Prefabricated building engineering monitoring method, device and intelligent terminal based on Internet of Things

Through the Internet of Things technology, the three-dimensional models of prefabricated components are generated and compared, which solves the problems of low monitoring efficiency of prefabricated components and difficulty in detecting damage of prefabricated components, and achieves efficient monitoring and environmentally friendly utilization.

CN116228981BActive Publication Date: 2024-11-26SUZHOU ONTARIO ARCHITECTURAL DESIGN CO LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202310219677.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-03-08
Publication Date
2024-11-26
Estimated Expiration
2043-03-08

AI Technical Summary

Technical Problem

The existing prefabricated construction project monitoring methods are inefficient, which affects the construction progress, and prefabricated components are easily damaged during transportation, making it difficult to detect in time.

Method used

Using an Internet of Things method, a three-dimensional model is generated by obtaining the actual image and ultrasonic image of prefabricated components, and error comparison is performed. Combined with the design of the three-dimensional model, we determine whether the components meet the requirements, and establish a reuse database to improve detection efficiency and environmentally friendly utilization.

Benefits of technology

It significantly improves the work efficiency of construction engineering monitoring, ensures the accuracy and quality of prefabricated components, reduces the impact of construction progress, and saves resources through reuse of the database.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116228981B_ABST
    Figure CN116228981B_ABST
Patent Text Reader

Abstract

The present application relates to the field of prefabricated building technology, and in particular to a method, device and intelligent terminal for monitoring prefabricated building projects based on the Internet of Things, wherein the method comprises obtaining an actual image of a prefabricated component and generating a first three-dimensional model of the prefabricated component; obtaining an ultrasonic image of the prefabricated component and generating a second three-dimensional model of the prefabricated component; comparing the first three-dimensional model with the second three-dimensional model, comparing the error between the two with a preset first error threshold, and if the error between the two is less than the first error threshold, using the first three-dimensional model as the actual three-dimensional model of the prefabricated component; obtaining prefabricated component information and deriving a corresponding design three-dimensional model, comparing the actual three-dimensional model with the design three-dimensional model, and judging whether the error range between the two is less than the preset second error threshold. The present application can improve the work efficiency of construction project monitoring.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of prefabricated buildings, and in particular to a method, device and intelligent terminal for monitoring prefabricated building projects based on the Internet of Things. Background Art

[0002] With the development of modern industrial technology, buildings can be built in batches like automated machine production, such as prefabricated buildings. Prefabricated buildings are a type of building that mainly uses prefabricated structures for integration. Its advantages are fast construction speed, less construction waste and high construction efficiency. Therefore, prefabricated buildings have been introduced as one of the main methods of construction all over the world.

[0003] Construction project monitoring is the most important process in prefabricated buildings. The prefabricated components of prefabricated buildings need to be transported from the production site to the construction site. During the transportation process, whether it is the bumps encountered during the driving of the transport vehicle or improper operation during the transportation of the prefabricated components, it may cause damage to the prefabricated components, such as cracks, breaks, peeling, etc. Therefore, before the prefabricated components are built, they need to be inspected in all aspects. Specifically, each prefabricated building is equipped with a BIM model (Building Information Model) of its construction drawings. The three-dimensional model of each prefabricated component can be exported through the BIM model. The on-site staff uses the exported three-dimensional model of the prefabricated components to compare the dimensions one by one with the prefabricated components on site to determine whether the prefabricated components are qualified.

[0004] The main advantage of prefabricated buildings lies in their fast construction speed. The current method of monitoring construction projects is still mainly for staff to check prefabricated components one by one, which greatly reduces the efficiency of construction project monitoring and easily affects the construction progress of prefabricated buildings. Summary of the invention

[0005] In order to improve the work efficiency of construction project monitoring, the present application provides a method, device and intelligent terminal for monitoring prefabricated construction projects based on the Internet of Things.

[0006] In the first aspect, the present application provides a method for monitoring an assembled building project based on the Internet of Things, which adopts the following technical solutions:

[0007] A method for monitoring an assembled building project based on the Internet of Things comprises the following steps:

[0008] Acquire an actual image of the prefabricated component, and generate a first three-dimensional model of the prefabricated component based on the actual image;

[0009] Acquire an ultrasonic image of the prefabricated component, and generate a second three-dimensional model of the prefabricated component based on the ultrasonic image;

[0010] The first three-dimensional model and the second three-dimensional model are compared, and the error between the two is compared with a preset first error threshold. If the error between the two is less than the first error threshold, the first three-dimensional model is used as the actual three-dimensional model of the prefabricated component; if the error between the two is greater than or equal to the first error threshold, the actual image of the prefabricated component is reacquired and the first three-dimensional model is generated, and the comparison is continued until the error between the two is less than the first error threshold;

[0011] The prefabricated component information is obtained and the corresponding designed three-dimensional model is exported, and the actual three-dimensional model is compared with the designed three-dimensional model to determine whether the error range of the two is less than a preset second error threshold.

[0012] By adopting the above technical solution, when inspecting the prefabricated components, firstly, the actual image of the prefabricated components is used in a conventional manner to generate the first three-dimensional model of the prefabricated components, and then the ultrasonic image of the prefabricated components is obtained by ultrasonic wave to generate the second three-dimensional model of the prefabricated components, and then the first three-dimensional model is compared with the second three-dimensional model for error, until the error is less than the preset first error threshold, the first three-dimensional model is determined as the actual three-dimensional model. This operation is because there are too many environmental factors affecting the construction site, and the actual image obtained is easily affected. Generating a three-dimensional model only by the actual image cannot guarantee the accuracy of the model. Therefore, the second three-dimensional model is generated by introducing the ultrasonic method, which is equivalent to optimizing the three-dimensional model, so that the generated actual three-dimensional model is as accurate as possible. Finally, the actual three-dimensional model obtained is compared with the derived design three-dimensional model, and the prefabricated components are judged whether they meet the requirements based on the second error threshold. Compared with the inspection of prefabricated components one by one by the staff, the work efficiency of construction project monitoring is greatly improved, so that the construction progress of prefabricated buildings is not easily affected.

[0013] In a specific implementation manner, acquiring an actual image of the prefabricated component and generating a first three-dimensional model of the prefabricated component based on the actual image comprises:

[0014] Acquire an actual image of the prefabricated component, construct a low-precision model of the prefabricated component based on the actual image, and generate a diffuse reflection sticker;

[0015] Performing fine processing on the low-precision model to generate a high-precision model;

[0016] The first three-dimensional model is constructed based on the diffuse reflection sticker and the high-precision model.

[0017] By adopting the above technical solution, when constructing a three-dimensional model using the actual image of the prefabricated component, a simple low-precision model is first constructed using the actual image taken, and a diffuse reflection sticker of the prefabricated component is obtained, and then the low-precision model is finely processed to obtain a high-precision model, and finally the two are combined to construct the first three-dimensional model. The finely processed three-dimensional model can minimize the size error with the prefabricated component, and the diffuse reflection sticker makes it easier to find the same reference when comparing the three-dimensional model later.

[0018] In a specific implementation manner, acquiring an ultrasonic image of the prefabricated component and generating a second three-dimensional model of the prefabricated component based on the ultrasonic image comprises:

[0019] Using an ultrasonic probe to acquire ultrasonic images of the prefabricated component;

[0020] The three-dimensional profile measurement technology is used to obtain the three-dimensional position information of each frame of ultrasonic image in space;

[0021] The ultrasonic image is three-dimensionally reconstructed based on the three-dimensional position information of each frame of the ultrasonic image and a second three-dimensional model of the prefabricated component is generated.

[0022] By adopting the above technical solution, ultrasonic images of prefabricated components are collected using ultrasonic probes, and the ultrasonic image collection process is not easily interfered by various environmental factors, such as light and the angle of the prefabricated components.

[0023] In a specific implementation scheme, obtaining prefabricated component information includes:

[0024] The electronic code preset on the prefabricated component is scanned by a code scanning device, wherein the electronic code contains the designed three-dimensional model of the prefabricated component.

[0025] By adopting the above technical solution, the design three-dimensional model of the prefabricated component is obtained by scanning the code. Compared with exporting the corresponding design three-dimensional model one by one according to the model of the prefabricated component, the inspection speed of the prefabricated component can be greatly accelerated.

[0026] In a specific implementation manner, comparing the first three-dimensional model with the second three-dimensional model includes:

[0027] Receiving and storing the uploaded first three-dimensional model and second three-dimensional model;

[0028] Performing lightweight conversion on the received first three-dimensional model and the second three-dimensional model, converting the two into a unified three-dimensional lightweight format and storing the converted results;

[0029] The converted three-dimensional lightweight format information of the first three-dimensional model and the second three-dimensional model are compared to determine the error value between the two, and the error value is generated and stored.

[0030] By adopting the above technical solution, converting the first three-dimensional model and the second three-dimensional model into a lightweight format facilitates the transmission and rapid loading and viewing of the three-dimensional models, thereby further accelerating the inspection speed of the prefabricated components.

[0031] In a specific implementation manner, comparing the actual three-dimensional model with the designed three-dimensional model includes:

[0032] Receive and store uploaded actual 3D models and designed 3D models;

[0033] Performing lightweight conversion on the received actual three-dimensional model and the designed three-dimensional model, converting both into a unified three-dimensional lightweight format and storing the converted results;

[0034] The actual three-dimensional model and the three-dimensional lightweight format information after conversion of the designed three-dimensional model are compared, an error value between the two is determined, and the error value is generated and stored.

[0035] By adopting the above technical solution, converting the actual three-dimensional model and the designed three-dimensional model into a lightweight format facilitates the transmission and rapid loading and viewing of the three-dimensional model, thereby further speeding up the inspection speed of prefabricated components.

[0036] In a specific possible implementation scheme, the method of obtaining the prefabricated component information and deriving the corresponding designed three-dimensional model, comparing the actual three-dimensional model with the designed three-dimensional model, and determining whether the error range between the two is less than a preset second error threshold database further includes:

[0037] Establish a reuse database for prefabricated components;

[0038] The actual three-dimensional model of the prefabricated component that does not meet the requirements and its corresponding three-dimensional lightweight format are stored in the reuse database.

[0039] By adopting the above technical solution, a reuse database of prefabricated components that do not meet the requirements is established. If prefabricated components of corresponding sizes need to be manufactured later, an attempt can be made to search in the reuse database of prefabricated components first. If there are prefabricated components that match or are within the error range, they can be used directly. By trying to reuse the prefabricated components, the effect of saving energy and protecting the environment can be achieved.

[0040] In the second aspect, the present application provides an Internet of Things-based prefabricated building engineering monitoring device, which adopts the following technical solution:

[0041] An assembled building engineering monitoring device based on the Internet of Things, comprising:

[0042] A first model generation module, used for acquiring an actual image of the prefabricated component and generating a first three-dimensional model of the prefabricated component based on the actual image;

[0043] A second model generation module, used for acquiring an ultrasonic image of the prefabricated component and generating a second three-dimensional model of the prefabricated component based on the ultrasonic image;

[0044] A first model comparison module is used to compare the first three-dimensional model and the second three-dimensional model, and compare the error between the two models with a preset first error threshold. If the error between the two models is less than the first error threshold, the first three-dimensional model is used as the actual three-dimensional model of the prefabricated component; if the error between the two models is greater than or equal to the first error threshold, the actual image of the prefabricated component is re-acquired and the first three-dimensional model is generated, and the comparison is continued until the error between the two models is less than the first error threshold;

[0045] The second model comparison module is used to obtain prefabricated component information and derive the corresponding designed three-dimensional model, compare the actual three-dimensional model with the designed three-dimensional model, and determine whether the error range of the two is less than a preset second error threshold.

[0046] By adopting the above technical solution, when inspecting the prefabricated components, firstly, the actual image of the prefabricated components is used in a conventional manner to generate the first three-dimensional model of the prefabricated components, and then the ultrasonic image of the prefabricated components is obtained by ultrasonic wave to generate the second three-dimensional model of the prefabricated components, and then the first three-dimensional model is compared with the second three-dimensional model for error, until the error is less than the preset first error threshold, the first three-dimensional model is determined as the actual three-dimensional model. This operation is because there are too many environmental factors affecting the construction site, and the actual image obtained is easily affected. Generating a three-dimensional model only by the actual image cannot guarantee the accuracy of the model. Therefore, the second three-dimensional model is generated by introducing the ultrasonic method, which is equivalent to optimizing the three-dimensional model, so that the generated actual three-dimensional model is as accurate as possible. Finally, the actual three-dimensional model obtained is compared with the derived design three-dimensional model, and the prefabricated components are judged whether they meet the requirements based on the second error threshold. Compared with the inspection of prefabricated components one by one by the staff, the work efficiency of construction project monitoring is greatly improved, so that the construction progress of prefabricated buildings is not easily affected.

[0047] In a third aspect, the present application provides a smart terminal, which adopts the following technical solution:

[0048] A smart terminal, comprising a processor and a memory, wherein the memory stores at least one instruction, at least one program, a code set or an instruction set, and the at least one instruction, the at least one program, the code set or the instruction set is loaded and executed by the processor to implement a prefabricated building project monitoring method based on the Internet of Things as described in any one of the first aspects.

[0049] In a fourth aspect, the present application provides a computer-readable storage medium, which adopts the following technical solution:

[0050] A computer-readable storage medium, wherein at least one instruction, at least one program, a code set or an instruction set is stored in the storage medium, and the at least one instruction, the at least one program, the code set or the instruction set is loaded and executed by a processor to implement a prefabricated building project monitoring method based on the Internet of Things as described in any one of the first aspects.

[0051] In summary, the present application includes at least one of the following beneficial technical effects:

[0052] 1. When inspecting prefabricated components, first generate a first three-dimensional model of the prefabricated components using the actual image of the prefabricated components in a conventional manner, then use ultrasound to obtain the ultrasonic image of the prefabricated components to generate a second three-dimensional model of the prefabricated components, and then compare the errors of the first three-dimensional model and the second three-dimensional model until the error is less than the preset first error threshold, and then define the first three-dimensional model as the actual three-dimensional model. This operation is because there are too many environmental influencing factors at the construction site, and the actual image obtained is easily affected. Generating a three-dimensional model only by using the actual image cannot guarantee the accuracy of the model. Therefore, introducing ultrasound to generate the second three-dimensional model is equivalent to optimizing the three-dimensional model, so that the generated actual three-dimensional model is as accurate as possible. Finally, the actual three-dimensional model is compared with the derived design three-dimensional model, and it is judged whether the prefabricated components meet the requirements based on the second error threshold. Compared with the inspection of prefabricated components one by one by the staff, the work efficiency of construction project monitoring is greatly improved, and the construction progress of prefabricated buildings is not easily affected;

[0053] 2. When constructing a 3D model using the actual image of the prefabricated component, first construct a simple low-precision model using the actual image captured, and obtain the diffuse reflection sticker of the prefabricated component. Then, finely process the low-precision model to obtain a high-precision model, and finally combine the two to construct the first 3D model. The finely processed 3D model can minimize the size error with the prefabricated component, and the diffuse reflection sticker makes it easier to find the same reference when comparing the 3D model later;

[0054] 3. By establishing a reuse database of prefabricated components that do not meet the requirements, if you need to manufacture prefabricated components of corresponding sizes in the future, you can try to search in the reuse database of prefabricated components first. If there are matching prefabricated components or prefabricated components within the error range, they can be used directly. By trying to reuse prefabricated components, it can play a role in saving energy and protecting the environment. BRIEF DESCRIPTION OF THE DRAWINGS

[0055] Figure 1It is a flow chart of the method for monitoring prefabricated building projects based on the Internet of Things in an embodiment of the present application.

[0056] Figure 2 It is a structural block diagram of an assembled building engineering monitoring device based on the Internet of Things in an embodiment of the present application.

[0057] Explanation of reference numerals: 100, first model generation module; 200, second model generation module; 300, first model comparison module; 400, second model comparison module. DETAILED DESCRIPTION

[0058] The present application is further described in detail below in conjunction with the accompanying drawings.

[0059] The present application embodiment discloses a method for monitoring an assembled building project based on the Internet of Things. Figure 1 ,The prefabricated building engineering monitoring method based on the Internet of Things includes the following steps:

[0060] S100: construct a first three-dimensional model of the prefabricated component by using an image.

[0061] The actual image of the prefabricated component is obtained, and the first three-dimensional model of the prefabricated component is generated based on the actual image. Specifically, the actual image of the prefabricated component is first obtained by using a high-definition single-lens reflex camera set around the prefabricated component, and a low-precision model of the prefabricated component is constructed based on the actual image using a 3D MAX production tool and a diffuse reflection sticker is generated using a Photoshop drawing tool. Then, the low-precision model is finely processed using the model making software zbrush to generate a high-precision model. Finally, based on the diffuse reflection sticker and the high-precision model, 3D MAX is used again to construct the first three-dimensional model and the first three-dimensional model is uploaded to the processor. The finely processed three-dimensional model can minimize the size error with the prefabricated component. The main function of the diffuse reflection sticker is to record the color and texture of the surface of the object, and the diffuse reflection sticker is convenient for finding the same reference object when comparing the three-dimensional model later.

[0062] S200, constructing a second three-dimensional model of the prefabricated component by using ultrasonic method.

[0063] An ultrasonic image of the prefabricated component is acquired, and a second three-dimensional model of the prefabricated component is generated based on the ultrasonic image. Specifically, the ultrasonic image of the prefabricated component is first acquired by an ultrasonic probe connected to an ultrasonic device, and then the three-dimensional position information of each frame of the ultrasonic image in space is acquired by using a three-dimensional profile measurement technology. Finally, based on the three-dimensional position information of each frame of the ultrasonic image, 3D MAX is used to perform three-dimensional reconstruction on the ultrasonic image and generate a second three-dimensional model of the prefabricated component, and the second three-dimensional model is uploaded to the processor.

[0064] S300: Compare the first three-dimensional model with the second three-dimensional model, and generate an actual three-dimensional model of the prefabricated component based on the comparison result.

[0065] After first receiving and storing the uploaded first three-dimensional model and second three-dimensional model, the received first three-dimensional model and second three-dimensional model are lightweight converted, and the two are converted into a unified three-dimensional lightweight format and the converted results are stored. Then, the three-dimensional lightweight format information of the first three-dimensional model and the second three-dimensional model after conversion is compared, so as to determine the error value of the two, generate and store the error value. By converting the first three-dimensional model and the second three-dimensional model into a lightweight format, it is helpful to transmit the three-dimensional model and quickly load and view it, so as to further speed up the inspection speed of the prefabricated component. Next, the error value of the two is compared with the preset first error threshold. If the error value of the two is less than the first error threshold, the first three-dimensional model is used as the actual three-dimensional model of the prefabricated component, and the actual three-dimensional model is uploaded to the processor. If the error value of the two is greater than or equal to the first error threshold, the step S100 is repeated. It should be noted that the angle of the actual image should be changed, the actual image of the prefabricated component is re-acquired and the first three-dimensional model is generated, and then the comparison with the second three-dimensional model is continued until the error value of the two is less than the first error threshold. This operation is because there are too many environmental factors at the construction site, and the actual images obtained are easily affected. Generating a three-dimensional model of prefabricated components only through actual images cannot guarantee the accuracy of the three-dimensional model. Therefore, ultrasonic waves are introduced to generate a second three-dimensional model. Constructing and comparing three-dimensional models in two different ways is equivalent to optimizing the three-dimensional model, so that the actual three-dimensional model generated is as accurate as possible.

[0066] S400: Obtain a designed three-dimensional model of the prefabricated component, and compare the actual three-dimensional model with the designed three-dimensional model.

[0067] Each prefabricated component is provided with an electronic code, and the design three-dimensional model of the prefabricated component can be obtained by scanning the electronic code. First, the electronic code on the prefabricated component is scanned by a code scanning device arranged on the side of the prefabricated component, and the design three-dimensional model of the prefabricated component is obtained and uploaded to the processor. The design three-dimensional model of the prefabricated component is obtained by scanning the code, which can greatly speed up the inspection speed of the prefabricated component compared with exporting the corresponding design three-dimensional model one by one according to the model of the prefabricated component. Subsequently, the uploaded actual three-dimensional model and the design three-dimensional model are received and stored, and the received actual three-dimensional model and the design three-dimensional model are lightweight converted, and the two are converted into a unified three-dimensional lightweight format and the converted results are stored. The three-dimensional lightweight format information of the actual three-dimensional model and the design three-dimensional model after conversion is compared, and the error values ​​of the two are determined, and the error values ​​are generated and stored. Converting the actual three-dimensional model and the design three-dimensional model into a lightweight format facilitates the transmission and quick loading and viewing of the three-dimensional model, thereby further speeding up the inspection speed of the prefabricated component. Finally, it is determined whether the error value between the actual three-dimensional model and the designed three-dimensional model is less than the preset second error threshold. If it is less than the second error threshold, it is determined that the prefabricated component meets the engineering requirements. If it is greater than or equal to the second error threshold, the prefabricated component is subjected to defect removal operation.

[0068] After the inspection of the prefabricated components, the reuse database of prefabricated components is also established, and the actual three-dimensional models of the prefabricated components that do not meet the project requirements and their corresponding three-dimensional lightweight formats are stored in the reuse database. By establishing a reuse database of prefabricated components that do not meet the requirements, if you need to manufacture prefabricated components of corresponding sizes in the future, you can try to search in the reuse database of prefabricated components first. If there are matching prefabricated components or prefabricated components within the error range, they can be used directly. By trying to reuse prefabricated components that did not meet the project requirements before, it can play a role in saving and environmental protection.

[0069] When inspecting the prefabricated components, firstly, the actual image of the prefabricated components is used in a conventional manner to generate the first three-dimensional model of the prefabricated components, and then the ultrasonic image of the prefabricated components is obtained by ultrasonic wave to generate the second three-dimensional model of the prefabricated components, and then the first three-dimensional model is compared with the second three-dimensional model for error, until the error is less than the preset first error threshold, the first three-dimensional model is determined as the actual three-dimensional model. This operation is because there are too many environmental factors affecting the construction site, and the actual image obtained is easily affected. Generating a three-dimensional model only by the actual image cannot guarantee the accuracy of the model. Therefore, the second three-dimensional model is generated by introducing the ultrasonic wave, which is equivalent to optimizing the three-dimensional model, so that the generated actual three-dimensional model is as accurate as possible. Finally, the actual three-dimensional model is compared with the derived design three-dimensional model, and it is judged whether the prefabricated components meet the requirements based on the second error threshold. Compared with the inspection of prefabricated components one by one by the staff, the work efficiency of construction project monitoring is greatly improved, so that the construction progress of prefabricated buildings is not easily affected.

[0070] The present application also discloses an Internet of Things-based prefabricated building engineering monitoring device. Figure 2 , the prefabricated building engineering monitoring device based on the Internet of Things includes:

[0071] A first model generation module 100 is used to obtain an actual image of the prefabricated component and generate a first three-dimensional model of the prefabricated component based on the actual image;

[0072] A second model generating module 200 is used to obtain an ultrasonic image of the prefabricated component and generate a second three-dimensional model of the prefabricated component based on the ultrasonic image;

[0073] The first model comparison module 300 is used to compare the first three-dimensional model and the second three-dimensional model, and compare the error between the two models with a preset first error threshold. If the error between the two models is less than the first error threshold, the first three-dimensional model is used as the actual three-dimensional model of the prefabricated component; if the error between the two models is greater than or equal to the first error threshold, the actual image of the prefabricated component is re-acquired and the first three-dimensional model is generated, and the comparison is continued until the error between the two models is less than the first error threshold;

[0074] The second model comparison module 400 is used to obtain prefabricated component information and derive the corresponding designed three-dimensional model, compare the actual three-dimensional model with the designed three-dimensional model, and determine whether the error range between the two is less than a preset second error threshold.

[0075] Optionally, the first model generation module 100 further includes:

[0076] A first acquisition submodule is used to acquire an actual image of the prefabricated component, construct a low-precision model of the prefabricated component based on the actual image, and generate a diffuse reflection sticker;

[0077] A fine processing submodule is used to perform fine processing on the low-precision model to generate a high-precision model;

[0078] The model building submodule is used to build the first three-dimensional model based on the diffuse reflection sticker and the high-precision model.

[0079] Optionally, the first model comparison module 300 further includes:

[0080] A first receiving submodule, used for receiving and storing the uploaded first three-dimensional model and second three-dimensional model;

[0081] A first conversion submodule is used to perform lightweight conversion on the received first three-dimensional model and the second three-dimensional model, convert the two into a unified three-dimensional lightweight format and store the converted results;

[0082] The first comparison submodule is used to compare the converted three-dimensional lightweight format information of the first three-dimensional model and the second three-dimensional model, determine the error value between the two, and generate and store the error value.

[0083] Optionally, the second model comparison module 400 further includes:

[0084] The second receiving submodule is used to receive and store the uploaded actual 3D model and the designed 3D model;

[0085] The second conversion submodule is used to perform lightweight conversion on the received actual 3D model and the designed 3D model, convert the two into a unified 3D lightweight format and store the converted results;

[0086] The second comparison submodule is used to compare the actual three-dimensional model and the three-dimensional lightweight format information after the design three-dimensional model is converted, determine the error value between the two, and generate and store the error value.

[0087] Optionally, the second model comparison module 400 further includes:

[0088] The database establishment module is used to establish a reuse database of prefabricated components, and store the actual three-dimensional models of prefabricated components that do not meet the requirements and their corresponding three-dimensional lightweight formats in the reuse database.

[0089] The embodiment of the present application also discloses an intelligent terminal, including a memory and a processor, wherein the memory stores a computer program, and when the computer program is executed by the processor, the processor executes the steps of the above-mentioned method for monitoring an assembled building project based on the Internet of Things. The steps of the method for monitoring an assembled building project based on the Internet of Things here may be the steps in the above-mentioned method for monitoring an assembled building project based on the Internet of Things.

[0090] The embodiment of the present application also discloses a computer-readable storage medium, which includes various steps in the above-mentioned method flow for monitoring prefabricated building projects based on the Internet of Things that can be loaded and executed by a processor.

[0091] Computer-readable storage media include, for example, various media that can store program codes, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk, or an optical disk.

[0092] Those skilled in the art can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional modules is used as an example. In actual applications, the above-mentioned functions can be assigned to different functional modules as needed, that is, the internal structure of the device is divided into different functional modules to complete all or part of the functions described above. The specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments, and will not be repeated here.

[0093] The above embodiments are only used to introduce the technical solution of the present application in detail, but the description of the above embodiments is only used to help understand the method and core idea of ​​the present application and should not be understood as limiting the present application. Any changes or substitutions that can be easily thought of by technicians in this technical field within the technical scope disclosed in the present application should be included in the protection scope of the present application.

Claims

1. A method for monitoring prefabricated building projects based on the Internet of Things, characterized in that: The following steps are involved: Acquire an actual image of the prefabricated component, and generate a first three-dimensional model of the prefabricated component based on the actual image; Acquire an ultrasonic image of the prefabricated component, and generate a second three-dimensional model of the prefabricated component based on the ultrasonic image; The first three-dimensional model and the second three-dimensional model are compared, and the error between the two is compared with a preset first error threshold. If the error between the two is less than the first error threshold, the first three-dimensional model is used as the actual three-dimensional model of the prefabricated component; if the error between the two is greater than or equal to the first error threshold, the actual image of the prefabricated component is reacquired and the first three-dimensional model is generated, and the comparison is continued until the error between the two is less than the first error threshold; Obtaining prefabricated component information and exporting a corresponding designed three-dimensional model, comparing the actual three-dimensional model with the designed three-dimensional model, and determining whether an error range between the two is less than a preset second error threshold; The obtaining of the actual image of the prefabricated component and generating the first three-dimensional model of the prefabricated component based on the actual image comprises: Acquire an actual image of the prefabricated component, construct a low-precision model of the prefabricated component based on the actual image, and generate a diffuse reflection sticker; Performing fine processing on the low-precision model to generate a high-precision model; The first three-dimensional model is constructed based on the diffuse reflection sticker and the high-precision model.

2. The method for monitoring prefabricated building projects based on the Internet of Things according to claim 1, characterized in that: The step of acquiring an ultrasonic image of the prefabricated component and generating a second three-dimensional model of the prefabricated component based on the ultrasonic image comprises: Acquiring ultrasonic images of the prefabricated components using an ultrasonic probe; The three-dimensional profile measurement technology is used to obtain the three-dimensional position information of each frame of ultrasonic image in space; The ultrasonic image is three-dimensionally reconstructed based on the three-dimensional position information of each frame of the ultrasonic image and a second three-dimensional model of the prefabricated component is generated.

3. The method for monitoring prefabricated building projects based on the Internet of Things according to claim 1, characterized in that: The obtaining of prefabricated component information comprises: The electronic code preset on the prefabricated component is scanned by a code scanning device, wherein the electronic code contains the designed three-dimensional model of the prefabricated component.

4. The method for monitoring prefabricated building projects based on the Internet of Things according to claim 1, characterized in that: The comparing the first three-dimensional model with the second three-dimensional model comprises: Receiving and storing the uploaded first three-dimensional model and second three-dimensional model; Performing lightweight conversion on the received first three-dimensional model and the second three-dimensional model, converting the two into a unified three-dimensional lightweight format and storing the converted results; The converted three-dimensional lightweight format information of the first three-dimensional model and the second three-dimensional model are compared to determine the error value between the two, and the error value is generated and stored.

5. The method for monitoring prefabricated building projects based on the Internet of Things according to claim 1, characterized in that: The comparing the actual 3D model with the designed 3D model comprises: Receive and store uploaded actual 3D models and designed 3D models; Performing lightweight conversion on the received actual three-dimensional model and the designed three-dimensional model, converting both into a unified three-dimensional lightweight format and storing the converted results; The actual three-dimensional model and the three-dimensional lightweight format information after conversion of the designed three-dimensional model are compared, an error value between the two is determined, and the error value is generated and stored.

6. The method for monitoring prefabricated building projects based on the Internet of Things according to claim 5 is characterized in that: After obtaining the prefabricated component information and deriving the corresponding designed three-dimensional model, comparing the actual three-dimensional model with the designed three-dimensional model, and determining whether the error range between the two is less than a preset second error threshold database, the following further comprises: Establish a reuse database for prefabricated components; The actual three-dimensional model of the prefabricated component that does not meet the requirements and its corresponding three-dimensional lightweight format are stored in the reuse database.

7. An assembled building engineering monitoring device based on the Internet of Things, characterized in that: include: A first model generation module (100) is used to obtain an actual image of the prefabricated component and generate a first three-dimensional model of the prefabricated component based on the actual image; A second model generating module (200) is used to obtain an ultrasonic image of the prefabricated component and generate a second three-dimensional model of the prefabricated component based on the ultrasonic image; A first model comparison module (300) is used to compare the first three-dimensional model and the second three-dimensional model, compare the error between the two models with a preset first error threshold, and if the error between the two models is less than the first error threshold, use the first three-dimensional model as the actual three-dimensional model of the prefabricated component; if the error between the two models is greater than or equal to the first error threshold, reacquire the actual image of the prefabricated component and generate the first three-dimensional model, and continue to compare until the error between the two models is less than the first error threshold; A second model comparison module (400) is used to obtain prefabricated component information and derive a corresponding designed three-dimensional model, compare the actual three-dimensional model with the designed three-dimensional model, and determine whether the error range between the two is less than a preset second error threshold; The obtaining of the actual image of the prefabricated component and generating the first three-dimensional model of the prefabricated component based on the actual image comprises: Acquire an actual image of the prefabricated component, construct a low-precision model of the prefabricated component based on the actual image, and generate a diffuse reflection sticker; Performing fine processing on the low-precision model to generate a high-precision model; The first three-dimensional model is constructed based on the diffuse reflection sticker and the high-precision model.

8. An intelligent terminal, characterized in that: The intelligent terminal includes a processor and a memory, wherein the memory stores at least one instruction, at least one program, a code set or an instruction set, and the at least one instruction, the at least one program, the code set or the instruction set is loaded and executed by the processor to implement a prefabricated building project monitoring method based on the Internet of Things as described in any one of claims 1 to 6.

9. A computer-readable storage medium, characterized in that: The storage medium stores at least one instruction, at least one program, a code set or an instruction set, and the at least one instruction, the at least one program, the code set or the instruction set are loaded and executed by the processor to implement a prefabricated building project monitoring method based on the Internet of Things as described in any one of claims 1 to 6.

Citation Information

Patent Citations

  • Method, device and apparatus for generating outer contour model of assembled building

    CN109242969A

  • Building engineering quality monitoring method and system based on BIM model

    CN112733239A

  • Full-angle appearance detection method and device for plastic product

    CN114813757A

  • Assembling method and system based on BIM concrete segment prefabricated assembled bridge and application

    CN115659470A

  • Method, apparatus and readable storage medium for acquiring an image

    US20200085411A1