A construction method of a point-shaped adhesive anchoring system of a wall facing brick
By using a point-based adhesive anchoring system to firmly anchor the facing bricks to the wall, the safety hazards and material waste of traditional methods are solved, achieving efficient and environmentally friendly wall facing brick construction and improving construction quality and efficiency.
Patent Information
- Application Number
- CN202310399317.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-04-14
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2043-04-14
AI Technical Summary
Traditional wall cladding methods pose safety hazards, aesthetic problems, and material waste, and have high construction costs. Traditional steel keel dry-hanging methods also occupy a lot of space.
A dotted anchoring system is used, in which the dotted anchors are fixed to the wall with countersunk screws and tile adhesive. The facing tiles are leveled and pasted using the dotted anchors, and the flatness is adjusted using joint sealant. Finally, grout is used to seal the joints.
It improves the adhesion of facing bricks, reduces material usage, lowers construction costs, conforms to the concept of environmental protection and low carbon, simplifies the construction process, and improves construction quality and efficiency.
Smart Images

Figure CN116290640B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of building construction technology and discloses a construction method for a dotted adhesive anchoring system for wall cladding bricks. Background Technology
[0002] Currently, in the construction industry, traditional wall tile installation methods mostly employ mortar laying or steel keel dry-hanging. Mortar laying is a wet operation, which is detrimental to on-site construction and environmental protection. Furthermore, after mortar-laying tiles, a series of problems often arise, such as hollow tiles, tile detachment, and efflorescence on the tile surface, posing both safety hazards and affecting aesthetics. Steel keel dry-hanging wall tile installation requires a large amount of metal material for the framework, increasing building weight and construction costs. Moreover, the keel framework significantly encroaches on building space, greatly reducing the user's usable floor area. Therefore, there is an urgent need to develop a wall tile installation method that simultaneously meets the requirements of aesthetics and safety. Summary of the Invention
[0003] To address the above problems, this invention provides a construction method for a dotted adhesive anchoring system for wall cladding bricks.
[0004] The specific technical solution is: a construction method for a dotted adhesive anchoring system for wall cladding bricks, characterized by the following steps: Step 1: Measure and lay out the lines. Determine the position and quantity of the hanging pieces according to the layout of the facing bricks. Use a chalk line to mark the center position of the hanging pieces on the wall. Step 2: Drill holes in the wall. Drill holes in the wall according to the position of the center anchor point of the mounting bracket. The diameter and depth of the hole are determined by the diameter and effective length of the countersunk screw. This hole is the mounting hole for the countersunk screw. Step 3: Initial installation of the spot mounting plate. Use countersunk screws to pass through the pre-drilled hole in the center of the spot mounting plate, and then anchor the countersunk screws together with the spot mounting plate to the pre-drilled hole in the wall. When anchoring, a gap must be left between the spot mounting plate and the wall base to prepare for leveling the spot mounting plate. Step 4: Leveling the point hanging plates. Level the point hanging plates on the wall by adjusting the reserved gap between the point hanging plates and the wall base. When leveling, use a five-line instrument to lay out the line as the leveling control line. Then, adjust the anchoring depth of the countersunk screws to make all the point hanging plates flush with the leveling control line so that the point hanging plates are all on the same plane. Step 5: Fill and grind the gaps between the spot-mounted tiles. After leveling the spot-mounted tiles as a whole, fill the gaps between the spot-mounted tiles and the wall base with tile adhesive to ensure that the spot-mounted tiles are firmly bonded to the wall base. After filling, let it stand and solidify for 12 hours. Then grind the bonding area between the spot-mounted tiles and the back of the facing tiles to make the contact surface rougher and enhance the adhesion between the facing tiles and the spot-mounted tiles. Step Six: Apply tile adhesive. Apply tile adhesive evenly to each fixed tile, ensuring the adhesive covers the entire surface of the tile. Then, lay the polished decorative tiles on the wall from bottom to top. Insert joint clips between tiles to fix the gap size. Since the tiles need time to solidify, the bottom row of tiles needs temporary support. Remove the support after the tile adhesive has solidified. Step 7: Leveling with joint clips. When laying the facing bricks, insert joint clips between the facing bricks and use a five-line instrument as an auxiliary tool to adjust the flatness of the facing bricks and control the size of the joints. Step 8: Grouting and cleaning. 24 hours after the tiling is completed, remove the joint sealant along the grout lines, clean the grout lines and tile surfaces, and then fill the gaps with grout.
[0005] Furthermore, the number of dotted pieces mentioned in step one is 5, and the dotted pieces are arranged at the center and four corners of the decorative brick.
[0006] Furthermore, the longitudinal and transverse spacing between the positions of the hanging pieces mentioned in step one shall not exceed 600mm.
[0007] Furthermore, the dotted piece mentioned in step one is a square metal sheet with a side length of 50mm to 100mm and a thickness of 1.2mm to 1.5mm.
[0008] Furthermore, the dotted plate is a galvanized iron sheet.
[0009] Furthermore, the diameter of the pre-drilled hole at the center of the point-mounted plate described in step three is 11mm.
[0010] Furthermore, the gap between the dotted mounting plate and the wall substrate described in step three is 3mm to 15mm.
[0011] Furthermore, after the point hanging plates are leveled as described in step four, the flatness error is controlled within 3mm.
[0012] Furthermore, the thickness of the tile adhesive applied in step six should be controlled between 3 and 8 mm.
[0013] The beneficial effects of this invention are: This invention uses countersunk screws and tile adhesive to anchor the mounting plates to the wall according to the predetermined layout and marking points. Then, the decorative tiles are pasted onto the mounting plates with tile adhesive, and the decorative tiles are leveled using a joint clamp to complete the decorative tile installation. The beneficial effects of this construction method are as follows: First, this method has low requirements for the flatness of the wall base, eliminating the tedious base leveling process such as wall plastering. Simultaneously, the bonding of the facing bricks and the anchor points to the wall surface through an adhesive-anchor combination greatly enhances the adhesion of the facing bricks, fundamentally solving the problem of facing brick detachment caused by wall base issues and effectively improving construction quality. Second, this method only bonds and lays the facing bricks at the anchor points, eliminating the need to apply adhesive to the entire back of the facing bricks, effectively saving materials. Third, this method distributes the weight of the facing bricks onto the anchor points, transferring the load to the wall through the anchor points, effectively improving the wall's load-bearing capacity. Fourth, this construction method is simple to operate, highly efficient, and widely applicable, conforming to the national green, environmentally friendly, and low-carbon construction concepts, and has high promotional value. Attached Figure Description
[0014] Figure 1 This is a schematic diagram of the construction process for the dotted adhesive anchoring system for wall cladding bricks; Figure 2 This is a cross-sectional view of the dotted adhesive anchoring system for wall cladding bricks; Figure 3 This is a schematic diagram of the point mounting plate and countersunk screw; In the picture: 1-Hanging plate, 2-Counterhead screw, 3-Tile adhesive, 4-Facing tile. Implementation
[0015] To make the technical problems and solutions solved by the present invention clearer, the present invention will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely for explaining the present invention and are not intended to limit the present invention.
[0016] like Figure 1 As shown in the figure, this embodiment discloses a construction method for a dotted adhesive anchoring system for wall cladding bricks, including the following steps: Step 1: Measurement and Laying Out. Determine the position and number of anchor points according to the tile layout plan. Use a chalk line to mark the center position of the anchor points on the wall. The number and position of the anchor points are determined based on the size of the tiles. Generally, five anchor points are placed per tile, one at the center and one at each of the four corners. The longitudinal and transverse spacing between the anchor points should not exceed 600mm. The anchor point is a square galvanized iron sheet with a side length of 50mm~100mm and a thickness of 1.2mm~1.5mm. An 11mm pre-drilled hole is set in the center of the galvanized iron sheet for passing through a countersunk screw, serving as the main anchor point for the anchor point. Step 2: Drill holes in the wall. Drill holes in the wall according to the position of the center anchor point of the mounting bracket. The diameter and depth of the hole are determined by the diameter and effective length of the countersunk screw. This hole is the mounting hole for the countersunk screw. Step 3: Initial installation of the spot mounting plate. Use countersunk screws to pass through the pre-drilled hole in the center of the spot mounting plate, and then anchor the countersunk screws together with the spot mounting plate to the pre-drilled hole in the wall. When anchoring, a gap of 3mm to 15mm must be left between the spot mounting plate and the wall base to prepare for leveling the spot mounting plate. Step 4: Leveling the hanging plates. Level the hanging plates on the wall by adjusting the reserved gap between the hanging plates and the wall base. When leveling, use a five-line instrument to lay out the lines as leveling control lines. Then, adjust the anchoring depth of the countersunk screws to make all the hanging plates flush with the leveling control lines, so that the hanging plates are all on the same plane. After the hanging plates are leveled, the overall flatness error is controlled within 3mm. Step 5: Fill and grind the gaps between the spot-mounted tiles. After leveling the spot-mounted tiles as a whole, fill the gaps between the spot-mounted tiles and the wall base with tile adhesive to ensure that the spot-mounted tiles are firmly bonded to the wall base. After filling, let it stand and solidify for 12 hours. Then grind the bonding area between the spot-mounted tiles and the back of the facing tiles to make the contact surface rougher and enhance the adhesion between the facing tiles and the spot-mounted tiles. Step Six: Apply tile adhesive. Apply tile adhesive evenly to each fixed tile, with a thickness of 3mm to 8mm, covering the entire surface of the tile. Then, lay the sanded tiles on the wall from bottom to top, inserting joint clips between tiles to fix the gap size. Since the tiles need time to solidify, the bottom row of tiles needs temporary support. Remove the support after the tile adhesive has solidified. Step 7: Leveling with joint clips. When laying the facing bricks, insert joint clips between the facing bricks and use a five-line instrument as an auxiliary tool to adjust the flatness of the facing bricks and control the size of the joints. Step 8: Grouting and cleaning. 24 hours after the tiling is completed, remove the joint sealant along the grout lines, clean the grout lines and tile surfaces, and then fill the gaps with grout.
[0017] The above construction method is applicable to walls of various materials, such as concrete walls, masonry walls, ALC walls, and solid walls such as wood, and is mostly used for interior walls. This method has low requirements for the flatness of the wall base, eliminating the tedious leveling process of plastering and other base leveling procedures. Simultaneously, the bonding of the facing bricks and the anchor points to the wall surface through an adhesive-anchor combination greatly enhances the adhesion of the facing bricks, fundamentally solving the problem of facing brick detachment caused by wall base issues, and effectively improving construction quality. This method only bonds and lays the facing bricks at the anchor points, eliminating the need to apply adhesive to the entire back of the facing bricks, effectively saving materials. This method distributes the weight of the facing bricks onto the anchor points, transferring the load to the wall through the anchor points, effectively improving the wall's load-bearing capacity. This method uses tile adhesive for bonding, which greatly reduces dust generation, promoting civilized construction and environmental protection on site. Meanwhile, this construction method reduces on-site wet work, is simple to operate, has high construction efficiency, low labor intensity, and low construction cost. It conforms to the national green, environmentally friendly, and low-carbon construction concept and has high promotion value.
[0018] The present invention has been described in detail above through specific and preferred embodiments. However, those skilled in the art should understand that the present invention is not limited to the embodiments described above. Any modifications, equivalent substitutions, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.
Claims
1. A construction method for a dotted adhesive anchoring system for wall cladding bricks, characterized in that, Includes the following steps: Step 1: Measure and lay out the lines. Determine the position and quantity of the dotted tiles according to the tile layout plan. Use a chalk line to mark the center position of the dotted tiles on the wall. There are 5 dotted tiles in total, one at the center and one at each of the four corners of the tile layout. Step 2: Drill holes in the wall. Drill holes in the wall according to the position of the center anchor point of the mounting bracket. The diameter and depth of the hole are determined by the diameter and effective length of the countersunk screw. This hole is the mounting hole for the countersunk screw. Step 3: Initial installation of the anchor plate. Insert a countersunk screw through the pre-drilled hole in the center of the anchor plate, then anchor the countersunk screw and the anchor plate together to the pre-drilled hole in the wall. A gap must be left between the anchor plate and the wall substrate during anchoring to allow for leveling. The diameter of the pre-drilled hole in the center of the anchor plate is 11mm; the gap between the anchor plate and the wall substrate is 3mm to 15mm. Step 4: Leveling the point hanging plates. Level the point hanging plates on the wall by adjusting the reserved gap between the point hanging plates and the wall base. When leveling, use a five-line instrument to lay out the line as the leveling control line. Then, adjust the anchoring depth of the countersunk screws to make all the point hanging plates flush with the leveling control line so that the point hanging plates are all on the same plane. Step 5: Fill and grind the gaps between the spot-mounted tiles. After leveling the spot-mounted tiles as a whole, fill the gaps between the spot-mounted tiles and the wall base with tile adhesive to ensure that the spot-mounted tiles are firmly bonded to the wall base. After filling, let it stand and solidify for 12 hours. Then grind the bonding area between the spot-mounted tiles and the back of the facing tiles to make the contact surface rougher and enhance the adhesion between the facing tiles and the spot-mounted tiles. Step Six: Apply tile adhesive. Evenly apply tile adhesive to each fixed tile, ensuring the adhesive covers the entire surface of the tile. Then, lay the sanded decorative tiles onto the wall from bottom to top, inserting joint clips between tiles to secure the gaps. Since tiles require time to harden, the bottom row of tiles needs temporary support; remove the support after the tile adhesive has hardened. The thickness of the tile adhesive application should be controlled between 3 and 8 mm. Step 7: Leveling with joint clips. When laying the facing bricks, insert joint clips between the facing bricks and use a five-line instrument as an auxiliary tool to adjust the flatness of the facing bricks and control the size of the joints. Step 8: Grouting and cleaning. 24 hours after the tiling is completed, remove the joint sealant along the grout lines, clean the grout lines and tile surfaces, and then fill the gaps with grout.
2. The construction method of a dotted adhesive anchoring system for wall cladding bricks according to claim 1, characterized in that, The longitudinal and transverse spacing of the point hanging pieces shall not exceed 600mm.
3. The construction method of a dotted adhesive anchoring system for wall cladding bricks according to claim 2, characterized in that, The dotted plate is a square metal sheet with a side length of 50mm to 100mm and a thickness of 1.2mm to 1.5mm.
4. The construction method of the dotted adhesive anchoring system for wall cladding bricks according to claim 3, characterized in that, The dotted plate is a galvanized iron sheet.
5. The construction method of a dotted adhesive anchoring system for wall cladding bricks according to claim 1, characterized in that, After the point-mounted plates are leveled as described in step four, the flatness error is controlled within 3mm.
Citation Information
Patent Citations
Light external wall point-hang heat-insulation and decorative plate combined anchoring system and method for constructing same
CN105507539A
Mounting system of insulating and decorating integrated plate
CN202755597U