A recycling and utilization conveying system for calcium carbide dust
By designing a calcium carbide dust recycling and utilization conveying system, using Roots fan and screw conveyor to achieve efficient recycling and reuse of calcium carbide dust, it solves the problems of calcium carbide dust pollution and safety hazards, reduces production costs and environmental pollution, and improves the system Practical and safe.
Patent Information
- Application Number
- CN202310476052.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-04-28
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2043-04-28
AI Technical Summary
During the PVC production process of calcium carbide method, the production of calcium carbide dust leads to environmental pollution and safety hazards. The existing recycling device has a short maintenance cycle and is insufficient in practicality. The pneumatic conveying system needs to stop transporting in the interface part for gas-solid separation, which affects efficiency.
A calcium carbide dust recycling and utilization conveying system is designed, including a Roots fan, collection pipeline, convection settlement plate and feeding system. The calcium carbide dust is sucked in through high-speed airflow and stored in the collection chamber temporarily, and is carried out using a screw conveyor and pneumatic conveying pipeline. Convey and reduce the risk of dust explosion through inert gas circulation.
It realizes efficient recycling and reuse of calcium carbide dust, reduces production costs, reduces environmental pollution and dust explosion risks, and the system is compact in structure, safe in use, and has good economical and practicality.
Smart Images

Figure CN116713284B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of recovery and transportation of carbide dust, and more specifically to a recovery and utilization transportation system of carbide dust. Background Art
[0002] The production process of polyvinyl chloride (PVC) is divided into two types: calcium carbide method and ethylene method. my country has relatively rich coal resources and relatively few oil reserves. At present, the process of producing calcium carbide with coal and lime as raw materials, and then using calcium carbide as raw materials to produce PVC still accounts for a large proportion in my country. In the production process of PVC by calcium carbide method, calcium carbide crushing is the primary process. In order to ensure the safe operation of the acetylene generator and improve the efficiency of calcium carbide hydrolysis, the calcium carbide particle size is generally required to be 30 to 50 mm. In the process of calcium carbide crushing and transportation, calcium carbide dust will inevitably be generated. A large amount of calcium carbide dust floats in the air, which will pollute the environment and endanger human health on the one hand; on the other hand, since the calcium carbide dust generated in the crushing process also contains certain effective ingredients, the generation of calcium carbide dust will also cause certain calcium carbide loss and increase the consumption of calcium carbide in the PVC production process. Calcium carbide dust is a powdery substance made by calcium carbide processing. The main components are calcium oxide and calcium hydroxide. It is usually used as an industrial raw material for the production of a variety of chemical substances, including acetylene, calcium chloride, sodium hydroxide, etc. When using calcium carbide dust, care must be taken to prevent safety issues such as dust explosions.
[0003] When the calcium carbide process is used for production, the exhaust gas often contains some calcium carbide dust. The exhaust gas causes environmental pollution and affects the health of workers. Most of the existing filtering and recovery devices use filter plates or filter bags for recovery, with short maintenance cycles and waste manpower and material resources. In the transportation process of recycling calcium carbide dust, a pneumatic conveying system is used to avoid the escape of calcium carbide dust and reduce the risk of dust explosion. However, in order to facilitate gas-solid separation, the interface part of pneumatic transportation is usually separated by filter bags. The transportation needs to be stopped during the collection of calcium carbide dust, and the filtering equipment is large in size and lacks practicality. Summary of the invention
[0004] In view of the problems existing in the prior art, the purpose of the present invention is to provide a recovery and utilization conveying system for calcium carbide dust.
[0005] To solve the above problems, the present invention adopts the following technical solutions.
[0006] A recycling and utilization conveying system for calcium carbide dust includes a recycling system and a feeding system, wherein the recycling system includes:
[0007] An exhaust pipe for discharging waste gas containing calcium carbide dust;
[0008] A Roots blower, wherein the Roots blower is used to generate a high-speed airflow;
[0009] A collecting pipe, wherein the collecting pipe is inserted into the exhaust pipe and one end of the collecting pipe is connected to the Roots blower to form a recovery channel;
[0010] A flow guide hood, which is located inside the exhaust pipe and communicates with the inside of the collection pipe, and is used to suck calcium carbide dust into the collection pipe;
[0011] A convection settling plate, which is located at the top of the collecting pipe and is fixedly installed inside the exhaust pipe;
[0012] A collecting bin, the other end of the collecting pipe is connected to the collecting bin and is used for temporarily storing calcium carbide dust;
[0013] Among them, the feeding system includes:
[0014] a first screw conveyor, the first screw conveyor being used to output the calcium carbide dust in the collection bin;
[0015] A pneumatic conveying pipeline, wherein the pneumatic conveying pipeline is used to convey calcium carbide dust;
[0016] a second screw conveyor, the second screw conveyor being used to output the calcium carbide dust in the pneumatic conveying pipeline;
[0017] A gas temporary storage tank, wherein the gas temporary storage tank is used to store the inert gas required by the pneumatic conveying system;
[0018] A booster pump, which is installed in the gas temporary storage tank and is used to pressurize the inert gas input into the gas temporary storage tank;
[0019] A gas circulation pipe, the gas circulation pipe is used to connect the booster pump and the gas temporary storage tank to the pneumatic conveying pipeline;
[0020] A one-way control valve is installed on the gas circulation pipe and is used to control the flow rate of gas supplied from the gas temporary storage tank to the pneumatic conveying pipeline.
[0021] As a further description of the above technical solution:
[0022] The through-opening of the collecting pipe and the exhaust pipe is sealed, and the convection settling plate is inclined.
[0023] As a further description of the above technical solution:
[0024] A negative pressure pump is installed on the collection bin, and an air outlet pipe connected to the negative pressure pump is connected to the collection bin. A filter plate is fixedly installed inside the collection bin, and the filter plate is located between the air outlet pipe and the connection between the collection pipe and the collection bin.
[0025] As a further description of the above technical solution:
[0026] The air outlet end of the negative pressure pump is connected with an air guide pipe, the other end of the air guide pipe is connected with an exhaust pipe, and the connection between the exhaust pipe and the air guide pipe is located above the convection settling plate.
[0027] As a further description of the above technical solution:
[0028] The ends of the augers of the first and second screw conveyors away from the motors are provided with evenly distributed dust through holes, and the distribution length of the dust through holes is greater than one third of the inner length of the augers in the pneumatic conveying pipeline.
[0029] As a further description of the above technical solution:
[0030] A filter cloth for filtering calcium carbide dust is fixedly installed inside the pneumatic conveying pipeline, and the filter cloth is located above the auger of the second screw conveyor and contacts with the auger of the second screw conveyor.
[0031] As a further description of the above technical solution:
[0032] The dust through hole is located below the connection point between the two gas circulation pipes and the pneumatic conveying pipeline.
[0033] As a further description of the above technical solution:
[0034] The feeding system further comprises a crusher, and the crusher is located below the second screw conveyor.
[0035] Compared with the prior art, the advantages of the present invention are:
[0036] (1) This solution can recover the calcium carbide dust contained in the exhaust gas, thereby avoiding the pollution of the environment by the calcium carbide dust. At the same time, the collection of the calcium carbide dust can facilitate the reuse of the calcium carbide dust, thereby reducing production costs.
[0037] (2) This solution transports carbide dust in a relatively sealed environment, thereby reducing the reaction between carbide dust and oxygen to produce acetylene and other substances during the transportation process, and transports it through inert gas, reducing the risk of dust explosion, making it safer to use.
[0038] (3) This solution can implement closed-loop use of the inert gas used in the pneumatic conveying system, reduce the loss of inert gas, and thus reduce the cost of conveying calcium carbide dust, thus having better economy and usability. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] Figure 1 It is a schematic diagram of the system structure of the present invention;
[0040] Figure 2 It is a schematic diagram of the front cross-sectional structure of the exhaust pipe of the present invention;
[0041] Figure 3 It is a schematic diagram of the front cross-sectional structure of the collecting bin of the present invention;
[0042] Figure 4 It is a schematic diagram of the front cross-sectional structure of the second screw conveyor of the present invention.
[0043] Description of the numbers in the figure:
[0044] 1. Exhaust pipe; 2. Roots blower; 3. Collection pipe; 4. Drainage hood; 5. Convection settling plate; 6. Collection bin; 61. Negative pressure pump; 62. Exhaust pipe; 63. Filter plate; 64. Air guide pipe; 7. First screw conveyor; 8. Pneumatic conveying pipe; 9. Second screw conveyor; 10. Gas temporary storage tank; 11. Booster pump; 12. Gas circulation pipe; 13. One-way control valve; 14. Dust through hole; 15. Filter cloth; 16. Crusher. DETAILED DESCRIPTION
[0045] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention;
[0046] See also Figure 1-4 In the present invention, a system for recycling and utilizing calcium carbide dust comprises a recycling system and a feeding system, wherein the recycling system comprises:
[0047] An exhaust pipe 1 for discharging waste gas containing calcium carbide dust. In the industrial calcium carbide production process, the waste gas needs to be discharged through the exhaust pipe 1 or chimney, but the discharged waste gas may contain unprecipitated calcium carbide dust; a Roots blower 2, which is used to generate a high-speed airflow, and a positive-pressure wind flow is generated by the operation of the Roots blower 2; a collecting pipe 3, which is inserted into the exhaust pipe 1, and one end of the collecting pipe 3 is connected to the Roots blower 2 to form a recovery channel. When the high-speed airflow passes through the collecting pipe 3, a negative pressure is generated at other openings of the collecting pipe 3 except the outlet through the high-speed airflow; a drainage hood 4, which is located inside the exhaust pipe 1 and is connected to the inside of the collecting pipe 3, and is used to collect the calcium carbide dust. The calcium carbide dust is sucked into the collection pipe 3, and the drainage hood 4 uses the negative pressure generated by the high-speed airflow in the collection pipe 3 to introduce the calcium carbide dust into the interior of the collection pipe 3, and then sends it to the collection bin 6 for collection through the high-speed airflow; the convection settling plate 5 is located at the top of the collection pipe 3 and is fixedly installed inside the exhaust pipe 1. First, the calcium carbide dust undergoes a primary physical sedimentation by its own gravity, and then the remaining small amount of calcium carbide dust collides with the convection settling plate 5 and the reflux convection generated by the convection settling plate 5 forms a secondary physical sedimentation, so that the drainage hood 4 can absorb and collect the calcium carbide dust; the collection bin 6, the other end of the collection pipe 3 is connected to the collection bin 6, and is used to temporarily store the calcium carbide dust;
[0048] Among them, the feeding system includes:
[0049] A first screw conveyor 7 is used to output the calcium carbide dust in the collecting bin 6; a pneumatic conveying pipe 8 is used to convey the calcium carbide dust through the pneumatic conveying pipe 8 to form a passage with the subsequent utilization equipment of the calcium carbide dust in the collecting bin 6; a second screw conveyor 9 is used to output the calcium carbide dust in the pneumatic conveying pipe 8, and the pneumatic conveying of the calcium carbide dust is assisted by the first screw conveyor 7 and the second screw conveyor 9, which is convenient for the initial entry and discharge of the calcium carbide dust in the pneumatic conveying pipe 8, and the working stability is higher; a gas temporary storage tank 10, the gas temporary storage tank 10 is used to store the inert gas required for the pneumatic conveying system; a booster pump 11 is installed on the gas temporary storage tank 10, and is used to input the gas temporary storage tank 10 is pressurized by the inert gas; a gas circulation pipe 12, the gas circulation pipe 12 is used to connect the booster pump 11 and the gas storage tank 10 to the pneumatic conveying pipeline 8, the high-pressure gas in the gas storage tank 10 is introduced into the inside of the pneumatic conveying pipeline 8 through the gas circulation pipe 12, and the calcium carbide dust is transported from one end of the pneumatic conveying pipeline 8 to the other end by the inert gas. Then the inert gas flows back to the inside of the gas storage tank 10 through another gas circulation pipe 12 for storage, and the booster pump 11 provides power for the inert gas to enter the inside of the gas storage tank 10 to maintain the high-pressure state of the gas storage tank 10; a one-way control valve 13, the one-way control valve 13 is installed on the gas circulation pipe 12, and is used to control the flow rate of gas supplied from the gas storage tank 10 to the pneumatic conveying pipeline 8.
[0050] In the present invention, the discharged calcium carbide dust can be drained and recovered, the calcium carbide dust in the flue gas can be effectively absorbed, and the smoke emission can be reduced. The structure is novel, and the smoke emission is convenient while playing a recycling role. It is more environmentally friendly and easy to install and use. The calcium carbide dust can be pneumatically conveyed in a relatively closed environment, and inert gas can be used to reduce the risk of dust explosion. The closed environment can avoid the escape of calcium carbide dust or the leakage of gas, which is more economical and environmentally friendly, and has higher safety in use.
[0051] See also Figure 1 and Figure 2 , wherein: the collection pipe 3 and the exhaust pipe 1 are sealed, and the convection settling plate 5 is inclined.
[0052] In the present invention, by displacing the discharge port of the exhaust pipe 1, the inclined convection settling plate 5 facilitates the formation of a reflux airflow and the sliding of calcium carbide dust, so as to facilitate the drainage and collection of calcium carbide dust.
[0053] See also Figure 1 and Figure 3, wherein: a negative pressure pump 61 is installed on the collecting bin 6, an air outlet pipe 62 connected to the negative pressure pump 61 is connected to the collecting bin 6, a filter plate 63 is fixedly installed inside the collecting bin 6, and the filter plate 63 is located between the air outlet pipe 62 and the connection between the collecting pipe 3 and the collecting bin 6.
[0054] In the present invention, the negative pressure pump 61 can form a negative pressure environment inside the collection bin 6 through the outlet pipe 62, assisting the Roots blower 2 to form a high-speed airflow in the collection pipe 3, while facilitating the suction of calcium carbide dust, and the filter plate 63 can block the calcium carbide dust and prevent it from being discharged through the outlet pipe 62.
[0055] See also Figure 1-3 , wherein: the air outlet end of the negative pressure pump 61 is connected to an air guide pipe 64 , the other end of the air guide pipe 64 is connected to the exhaust pipe 1 , and the connection between the exhaust pipe 1 and the air guide pipe 64 is located above the convection settling plate 5 .
[0056] In the present invention, since the drainage hood 4 drains not only calcium carbide dust but also part of the exhaust gas, the airflow generated by the negative pressure pump 61 when working can be introduced into the exhaust pipe 1 through the air guide pipe 64 for discharge.
[0057] See also Figure 1-4 , wherein: the ends of the auger of the first screw conveyor 7 and the second screw conveyor 9 away from the motor are provided with uniformly distributed dust through holes 14, and the distribution length of the dust through holes 14 is greater than one third of the inner length of the auger located in the pneumatic conveying pipe 8.
[0058] In the present invention, the dust through hole 14 can facilitate the passage of calcium carbide dust, so that the inert gas can blow or disperse the calcium carbide dust, as well as the gas-solid separation. The auger parts of the first screw conveyor 7 and the second screw conveyor 9 that do not have the dust through hole 14 and the accumulated calcium carbide dust block and seal the two ends of the pneumatic conveying pipe 8, thereby reducing or avoiding gas leakage and ensuring the airtightness of the pneumatic conveying system. The accumulated calcium carbide dust is transported by the rotation of the auger.
[0059] See also Figure 4 , wherein: a filter cloth 15 for filtering calcium carbide dust is fixedly installed inside the pneumatic conveying pipeline 8, and the filter cloth 15 is located above the auger of the second screw conveyor 9 and contacts with the auger of the second screw conveyor 9.
[0060] In the present invention, the calcium carbide dust in the inert gas can be filtered through the filter cloth 15, thereby completing gas-solid separation and facilitating the recovery of the inert gas in the pneumatic conveying system. At the same time, the rotating auger of the second screw conveyor 9 can scrape the surface of the filter cloth 15, thereby ensuring the gas permeability of the filter cloth 15 and preventing blockage. At the same time, the dust through hole 14 opened on the auger of the second screw conveyor 9 can reduce the influence of the auger on the passage of the inert gas.
[0061] See also Figure 3 and Figure 4 , wherein: the dust through hole 14 is located below the connection point between the two gas circulation pipes 12 and the pneumatic conveying pipeline 8, and the dust through hole 14 facilitates the passage of the inert gas of the pneumatic conveying system.
[0062] See also Figure 1 and Figure 4 , wherein: the feeding system further includes a crusher 16 , and the crusher 16 is located below the second screw conveyor 9 .
[0063] In the present invention, the calcium carbide dust extruded and conveyed by the second screw conveyor 9 is crushed and dispersed by the crusher 16 to avoid the calcium carbide dust from agglomerating after extrusion, thereby facilitating the subsequent recycling of the calcium carbide dust.
[0064] The above is only a preferred specific implementation of the present invention; however, the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical solution and its improved conception within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A system for recycling and utilizing calcium carbide dust, characterized in that: It includes a recycling system and a feeding system, wherein the recycling system includes: An exhaust pipe (1) for discharging waste gas containing calcium carbide dust; A Roots blower (2), wherein the Roots blower (2) is used to generate a high-speed airflow; A collecting pipe (3), wherein the collecting pipe (3) is inserted into the exhaust pipe (1) and one end of the collecting pipe is connected to the Roots blower (2) to form a recovery channel; A flow guide hood (4), the flow guide hood (4) being located inside the exhaust pipe (1) and communicating with the inside of the collection pipe (3), and being used to draw calcium carbide dust into the collection pipe (3); A convection settling plate (5), the convection settling plate (5) being located at the top of the collecting pipe (3) and fixedly mounted inside the exhaust pipe (1); A collecting bin (6), the other end of the collecting pipe (3) being connected to the collecting bin (6) for temporarily storing calcium carbide dust; A negative pressure pump (61) is installed on the collecting bin (6), an air outlet pipe (62) connected to the negative pressure pump (61) is connected to the collecting bin (6), a filter plate (63) is fixedly installed inside the collecting bin (6), and the filter plate (63) is located between the air outlet pipe (62) and the connection between the collecting pipe (3) and the collecting bin (6); Among them, the feeding system includes: a first screw conveyor (7), the first screw conveyor (7) being used to output the calcium carbide dust in the collection bin (6); A pneumatic conveying pipeline (8), wherein the pneumatic conveying pipeline (8) is used to convey calcium carbide dust; a second screw conveyor (9), the second screw conveyor (9) being used to discharge the calcium carbide dust in the pneumatic conveying pipeline (8); A gas temporary storage tank (10), wherein the gas temporary storage tank (10) is used to store inert gas required by the pneumatic conveying system; A booster pump (11), the booster pump (11) being installed in the gas temporary storage tank (10) and used for boosting the pressure of the inert gas input into the gas temporary storage tank (10); A gas circulation pipe (12), wherein the gas circulation pipe (12) is used to connect the booster pump (11) and the gas temporary storage tank (10) to the pneumatic conveying pipeline (8); a one-way control valve (13), the one-way control valve (13) being installed on the gas circulation pipe (12) and used for controlling the flow rate of gas delivered from the gas temporary storage tank (10) to the pneumatic conveying pipeline (8); The collection pipe (3) and the exhaust pipe (1) are sealed, and the convection settling plate (5) is arranged at an angle; The air outlet end of the negative pressure pump (61) is connected to an air guide pipe (64), the other end of the air guide pipe (64) is connected to the exhaust pipe (1), and the connection between the exhaust pipe (1) and the air guide pipe (64) is located above the convection settling plate (5); The ends of the auger of the first screw conveyor (7) and the second screw conveyor (9) away from the motor are provided with evenly distributed dust through holes (14), and the distribution length of the dust through holes (14) is greater than one third of the inner length of the auger located in the pneumatic conveying pipe (8); A filter cloth (15) for filtering calcium carbide dust is fixedly installed inside the pneumatic conveying pipeline (8), and the filter cloth (15) is located above the auger of the second screw conveyor (9) and is in contact with the auger of the second screw conveyor (9); The dust through hole (14) is located below the connection point between the two gas circulation pipes (12) and the pneumatic conveying pipe (8).
2. The system for recycling and utilizing calcium carbide dust according to claim 1 is characterized in that: The feeding system further comprises a crusher (16), wherein the crusher (16) is located below the second screw conveyor (9).