A firewall determination method, device, equipment and storage medium

Determining the building structure and firewall parameters through the BIM model solves the problems of low efficiency and insufficient accuracy of traditional detection methods, and achieves fast and accurate firewall detection.

CN116595620BActive Publication Date: 2024-10-18CHINA DESIGN DIGITAL TECH CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202310655847.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-06-02
Publication Date
2024-10-18
Estimated Expiration
2043-06-02

AI Technical Summary

Technical Problem

Traditional firewall detection methods rely on manual inspections and sensors, resulting in high time costs, low efficiency, and inaccurate detection results.

Method used

The BIM model is used to determine whether the building meets the structural requirements, and the wall parameters of the firewall are compared with the standard parameters. The height parameters and wall parameters are calculated for detection, which reduces human participation and improves detection efficiency and accuracy.

Benefits of technology

It can quickly and accurately detect whether the firewall meets the design requirements, reduce time costs, and provide more accurate results through multi-dimensional detection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116595620B_ABST
    Figure CN116595620B_ABST
Patent Text Reader

Abstract

The present application relates to a method, device, equipment and storage medium for judging a firewall, which is applied to computer equipment. The method includes: obtaining the first floor in the first BIM model corresponding to the building with a podium, the first floor being any floor in the first BIM model whose height parameter is less than the set parameter; judging whether the first floor meets the preset structural requirements, and if it meets the preset structural requirements, judging that there is a firewall on the first floor; comparing the wall parameters of the firewall on the first floor with the standard parameters, and if the wall parameters are the same as the standard parameters, judging that the firewall on the first floor meets the design requirements. The technical effect of the present application is: reducing time cost and improving efficiency when used to detect whether the firewall meets the requirements.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of building design, and in particular to a fire wall determination method, device, equipment and storage medium. Background Art

[0002] In the construction field, firewalls are one of the important measures to ensure the safety of buildings. Therefore, firewalls need to be tested to ensure that they meet the requirements.

[0003] Traditional firewall detection methods mainly rely on manual inspections and monitoring using sensors and other equipment. All of the above methods require a lot of manual participation, which has the problems of high time cost and low efficiency. Summary of the invention

[0004] The present application provides a firewall determination method, apparatus, device and storage medium, which are used to reduce time cost and improve efficiency when detecting whether a firewall meets requirements.

[0005] In the first aspect, the present application proposes a firewall determination method, which adopts the following technical solution: obtaining the first floor in the first BIM model corresponding to the building with a podium, the first floor being any floor in the first BIM model whose height parameter is less than the set parameter; judging whether the first floor meets the preset structural requirements, if it meets the preset structural requirements, judging that there is a firewall on the first floor; comparing the wall parameters of the firewall on the first floor with the standard parameters, if the wall parameters are the same as the standard parameters, judging that the firewall on the first floor meets the design requirements.

[0006] By adopting the above technical solution, a BIM model is established, wherein the BIM model corresponds to the building to be inspected; by judging the BIM model, it can be directly obtained whether the current building meets the structural requirements. If it does, it is determined that there is a firewall in the current building, and then the wall parameters of the firewall on the floor to be inspected are compared with the standard parameters, so as to judge whether the firewall of the current building meets the requirements. The whole process does not require too much manpower participation, reduces time cost and improves detection efficiency. In addition, the present application involves multiple detection dimensions, and the detection results are more accurate.

[0007] Optionally, before obtaining the first floor in the first BIM model corresponding to the building with a podium, it also includes: obtaining a height parameter of the first BIM model; if the height parameter of the first BIM model is greater than a set threshold, determining that the first BIM model meets the judgment requirements.

[0008] By adopting the above technical solution, the BIM model can be pre-checked to see if it meets the inspection requirements, thus avoiding the situation where the building height does not meet the subsequent inspection requirements.

[0009] Optionally, obtaining the height parameter of the first BIM model includes: obtaining the type of building corresponding to the first BIM model, the type of building including non-residential; if the type of building corresponding to the first BIM model is the non-residential, obtaining the roof type of the first BIM model, the roof type including a sloped roof and a non-sloped roof; if the roof type is the sloped roof, calculating the height parameter of the first BIM model by a first formula; the first formula: H1=h1+h2; wherein H1 is the height parameter of the first BIM model, h1 is the roof elevation in the first BIM model, and h2 is the outdoor floor height in the first BIM model; if the roof type is the non-sloped roof, calculating the height parameter of the first BIM model by a second formula; the second formula: H2=h3+(h4-h3) / 2+h2; wherein H2 is the height parameter of the first BIM model, h2 is the outdoor floor height in the first BIM model, h3 is the eaves height in the first BIM model, and h4 is the ridge elevation in the first BIM model.

[0010] By adopting the above technical solution, the height parameters of the BIM model can be accurately calculated using the corresponding formula, thereby obtaining the height of the building, which provides accurate parameters for subsequent judgment of whether the building's firewall meets the requirements, making the final detection result more accurate.

[0011] Optionally, the type of the building also includes a residence, and after obtaining the type of the building corresponding to the first BIM model, it also includes: if the type of the building is the residence, calculating the height parameter of the first BIM model by a third formula; the third formula: H3=h5-h6; wherein H3 is the height parameter of the first BIM model, h5 is the height of the highest floor in the first BIM model, and h6 is the height of the first floor in the first BIM model.

[0012] By adopting the above technical solution, the height parameters of the BIM model can be accurately calculated using the corresponding formula, thereby obtaining the height of the building, which provides accurate parameters for subsequent judgment of whether the building's firewall meets the requirements, making the final detection result more accurate.

[0013] Optionally, if the height parameter of the first BIM model is greater than a set threshold, after determining that the first BIM model meets the judgment requirements, it also includes: obtaining the mapping outline of the second floor in the first BIM model, wherein the second floor is any floor whose height parameter is greater than the set threshold; comparing the mapping outline of the second floor with the mapping outline of the first floor; if the mapping outline of the second floor does not cover the mapping outline of the first floor, the podium exists in the building.

[0014] By adopting the above technical solution, it is possible to accurately determine whether there is a podium on the current floor, which provides accurate parameters for subsequent determination of whether the building's firewall meets the requirements, making the final detection result more accurate.

[0015] Optionally, the wall parameters include wall thickness, wall height and firewall level, the standard parameters include a first parameter, a second parameter and a third parameter, and the comparing the wall parameters of the firewall on the first floor with the standard parameters, if the wall parameters are the same as the standard parameters, then determining that the firewall on the first floor meets the design requirements includes: determining whether the wall thickness is the same as the first parameter, whether the wall height is the same as the second parameter, and whether the firewall level is the same as the third parameter; if all are the same, then the firewall on the first floor meets the design requirements; if there is at least one parameter in the wall parameters that is different from the corresponding parameter in the standard parameters, then the firewall on the first floor does not meet the design requirements.

[0016] By adopting the above technical solution, the wall parameters and standard parameters are compared in multiple dimensions, so that it is possible to accurately determine whether the fire wall of the current building meets the construction requirements, and the detection results are more accurate.

[0017] Optionally, if at least one parameter among the wall parameters is different from the corresponding parameter in the standard parameters, then the fire wall on the first floor does not meet the design requirements, it also includes: sending an adjustment plan to the user terminal, so that the user can make the fire wall meet the design requirements according to the adjustment plan.

[0018] By adopting the above technical solution, when it is detected that the firewall does not meet the construction requirements, the places where the firewall does not meet the requirements can be obtained, and then a suitable adjustment plan can be pushed to make the firewall meet the design requirements.

[0019] In the second aspect, the present application provides a firewall judgment device, which includes: a closing module, a judgment module and a comparison module; wherein the closing module is used to obtain the first floor in the first BIM model corresponding to the building with a podium, and the first floor is any floor in the first BIM model whose height parameter is less than the set parameter; the judgment module is used to judge whether the first floor meets the preset structural requirements, and if it meets the preset structural requirements, it is determined that there is a firewall on the first floor; the comparison module is used to compare the wall parameters of the firewall on the first floor with the standard parameters, and if the wall parameters are the same as the standard parameters, it is determined that the firewall on the first floor meets the design requirements.

[0020] By adopting the above technical solution, a BIM model is established, wherein the BIM model corresponds to the building to be inspected; by judging the BIM model, it can be directly obtained whether the current building meets the structural requirements. If it does, it is determined that there is a firewall in the current building, and then the wall parameters of the firewall on the floor to be inspected are compared with the standard parameters, so as to judge whether the firewall of the current building meets the requirements. The whole process does not require too much manpower participation, reduces time cost and improves detection efficiency. In addition, the present application involves multiple detection dimensions, and the detection results are more accurate.

[0021] In a third aspect, the present application provides an electronic device that adopts the following technical solution: it includes a processor, a memory, a user interface and a network interface, the memory is used to store instructions, the user interface and the network interface are used to communicate with other devices, and the processor is used to execute the instructions stored in the memory so that the electronic device executes a computer program such as any of the above-mentioned firewall judgment methods.

[0022] In a fourth aspect, the present application provides a computer-readable storage medium, which adopts the following technical solution: storing a computer program that can be loaded by a processor and execute any of the above-mentioned firewall judgment methods.

[0023] In summary, the present application includes at least one of the following beneficial technical effects:

[0024] 1. By establishing a BIM model, wherein the BIM model corresponds to the building to be inspected; by judging the BIM model, it is possible to directly determine whether the current building meets the structural requirements. If so, it is determined that the current building has a firewall, and then the wall parameters of the firewall of the floor to be inspected are compared with the standard parameters, so as to determine whether the firewall of the current building meets the requirements. The whole process does not require too much manpower participation, which reduces time cost and improves inspection efficiency. In addition, this application involves multiple inspection dimensions, and the inspection results are more accurate.

[0025] 2. By comparing wall parameters and standard parameters in multiple dimensions, it is possible to accurately determine whether the firewall of the current building meets the construction requirements, and the test results are more accurate. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0027] Figure 1 It is a flowchart of a firewall determination method provided by an embodiment of the present application;

[0028] Figure 2 It is a plan view of any floor provided in an embodiment of the present application;

[0029] Figure 3 It is a schematic diagram of a firewall determination device provided in an embodiment of the present application;

[0030] Figure 4 It is a structural schematic diagram of an electronic device provided in an embodiment of the present application.

[0031] Explanation of the accompanying drawings: 1. Closing module; 2. Judgment module; 3. Comparison module; 1000. Electronic device; 1001. Processor; 1002. Communication bus; 1003. User interface; 1004. Network interface; 1005. Memory. DETAILED DESCRIPTION

[0032] In order to enable those skilled in the art to better understand the technical solutions in this specification, the technical solutions in the embodiments of this specification will be clearly and completely described below in conjunction with the drawings in the embodiments of this specification. Obviously, the described embodiments are only part of the embodiments of this application, not all of the embodiments.

[0033] In the description of the embodiments of the present application, words such as "illustrative", "for example" or "for example" are used to indicate examples, illustrations or explanations. Any embodiment or design described as "illustrative", "for example" or "for example" in the embodiments of the present application should not be interpreted as being more preferred or more advantageous than other embodiments or design. Specifically, the use of words such as "illustrative", "for example" or "for example" is intended to present related concepts in a specific way. In addition, unless otherwise specified, the meaning of the term "multiple" refers to two or more. For example, multiple systems refer to two or more systems, and multiple screen terminals refer to two or more screen terminals. In addition, the terms "first" and "second" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance or implicitly indicating the indicated technical features. Thus, the features defined as "first" and "second" can explicitly or implicitly include one or more of the features. The terms "including", "comprising", "having" and their variations all mean "including but not limited to", unless otherwise specifically emphasized.

[0034] The present application is further described in detail below in conjunction with the accompanying drawings.

[0035] The following will provide a clear and complete description of the technical solutions in the embodiments of the present application in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments.

[0036] Figure 1The flowchart of a firewall determination method provided in the embodiment of the present application is as follows. It should be understood that although Figure 1 The steps in the flowchart are shown in sequence as indicated by the arrows, but the steps are not necessarily executed in the order indicated by the arrows; unless otherwise specified in this document, there is no strict order restriction for the execution of the steps, and the steps may be executed in other orders; and Figure 1 At least part of the steps may include multiple sub-steps or multiple stages. These sub-steps or stages are not necessarily executed at the same time, but can be executed at different times. The execution order of these sub-steps or stages is not necessarily sequential, but can be executed in turn or alternately with other steps or at least part of the sub-steps or stages of other steps.

[0037] like Figure 1 As shown, Figure 1 It is a flowchart of a firewall determination method provided in an embodiment of the present application, and the method includes S101-S103.

[0038] S101, obtaining a first floor in a first BIM model corresponding to a building having a podium, where the first floor is any floor in the first BIM model whose height parameter is less than a set parameter.

[0039] In one example, in a high-rise building, the podium usually refers to a section of structure at the bottom of the building, which is usually more than three stories high, similar to a "base" or "colonnade". The podium in a high-rise building is closely related to the firewall. The podium is usually a section of structure at the bottom of the building, while the firewall is a partition wall inside the building to prevent the spread of fire. In a high-rise building, the podium usually serves as one of the supporting structures of the building, and can also serve as a firewall to isolate the space at the bottom and upper part of the building to prevent the fire from spreading to the upper part. Therefore, before judging whether a building's firewall is qualified, it is necessary to determine whether the building has a podium. All judgments are based on the premise that the current building has a podium. Here, it can be assumed that the building to be built has a podium.

[0040] After confirming that the current building to be built has a podium, a BIM model is established. BIM is the abbreviation of Building Information Modeling, which is a method of building design, construction and management based on digital technology. BIM model refers to the digital modeling of the geometric form, materials, structure, performance, cost, progress and other information of each part of the building on the building information modeling software platform to form a three-dimensional building information model. The BIM model not only contains the spatial information of the building design, but also includes information on time and cost, and can be maintained and updated throughout the life cycle of the building. The first BIM model here can be understood as the BIM model of the building to be built. Through the first BIM model, it can be determined whether there is a firewall in the building to be built and whether the firewall meets the requirements.

[0041] Here, the first floor can be understood as any floor whose height parameter is less than the set parameter. The height parameter is the actual height of the building to be built during the actual construction process. The set parameter can be 24m, because in the definition of the podium, the height of the podium generally does not exceed 24m. The set parameter is set to 24m. Of course, it can be set according to the actual situation during actual application.

[0042] Before the first floor in the first BIM model corresponding to the building with a podium, it also includes: obtaining a height parameter of the first BIM model; if the height parameter of the first BIM model is greater than a set threshold, determining that the first BIM model meets the judgment requirements.

[0043] In one example, when determining whether the current building has a podium, it is necessary to determine whether the height of the current building meets the preset requirements. By obtaining the height parameters of the first BIM model, it is possible to directly obtain whether the height of the current building meets the requirements. The set threshold here can be 24m. When the floor height is greater than 24m, the current building is considered to meet the requirements and the next step of judgment can be performed.

[0044] Obtaining the height parameter of the first BIM model includes: obtaining the type of building corresponding to the first BIM model, the type of building including non-residential; if the type of building corresponding to the first BIM model is non-residential, obtaining the roof type of the first BIM model, the roof type including sloping roof and non-sloping roof; if the roof type is a sloping roof, calculating the height parameter of the first BIM model through a first formula; the first formula: H1=h1+h2; wherein H1 is the height parameter of the first BIM model, h1 is the roof elevation in the first BIM model, and h2 is the outdoor floor height in the first BIM model; if the roof type is a non-sloping roof, calculating the height parameter of the first BIM model through a second formula; the second formula: H2=h3+(h4-h3) / 2+h2; wherein H2 is the height parameter of the first BIM model, h2 is the outdoor floor height in the first BIM model, h3 is the eaves height in the first BIM model, and h4 is the ridge elevation in the first BIM model.

[0045] In one example, it is determined whether the current building to be built is a high-rise building according to the height parameter of the first BIM model. If the building is a high-rise building, it is further determined whether the current building is a non-residential building. The roof type of the building is determined to be a pitched roof or a non-pitch roof, and the building height calculation method is selected according to the roof type. If the roof type is a pitched roof, the height parameter of the first BIM model is calculated by the first formula; the first formula: H1 = h1 + h2; wherein H1 is the height parameter of the first BIM model, which can be directly obtained; h1 is the roof elevation in the first BIM model, which can also be directly obtained; h2 is the outdoor floor height in the first BIM model; if the roof type is a non-pitch roof, the height parameter of the first BIM model is calculated by the second formula; the second formula: H2 = h3 + (h4-h3) / 2 + h2; wherein H2 is the height parameter of the first BIM model, h2 is the outdoor floor height in the first BIM model, h3 is the eaves height in the first BIM model, and h4 is the ridge elevation in the first BIM model. The above height parameters can be directly obtained through the BIM model, and then the heights of different types of buildings can be calculated using the corresponding formulas. No further details will be given here.

[0046] The type of building also includes residential. After obtaining the type of building corresponding to the first BIM model, it also includes: if the type of the building is residential, calculating the height parameter of the first BIM model by a third formula; the third formula: H3=h5-h6; wherein H3 is the height parameter of the first BIM model, h5 is the height of the highest floor in the first BIM model, and h6 is the height of the first floor in the first BIM model.

[0047] In an example, both h5 and h6 can be directly obtained, and different height calculation methods are only selected for different house types and structures to facilitate the accuracy of subsequent judgments.

[0048] If the height parameter of the first BIM model is greater than the set threshold, after determining that the first BIM model meets the judgment requirements, it also includes: obtaining a mapping outline of a second floor in the first BIM model, wherein the second floor is any floor whose height parameter is greater than the set threshold; comparing the mapping outline of the second floor with the mapping outline of the first floor; if the mapping outline of the second floor does not cover the mapping outline of the first floor, the building has the podium.

[0049] In an example, the podium can be determined by comparing the mapping outline of the second floor with the mapping outline of the first floor. The first floor here can be understood as any floor with a height below 24m, and the second floor is any floor above 24m. The mapping outline can be a bird's-eye view of each floor. If the bird's-eye view of the second floor does not cover the bird's-eye view of the first floor, it is considered that the current building has a podium.

[0050] S102, determining whether the first floor meets the preset structural requirements. If it meets the preset structural requirements, determining that there is a firewall on the first floor.

[0051] In one example, generally speaking, floors with firewalls are designed according to preset requirements, such as Figure 2 As shown, Figure 2 A plan view of any floor provided in an embodiment of the present application, wherein there are multiple areas in the figure, each of which can be called a fire partition, the bold part in the figure can be considered as a wall, and each fire partition is separated from the adjacent area by a wall. The preset structural requirements here can be understood as Figure 2 The construction structure shown, of course, may be different between different buildings and different floors of different buildings. Each floor may have a different preset structure according to the situation, for example, whether there are walls between the fire partitions, whether there are windows on the fire wall, etc., which will not be described in detail here. According to the above method, it can be determined whether there are fire walls on all floors.

[0052] S103, comparing the wall parameters of the fire wall on the first floor with the standard parameters, if the wall parameters are the same as the standard parameters, it is determined that the fire wall on the first floor meets the design requirements.

[0053] In one example, after determining that the first floor is a floor with a firewall, it is necessary to determine whether the wall parameters of the firewall meet the requirements. Generally speaking, users will assign values ​​to various components in the BIM model. Since manual assignment may have deviations, after the user assigns values, it is necessary to check whether they meet the requirements to avoid the occurrence of user input that is inconsistent with the project design parameters and content. For the firewall, it is necessary to determine whether there are windows on the firewall, whether there are doors on the firewall, whether the door opened on the firewall is a Class A fire door (if the door attribute is Class A, the door opened on the firewall is considered to be a Class A fire door), etc. The wall parameters here include but are not limited to the above dimensions. The specific dimensions can be set according to the actual situation. In addition, all dimensions must meet the requirements and the wall parameters must be exactly the same as the standard parameters before the current firewall can be considered to meet the design requirements. If there is one that does not meet the requirements, the current firewall is considered to not meet the requirements.

[0054] The wall parameters include wall thickness, wall height and firewall level, and the standard parameters include the first parameter, the second parameter and the third parameter. The wall parameters of the firewall on the first floor are compared with the standard parameters. If the wall parameters are the same as the standard parameters, it is determined that the firewall on the first floor meets the design requirements, including: judging whether the wall thickness is the same as the first parameter, whether the wall height is the same as the second parameter, and whether the firewall level is the same as the third parameter; if all are the same, the firewall on the first floor meets the design requirements; if there is at least one parameter in the wall parameters that is different from the corresponding parameter in the standard parameters, the firewall on the first floor does not meet the design requirements.

[0055] In one example, the wall parameters include wall thickness, wall height and firewall level, and the standard parameters include the first parameter, the second parameter and the third parameter, where the wall thickness corresponds to the first parameter, the wall height corresponds to the second parameter, and the firewall level corresponds to the third parameter; the first parameter, the second parameter and the third parameter here can all be understood as specified values. When all standard parameters meet the requirements, it is determined that the firewall meets the design requirements. If any parameter does not meet the requirements, it is determined that the firewall does not meet the design requirements. The standard parameters here include but are not limited to the above dimensions, which can be set according to actual conditions. The statistical method is the same as above, and no further elaboration is given here.

[0056] If at least one parameter in the wall parameters is different from the corresponding parameter in the standard parameters, then the fire wall of the first floor does not meet the design requirements, and the method further includes: sending an adjustment plan to the user terminal so that the user can make the fire wall meet the design requirements according to the adjustment plan.

[0057] In one example, when it is detected that the firewall design does not meet the requirements, the system automatically generates an adjustment plan so that the user can make adjustments according to the adjustment plan so that the firewall meets the design requirements. The adjustment plan here is not only for the firewall, but also applies to other aspects. For example, if the current floor does not meet the structural requirements, a rectification plan is sent to the floor that does not meet the requirements, so that the user can make modifications to make the current floor meet the requirements.

[0058] Based on the above method, an embodiment of the present application also discloses a schematic diagram of a firewall determination device.

[0059] like Figure 3 As shown, Figure 3 It is a schematic diagram of a fire wall judgment device; the device comprises: a closing module 1, a judging module 2 and a comparing module 3; wherein the closing module 1 is used to obtain the first floor in the first BIM model corresponding to the building with the podium, and the first floor is any floor in the first BIM model whose height parameter is less than the set parameter; the judging module 2 is used to judge whether the first floor meets the preset structural requirements, and if it meets the preset structural requirements, it is judged that there is a fire wall on the first floor; the comparing module 3 is used to compare the wall parameters of the fire wall on the first floor with the standard parameters, and if the wall parameters are the same as the standard parameters, it is judged that the fire wall on the first floor meets the design requirements.

[0060] It should be noted that: when the device provided in the above embodiment realizes its function, only the division of the above functional modules is used as an example. In actual application, the above functions can be assigned to different functional modules as needed, that is, the internal structure of the device is divided into different functional modules to complete all or part of the functions described above. In addition, the device and method embodiments provided in the above embodiment belong to the same concept, and the specific implementation process is detailed in the method embodiment, which will not be repeated here.

[0061] A computer-readable storage medium is provided in an embodiment of the present application. The computer-readable storage medium stores instructions. When the instructions are executed, one or more of the methods described in the above embodiments are executed.

[0062] Below Figure 4 Taking as an example, the structural diagram of the electronic device in the example of this application is described in detail.

[0063] A schematic diagram of the structure of an electronic device is provided for an embodiment of the present application. Figure 4 As shown, the electronic device 1000 may include: at least one processor 1001 , at least one network interface 1004 , a user interface 1003 , a memory 1005 , and at least one communication bus 1002 .

[0064] The communication bus 1002 is used to realize the connection and communication between these components.

[0065] The user interface 1003 may include a display screen (Display) and a camera (Camera), and the optional user interface 1003 may also include a standard wired interface and a wireless interface.

[0066] The network interface 1004 may optionally include a standard wired interface or a wireless interface (such as a WI-FI interface).

[0067] Among them, the processor 1001 may include one or more processing cores. The processor 1001 uses various interfaces and lines to connect various parts in the entire server, and executes various functions of the server and processes data by running or executing instructions, programs, code sets or instruction sets stored in the memory 1005, and calling data stored in the memory 1005. Optionally, the processor 1001 can be implemented in at least one hardware form of digital signal processing (Digital Signal Processing, DSP), field programmable gate array (Field-Programmable Gate Array, FPGA), and programmable logic array (Programmable Logic Array, PLA). The processor 1001 can integrate one or more combinations of a central processing unit (Central Processing Unit, CPU), a graphics processing unit (Graphics Processing Unit, GPU) and a modem. Among them, the CPU mainly processes the operating system, user interface and application programs; the GPU is responsible for rendering and drawing the content to be displayed on the display screen; the modem is used to process wireless communications. It can be understood that the above-mentioned modem may not be integrated into the processor 1001, and it can be implemented separately through a chip.

[0068] Among them, the memory 1005 may include a random access memory (Random Access Memory, RAM) and may also include a read-only memory (Read-Only Memory). Optionally, the memory 1005 includes a non-transitory computer-readable storage medium. The memory 1005 can be used to store instructions, programs, codes, code sets or instruction sets. The memory 1005 may include a program storage area and a data storage area, wherein the program storage area may store instructions for implementing an operating system, instructions for at least one function (such as a touch function, a sound playback function, an image playback function, etc.), instructions for implementing the above-mentioned various method embodiments, etc.; the data storage area may store data involved in the above-mentioned various method embodiments, etc. The memory 1005 may optionally be at least one storage device located away from the aforementioned processor 1001. As Figure 4 As shown, the memory 1005 as a computer storage medium may include an operating system, a network communication module, a user interface module, and an application program of a firewall determination method.

[0069] exist Figure 4 In the electronic device 1000 shown, the user interface 1003 is mainly used to provide an input interface for the user and obtain data input by the user; and the processor 1001 can be used to call an application program storing a firewall judgment method in the memory 1005. When executed by one or more processors, the electronic device executes one or more methods described in the above embodiments.

[0070] An electronic device readable storage medium stores instructions, which, when executed by one or more processors, enable the electronic device to execute one or more of the methods described in the above embodiments.

[0071] It should be noted that, for the aforementioned method embodiments, for the sake of simplicity, they are all described as a series of action combinations, but those skilled in the art should be aware that the present application is not limited by the order of the actions described, because according to the present application, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required for the present application.

[0072] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0073] In the several embodiments provided in the present application, it should be understood that the disclosed devices can be implemented in other ways. For example, the device embodiments described above are only schematic, such as the division of the units, which is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some service interfaces, and the indirect coupling or communication connection of devices or units can be electrical or other forms.

[0074] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0075] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0076] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable memory. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, which is stored in a memory and includes several instructions for a computer device (which can be a personal computer, server or network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present application. The aforementioned memory includes: various media that can store program codes, such as USB flash drives, mobile hard drives, magnetic disks or optical disks.

[0077] The above is only an exemplary embodiment of the present disclosure, and the scope of the present disclosure cannot be limited thereto. That is, any equivalent changes and modifications made according to the teachings of the present disclosure are still within the scope of the present disclosure. After considering the specification and practicing the disclosure here, those skilled in the art will easily think of other embodiments of the present disclosure. This application is intended to cover any modification, use or adaptation of the present disclosure, which follows the general principles of the present disclosure and includes common knowledge or customary technical means in the technical field not recorded in the present disclosure. The description and examples are only regarded as exemplary, and the scope and spirit of the present disclosure are defined by the claims.

Claims

1. A firewall determination method, characterized in that: Applied to a computer device, the method comprises: Obtaining height parameters of the first BIM model; If the height parameter of the first BIM model is greater than a set threshold, it is determined that the first BIM model meets the determination requirement; Acquire a mapping outline of a second floor in the first BIM model, wherein the second floor is any floor whose height parameter is greater than the set threshold; comparing the mapped profile of the second floor with the mapped profile of the first floor; If the mapping outline of the second floor does not cover the mapping outline of the first floor, then the building has a podium; Obtain a first floor in a first BIM model corresponding to a building having a podium, where the first floor is any floor in the first BIM model whose height parameter is less than a set parameter; Determining whether the first floor meets preset structural requirements, and if so, determining that there is a firewall on the first floor; The wall parameters of the fire wall on the first floor are compared with standard parameters. If the wall parameters are the same as the standard parameters, it is determined that the fire wall on the first floor meets the design requirements.

2. A firewall determination method according to claim 1, characterized in that: The obtaining of the height parameter of the first BIM model includes: Acquire a type of a building corresponding to the first BIM model, where the type of the building includes non-residential; If the type of the building corresponding to the first BIM model is the non-residential building, obtaining the roof type of the first BIM model, where the roof type includes a sloped roof and a non-sloped roof; If the roof type is the sloped roof, calculating the height parameter of the first BIM model by using a first formula; First formula: H1=h1+h2; Among them, H1 is the height parameter of the first BIM model, h1 is the roof elevation in the first BIM model, and h2 is the outdoor floor height in the first BIM model; If the roof type is the non-slope roof, calculating the height parameter of the first BIM model by a second formula; The second formula: H2 = h3 + (h4 - h3) / 2 + h2; Among them, H2 is the height parameter of the first BIM model, h2 is the outdoor floor height in the first BIM model, h3 is the eaves height in the first BIM model, and h4 is the ridge elevation in the first BIM model.

3. A firewall determination method according to claim 2, characterized in that: The type of the building also includes a residence. After acquiring the type of the building corresponding to the first BIM model, the method further includes: If the type of the building is the residence, calculating the height parameter of the first BIM model by a third formula; The third formula: H3 = h5-h6; Among them, H3 is the height parameter of the first BIM model, h5 is the height of the highest floor in the first BIM model, and h6 is the height of the first floor in the first BIM model.

4. A firewall determination method according to claim 1, characterized in that: The wall parameters include wall thickness, wall height and fire wall grade, the standard parameters include first parameters, second parameters and third parameters, and comparing the wall parameters of the fire wall on the first floor with the standard parameters, if the wall parameters are the same as the standard parameters, then determining that the fire wall on the first floor meets the design requirements includes: Determine whether the wall thickness is the same as the first parameter, whether the wall height is the same as the second parameter, and whether the firewall level is the same as the third parameter; If all are the same, the fire wall on the first floor meets the design requirements; If at least one parameter among the wall parameters is different from the corresponding parameter in the standard parameters, the fire wall of the first floor does not meet the design requirements.

5. A firewall determination method according to claim 4, characterized in that: If at least one parameter in the wall parameters is different from a corresponding parameter in the standard parameters, then the fire wall of the first floor does not meet the design requirements, the method further includes: The adjustment plan is sent to the user terminal, so that the user can make the firewall meet the design requirements according to the adjustment plan.

6. A firewall determination device, characterized in that: The device comprises: a closing module (1), a judging module (2) and a comparing module (3); wherein: The closing module (1) is used to obtain a height parameter of a first BIM model; if the height parameter of the first BIM model is greater than a set threshold, it is determined that the first BIM model meets the judgment requirement; obtain a mapping outline of a second floor in the first BIM model, wherein the second floor is any floor whose height parameter is greater than the set threshold; compare the mapping outline of the second floor with the mapping outline of the first floor; if the mapping outline of the second floor does not cover the mapping outline of the first floor, the building has a podium; obtain a first floor in the first BIM model corresponding to the building with a podium, wherein the first floor is any floor whose height parameter in the first BIM model is less than the set parameter; the judgment module (2) is used to judge whether the first floor meets the preset structural requirements, and if it meets the preset structural requirements, it is determined that the first floor has a firewall; The comparison module (3) is used to compare the wall parameters of the fire wall on the first floor with standard parameters. If the wall parameters are the same as the standard parameters, it is determined that the fire wall on the first floor meets the design requirements.

7. An electronic device, characterized in that: It includes a processor, a memory, a user interface and a network interface, the memory is used to store instructions, the user interface and the network interface are used to communicate with other devices, and the processor is used to execute the instructions stored in the memory so that the electronic device executes the method as described in any one of claims 1-5.

8. A computer-readable storage medium, characterized in that: A computer program is stored which can be loaded by a processor and execute the method according to any one of claims 1 to 5.

Citation Information

Patent Citations

  • Constructional engineering design semantic structured description and compliance review method and system

    CN116186831A