Artificial spawning ground for fish in multiple habitats with large water level fluctuations and construction method
By designing multi-habitat structures in the artificial spawning ground of fish, including beach protection embankment, water drop weir, deep pool and island pile, combined with sand and gravel mixed base and ecological gabion cage, the river section with large water level fluctuations is solved. The problem of difficulty in maintaining the beach surface of artificial spawning grounds and poor water level adaptability has achieved diversified water flow distribution and sustainability of fish spawning grounds.
Patent Information
- Application Number
- CN202311009971.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-08-10
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2043-08-10
AI Technical Summary
It is difficult for existing artificial spawning grounds to maintain appropriate water levels and flow velocities in river sections with large water levels fluctuations, and it is difficult to maintain the beach surface and lack of water flow diversity, which affects the fish spawning and hatching effects.
Design a multi-habitat fish artificial spawning ground, including strip-shaped beach protection embankment, fish scale waterfall weir, deep pools and island piles, and is composed of sand and gravel mixed base and ecological gabion cage, through the water diversion embankment and overflow ports regulate water flow to create a diverse habitat and flow state.
Effectively protect the beach surface, adapt to water level fluctuations, enrich water flow distribution, improve the sustainability and spawning effect of the spawning ground, and meet the fish's egg laying and hatching needs.
Smart Images

Figure CN116762734B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of water ecological construction, and in particular to an artificial spawning ground for fish in multiple habitats with large water level fluctuations and a construction method thereof. Background Art
[0002] my country boasts abundant hydropower resources and is a major player in water conservancy and hydropower construction, boasting a vast number of hydropower stations of various types. However, the construction of these projects can alter water temperatures in reservoir areas, block fish migration pathways, alter river hydrodynamics and riverbed geology, and even flood natural spawning grounds. These negative impacts on fish populations cannot be ignored.
[0003] Numerous artificial spawning grounds have been constructed across China, but due to the complex hydrological and geomorphological conditions of mountainous rivers and the limitations of the operational methods of regulating power stations, these facilities still face numerous challenges. Firstly, mountainous rivers often experience high flow volumes and velocities during flood season, significantly impacting and damaging artificial spawning grounds. In severe cases, this can lead to significant loss of riverbed sediment and even beach washout, compromising the sustainability of these sites. Secondly, most existing artificial spawning grounds are designed for river sections with minimal fluctuations in flow and water levels. However, when located near power stations with weaker regulating capabilities (such as run-of-the-river daily regulating power stations), the reservoir water level fluctuates significantly and frequently, making it difficult for existing artificial spawning grounds to maintain the optimal water level and flow velocity required for fish spawning and hatching, thus hindering their effectiveness. Furthermore, flow optimization measures for artificial spawning grounds often rely on single stone embellishments, resulting in low flow diversity and limited stimulation for fish spawning. Summary of the Invention
[0004] The purpose of the embodiments of the present application is to provide a multi-habitat artificial spawning site and construction method for fish in areas with large water level fluctuations, which solves the technical problems of the existing artificial spawning sites, such as the difficulty in maintaining the beach surface, poor water level adaptability and single habitat.
[0005] In a first aspect, an artificial spawning ground for fish in multiple habitats suitable for large water level fluctuations is provided, which is arranged in the main river channel and comprises:
[0006] A beach protection dike is arranged in a strip shape on the side beach of the main river channel, the axis of the beach protection dike is arranged in a crescent shape around the side beach, overflow outlets are provided at intervals downstream of the beach protection dike, and a water retaining dam of a preset height is provided at the bottom of the overflow outlet;
[0007] The beach surface is composed of a bottom layer laid in the beach area surrounded by the beach protection dike, and the slope ratio of the beach surface from upstream to downstream is 1‰ to 2‰;
[0008] A diversion dike is arranged in a straight line upstream of the beach protection dike, with one end of the diversion dike connected to the beach protection dike and the other end extending into the main river channel. The axis of the diversion dike forms an angle of 15° to 30° with the direction of water flow, and the top of the diversion dike is slightly higher than the preset water level, so as to guide the water flow of the main river channel into the beach protection dike;
[0009] Multiple drop weirs are distributed on the beach in a fish-scale-like plane, each drop weir is V-shaped, the V-shaped opening of each drop weir is arranged toward the water flow, and two adjacent rows of drop weirs are staggered along the water flow direction;
[0010] A deep pool is arranged in the middle and upper reaches of the beach and distributed between the multiple drop weirs. The deep pool has a preset depth and a first paved surface is provided on the bottom surface of the preset depth.
[0011] The pile island is arranged downstream of the beach and distributed between the multiple drop weirs. The pile island is higher than the beach by a preset height, and a second paved surface is provided on the surface at the preset height.
[0012] In one embodiment, the substrate layer adopts a sand-gravel mixed substrate, which includes sand particles with a particle size of 1-5 cm accounting for 60%-70%, gravel with a particle size of 5-10 cm accounting for 10%-20%, and sand and gravel with a particle size greater than 10 cm and less than 1 cm. The thickness of the substrate layer is about 30-40 cm.
[0013] In one embodiment, the water diversion dike and the beach protection dike are both composed of two layers of ecological gabion boxes, the ecological gabion boxes are arranged in a herringbone shape, and the interiors of the ecological gabion boxes are filled with stone blocks.
[0014] In one embodiment, the elevation of the water retaining embankment is 60-80 cm higher than the beach surface.
[0015] In one embodiment, the edges of the deep pool and the island are stabilized by single-layer ecological gabions, and the first and second paving surfaces are both gravel paving surfaces.
[0016] In one embodiment, the depth of the deep pool is 50-60 cm, and the height of the pile island is 40-50 cm.
[0017] In one embodiment, the V-shaped inner angle of the weir is 120°.
[0018] According to a second aspect of the present application, a method for constructing a multi-habitat artificial spawning site for fish with large water level fluctuations is also provided, comprising the following steps:
[0019] S1. Preliminary site selection: the convex bank beach at the turning point of the main river channel is selected as the side beach to be constructed;
[0020] S2. Arranging a beach protection dike in a strip shape on the selected side beach, so that the axis of the dike is crescent-shaped and arranged around the side beach, and providing overflow outlets at intervals downstream of the dike, and providing a water retaining dam of a preset height at the bottom of the overflow outlet;
[0021] S3: construct the waterfall weir, deep pool and island in sequence;
[0022] S4. Laying a bottom layer in the beach area surrounded by the beach protection dike to form a beach surface, so that the beach surface slope ratio from upstream to downstream is 1‰ to 2‰;
[0023] S5. Construct a water diversion dike, and arrange the water diversion dike in a straight line upstream of the beach protection dike, so that one end of the water diversion dike is connected to the beach protection dike and the other end extends into the main river channel, and the axis of the water diversion dike forms an angle of 15° to 30° with the direction of water flow.
[0024] In one embodiment, after S2 and before S3, the original beach surface of the side beach is cleared and leveled, and the slope and terrain are reshaped according to preset requirements.
[0025] In one embodiment, the substrate layer adopts a sand and gravel mixed substrate, which includes sand with a particle size of 1-5 cm accounting for 60%-70%, gravel with a particle size of 5-10 cm accounting for 10%-20%, and sand and gravel with a particle size greater than 10 cm and less than 1 cm. The thickness of the substrate layer is about 30 to 40 cm. When laying the substrate layer, it is laid in layers in order from large to small particle size to form a beach surface.
[0026] The artificial spawning ground for fish in multiple habitats with large water level fluctuations and the construction method of this application have the following beneficial effects:
[0027] 1. Use beach dikes and waterfall weirs to effectively protect the beach surface and bottom sediment during the flood season, preventing excessive scouring and loss. Strip-shaped beach dikes are installed along the outer edge of the spawning grounds to resist the impact of upstream water during the flood season, preventing large-scale beach collapse and erosion. At the same time, fish-scale waterfall weirs are deployed within the spawning grounds to enrich the flow pattern and divide the beach into grid-like blocks. This can effectively protect the bottom sediment, prevent it from shifting and losing under the influence of flood water, and improve the sustainability of the spawning grounds.
[0028] 2. Build a diversion dike upstream of the spawning grounds and a water retention bank downstream to minimize the impact of reservoir water level fluctuations on the spawning grounds' habitats. By building a diversion dike upstream of the spawning grounds to divert water from the main river channel into the artificial spawning grounds, and by building a water retention bank downstream of the spawning grounds, we can ensure a consistent water level in the spawning grounds, meeting the needs of fish spawning and hatching, and preventing the spawning grounds from being exposed and cut off due to significant fluctuations in the reservoir water level.
[0029] 3. Continuous overflows are installed midway and downstream of the spawning grounds, along with scale-shaped drop weirs, deep pools, and islands within the spawning grounds. This enriches the flow pattern within the spawning grounds, attracting fish and stimulating spawning. By installing continuous overflows midway and downstream of the spawning grounds, the water flow is narrowed and increased in velocity, thereby attracting fish. By installing scale-shaped drop weirs, deep pools, and islands within the spawning grounds, the turbulence of the water flow is increased, creating a variety of flow patterns and depths, including rapids, slow currents, and backflows. This creates diverse habitats and stimulates fish spawning. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the following is a brief introduction to the drawings required for use in the embodiments. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other relevant drawings can be obtained based on these drawings without creative work.
[0031] Figure 1 This is a schematic diagram of the structure of an artificial spawning ground for fish in multiple habitats with large water level fluctuations according to an embodiment of the present application;
[0032] Figure 2 for Figure 1 Cross-sectional view of
[0033] Figure 3 for Figure 1 longitudinal section of
[0034] Figure 4 It is a cross-sectional view of an overflow port and a water retaining sill according to an embodiment of the present application.
[0035] 100, beach protection dike; 110, overflow outlet; 120, water conservation bank; 200, beach surface; 300, waterfall weir; 400, deep pool; 500, island; 600, water diversion dike; 700, main river channel; 710, side beach. DETAILED DESCRIPTION
[0036] To make the objectives, technical solutions, and advantages of the embodiments of the present application more clear, the technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the accompanying drawings of the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Generally, the components of the embodiments of the present application described and shown in the drawings herein can be arranged and designed in various different configurations.
[0037] Therefore, the following detailed description of the embodiments of the present application provided in the accompanying drawings is not intended to limit the scope of the present application for protection, but merely represents selected embodiments of the present application. All other embodiments obtained by persons of ordinary skill in the art based on the embodiments in the present application without creative work are within the scope of protection of the present application.
[0038] my country boasts abundant hydropower resources and is a major player in water conservancy and hydropower engineering, boasting a vast number of hydropower stations and reservoirs. While these projects offer social and economic benefits such as flood control and power generation, irrigation and water supply, and shipping and aquaculture, they inevitably impact the local ecological environment, particularly fish habitats. Numerous artificial spawning grounds have been constructed across China, optimizing water flow and improving bottom conditions to create suitable habitats for specific fish species. However, due to the complex hydrological and geomorphological conditions of mountainous rivers and the limitations of regulating power station operations, the development of artificial spawning grounds for fish still presents numerous challenges.
[0039] On the one hand, mountain rivers have large water volumes and high flow rates during flood season, which often cause significant erosion and damage to artificial spawning grounds. In severe cases, this can cause a large amount of riverbed sediment to be lost or even the beach to be washed away, affecting the sustainability of artificial spawning grounds.
[0040] On the other hand, most artificial spawning grounds are suitable for river sections where water volume and water level do not change much. However, due to the weak regulation capacity of run-of-river daily regulation power stations, the daily water level in the reservoir area changes greatly and frequently. Artificial spawning grounds find it difficult to maintain the appropriate water level and flow rate required for fish spawning and hatching, and therefore the operation effect cannot be effectively guaranteed.
[0041] In addition, existing water flow optimization measures in artificial spawning grounds are mainly based on single stone embellishment, the water flow diversity is not high, and the stimulation to fish spawning is relatively limited.
[0042] In order to solve the problems of the existing artificial spawning grounds, such as the difficulty in maintaining the beach surface, poor water level adaptability and single habitat, this application proposes a multi-habitat artificial spawning ground for fish suitable for large water level fluctuations. Figure 1 This is a schematic diagram of a multi-habitat artificial spawning ground for fishes with large water level fluctuations according to an embodiment of the present application. Figure 1The artificial spawning ground is arranged in the main river channel, including a beach protection dike 100, a beach surface 200, a water diversion dike 600, multiple waterfall weirs 300, a deep pool 400 and an island 500.
[0043] The beach protection dikes 100 are arranged in strips along the side beaches 710 of the main channel 700. The axis of the dikes 100 is arranged in a crescent shape around the side beaches 710. Overflow outlets 110 are spaced at intervals downstream of the dikes 100, and a water retaining bank 120 of a preset height is located at the bottom of the overflow outlets 110. In this embodiment, the water retaining bank 120 is 60-80 cm above the beach surface 200. By installing strips of beach protection dikes along the outer edge of the spawning ground, the impact of upstream water is resisted during flood season, preventing large-scale beach collapse and erosion. Continuous overflow outlets are installed mid- and downstream of the spawning ground to narrow the water flow, increase flow velocity, and achieve a fish-attracting effect. A water retaining bank is also installed downstream of the spawning ground to ensure a constant water level in the spawning ground to meet the needs of fish spawning and hatching, and to prevent the spawning ground from being exposed and cut off due to large fluctuations in the reservoir water level.
[0044] The beach surface 200 is composed of a bottom layer laid in the beach area surrounded by the beach protection dike 100, and the slope ratio of the beach surface 200 from upstream to downstream is 1‰ to 2‰; in one embodiment, the slope ratio of the beach surface 200 is 1‰.
[0045] The diversion dike 600 is arranged in a straight line upstream of the beach protection dike 100. One end of the diversion dike 600 is connected to the beach protection dike 100, and the other end extends into the main channel 700. The axis of the diversion dike 600 is at an angle of 15° to 30° to the direction of water flow. In one embodiment, the axis of the diversion dike 600 is at a 30° angle to the direction of water flow. The top of the diversion dike 600 is slightly above the preset water level, which is used to direct water flow from the main channel 700 into the beach protection dike 100. The preset water level is the normal water level, which allows water to be diverted from the main channel to the artificial spawning ground. By placing the diversion dike upstream of the spawning ground, water flow is diverted from the main channel to the artificial spawning ground.
[0046] Multiple drop weirs 300 are distributed across the beach 200 in a fish-scale pattern, each V-shaped. In one embodiment, the V-shaped internal angle of the drop weir 300 is approximately 120°. The V-shaped opening of each drop weir 300 faces the water flow, and two adjacent rows of drop weirs 300 are staggered along the water flow. The fish-scale-shaped drop weirs arranged across the beach not only enrich the flow pattern but also divide the beach into grid-like sections. This effectively protects the beach substrate, preventing its displacement and loss during flood season, thereby improving the sustainability of the spawning grounds.
[0047] The deep pool 400 is arranged in the middle and upper reaches of the beach 200 and distributed between the multiple drop weirs 300. The deep pool 400 has a preset depth and a first paved surface is provided on the bottom of the preset depth.
[0048] The islands 500 are located downstream of the beach 200 and are distributed between the multiple weirs 300. The islands 500 are elevated above the beach 200 by a predetermined height and have a second paved surface at the predetermined height. In this embodiment, the deep pool 400 is 50-60 cm deep, and the islands 500 are 40-50 cm high.
[0049] During the above implementation process, continuous overflow outlets, fish-scale-shaped waterfall weirs, deep pools and islands are respectively set up in the middle and downstream of the spawning ground and inside the spawning ground to enrich the flow distribution of the spawning ground and achieve the effects of attracting fish at the inlet and stimulating spawning. When the water flows in the spawning ground, it overflows through the top of the waterfall weir or flows through the gap between the two waterfall weirs, increasing the turbulence of the water flow. At the same time, when flowing through the deep pools and islands, the water depth and flow rate change, thereby creating a variety of flow patterns and water depths such as rapids, slow flows, and backflows, creating a diverse habitat and stimulating fish spawning. The artificial spawning ground disclosed in this application has an easy-to-maintain beach surface, strong water level adaptability and diverse habitats.
[0050] In one embodiment, the substrate layer adopts a sand-gravel mixed substrate, which includes sand particles with a particle size of 1-5 cm accounting for 60%-70%, gravel with a particle size of 5-10 cm accounting for 10%-20%, and sand and gravel with a particle size greater than 10 cm and less than 1 cm. The thickness of the substrate layer is about 30-40 cm.
[0051] In one embodiment, the dike 600 and the beach protection dike 100 are both composed of two layers of ecological gabions, which are arranged in a "T" shape and filled with stone blocks. The "T" shape double-layer structure is stable.
[0052] In one embodiment, the edges of the deep pool 400 and the island 500 are both stabilized with single-layer ecological gabions, and the first and second paving surfaces are both gravel paving surfaces, that is, the paving surfaces are made of the same bottom material as the beach surface.
[0053] In the above implementation process, the diversion dike, beach protection dike, the foot of the deep pool and the foot of the piled island are all made of gravel ecological gabion boxes, and the local stones can be used to fill the ecological gabion boxes.
[0054] In a second aspect, the present application also provides a method for constructing an artificial spawning site for fish in multiple habitats with large water level fluctuations, comprising the following steps:
[0055] S1. In the early stage of site selection, the convex bank beach at the turning point of the main river channel is selected as the side beach to be constructed. When selecting the site in the early stage, the natural convex bank beach at the turning point of the river channel should be selected as much as possible. This type of terrain is a natural beach with stable original landforms, and the flow rate and discharge volume during flood season are lower than those of the main river channel, which is convenient for beach surface maintenance.
[0056] S2. Layout a strip of beach protection dikes along the selected beachfront, with the dike's axis forming a crescent shape around the beachfront. Overflow outlets are installed at intervals downstream of the dikes, with water retention embankments of a predetermined height at the bottom of the overflow outlets. During construction, a temporary construction site is established on the shore, where ecological gabions are filled with local stone. Construction begins with the beach protection dikes to stabilize the existing beachfront.
[0057] S3: construct the waterfall weir, deep pool and island in sequence;
[0058] S4. Laying a bottom layer in the beach area surrounded by the beach protection dike to form a beach surface, so that the beach surface slope ratio from upstream to downstream is 1‰ to 2‰;
[0059] S5. Construct a water diversion dike, and arrange the water diversion dike in a straight line upstream of the beach protection dike, so that one end of the water diversion dike is connected to the beach protection dike and the other end extends into the main river channel, and the axis of the water diversion dike forms an angle of 15° to 30° with the direction of water flow.
[0060] In one embodiment, after S2 and before S3, the original beach surface of the side beach is cleared and leveled, and the slope and terrain are reshaped according to preset requirements.
[0061] In one embodiment, the substrate layer adopts a sand and gravel mixed substrate, which includes sand with a particle size of 1-5 cm accounting for 60%-70%, gravel with a particle size of 5-10 cm accounting for 10%-20%, and sand and gravel with a particle size greater than 10 cm and less than 1 cm. The thickness of the substrate layer is about 30 to 40 cm. When laying the substrate layer, it is laid in layers in order from large to small particle size to form a beach surface.
[0062] After construction is complete, regular monitoring and evaluation of the spawning grounds' operations will be conducted to assess the effectiveness of the spawning ground facilities. Regular maintenance of the spawning grounds will also be carried out, including clearing debris, replenishing the bottom sediment, and repairing damage. Inspections and maintenance will be conducted more frequently after the flood season.
[0063] The above description is merely a preferred embodiment of the present application and is not intended to limit the present application. Various modifications and variations are possible for those skilled in the art. Any modifications, equivalent substitutions, or improvements made within the spirit and principles of the present application shall be included within the scope of protection of the present application.
Claims
1. An artificial spawning ground for fish in multiple habitats with large water level fluctuations, arranged in a main river channel (700), characterized in that: include: The beach protection dike (100) is arranged in a strip shape on the side beach (710) of the main river channel (700), the side beach (710) being a convex bank beach at the turning point of the main river channel (700), the axis of the dike body of the beach protection dike (100) being arranged in a crescent shape around the side beach (710), the downstream of the beach protection dike (100) is provided with an overflow outlet (110) at intervals, and the bottom of the overflow outlet (110) is provided with a water retaining sill (120) of a preset height; The beach surface (200) is composed of a bottom layer laid in the side beach (710) area surrounded by the beach protection dike (100), and the slope ratio of the beach surface (200) from upstream to downstream is 1‰~2‰; A water diversion dike (600) is arranged in a straight line upstream of the beach protection dike (100); one end of the water diversion dike (600) is connected to the beach protection dike (100), and the other end extends into the main river channel (700); the axis of the dike body of the water diversion dike (600) forms an angle of 15° to 30° with the direction of water flow; the top of the water diversion dike (600) is slightly higher than a preset water level, and is used to guide the water flow of the main river channel (700) into the beach protection dike (100); A plurality of drop weirs (300) are distributed in a fish-scale-like plane on the beach surface (200), each drop weir (300) is V-shaped, the V-shaped opening of each drop weir (300) is arranged toward the water flow, and two rows of drop weirs (300) arranged adjacent to each other in the water flow direction are staggered; A deep pool (400) is arranged in the middle and upper reaches of the beach (200) and distributed between the plurality of drop weirs (300); the deep pool (400) has a preset depth, and a first paved surface is provided on the bottom surface of the preset depth; The island pile (500) is arranged downstream of the beach (200) and distributed between the plurality of drop weirs (300). The island pile (500) is higher than the beach (200) by a preset height and a second paved surface is provided on the surface at the preset height.
2. The artificial spawning ground for fish in multiple habitats with large water level fluctuations according to claim 1, characterized in that: The substrate layer adopts a sand-gravel mixed substrate, which includes sand with a particle size of 1-5 cm accounting for 60%-70%, gravel with a particle size of 5-10 cm accounting for 10%-20%, and sand and gravel with a particle size greater than 10 cm and less than 1 cm. The thickness of the substrate layer is 30~40 cm.
3. The artificial spawning ground for fish in multiple habitats with large water level fluctuations according to claim 1, characterized in that: The water diversion dike (600) and the beach protection dike (100) are both composed of two layers of ecological gabion boxes, the ecological gabion boxes are arranged in a triangular shape, and the interiors of the ecological gabion boxes are filled with stone blocks.
4. The artificial spawning ground for fish in multiple habitats with large water level fluctuations according to claim 1, characterized in that: The elevation of the water retaining bank (120) is 60-80 cm higher than the beach surface (200).
5. The artificial spawning ground for fish in multiple habitats with large water level fluctuations according to claim 2, characterized in that: The edges of the deep pool (400) and the island (500) are both stabilized by single-layer ecological gabion boxes, and the first paving surface and the second paving surface are both gravel paving surfaces.
6. The artificial spawning ground for fish in multiple habitats with large water level fluctuations according to claim 1, characterized in that: The depth of the deep pool (400) is 50-60 cm, and the height of the island (500) is 40-50 cm.
7. The artificial spawning ground for fish in multiple habitats with large water level fluctuations according to claim 1, characterized in that: The V-shaped internal angle of the drop weir (300) is 120°.
8. A method for constructing a multi-habitat artificial spawning site for fishes with large water level fluctuations, which is used for constructing a multi-habitat artificial spawning site for fishes with large water level fluctuations as claimed in any one of claims 1 to 7, characterized in that: The steps include: S1, preliminary site selection, select the turning point of the main river channel (700) as the convex bank beach as the side beach to be constructed (710); S2, arranging the beach protection dike (100) in a strip shape on the selected side beach (710), so that the axis of the dike (100) is arranged in a crescent shape around the side beach (710), and providing overflow outlets (110) at intervals downstream of the beach protection dike (100), and providing a water retaining dam (120) of a preset height at the bottom of the overflow outlet (110); S3, construct the waterfall weir (300), the deep pool (400) and the island (500) in sequence; S4, laying a bottom layer in the area of the side beach (710) surrounded by the beach protection dike (100) to form a beach surface (200), so that the slope ratio of the beach surface (200) from the upstream to the downstream of the beach surface (200) is 1‰~2‰; S5. Construct a water diversion dike (600), and arrange the water diversion dike (600) in a straight line upstream of the beach protection dike (100), so that one end of the water diversion dike (600) is connected to the beach protection dike (100), and the other end extends into the main river channel (700), and the axis of the dike body of the water diversion dike (600) forms an angle of 15° to 30° with the water flow direction.
9. The method for constructing a multi-habitat artificial spawning site for fishes with large water level fluctuations according to claim 8, characterized in that: After S2 and before S3, the original beach surface (200) of the side beach (710) is also cleared and leveled, and the slope and terrain are reshaped according to preset requirements.
10. The method for constructing a multi-habitat artificial spawning site for fishes with large water level fluctuations according to claim 8, characterized in that: The substrate layer is a sand-gravel mixed substrate, which includes sand with a particle size of 1-5 cm accounting for 60%-70%, gravel with a particle size of 5-10 cm accounting for 10%-20%, and sand and gravel with a particle size greater than 10 cm and less than 1 cm. The thickness of the substrate layer is 30-40 cm. When laying the substrate layer, it is laid in layers in descending order of particle size to form a beach surface (200).