threshold, the first target result of the candidate power modules is determined to be a fault; if the second number of candidate power modules is greater than or equal to the second threshold, the second target result of the candidate power modules is determined to be an abnormal output; if the third number of candidate power modules is greater than or equal to the third threshold, the second target result of the candidate power modules is determined to be a normal output; the above third threshold is greater than or equal to the second threshold and is less than the number of each sub-module.
[0101] Among them, the first threshold can be set according to actual conditions, for example, it can be 1, that is, when any sub-module fails and its output is low L, it is considered that the entire candidate power module fails and its output is low L, that is, the first target result of the candidate power module is a failure, and the corresponding output is low L; if all sub-modules are not faulty, then the entire candidate power module is considered to be fault-free and its output is high H, that is, the first target result of the candidate power module is not faulty, and the corresponding output is high H.
[0102] The second threshold and the third threshold can also be set according to actual conditions. For example, the second threshold can be 2, and the third threshold can be N (i.e., the total number of submodules in the candidate power module excluding redundant submodules); then, when 2 or more submodules of the candidate power module have abnormal output, that is, the output is low L, it is considered that the output of the entire candidate power module is abnormal, so that the final output is low L, that is, the second target result of the candidate power module is output abnormality, and the corresponding output is low L; when N or more submodules of the candidate power module have normal output, that is, the output is high, it is considered that the output of the entire candidate power module is normal, so that the final output is high H, that is, the second target result of the candidate power module is normal output, and the corresponding output is high H.
[0103] According to the two situations included in the first target result and the second target result of the above-mentioned candidate power module. The first target result includes whether there is a fault or no fault. Taking the FAULT signal as an example, the FAULT signal output corresponding to the fault is low L, and the FAULT signal output corresponding to no fault is high H. The second target result includes normal output or abnormal output. Taking the PWOK signal as an example, the PWOK signal output corresponding to the abnormal output is low L, and the PWOK signal output corresponding to the normal output is high H. So here the high and low of the FAULT signal and the high and low of the PWOK signal of the candidate power module exist Figure 6 The four combinations shown, that is, the N+1 submodules of the candidate power module exist in four scenarios.
[0104] For different combinations or different scenarios, the first type: when the output of the FAULT signal and the PWOK signal are both H, it can be considered that the submodules of the candidate power module are all outputting normally, with full load capacity and N+1 redundancy. The second type: when the output of the FAULT signal is H and the output of the PWOK signal is L, it can be considered that there is no fault in the submodules inside the candidate power module, and it may be that the power enable signal is not triggered, so you can wait for the confirmation enable signal. The third type: when the output of the FAULT signal is L and the output of the PWOK signal is H, it can be considered that any submodule in the candidate power module is faulty, that is, the output of one submodule is abnormal, and the other submodules are not faulty, which means that the candidate power module still has full load capacity, but does not have N+1 redundancy. In order not to affect the performance of the blade server, you can choose to maintain the candidate power module during the idle time period to minimize the impact on the blade server and improve the stability of the power supply system. Fourth type: When the outputs of the FAULT signal and the PWOK signal are both L, it can be considered that at least two sub-modules in the candidate power module are faulty, that is, the outputs of at least two sub-modules are abnormal, which means that the candidate power module does not have full load capacity and naturally does not have N+1 redundancy capability. In this case, you can choose to maintain the candidate power module as soon as possible.
[0105] In this embodiment, for the same candidate power module, the first signal result of whether each submodule has a fault and the second signal result of whether the output of each submodule is normal can be obtained, and the first target result and the second target result of the candidate power module can be obtained accordingly. In this way, the overall target result of the power module is determined by the signal results of each submodule, and the whole process of determining the target result of the power module can be refined, so that the target result obtained is more accurate. In addition, the target result of the power module is determined by the number of faults, the number of abnormal outputs, and the number of normal outputs in each submodule. The process is simple and intuitive, so the accuracy and efficiency of determining the target result of the power module can be further improved. Furthermore, different target results of the power module are determined by different quantities, so the accuracy and efficiency of determining the target result of the power module can be further improved.
[0106] The above embodiment mentioned that each candidate power module can be divided according to its target result, and the following embodiment illustrates this process.
[0107] In another embodiment, another power management method is provided, such as Figure 7 As shown, based on the above embodiment, the above S304 may include the following steps:
[0108] S502: If the first target result of the candidate power module is a fault, and the second target result of the candidate power module is a normal output, the candidate power module is determined as the first power module.
[0109] In this step, as mentioned above, the first target result includes a fault or no fault, and the second target result includes normal output or abnormal output. Taking the FAULT signal and the PWOK signal as an example, when the FAULT signal output of the candidate power module is low L but the PWOK signal output is high H, all the candidate power modules in this case can be regarded as the first power modules that need maintenance.
[0110] S504: select all candidate power modules except the first power module from the plurality of candidate power modules as second power modules.
[0111] In this step, when the FAULT signal output and the PWOK signal output of the candidate power module are both high H, when the FAULT signal output of the candidate power module is high H but the PWOK signal output is low L, and when the FAULT signal output and the PWOK signal output of the candidate power module are both low L, the candidate power modules in these three cases are all used as the second power module.
[0112] After obtaining the divided second power supply modules, the second power supply modules can be further divided according to the FAULT signal output results and PWOK signal output results corresponding to the second power supply modules. For example, for the second power supply modules whose FAULT signal output and PWOK signal output are both low L, it means that the second power supply module has a serious abnormality and can no longer provide full load power. In this case, it is necessary to immediately power off the blade server where the second power supply module is located and maintain the candidate power supply module. For the second power supply modules whose FAULT signal output and PWOK signal output are both high H, and the second power supply modules whose FAULT signal output is high H but whose PWOK signal output is low L, these power supply modules may not be repaired temporarily.
[0113] In this embodiment, by targeting a power module with a faulty output and normal output as the power module that needs maintenance, each candidate power module is divided into two categories of power modules. This makes it easy to quickly distinguish whether the power module needs to be powered off for maintenance, so as to maximize the working performance of the blade server.
[0114] A specific embodiment is given below to illustrate the technical solution of the embodiment of the present application. Based on the above embodiment, the method may include the following steps:
[0115] S1, for the same candidate power module, obtain the FAULT signal result and PWOK signal result corresponding to each submodule;
[0116] S2, counting a first number of each FAULT signal result indicating a fault, a second number of each PWOK signal result indicating an abnormal output, and a third number of each PWOK signal result indicating a normal output;
[0117] S3, if the first number of candidate power modules is greater than or equal to 1, determining that the FAULT target result of the candidate power module is a fault;
[0118] S4, if the second number of the candidate power modules is greater than or equal to 2, determining that the PWOK target result of the candidate power module is an output abnormality;
[0119] S5, if the third number of the candidate power modules is greater than or equal to N, determining that the PWOK target result of the candidate power modules is a normal output; N is greater than or equal to 2 and less than the number of each submodule;
[0120] S6, if the FAULT target result of the candidate power module is a fault, and the PWOK target result of the candidate power module is a normal output, the candidate power module is determined as the first power module that needs maintenance;
[0121] S7, selecting all candidate power modules except the first power module from the plurality of candidate power modules as second power modules;
[0122] S8, determining the power supply that can be provided by the computer device according to the power that can be provided by the first power module and the second power module respectively;
[0123] S9, detecting whether the supplied power meets the preset power demand;
[0124] S10, if the conditions are met, then power-off maintenance of the first power module is prohibited, and at the same time, it is determined that the first power module has full load capacity, and a prompt message is output; the prompt message is used to indicate that the first power module is powered off for maintenance during an idle period of the computer device;
[0125] S11: If the conditions are not met, the first power module may be powered off for maintenance.
[0126] It should be understood that, although the various steps in the flowcharts involved in the above-mentioned embodiments are displayed in sequence according to the indication of the arrows, these steps are not necessarily executed in sequence according to the order indicated by the arrows. Unless there is a clear explanation in this article, the execution of these steps does not have a strict order restriction, and these steps can be executed in other orders. Moreover, at least a part of the steps in the flowcharts involved in the above-mentioned embodiments can include multiple steps or multiple stages, and these steps or stages are not necessarily executed at the same time, but can be executed at different times, and the execution order of these steps or stages is not necessarily to be carried out in sequence, but can be executed in turn or alternately with other steps or at least a part of the steps or stages in other steps.
[0127] Based on the same inventive concept, the embodiment of the present application also provides a power management device for implementing the power management method involved above. The implementation solution provided by the device to solve the problem is similar to the implementation solution recorded in the above method, so the specific limitations in one or more power management device embodiments provided below can refer to the limitations of the power management method above, and will not be repeated here.
[0128] In one embodiment, Figure 8 As shown, a power management device is provided, comprising: a power determination module, a supply power determination module and a power management module, wherein:
[0129] A power supply determination module, used to determine a first power supply module and a second power supply module among candidate power supply modules of the computer device; the first power supply module is a power supply module that needs maintenance, and the second power supply module is a candidate power supply module among the candidate power supply modules except the first power supply module;
[0130] A power supply determination module, used to determine the power supply that can be provided by the computer device according to the power that can be provided by the first power module and the second power module respectively;
[0131] The power management module is used to detect whether the supplied power meets the preset power demand. If so, power-off maintenance of the first power module is prohibited.
[0132] In another embodiment, another power management device is provided. Based on the above embodiment, the power determination module may include:
[0133] A target result determination unit, used to determine a first target result and a second target result corresponding to each candidate power module; the first target result is used to characterize whether the candidate power module is faulty, and the second target result is used to characterize whether the output of the candidate power module is normal;
[0134] The dividing unit is used to divide each candidate power module into a first power module and a second power module according to the first target result and the second target result of each candidate power module.
[0135] In another embodiment, another power management device is provided. Based on the above embodiment, each of the candidate power modules includes at least one submodule, and the target result determination unit may include:
[0136] An acquisition subunit is used to acquire, for the same candidate power module, a first signal result and a second signal result corresponding to each submodule; the first signal result is used to indicate whether the submodule fails, and the second signal result is used to indicate whether the output of the submodule is normal;
[0137] The target result determination subunit is used to determine the first target result and the second target result of the candidate power module according to the first signal result and the second signal result corresponding to each submodule, and obtain the first target result and the second target result of each candidate power module.
[0138] Optionally, the above-mentioned target result determination subunit is specifically used to count the first number of first signal results that are faulty, the second number of second signal results that are abnormal output, and the third number of second signal results that are normal output; and determine the first target result and the second target result corresponding to the candidate power modules based on the first number, the second number and the third number of candidate power modules.
[0139] Optionally, the above-mentioned target result determination subunit is specifically used to determine that the first target result of the candidate power supply module is a fault if the first number of candidate power supply modules is greater than or equal to a first threshold; determine that the second target result of the candidate power supply module is abnormal output if the second number of candidate power supply modules is greater than or equal to a second threshold; determine that the second target result of the candidate power supply module is normal output if the third number of candidate power supply modules is greater than or equal to a third threshold; the above-mentioned third threshold is greater than or equal to the second threshold and is less than the number of each sub-module.
[0140] In another embodiment, another power management device is provided. Based on the above embodiment, the division unit may include:
[0141] A first determining subunit, configured to determine the candidate power module as the first power module if the first target result of the candidate power module is a fault and the second target result of the candidate power module is a normal output;
[0142] The second determining subunit is configured to select all candidate power modules except the first power module among the candidate power modules as second power modules.
[0143] In another embodiment, another power management device is provided. Based on the above embodiment, the above device may further include:
[0144] The output module is used to determine that the first power module has full load capacity and output a prompt message if the supplied power meets the power demand; wherein the prompt message is used to indicate that the first power module should be powered off for maintenance during the idle period of the computer device.
[0145] Each module in the above power management device can be implemented in whole or in part by software, hardware or a combination thereof. Each module can be embedded in or independent of a processor in a computer device in the form of hardware, or can be stored in a memory in a computer device in the form of software, so that the processor can call and execute the operations corresponding to each module.
[0146] In one embodiment, a computer device is provided, whose internal structure diagram can be as follows: Fig. 9 As shown. The computer device includes a processor, a memory and a network interface connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store signal detection data of the power module. The network interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a power management method is implemented.
[0147] Those skilled in the art will understand that Fig. 9 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.
[0148] In one embodiment, a computer device is provided, including a memory and a processor, wherein a computer program is stored in the memory, and when the processor executes the computer program, the following steps are implemented:
[0149] Determine a first power module and a second power module among candidate power modules of a computer device; the first power module is a power module that needs maintenance, and the second power module is a candidate power module other than the first power module among the candidate power modules; determine the supply power that the computer device can provide based on the power that the first power module and the second power module can provide respectively; detect whether the supply power meets the preset power demand, and if so, prohibit power-off maintenance of the first power module.
[0150] In one embodiment, when the processor executes the computer program, the processor further implements the following steps:
[0151] Determine a first target result and a second target result corresponding to each candidate power module; the first target result is used to characterize whether the candidate power module is faulty, and the second target result is used to characterize whether the output of the candidate power module is normal; according to the first target result and the second target result of each candidate power module, divide each candidate power module into a first power module and a second power module.
[0152] In one embodiment, when the processor executes the computer program, the processor further implements the following steps:
[0153] For the same candidate power module, the first signal result and the second signal result corresponding to each submodule are obtained; the above-mentioned first signal result is used to characterize whether the submodule is faulty, and the above-mentioned second signal result is used to characterize whether the output of the submodule is normal; according to the first signal result and the second signal result corresponding to each submodule, the first target result and the second target result of the candidate power module are determined, and the first target result and the second target result of each candidate power module are obtained.
[0154] In one embodiment, when the processor executes the computer program, the processor further implements the following steps:
[0155] Count the first number of first signal results that are faults, the second number of second signal results that are abnormal outputs, and the third number of second signal results that are normal outputs; determine the first target results and the second target results corresponding to the candidate power modules based on the first number, the second number, and the third number of candidate power modules.
[0156] In one embodiment, when the processor executes the computer program, the processor further implements the following steps:
[0157] If the first number of candidate power modules is greater than or equal to the first threshold, the first target result of the candidate power modules is determined to be a fault; if the second number of candidate power modules is greater than or equal to the second threshold, the second target result of the candidate power modules is determined to be abnormal output; if the third number of candidate power modules is greater than or equal to the third threshold, the second target result of the candidate power modules is determined to be normal output; the above third threshold is greater than or equal to the second threshold and is less than the number of each sub-module.
[0158] In one embodiment, when the processor executes the computer program, the processor further implements the following steps:
[0159] If the first target result of the candidate power module is a fault, and the second target result of the candidate power module is normal output, the candidate power module is determined as the first power module; and the other candidate power modules except the first power module are all determined as the second power modules.
[0160] In one embodiment, when the processor executes the computer program, the processor further implements the following steps:
[0161] If the supplied power meets the power demand, it is determined that the first power module has full load capacity and a prompt message is output; wherein the prompt message is used to instruct the first power module to be powered off for maintenance during an idle period of the computer device.
[0162] In one embodiment, a computer-readable storage medium is provided, on which a computer program is stored, and when the computer program is executed by a processor, the following steps are implemented:
[0163] Determine a first power module and a second power module among candidate power modules of a computer device; the first power module is a power module that needs maintenance, and the second power module is a candidate power module other than the first power module among the candidate power modules; determine the supply power that the computer device can provide based on the power that the first power module and the second power module can provide respectively; detect whether the supply power meets the preset power demand, and if so, prohibit power-off maintenance of the first power module.
[0164] In one embodiment, when the computer program is executed by a processor, the following steps are also implemented:
[0165] Determine a first target result and a second target result corresponding to each candidate power module; the first target result is used to characterize whether the candidate power module is faulty, and the second target result is used to characterize whether the output of the candidate power module is normal; according to the first target result and the second target result of each candidate power module, divide each candidate power module into a first power module and a second power module.
[0166] In one embodiment, when the computer program is executed by a processor, the following steps are also implemented:
[0167] For the same candidate power module, the first signal result and the second signal result corresponding to each submodule are obtained; the above-mentioned first signal result is used to characterize whether the submodule is faulty, and the above-mentioned second signal result is used to characterize whether the output of the submodule is normal; according to the first signal result and the second signal result corresponding to each submodule, the first target result and the second target result of the candidate power module are determined, and the first target result and the second target result of each candidate power module are obtained.
[0168] In one embodiment, when the computer program is executed by a processor, the following steps are also implemented:
[0169] Count the first number of first signal results that are faults, the second number of second signal results that are abnormal outputs, and the third number of second signal results that are normal outputs; determine the first target results and the second target results corresponding to the candidate power modules based on the first number, the second number, and the third number of candidate power modules.
[0170] In one embodiment, when the computer program is executed by a processor, the following steps are also implemented:
[0171] If the first number of candidate power modules is greater than or equal to the first threshold, the first target result of the candidate power modules is determined to be a fault; if the second number of candidate power modules is greater than or equal to the second threshold, the second target result of the candidate power modules is determined to be abnormal output; if the third number of candidate power modules is greater than or equal to the third threshold, the second target result of the candidate power modules is determined to be normal output; the above third threshold is greater than or equal to the second threshold and is less than the number of each sub-module.
[0172] In one embodiment, when the computer program is executed by a processor, the following steps are also implemented:
[0173] If the first target result of the candidate power module is a fault, and the second target result of the candidate power module is normal output, the candidate power module is determined as the first power module; and the other candidate power modules except the first power module are all determined as the second power modules.
[0174] In one embodiment, when the computer program is executed by a processor, the following steps are also implemented:
[0175] If the supplied power meets the power demand, it is determined that the first power module has full load capacity and a prompt message is output; wherein the prompt message is used to instruct the first power module to be powered off for maintenance during an idle period of the computer device.
[0176] In one embodiment, a computer program product is provided, comprising a computer program, which, when executed by a processor, implements the following steps:
[0177] Determine a first power module and a second power module among candidate power modules of a computer device; the first power module is a power module that needs maintenance, and the second power module is a candidate power module other than the first power module among the candidate power modules; determine the supply power that the computer device can provide based on the power that the first power module and the second power module can provide respectively; detect whether the supply power meets the preset power demand, and if so, prohibit power-off maintenance of the first power module.
[0178] In one embodiment, when the computer program is executed by a processor, the following steps are also implemented:
[0179] Determine a first target result and a second target result corresponding to each candidate power module; the first target result is used to characterize whether the candidate power module is faulty, and the second target result is used to characterize whether the output of the candidate power module is normal; according to the first target result and the second target result of each candidate power module, divide each candidate power module into a first power module and a second power module.
[0180] In one embodiment, when the computer program is executed by a processor, the following steps are also implemented:
[0181] For the same candidate power module, the first signal result and the second signal result corresponding to each submodule are obtained; the above-mentioned first signal result is used to characterize whether the submodule is faulty, and the above-mentioned second signal result is used to characterize whether the output of the submodule is normal; according to the first signal result and the second signal result corresponding to each submodule, the first target result and the second target result of the candidate power module are determined, and the first target result and the second target result of each candidate power module are obtained.
[0182] In one embodiment, when the computer program is executed by a processor, the following steps are also implemented:
[0183] Count the first number of first signal results that are faults, the second number of second signal results that are abnormal outputs, and the third number of second signal results that are normal outputs; determine the first target results and the second target results corresponding to the candidate power modules based on the first number, the second number, and the third number of candidate power modules.
[0184] In one embodiment, when the computer program is executed by a processor, the following steps are also implemented:
[0185] If the first number of candidate power modules is greater than or equal to the first threshold, the first target result of the candidate power modules is determined to be a fault; if the second number of candidate power modules is greater than or equal to the second threshold, the second target result of the candidate power modules is determined to be abnormal output; if the third number of candidate power modules is greater than or equal to the third threshold, the second target result of the candidate power modules is determined to be normal output; the above third threshold is greater than or equal to the second threshold and is less than the number of each sub-module.
[0186] In one embodiment, when the computer program is executed by a processor, the following steps are also implemented:
[0187] If the first target result of the candidate power module is a fault, and the second target result of the candidate power module is normal output, the candidate power module is determined as the first power module; and the other candidate power modules except the first power module are all determined as the second power modules.
[0188] In one embodiment, when the computer program is executed by a processor, the following steps are also implemented:
[0189] If the supplied power meets the power demand, it is determined that the first power module has full load capacity and a prompt message is output; wherein the prompt message is used to instruct the first power module to be powered off for maintenance during an idle period of the computer device.
[0190] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in the present application can include at least one of non-volatile and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetoresistive random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited to this. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, etc., but are not limited to this.
[0191] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0192] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.
Claims
1. A power management method, characterized in that: The method comprises: Determine a first target result and a second target result corresponding to each candidate power module in the computer device; the first target result is used to characterize whether the candidate power module fails, and the second target result is used to characterize whether the output of the candidate power module is normal; According to the first target result and the second target result of each candidate power module, each candidate power module is divided into a first power module and a second power module; the first power module is a power module that needs maintenance, and the second power module is a candidate power module among the candidate power modules except the first power module; Determining the power supply that the computer device can provide according to the power that the first power module and the second power module can each provide; Detect whether the supplied power meets the preset power demand, and if so, prohibit power-off maintenance of the first power module.
2. The method according to claim 1, characterized in that Each of the candidate power modules includes at least one submodule, and the determining of the first target result and the second target result corresponding to each of the candidate power modules in the computer device includes: For the same candidate power module, obtaining a first signal result and a second signal result corresponding to each submodule; the first signal result is used to indicate whether the submodule fails, and the second signal result is used to indicate whether the output of the submodule is normal; According to the first signal results and the second signal results corresponding to each of the submodules, the first target result and the second target result of the candidate power module are determined, and the first target result and the second target result of each of the candidate power module are obtained.
3. The method according to claim 2, characterized in that Determining the first target result and the second target result of the candidate power module according to the first signal result and the second signal result corresponding to each of the submodules includes: Counting a first number of first signal results indicating a fault, a second number of second signal results indicating an abnormal output, and a third number of second signal results indicating a normal output; According to the first quantity, the second quantity and the third quantity of the candidate power modules, a first target result and a second target result corresponding to the candidate power modules are determined.
4. The method according to claim 3, characterized in that The determining, according to the first quantity, the second quantity, and the third quantity of the candidate power modules, the first target result and the second target result corresponding to the candidate power modules comprises: If the first number of the candidate power modules is greater than or equal to a first threshold, determining that the first target result of the candidate power modules is a failure; If the second number of the candidate power modules is greater than or equal to a second threshold, determining that the second target result of the candidate power modules is output abnormality; If the second number of the candidate power modules is greater than or equal to a third threshold, the second target result of the candidate power modules is determined to be normal output; the third threshold is greater than the second threshold and less than the number of each submodule.
5. The method according to any one of claims 1 to 4, characterized in that: The step of dividing each candidate power module into a first power module and a second power module according to the first target result and the second target result of each candidate power module includes: If the first target result of the candidate power module is a fault, and the second target result of the candidate power module is a normal output, the candidate power module is determined to be the first power module; All candidate power modules among the candidate power modules except the first power module are used as the second power modules.
6. The method according to any one of claims 1 to 4, characterized in that: The method further comprises: If the supplied power meets the power demand, it is determined that the first power module has full load capacity and a prompt message is output; the prompt message is used to instruct the first power module to be powered off for maintenance during an idle period of the computer device.
7. A power management device, characterized in that: The device comprises: A power supply determination module, used to determine a first target result and a second target result corresponding to each candidate power supply module in a computer device; the first target result is used to characterize whether the candidate power supply module is faulty, and the second target result is used to characterize whether the output of the candidate power supply module is normal; according to the first target result and the second target result of each candidate power supply module, each candidate power supply module is divided into a first power supply module and a second power supply module; the first power supply module is a power supply module that needs maintenance, and the second power supply module is a candidate power supply module among the candidate power supply modules except the first power supply module; A power supply determination module, used to determine the power supply that can be provided by the computer device according to the power that can be provided by the first power module and the second power module respectively; The power management module is used to detect whether the supplied power meets the preset power demand. If so, power-off maintenance of the first power module is prohibited.
8. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 6 are implemented.
9. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 6 are implemented.