A new type of construction ship and construction method suitable for single pile foundation sinking

By integrating pile sinking and anti-swage functions on the construction ship, the problem of silt and sand erosion caused by the long entry time of the stone-throwing ship after the pile sinking of offshore wind power single-pile foundation is solved, timely protection of single-pile foundation is achieved, and construction efficiency is improved Basic protection effect.

CN117090197BActive Publication Date: 2024-11-26SHANGHAI INVESTIGATION DESIGN & RES INST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311097413.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-08-29
Publication Date
2024-11-26
Estimated Expiration
2043-08-29

AI Technical Summary

Technical Problem

The stone-throwing ship has a long time to enter the site after the pile sinks on the offshore wind power single-pile foundation, resulting in serious silt and sand surrounding the single-pile foundation, affecting subsequent construction.

Method used

A new type of construction ship is designed, with pile sinking parts and anti-swish parts on the hull, and pile sinking is used to use cranes and hydraulic hammers to prevent piles from being washed away. Then, anti-swishing is carried out on the outer peripheral surface of the single pile foundation through a crane and anti-swishing block to form an internal The ring and outer ring protection areas are filled with sandbags and mesh stones.

Benefits of technology

It realizes immediate anti-swage after the single pile foundation sinks into piles, avoids the impact of silt and sand erosion on construction, and improves construction efficiency and foundation protection effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117090197B_ABST
    Figure CN117090197B_ABST
Patent Text Reader

Abstract

The present invention provides a new type of construction ship and construction method suitable for pile sinking of a single pile foundation, comprising a hull, a pile sinking parts section, and an anti-scouring parts section, wherein the pile sinking parts section and the anti-scouring parts section are respectively arranged at both ends of the hull; the pile sinking parts section comprises a crane and a hydraulic hammer, wherein the hydraulic hammer is detachably connected to the crane; the anti-scouring parts section comprises a crane and an anti-scouring block, wherein the anti-scouring block is arranged at the outer peripheral surface of the single pile foundation through the crane. The present invention simultaneously arranges the pile sinking parts section and the anti-scouring parts section on the same hull, utilizes the pile sinking parts section to sink the single pile foundation, and then immediately moves the hull by anchoring to bring the ship's side close to the single pile foundation, thereby avoiding the problem in the prior art that the riprap ship takes a long time to enter the site, resulting in serious silt scouring around the pile foundation, which has a great impact on subsequent construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of offshore wind power foundation protection construction, and in particular to a new type of construction ship and construction method suitable for single pile foundation sinking. Background Art

[0002] With the rapid development of offshore wind power development, large-diameter single pile foundations have been widely used, and the construction difficulty of wind turbine pile sinking has increased accordingly, and the foundation scouring after pile sinking has become more severe. The pile foundation of offshore wind power will be affected by tides or ocean currents, forming eddies around the pile foundation. The larger the pile foundation, the larger the flow resistance area and the faster the eddy speed; the closer to the pile foundation, the greater the water flow speed. Therefore, it is easier to form sediment scouring near the pile foundation. The impact of scouring on the wind turbine foundation includes reducing the foundation stiffness, changing the foundation natural vibration period, reducing the foundation's ability to resist storms, causing the foundation structure to tilt, etc. The erosion of offshore pile foundations is also relatively complicated.

[0003] Traditional construction uses a piling ship and two stone-throwing ships to carry out pile foundation sinking construction and foundation anti-scouring operations. After the piling ship completes the pile sinking operation, the stone-throwing ship enters the site. Due to the long entry time, the mud and sand around the single pile foundation are severely scoured, which has a great impact on subsequent construction. Summary of the invention

[0004] In view of the shortcomings of the prior art described above, the purpose of the present invention is to provide a new construction ship and construction method suitable for single pile foundation sinking, which is used to solve the problems in the prior art that the riprap ship takes a long time to enter the site after the piling is completed, and the silt scouring around the single pile foundation sinking is serious, which has a great impact on the subsequent construction and shipbuilding.

[0005] To achieve the above-mentioned purpose and other related purposes, the present invention provides a new type of construction ship suitable for single pile foundation pile driving, including a hull, a pile driving parts section, and an anti-scour parts section, wherein the pile driving parts section and the anti-scour parts section are respectively arranged at both ends of the hull; the pile driving parts section includes a crane and a hydraulic hammer, and the hydraulic hammer is detachably connected to the crane; the anti-scour parts section includes a crane and an anti-scour block, and the anti-scour block is arranged on the outer peripheral surface of the single pile foundation through the crane.

[0006] Preferably, the anti-scour blocks include sandbags and net stones, and the anti-scour blocks are placed on the hull; when the single pile foundation is completed, the anti-scour blocks are placed on the periphery of the single pile foundation by a crane.

[0007] To achieve the above purpose or other purposes, the present invention also discloses a construction method suitable for sinking a single pile foundation, using the above-mentioned new construction ship suitable for sinking a single pile foundation, and a pile stabilizing platform is also arranged on the seabed; the steps are as follows:

[0008] S1: The ship moves to the pile sinking area, and the monopile foundation is hoisted into the pile stabilizing platform by a crane; the monopile foundation penetrates into the seabed by its own weight;

[0009] S2: Connect the hydraulic hammer to the crane and sink the monopile foundation with the hydraulic hammer. The monopile foundation is penetrated into the seabed to a certain depth;

[0010] S3: Place one end of the hull with the anti-scouring parts close to the monopile foundation, and place the anti-scouring blocks on the seabed on the outer peripheral surface of the monopile foundation by a crane to complete the anti-scouring of the monopile foundation.

[0011] Preferably, two layers of hydraulically-corrected guide pile-holding components are provided on the pile-stabilizing platform, and the hydraulically-corrected guide pile-holding components are used to adjust the verticality of the single pile foundation.

[0012] Preferably, a pile top steel cap is further provided at the end of the hydraulic hammer, the pile top steel cap is connected to the telescopic end of the hydraulic hammer, and the pile top steel cap is sleeved on the top of the single pile foundation.

[0013] Preferably, in step S2, the impact of the hydraulic hammer on the single pile foundation starts with a single hit, and the penetration of the single pile foundation needs to be observed after each hammer hit; after continuous observation for 3 to 5 hammer hits, if the penetration of the single pile foundation is less than 5 cm / single hammer, the hydraulic hammer is controlled to continuously hit the single pile foundation to complete the pile sinking; conversely, if the penetration of the single pile foundation is not less than 5 cm / single hammer, the hydraulic hammer is controlled to hit the single pile foundation once.

[0014] Preferably, in step S2, when the hydraulic hammer impacts the single pile foundation, the hammering rate and energy of the hydraulic hammer are adjusted in real time so that the pile penetration of the single pile foundation is between 1 cm and 2 cm.

[0015] Preferably, after the single pile foundation is sunk in step S2, a layer of geotextile is covered on the outer surface of the single pile foundation in contact with the anti-scour block in step S3, and the specification of the geotextile is 600g / ㎡.

[0016] Preferably, the anti-scour blocks in step S3 form a single pile foundation protection area, and the single pile foundation protection area is divided into an inner ring protection area and an outer ring protection area; the inner ring protection area is composed of sandbag filling, and the outer ring protection area is composed of net bag stones and sandbag filling.

[0017] Preferably, the hull is provided with a GPS positioning system; the turning of the hull in step S3 brings the side of the hull close to the monopile foundation protection area by means of anchoring.

[0018] As described above, the novel construction vessel and construction method applicable to single pile foundation sinking according to the present invention have the following beneficial effects:

[0019] The present invention relates to a novel construction ship and construction method suitable for pile sinking of a single pile foundation. A pile sinking parts section and an anti-scouring parts section are simultaneously arranged on the same hull. The pile sinking parts section is used to sink the single pile foundation. Then, the hull is immediately moved close to the single pile foundation by means of anchoring, and the outer peripheral surface of the single pile foundation is subjected to anti-scouring operations. This can avoid the problem in the prior art of using one piling ship and two riprap ships to carry out pile sinking construction and foundation anti-scouring operations of the single pile foundation. After the piling ship completes the pile sinking operation, the riprap ship enters the site. Due to the long entry time, the mud and sand around the pile foundation are severely scoured, which has a great impact on subsequent construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a schematic diagram of the process of the novel construction method of the single pile foundation sinking of the present invention;

[0021] Figure 2 A schematic diagram of a new type of construction vessel for sinking piles of a single pile foundation according to the present invention performing a pile sinking operation;

[0022] Figure 3 A schematic diagram of a new type of construction ship for sinking piles of a single pile foundation according to the present invention performing anti-scouring operations;

[0023] Figure 4 It is a schematic diagram of the single pile foundation protection area in the novel construction method of single pile foundation sinking of the present invention.

[0024] Description of reference numerals:

[0025] 1. Hull; 2. Crane; 3. Hydraulic hammer; 4. Single pile foundation; 5. Single pile foundation protection area; 501. Sandbag; 502. Net stone; 6. Crane; 7. Anti-scour block. DETAILED DESCRIPTION

[0026] The following is a description of the implementation of the present invention by means of specific embodiments. Those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification.

[0027] It should be noted that the structures, proportions, sizes, etc. illustrated in the drawings of this specification are only used to match the contents disclosed in the specification for people familiar with this technology to understand and read, and are not used to limit the limiting conditions for the implementation of the present invention, so they have no substantial technical significance. Any modification of the structure, change of the proportional relationship or adjustment of the size should still fall within the scope of the technical content disclosed by the present invention without affecting the effects and purposes that can be achieved by the present invention. At the same time, the terms such as "upper", "lower", "left", "right", "middle" and "one" quoted in this specification are only for the convenience of description, and are not used to limit the scope of the implementation of the present invention. The change or adjustment of their relative relationship should also be regarded as the scope of the implementation of the present invention without substantially changing the technical content.

[0028] like Figure 2 , Figure 3 , Figure 4 As shown, the present invention provides a new type of construction ship suitable for pile driving of a single pile foundation, comprising a hull 1, a pile driving parts section, and an anti-scouring parts section, wherein the pile driving parts section is arranged at the left end of the hull 1, and the anti-scouring parts section is arranged at the right end of the hull 1; the pile driving parts section comprises a crane 2 and a hydraulic hammer 3, and the hydraulic hammer 3 is detachably connected to the crane 2; the anti-scouring parts section comprises a crane 6 and an anti-scouring block 7, and the anti-scouring block 7 is arranged on the outer peripheral surface of the single pile foundation 4 through the crane 6.

[0029] The present invention relates to a new type of construction ship suitable for single pile foundation pile driving, in which a pile driving component part and an anti-scouring component part are respectively arranged at both end parts of the same hull 1, the pile driving component part is used to penetrate the single pile foundation 4 into the seabed, and the anti-scouring component part is used to lay a single pile foundation protection area 5 on the outer peripheral surface of the single pile foundation 4, so as to prevent the bottom of the single pile foundation 4 from being scoured by eddy currents and mud, resulting in reduced rigidity of the single pile foundation 4, reduced storm resistance of the single pile foundation 4, and structural inclination of the single pile foundation 4.

[0030] Furthermore, in this embodiment, the single pile foundation 4 adopts a large-diameter steel pipe pile.

[0031] Preferably, Figure 3 , Figure 4 As shown, the anti-scour block 7 includes a sandbag 501 and a net bag stone 502, and the anti-scour block 7 is placed on the hull 1; after the pile sinking of the monopile foundation 4 is completed, the anti-scour block 7 is placed on the periphery of the monopile foundation 4 by the crane 6. In this embodiment, the area close to the monopile foundation 4 is filled with sandbags 501, and the area far from the monopile foundation 4 is filled with net bag stones 502.

[0032] To achieve the above purpose or other purposes, the present invention also discloses a construction method suitable for sinking piles of a single pile foundation, using the above-mentioned new type of construction ship suitable for sinking piles of a single pile foundation, and a pile stabilizing platform (the pile stabilizing platform is not drawn in the figure) is also arranged on the seabed; Figure 1 As shown; the steps are as follows:

[0033] A1: Drive the hull 1 to the expected pile sinking area. The hull 1 is provided with a GPS system. The position of the hull 1 is adjusted and corrected by using the GPS system so that the pile sinking parts at the left end of the hull 1 are close to the expected pile sinking area; start the crane 2 and connect the monopile foundation 4 to the hook of the crane 2, and vertically penetrate the monopile foundation 4 into the pile stabilizing platform on the seabed to ensure the verticality of the monopile foundation 4.

[0034] A2: Separate the hook of the crane 2 from the monopile foundation 4, and install the hydraulic hammer 3 on the hook, make the bottom end of the hydraulic hammer 3 contact the top end of the monopile foundation 4, start the hydraulic hammer 3, and the hydraulic hammer 3 works to sink the monopile foundation 4. The monopile foundation 4 is penetrated into the seabed by force to reach a set depth position.

[0035] A3: Design the size of the monopile foundation protection area 5 according to the parameters of the wind turbine set installed on the monopile foundation 4.

[0036] A4: The ship's side is brought close to the monopile foundation protection area 5 by means of the GPS system and the anchoring method, and the anti-scour blocks 7 are placed on the seabed on the outer peripheral surface of the monopile foundation 4 in sequence by means of the crane 6, thereby completing the anti-scour construction of the monopile foundation 4.

[0037] Preferably, in this embodiment, two layers of hydraulic straightening guide pile holding components are provided on the pile stabilizing platform, and the hydraulic straightening guide pile holding components are used to adjust the verticality of the single pile foundation 4. Further, the top view of the pile stabilizing platform is rectangular, and a through hole is provided in the middle of the pile stabilizing platform. The single pile foundation 4 passes through the middle through hole of the pile stabilizing platform from top to bottom, and the verticality of the single pile foundation 4 is adjusted by means of two layers of hydraulic straightening guide pile holding components. The pile stabilizing platform in this embodiment can adopt the negative pressure cylinder pile stabilizing platform in publication number CN113718775A.

[0038] Preferably, in this embodiment, a pile top steel cap is further provided at the end of the hydraulic hammer 3 , the pile top steel cap is connected to the telescopic end of the hydraulic hammer 3 , and the pile top steel cap is sleeved on the top of the single pile foundation 4 .

[0039] Preferably, in the above step A2, the impact of the hydraulic hammer 3 on the monopile foundation 4 starts with a single hit, and the penetration of the monopile foundation 4 needs to be observed after each hammering; after continuous observation of 3 to 5 hammers, if the penetration of the monopile foundation 4 is less than 5 cm / single hammer, the hydraulic hammer 3 is controlled to hit the monopile foundation 4 continuously to complete the pile sinking; on the contrary, if the penetration of the monopile foundation 4 is not less than 5 cm / single hammer, the hydraulic hammer 3 is controlled to hit the monopile foundation 4 once. In this embodiment, the purpose of constantly observing the penetration of the monopile foundation 4 is to ensure the stability of the monopile foundation 4 penetrating the seabed and to avoid the phenomenon of the pile slipping when the hydraulic hammer 3 applies the striking force.

[0040] Preferably, in step A2, when the hydraulic hammer 3 impacts the single pile foundation 4, the operator adjusts the hammering rate and energy of the hydraulic hammer 3 in real time, so that the pile penetration of the single pile foundation 4 is between 1 cm and 2 cm.

[0041] Preferably, after the pile sinking of the single pile foundation 4 is completed in step A2, a layer of geotextile is covered on the outer surface of the single pile foundation 4 that contacts the anti-scour block 7 in step A4, and the specification of the geotextile is 600g / ㎡. In this embodiment, the purpose of covering the outer surface of the single pile foundation 4 with a layer of geotextile is to prevent the anti-scour block 7 from colliding with the single pile foundation 4 when the anti-scour block 7 is dumped.

[0042] Preferably, Figure 4 As shown, the anti-scour block 7 in step A4 forms a monopile foundation protection area 5, and the monopile foundation protection area 5 is divided into an inner ring protection area and an outer ring protection area; the inner ring protection area is formed by filling with sandbags 501, and the outer ring protection area is formed by filling with net bag stones 502 and sandbags 501. Further, in this embodiment, the range of the monopile foundation protection area 5 is designed based on the parameters of the wind turbine set on the monopile foundation 4.

[0043] Preferably, in this embodiment, a GPS positioning system is provided on the hull 1; the turning of the hull 1 in step A4 brings the side of the hull 1 close to the monopile foundation protection area 5 by means of anchoring. Further, in this embodiment, the monopile foundation protection area 5 is divided into a plurality of grids, and the volume of anti-scour blocks 7 required for each grid is calculated according to the parameters of the wind turbine generator set, and the filling is performed by the crane 6. When the filling of the grid is completed, the hull 1 is moved to the remaining required filling position by performing the anchoring operation, and the filling operation of the crane 6 is repeated to complete the riprap construction of the remaining positions.

[0044] The novel construction vessel and construction method applicable to single pile foundation sinking involved in the present invention have the following beneficial effects:

[0045] 1. The hull 1 of the present invention is provided with a pile sinking component part and an anti-scouring component part, which are respectively arranged at both ends of the hull 1. When the pile sinking operation is performed on the single pile foundation 4, the pile sinking component part at the left end of the hull 1 is brought close to the expected piling area, and the pile sinking operation of the single pile foundation 4 is completed by the crane 2 and the hydraulic hammer 3 in the pile sinking component part. After the pile sinking operation is completed, the side of the hull 1 is brought close to the single pile foundation protection area 5 by means of anchoring, and the anti-scouring component part on the hull 1 is used to throw net bag stones 502 and sandbags 501 around the single pile foundation 4 to form a single pile foundation protection area 5, so as to ensure that the bottom end of the single pile foundation 4 realizes the anti-scouring function.

[0046] 2. The present invention immediately performs anti-scouring operations after the pile sinking operation of the single pile foundation 4 is completed, which can avoid the situation in the prior art where after the pile sinking operation of the single pile foundation 4 is completed, the riprap boat takes a long time to enter the site, resulting in serious scouring of mud and sand around the single pile foundation 4, which has a great impact on subsequent construction.

[0047] 3. The new construction vessel and construction method suitable for single pile foundation sinking involved in the present invention are particularly suitable for the construction of wind farms under geological conditions dominated by silty sand, etc., and are of great significance to the construction technology of offshore wind power foundation protection.

[0048] Therefore, the present invention effectively overcomes various shortcomings in the prior art and has high industrial utilization value.

[0049] The above embodiments are merely illustrative of the principles and effects of the present invention, and are not intended to limit the present invention. Anyone familiar with the art may modify or alter the above embodiments without departing from the spirit and scope of the present invention. Therefore, all equivalent modifications or alterations made by a person of ordinary skill in the art without departing from the spirit and technical concept disclosed by the present invention shall still be covered by the claims of the present invention.

Claims

1. A construction method suitable for pile sinking of a single pile foundation, using a new type of construction ship suitable for pile sinking of a single pile foundation, the new type of construction ship comprising a hull (1), a pile sinking parts section, and an anti-scouring parts section, wherein the pile sinking parts section and the anti-scouring parts section are respectively arranged at two ends of the hull (1); the pile sinking parts section comprises a crane (2) and a hydraulic hammer (3), wherein the hydraulic hammer (3) is detachably connected to the crane (2); the anti-scouring parts section comprises a crane (6) and an anti-scouring block (7), wherein the anti-scouring block (7) is arranged at the outer peripheral surface of the single pile foundation (4) through the crane (6); the anti-scouring block (7) comprises a sandbag (501) and a net bag stone (502), wherein the anti-scouring block (7) is placed on the hull (1); when the pile sinking of the single pile foundation (4) is completed, the anti-scouring block (7) is placed on the outer periphery of the single pile foundation (4) through the crane (6); Features: A pile stabilizing platform is also provided on the seabed; two layers of hydraulic straightening guide pile holding components are provided on the pile stabilizing platform, and the hydraulic straightening guide pile holding components are used to adjust the verticality of the single pile foundation (4); Here are the steps: S1: The ship (1) moves to the pile sinking area, and the monopile foundation (4) is hoisted into the pile stabilizing platform by the crane (2); the monopile foundation (4) penetrates into the seabed by its own weight; S2: Connect the hydraulic hammer (3) to the crane (2), and sink the monopile foundation (4) by means of the hydraulic hammer (3), so that the monopile foundation (4) penetrates into the seabed to a predetermined depth; The end of the hydraulic hammer (3) is also provided with a pile top steel cap, the pile top steel cap is connected to the telescopic end of the hydraulic hammer (3), and the pile top steel cap is sleeved on the top of the single pile foundation (4); the impact of the hydraulic hammer (3) on the single pile foundation (4) begins with a single strike, and the penetration of the single pile foundation (4) is observed after each strike; after continuous observation for 3 to 5 strikes, if the penetration of the single pile foundation (4) is less than 5 cm / single hammer, the hydraulic hammer (3) is controlled to strike the single pile foundation (4) continuously to complete the pile sinking; on the contrary, if the penetration of the single pile foundation (4) is not less than 5 cm / single hammer, the hydraulic hammer (3) is controlled to strike the single pile foundation (4) once; After the pile sinking of the single pile foundation (4) is completed in step S2, a layer of geotextile is covered on the outer surface of the single pile foundation (4) in contact with the anti-scour block (7) in step S3, and the specification of the geotextile is 600g / ㎡; S3: one end of the hull (1) having the anti-scouring component is brought close to the monopile foundation (4), and an anti-scouring block (7) is placed on the seabed on the outer peripheral surface of the monopile foundation (4) by a crane (6), thereby completing the anti-scouring operation of the monopile foundation (4); the anti-scouring block (7) forms a monopile foundation protection area (5), and the monopile foundation protection area (5) is divided into an inner ring protection area and an outer ring protection area; the inner ring protection area is formed by sandbags (501) dumped and filled, and the outer ring protection area is formed by net bag stones (502) and sandbags (501) dumped and filled.

2. The construction method applicable to pile sinking of a single pile foundation according to claim 1, Features: The hull (1) is provided with a GPS positioning system; in step S3, the hull (1) is turned so that the side of the hull (1) approaches the monopile foundation protection area (5) by means of anchoring.