A construction method and system for a highway passing through a coal seam goaf section

Through detailed analysis of the depth, scope and geotechnical characteristics of the goaf, appropriate grouting materials and equipment are selected, and grouting parameters are monitored and adjusted in real time to solve the problems of insufficient foundation treatment and low construction efficiency in the existing technology, and achieve for higher project quality and safety.

CN117127585BActive Publication Date: 2024-10-29HENAN JIAO YUAN ENG TECH CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311118753.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-09-01
Publication Date
2024-10-29
Estimated Expiration
2043-09-01

AI Technical Summary

Technical Problem

The existing technology fails to fully consider the depth, scope and geotechnical characteristics of the multi-layer goaf during the construction of the highway crossing the coal seam goaf section, resulting in insufficient foundation treatment and failure to meet the safety needs of the highway, and the grouting materials And improper selection of equipment leads to low construction efficiency.

Method used

Analyze the depth, scope and geotechnical characteristics of the multi-layer goaf according to the geological survey results, select suitable grouting materials and equipment, use professional drilling rigs to set up grouting holes, and monitor the size of the voids in real time through high-precision measuring equipment, using layered Three-dimensional cross grouting and geological radar detect the grouting effect, and dynamically adjust grouting parameters to ensure foundation stability.

Benefits of technology

It improves the pertinence and effect of foundation reinforcement, ensures construction safety and efficiency, avoids unnecessary reinforcement processes through real-time monitoring and dynamic adjustment, saves materials and human resources, and achieves higher project quality and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117127585B_ABST
    Figure CN117127585B_ABST
Patent Text Reader

Abstract

The present invention discloses a construction method and system for a highway crossing a coal seam goaf section, and the construction method includes the following steps: analyzing the depth, range and geotechnical characteristics of multi-layer goaf areas according to geological survey results; using professional drilling rigs to set up grouting holes at key positions of different layers of goaf areas; using high-precision measuring equipment to monitor the size of the voids in the goaf areas in real time, and selecting grouting equipment according to soil geological conditions and grouting materials; using the grouting equipment to perform layered three-dimensional cross grouting; real-time monitoring of potential dangerous phenomena inside the foundation; using geological radar to detect the grouting effect and analyze the detection data; and evaluating whether it is necessary to combine other foundation reinforcement technologies. The high-precision measuring equipment of the present invention can monitor the size of the voids in the goaf areas in real time and obtain the size, depth and morphology of the voids in a timely manner, which is helpful to timely discover potential safety hazards and improve the accuracy of foundation reinforcement projects.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of construction technology, and in particular to a construction method and system for a highway passing through a coal seam goaf section. Background Art

[0002] The mined-out section of a coal seam refers to the area of ​​the coal seam that has been mined out during the coal mining process, also known as the goaf or goaf area. After the coal seam is mined out, the rock that originally supported the coal seam loses its support, leading to problems such as a drop in surface and underground water levels and ground subsidence. At the same time, the goaf may also produce safety hazards such as harmful gases and fires, posing a threat to coal mine safety production and environmental protection.

[0003] The highway passing through the coal seam goaf section means that the highway passes through the coal mine area that has been mined during construction. The goaf area refers to the coal mine area that has been excavated. These areas usually have greater geological instability and subsidence risks, so a series of technical measures need to be taken to ensure the safety and stability of the road.

[0004] The disadvantages of the existing construction methods of expressways crossing coal seam goaf sections mainly include the following:

[0005] 1. Existing technologies often fail to fully consider the depth, scope and geotechnical characteristics of multi-layer goafs, which may lead to inadequate foundation treatment and fail to meet the safety requirements of highways.

[0006] 2. The existing technology may not select appropriate grouting materials according to the size and shape of the voids in different layers of goaf, which may lead to poor grouting effect and even cause foundation stability problems.

[0007] 3. The existing technology may not select suitable grouting equipment according to soil geological conditions and grouting materials, which may lead to low construction efficiency and fail to meet the progress requirements of highway construction.

[0008] Currently, no effective solution has been proposed for the problems in the related technologies. Summary of the invention

[0009] Purpose of the invention: To provide a construction method and system for a highway passing through a coal seam goaf section, so as to overcome the above-mentioned technical problems existing in the existing related technologies.

[0010] Technical solution: According to one aspect of the present invention, a construction method for a highway crossing a coal seam goaf section is provided, and the construction method comprises the following steps:

[0011] S1. According to the geological survey results, the depth, range and geotechnical characteristics of multi-layer goaf are analyzed to obtain the size and shape of the cavities in different layers of goaf;

[0012] S2. According to the size and shape of the cavities in different layers of goaf, select grouting materials suitable for the conditions of the goaf, use professional drilling rigs to set up grouting holes at key locations in different layers of goaf, and reinforce the openings of the grouting holes;

[0013] S3. Use high-precision measuring equipment to monitor the size of the voids in the goaf in real time, and select grouting equipment based on soil geological conditions and grouting materials;

[0014] S4, using the grouting equipment to perform layered three-dimensional cross grouting, and using a grouting pipeline to transport the slurry to the grouting hole;

[0015] S5. Use valves to adjust the inflow and outflow of slurry, monitor the potential dangerous phenomena inside the foundation in real time, and adjust the grouting parameters;

[0016] S6. Use geological radar to detect the grouting effect, analyze the test data, and evaluate the reinforcement effect;

[0017] S7. Based on the grouting reinforcement results and geological conditions, evaluate whether it is necessary to combine other foundation reinforcement technologies.

[0018] In a further embodiment, the step of analyzing the depth, range and geotechnical properties of multi-layer goaf areas according to geological survey results to obtain the size and shape of the cavities in different layers of goaf areas includes the following steps:

[0019] S11. Set up the mining plan according to the project requirements and collect geological exploration data at the construction site of the goaf section;

[0020] S12, analyzing the geological survey data to obtain basic information of the goaf;

[0021] S13, according to the basic situation of the goaf and the mining plan, identify the specific location, depth and range of the multi-layer goaf, and analyze the foundation deformation and stability problems caused by the mining process;

[0022] S14. Study the geotechnical characteristics of goafs at different levels according to the basic conditions of the goafs, and calculate the sizes and shapes of the cavities at different levels.

[0023] In a further embodiment, the method of selecting grouting materials suitable for the conditions of the goaf according to the size and shape of the cavities in different layers of goaf, and using a professional drilling rig to set up grouting holes at key locations in different layers of goaf to reinforce the orifices to prevent collapse includes the following steps:

[0024] S21. Select appropriate grouting materials according to the geotechnical characteristics, cavity size and shape of different layers of goaf;

[0025] S22. Analyze the structural characteristics of goafs at different layers and determine the key locations of grouting holes;

[0026] S23, using a professional drilling rig to drill grouting holes at key locations, and reinforcing the openings of the grouting holes;

[0027] S24. Formulate a grouting plan based on the specific conditions of the key locations of the grouting holes;

[0028] S25. According to the grouting scheme, use professional grouting equipment to perform grouting treatment on each of the grouting holes.

[0029] In a further embodiment, analyzing the structural characteristics of different layers of goaf and determining the key positions of grouting holes comprises the following steps:

[0030] S221. Obtain geological survey data, mining history and monitoring data of different goaf areas;

[0031] S222. Determine the geometry, rock structure and material properties of different goafs based on geological survey data, mining history and monitoring data;

[0032] S223, dividing the grid according to the geometric shapes, rock structure and material properties of different goafs, and assigning corresponding material properties to each unit in the grid;

[0033] S224, setting boundary conditions and loads, using a solver to solve the finite element model, and obtaining the deformation and stress distribution of the goaf;

[0034] S225, inputting the deformation and stress distribution of the goaf into a finite element analysis model, and calculating key locations where collapse occurs, where cavities are densely connected, and where leakage is likely to occur;

[0035] S226. Based on the calculation results and actual project conditions, make a comprehensive judgment on the location of the grouting holes and determine the key locations of the grouting holes.

[0036] In a further embodiment, the method of using high-precision measuring equipment to monitor the size of the voids in the goaf in real time and selecting grouting equipment according to soil geological conditions and grouting materials includes the following steps:

[0037] S31. Use high-precision measuring equipment to monitor the size of the voids in the goaf in real time and obtain information on the size, depth and shape of the voids;

[0038] S32. Analyze the stability of the cavity, the risks involved, and the surrounding soil geological conditions based on the monitoring data;

[0039] S33, using numerical simulation to evaluate the stability of voids;

[0040] S34. Select appropriate grouting materials according to soil geological conditions and cavity characteristics;

[0041] S35. Comprehensively consider the soil geological conditions, cavity characteristics and performance of grouting materials, and establish an equipment selection optimization model with the lowest comprehensive loss value of the construction project as the optimization goal, so as to obtain the optimal grouting equipment for each construction process in the construction project;

[0042] S36. According to the specific conditions of the cavity and the grouting plan, deploy the optimal grouting equipment and carry out construction, monitor the grouting effect, and ensure the stability and safety of the goaf.

[0043] In a further embodiment, the evaluating the void stability using a numerical simulation model comprises the following steps:

[0044] S331, creating a three-dimensional geometric model of the cavity based on the geological survey data, mining history and monitoring data of the goaf area;

[0045] S332, based on the three-dimensional geometric model of the cavity and in combination with the surrounding soil geological conditions, a numerical simulation method is used to perform mechanical analysis on the cavity and its surrounding soil to obtain stress distribution, deformation characteristics and potential instability areas of the cavity and its surrounding soil;

[0046] S334. Determine whether the cavity has stability risk based on the stress distribution, deformation characteristics and potential instability area of ​​the cavity and its surrounding soil. If there is stability risk, further optimize the grouting scheme;

[0047] S335. Re-evaluate the cavity stability based on the cavity stability analysis and optimized grouting scheme;

[0048] S336. Repeat S331-S335 until a grouting scheme that meets the construction requirements and ensures the stability of the cavity is finally generated.

[0049] In a further embodiment, the formula of the equipment selection optimization model is as follows:

[0050] K(x)=λ1A(x)+λ2B(x), λ1+λ2=1

[0051] In the formula, K(x) is the comprehensive loss value of the project;

[0052] x is the name of the construction project;

[0053] A(x) is the cost of the construction project;

[0054] B(x) is the duration of the construction project;

[0055] λ1 and λ2 are the weights of the cost and duration of the construction project respectively.

[0056] In a further embodiment, the method of using a valve to adjust the inflow and outflow of slurry, real-time monitoring of potential dangerous phenomena inside the foundation, and adjusting grouting parameters includes the following steps:

[0057] S51. Use IoT sensor technology to collect construction parameter data during grouting;

[0058] S52, using the three-dimensional geometric model of the cavity and the numerical simulation method to analyze the real-time construction parameter data to evaluate the potential dangerous phenomena inside the foundation;

[0059] S53. According to the analysis results, adjust the valve to control the inflow and outflow of slurry, and adjust the grouting parameters accordingly to ensure the foundation reinforcement effect.

[0060] In a further embodiment, the step of evaluating whether it is necessary to combine other foundation reinforcement technologies to improve the overall stability of the multi-layer goaf foundation according to the grouting reinforcement results and geological conditions includes the following steps:

[0061] S71. Compare the stress distribution, deformation characteristics and characteristic changes of the potential unstable area of ​​the cavity and its surrounding soil before and after grouting reinforcement to evaluate the grouting reinforcement effect;

[0062] S72. Analyze whether the foundation stability meets the engineering requirements based on the geological conditions of the goaf and the construction environment;

[0063] S73. If the grouting reinforcement effect is not ideal or the foundation stability still does not meet the engineering requirements, consider using other foundation reinforcement technologies;

[0064] S74. Select appropriate foundation reinforcement technology and formulate corresponding construction plan according to specific conditions;

[0065] S75. Implement the corresponding construction plan, monitor the foundation reinforcement effect, and evaluate the overall stability of the foundation after multiple reinforcements.

[0066] According to another aspect of the present invention, a construction system for a highway crossing a coal seam goaf section is also provided, the system comprising: a geological survey and analysis module, a material selection and grouting hole arrangement module, a cavity monitoring and equipment selection module, a grouting construction module, a slurry adjustment and monitoring module, a grouting effect evaluation module and a comprehensive foundation reinforcement technology evaluation module;

[0067] The geological survey and analysis module is used to analyze the depth, range and geotechnical characteristics of multi-layer goafs according to the geological survey results, and obtain the size and shape of the cavities in different layers of goafs;

[0068] The material selection and grouting hole arrangement module is used to select grouting materials suitable for the conditions of the goaf according to the size and shape of the cavities in different layers of goaf, use professional drilling rigs to set up grouting holes at key locations in different layers of goaf, and reinforce the openings of the grouting holes;

[0069] The cavity monitoring and equipment selection module is used to use high-precision measurement equipment to monitor the cavity size of the goaf in real time and select grouting equipment according to soil geological conditions and grouting materials;

[0070] The grouting construction module is used to perform layered three-dimensional cross grouting using the grouting equipment, and use the grouting pipeline to transport the slurry to the grouting hole;

[0071] The slurry regulating and monitoring module is used to regulate the inlet and outlet of slurry by using valves, monitor the potential dangerous phenomena inside the foundation in real time, and adjust the grouting parameters;

[0072] The grouting effect evaluation module is used to detect the grouting effect using geological radar, analyze the detection data, and evaluate the reinforcement effect;

[0073] The comprehensive foundation reinforcement technology evaluation module is used to evaluate whether it is necessary to combine other foundation reinforcement technologies based on the grouting reinforcement results and geological conditions.

[0074] Beneficial effects:

[0075] 1. The present invention analyzes the size, shape and geotechnical characteristics of the voids in different layers of goaf, selects suitable grouting materials and equipment, and makes the reinforcement effect more obvious. By real-time monitoring of potential dangerous phenomena inside the foundation and using geological radar to detect the grouting effect, the construction process can be dynamically adjusted to improve the quality and safety of the project. The underground structure is detected by geological radar without destroying the ground or the foundation. The reinforcement effect can be accurately evaluated during the construction process. According to the grouting reinforcement results and geological conditions, it is evaluated whether it is necessary to combine other foundation reinforcement technologies, so that the whole process has strong adaptability and can be flexibly adjusted according to actual conditions. The layered three-dimensional cross grouting can make the slurry fully fill the void and reduce the waste of slurry. The real-time adjustment of the grouting parameters can avoid unnecessary reinforcement process and save materials and human resources. This construction method can effectively improve the foundation reinforcement effect and improve the quality and safety of the project.

[0076] 2. The present invention improves the pertinence and effect of foundation reinforcement by carefully analyzing the geotechnical characteristics, cavity size and shape of different layers of goaf, selecting appropriate grouting materials and key positions, and using finite element analysis to establish a geological model to calculate the deformation and stress distribution of the goaf, thereby determining the key positions of the grouting holes and making the grouting hole arrangement more accurate and reasonable. During the grouting process, the hole mouths are reinforced to prevent collapse to ensure construction safety. At the same time, the pressure changes and the surrounding environment are monitored during the grouting process to ensure the grouting effect and safety. The entire process is systematized and scientific, which helps to accurately and quickly formulate grouting plans and improve construction efficiency.

[0077] 3. The high-precision measuring equipment of the present invention can monitor the size of the voids in the goaf in real time, and obtain the size, depth and morphology information of the voids in time, which is helpful to timely discover potential safety hazards. Through accurate measurement of the void size and analysis of soil geological conditions, it can provide a basis for selecting suitable grouting materials and grouting equipment, improve the accuracy of foundation reinforcement projects, and evaluate the stability of the voids through numerical simulation, which is helpful to identify the stress distribution, deformation characteristics and potential unstable areas of the voids and their surrounding soils, thereby optimizing the grouting scheme and reducing safety risks. By optimizing the grouting scheme and selecting suitable grouting equipment, the grouting speed and effect can be improved, the engineering time can be shortened, and the project cost can be reduced. BRIEF DESCRIPTION OF THE DRAWINGS

[0078] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0079] Figure 1 The present invention is a flowchart of a construction method for a highway crossing a coal seam goaf section according to an embodiment of the present invention. DETAILED DESCRIPTION

[0080] In the following description, a large number of specific details are provided to provide a more thorough understanding of the present invention. However, it is apparent to those skilled in the art that the present invention can be implemented without one or more of these details. In other examples, in order to avoid confusion with the present invention, some technical features well known in the art are not described.

[0081] According to an embodiment of the present invention, a construction method and system for a highway passing through a coal seam goaf section are provided.

[0082] like Figure 1As shown, according to the construction method of a highway crossing a coal seam goaf section according to an embodiment of the present invention, the construction method comprises the following steps:

[0083] S1. According to the geological survey results, the depth, scope and geotechnical characteristics of multi-layer goaf are analyzed to obtain the size and shape of the cavities in different layers of goaf.

[0084] Preferably, the step of analyzing the depth, range and geotechnical characteristics of multi-layer goaf areas according to geological survey results to obtain the size and shape of the cavities in different layers of goaf areas comprises the following steps:

[0085] S11. According to the project requirements, set up the mining plan, including mining methods, schedule arrangement and construction resource allocation, carry out geological exploration work at the construction site of the goaf section, and collect geological exploration data at the construction site of the goaf section;

[0086] S12, analyzing the geological survey data to obtain the basic situation of the goaf, and understanding the basic situation of the goaf, such as stratum structure, rock and soil physical and mechanical properties, groundwater conditions, etc.;

[0087] S13, according to the basic conditions of the goaf and the mining plan, identify the specific location, depth and range of the multi-layer goaf, and analyze the foundation deformation and stability problems caused by the mining process, such as ground subsidence, landslide, etc.;

[0088] S14. Based on the basic conditions of the goaf, the geotechnical characteristics of different layers of goaf are studied, and the sizes and shapes of the cavities in different layers of goaf are calculated, which will help in subsequent decision-making on how to carry out foundation reinforcement work.

[0089] Specifically, the geotechnical characteristics, size and shape of voids in different layers of goaf are studied: Based on the geotechnical characteristics of different layers of goaf, including density, compressive strength, bearing capacity, etc., the size and shape of voids are calculated in combination with geological survey data and mining plans. This can provide an important reference basis for foundation reinforcement of goaf areas and formulate more effective foundation treatment measures in a targeted manner.

[0090] S2. According to the size and shape of the cavities in different layers of goaf, select grouting materials suitable for the conditions of the goaf, use professional drilling rigs to set up grouting holes at key locations in different layers of goaf, and reinforce the orifices of the grouting holes.

[0091] Preferably, the method of selecting grouting materials suitable for the conditions of the goaf according to the size and shape of the cavities in different layers of goaf, and using a professional drilling rig to set up grouting holes at key locations in different layers of goaf to reinforce the orifices to prevent collapse includes the following steps:

[0092] S21. Select appropriate grouting materials according to the geotechnical characteristics, cavity size and shape of different layers of goaf. Common grouting materials include cement slurry, chemical slurry (such as polyurethane, epoxy resin, etc.) and expansion grouting materials;

[0093] S22. Analyze the structural characteristics of goafs at different layers and determine the key locations of grouting holes, including areas where collapse may occur, areas with densely connected voids, and areas prone to leakage;

[0094] S23, using a professional drilling rig to drill grouting holes at key locations, and reinforcing the openings of the grouting holes to prevent the openings from collapsing or rupturing due to pressure generated during the grouting process;

[0095] S24. Formulate a grouting plan based on the specific conditions of the key positions of the grouting holes, including the number of grouting holes, arrangement, hole depth, hole diameter, hole spacing and other parameters;

[0096] S25. According to the grouting scheme, use professional grouting equipment to perform grouting treatment on each of the grouting holes, monitor the pressure changes and the surrounding environment during the grouting process to ensure the grouting effect and safety.

[0097] Preferably, analyzing the structural characteristics of goafs at different layers and determining the key positions of grouting holes comprises the following steps:

[0098] S221. Obtain geological survey data, mining history and monitoring data of different goaf areas;

[0099] S222. Determine the geometry, rock structure and material properties of different goafs based on geological survey data, mining history and monitoring data;

[0100] S223, dividing the grid according to the geometric shapes, rock structure and material properties of different goafs, and assigning corresponding material properties to each unit in the grid;

[0101] S224, setting boundary conditions and loads, using a solver to solve the finite element model, and obtaining the deformation and stress distribution of the goaf;

[0102] S225, inputting the deformation and stress distribution of the goaf into a finite element analysis model, and calculating key locations where collapse occurs, where cavities are densely connected, and where leakage is likely to occur;

[0103] S226. Based on the calculation results and actual project conditions, make a comprehensive judgment on the location of the grouting holes and determine the key locations of the grouting holes.

[0104] Specifically, by collecting geological survey data, mining history and monitoring data, analyzing the geometry of the goaf, rock structure and material properties, and using the finite element analysis model to calculate the deformation and stress distribution of the goaf. Based on the calculation results and the actual project situation, a comprehensive judgment is made on the location of the grouting holes, thereby determining the key location of the grouting holes, improving the effect of foundation reinforcement, reducing project risks, and ensuring project safety.

[0105] S3. Use high-precision measuring equipment to monitor the size of voids in the goaf in real time, and select grouting equipment based on soil geological conditions and grouting materials.

[0106] Preferably, the method of using high-precision measuring equipment to monitor the size of the voids in the goaf in real time and selecting grouting equipment according to soil geological conditions and grouting materials includes the following steps:

[0107] S31. Use high-precision measuring equipment (such as micro-optical sensors, laser scanners or geological radars, etc.) to monitor the size of the voids in the goaf in real time and obtain information on the size, depth and shape of the voids;

[0108] S32. Analyze the stability of the cavity, the risks involved, and the surrounding soil geological conditions based on the monitoring data;

[0109] S33. Use numerical simulation (such as finite element analysis, finite difference analysis, etc.) to evaluate the stability of the cavity;

[0110] S34. Select appropriate grouting materials according to soil geological conditions (such as lithology, density, porosity, etc.) and cavity characteristics (such as size, shape, depth, etc.);

[0111] S35. Comprehensively consider the soil geological conditions, cavity characteristics and performance of grouting materials, and establish an equipment selection optimization model (such as drilling grouting machine, pressure grouting machine or vacuum grouting machine, etc.) with the lowest comprehensive loss value of the construction project as the optimization goal, and obtain the optimal grouting equipment for each construction process in the construction project;

[0112] S36. Based on the specific conditions of the cavity (such as location, size, shape, etc.) and the grouting plan, deploy the optimal grouting equipment and carry out construction, monitor the grouting effect, and ensure the stability and safety of the goaf.

[0113] Preferably, the method of evaluating the cavity stability using a numerical simulation model comprises the following steps:

[0114] S331, creating a three-dimensional geometric model of the cavity based on the geological survey data, mining history and monitoring data of the goaf area;

[0115] S332, based on the three-dimensional geometric model of the cavity and in combination with the surrounding soil geological conditions, a numerical simulation method is used to perform mechanical analysis on the cavity and its surrounding soil to obtain stress distribution, deformation characteristics and potential instability areas of the cavity and its surrounding soil;

[0116] S334. Determine whether the cavity has stability risk based on the stress distribution, deformation characteristics and potential instability area of ​​the cavity and its surrounding soil. If there is stability risk, further optimize the grouting scheme;

[0117] S335. Re-evaluate the cavity stability based on the cavity stability analysis and optimized grouting scheme;

[0118] S336. Repeat S331-S335 until a grouting scheme that meets the construction requirements and ensures the stability of the cavity is finally generated.

[0119] Preferably, the formula of the equipment selection optimization model is as follows:

[0120] K(x)=λ1A(x)+λ2B(x), λ1+λ2=1

[0121] In the formula, K(x) is the comprehensive loss value of the project;

[0122] x is the name of the construction project;

[0123] A(x) is the cost of the construction project;

[0124] B(x) is the duration of the construction project;

[0125] λ1 and λ2 are the weights of the cost and duration of the construction project respectively.

[0126] Specifically, the steps of evaluating the void stability using the numerical simulation model include creating a 3D void geometry model, using numerical simulation to perform mechanical analysis, determining the void stability risk, optimizing the grouting scheme, and re-evaluating the void stability. These steps help to better understand the key factors in the void stability assessment process, so as to develop a grouting scheme that meets the construction requirements.

[0127] S4, using the grouting equipment to perform layered three-dimensional cross grouting, and using a grouting pipe to transport the slurry to the grouting holes.

[0128] Specifically, one of the specific construction examples is as follows:

[0129] There is a rectangular cavity with a length of 100 meters, a width of 30 meters and a height of 10 meters in the goaf, which needs to be reinforced. In order to improve the grouting effect and engineering quality, the layered three-dimensional cross grouting method is now adopted. The following is an explanation of the relevant content and the specific construction parameter settings.

[0130] First, a certain number of grouting holes are set around the cavity to divide the cavity into several three-dimensional grids. For example, grouting holes are set every 5 meters along the length and width of the cavity, and the hole diameter is set to 75 mm.

[0131] According to the soil geological conditions (such as lithology, density, porosity, etc.) and the characteristics of the cavity (such as size, shape, depth, etc.), a suitable grouting material is selected. For example, in this embodiment, cement-clay mixed slurry can be selected as the grouting material.

[0132] Use numerical simulation method to generate optimization scheme, adjust parameters such as grouting hole depth and arrangement mode, and select appropriate grouting equipment. In this embodiment, pressure grouting machine can be selected as grouting equipment.

[0133] Grouting is started in accordance with the layered three-dimensional cross grouting method, and the slurry is transported to the grouting holes through the grouting pipe. The specific grouting sequence can be: starting from the bottom of the cavity, cross grouting each layer along the length direction, and then cross grouting along the width direction. For example, the grouting holes in the length direction of the first layer are first grouted, and then the grouting holes in the width direction of the layer are carried out. After completing one layer, the grouting work of the previous layer is carried out.

[0134] Grouting should be performed according to the designed flow rate and pressure each time to ensure that the slurry fully fills each part in the cavity. In this embodiment, the grouting flow rate can be set to 10 cubic meters per hour and the pressure to 1.0 MPa.

[0135] As the grouting process progresses, the grouting effect is monitored in real time, such as slurry leakage, soil deformation, etc. When problems are found, the grouting parameters or plans are adjusted in time to ensure the stability and safety of the cavity.

[0136] S5. Use valves to regulate the flow of slurry in and out, monitor potential dangerous phenomena inside the foundation in real time, and adjust grouting parameters.

[0137] Preferably, the method of using a valve to adjust the inflow and outflow of slurry, real-time monitoring of potential dangerous phenomena inside the foundation, and adjusting grouting parameters includes the following steps:

[0138] S51. Use IoT sensor technology to collect construction parameter data (such as pressure, flow rate, etc.) during the grouting process;

[0139] S52, using the three-dimensional geometric model of the cavity and the numerical simulation method to analyze the real-time construction parameter data, and evaluate the potential dangerous phenomena inside the foundation (such as excessive pores, water seepage, etc.);

[0140] S53. According to the analysis results, adjust the valve to control the inflow and outflow of slurry, and adjust the grouting parameters accordingly to ensure the foundation reinforcement effect.

[0141] Specifically, the application of IoT sensor technology in the grouting process can achieve the following functions: real-time monitoring of construction parameter data during the grouting process, and transmission to the monitoring center via wireless communication. This helps to detect potential problems in a timely manner and avoid engineering accidents. By analyzing and processing the collected data, the potential dangerous phenomena inside the foundation can be better evaluated, providing a basis for subsequent adjustment of grouting parameters. Based on the analysis results, valves are used to control the inlet and outlet of slurry and adjust the grouting parameters to ensure the foundation reinforcement effect and improve the quality of the project.

[0142] S6. Use geological radar to detect the grouting effect, analyze the test data, and evaluate the reinforcement effect.

[0143] Specifically, geological radar emits high-frequency electromagnetic waves. When the electromagnetic waves encounter different underground media, part of the electromagnetic waves will be reflected back to the receiving antenna. According to the time delay and amplitude change of the reflected signal, the morphology, depth and material properties of the underground structure can be inferred. By using geological radar to conduct underground detection before and after grouting, we can understand the distribution and morphology of the voids before grouting, as well as the slurry filling and reinforcement effect after grouting. Comparative analysis of the two detection results will help evaluate the effect of the entire reinforcement process. The raw data collected by the geological radar needs to be processed and analyzed by professional software. The processed radar profile can show the longitudinal distribution and depth information of the underground structure. By comparing the radar profiles before and after grouting, we can observe whether the voids are fully filled and whether the slurry has penetrated into the surrounding soil. According to the analysis results of the radar profile, the reinforcement effect of the grouting project can be obtained. For example, if the radar profile shows that the voids have been fully filled and the slurry forms a good combination with the surrounding soil, it means that the reinforcement effect is significant. On the contrary, it is necessary to consider adjusting the grouting parameters or methods to improve the reinforcement effect.

[0144] S7. Based on the grouting reinforcement results and geological conditions, evaluate whether it is necessary to combine other foundation reinforcement technologies.

[0145] Preferably, the step of evaluating whether it is necessary to combine other foundation reinforcement technologies to improve the overall stability of the multi-layer goaf foundation according to the grouting reinforcement results and geological conditions includes the following steps:

[0146] S71. Compare the stress distribution, deformation characteristics and characteristic changes of the potential unstable area of ​​the cavity and its surrounding soil before and after grouting reinforcement to evaluate the grouting reinforcement effect;

[0147] S72. Analyze whether the foundation stability meets the engineering requirements based on the geological conditions of the goaf (such as rock and soil characteristics, soil thickness, etc.) and the construction environment (such as traffic load, groundwater level, etc.);

[0148] S73. If the grouting reinforcement effect is not ideal or the foundation stability still does not meet the engineering requirements, consider using other foundation reinforcement technologies;

[0149] S74. Select appropriate foundation reinforcement technology and formulate corresponding construction plan according to specific conditions;

[0150] S75. Implement the corresponding construction plan, monitor the foundation reinforcement effect, and evaluate the overall stability of the foundation after multiple reinforcements.

[0151] In order to facilitate those skilled in the art to better understand the embodiments of the present application, the technical terms or some nouns that may be involved in the present application are now explained:

[0152] Discrete element model: a computational model based on the mechanical principle of particle interaction. It regards particles as discrete rigid bodies and solves the motion state of particles by analyzing the interaction forces between particles. This model is suitable for describing the motion and deformation behavior of solid particles under complex shapes and structures. The discrete element model describes the interaction between particles by establishing a contact model and an interaction force model between particles, and solves the relative motion and deformation process between particles through numerical methods.

[0153] Explanation of deformation and stress distribution in goaf: Goaf refers to the cavity or gap left after the ore body is extracted during underground mining. Due to the removal of the ore body, the surrounding rocks are subjected to huge pressure release, resulting in deformation of the rocks around the goaf. The rocks around the goaf usually experience different degrees of cracking, deformation and collapse. The specific deformation and stress distribution depend on factors such as the size, shape, depth, rock type and its physical and mechanical properties of the goaf. Generally speaking, the deformation around the goaf mainly includes the following: Collapse: When the goaf is shallow, the surrounding rocks may experience partial or comprehensive collapse, causing problems such as surface subsidence and pits; Cracking: The rocks around the goaf are subjected to huge stress release, and cracking may occur. These cracks may expand and cause instability of the mine working face; Sliding: When the goaf is large, the rocks may slide under the action of gravity, resulting in rock displacement and fault formation. The stress distribution around the goaf also depends on the above factors. Generally speaking, the stresses on the rocks around the goaf mainly include vertical stress and horizontal stress. Vertical stress mainly comes from surface gravity and the pressure of unmined rocks above the goaf; horizontal stress mainly comes from the compression of rock strata and the lateral compression of rocks around the goaf. These stresses will affect the deformation and instability of the surrounding rocks.

[0154] Geological radar, also known as Ground Penetrating Radar (GPR), is a non-destructive testing technology that can detect underground structures and features in real time and quickly. Using geological radar to detect the grouting effect can evaluate the filling and reinforcement effect of underground voids without destroying the foundation.

[0155] According to another embodiment of the present invention, there is also provided a construction system for a highway crossing a coal seam goaf section, the system comprising: a geological survey and analysis module, a material selection and grouting hole arrangement module, a cavity monitoring and equipment selection module, a grouting construction module, a slurry adjustment and monitoring module, a grouting effect evaluation module and a comprehensive foundation reinforcement technology evaluation module;

[0156] The geological survey and analysis module is used to analyze the depth, range and geotechnical characteristics of multi-layer goafs according to the geological survey results, and obtain the size and shape of the cavities in different layers of goafs;

[0157] The material selection and grouting hole arrangement module is used to select grouting materials suitable for the conditions of the goaf according to the size and shape of the cavities in different layers of goaf, use professional drilling rigs to set up grouting holes at key locations in different layers of goaf, and reinforce the openings of the grouting holes;

[0158] The cavity monitoring and equipment selection module is used to use high-precision measurement equipment to monitor the cavity size of the goaf in real time and select grouting equipment according to soil geological conditions and grouting materials;

[0159] The grouting construction module is used to perform layered three-dimensional cross grouting using the grouting equipment, and use the grouting pipeline to transport the slurry to the grouting hole;

[0160] The slurry regulating and monitoring module is used to regulate the inlet and outlet of slurry by using valves, monitor the potential dangerous phenomena inside the foundation in real time, and adjust the grouting parameters;

[0161] The grouting effect evaluation module is used to detect the grouting effect using geological radar, analyze the detection data, and evaluate the reinforcement effect;

[0162] The comprehensive foundation reinforcement technology evaluation module is used to evaluate whether it is necessary to combine other foundation reinforcement technologies based on the grouting reinforcement results and geological conditions.

[0163] In summary, with the help of the above-mentioned technical scheme of the present invention, the present invention analyzes the size, shape and geotechnical characteristics of the voids in different layers of goaf, selects suitable grouting materials and equipment, and makes the reinforcement effect more obvious. By real-time monitoring of potential dangerous phenomena inside the foundation and using geological radar to detect the grouting effect, the construction process can be dynamically adjusted to improve the quality and safety of the project. The underground structure is detected by geological radar without destroying the ground or the foundation. The reinforcement effect can be accurately evaluated during the construction process. According to the grouting reinforcement results and geological conditions, it is evaluated whether it is necessary to combine other foundation reinforcement technologies, so that the whole process has strong adaptability and can be flexibly adjusted according to actual conditions. Layered three-dimensional cross grouting can make the slurry fully fill the voids and reduce the waste of slurry. Real-time adjustment of grouting parameters can avoid unnecessary reinforcement processes and save materials and human resources. This construction method can effectively improve the foundation reinforcement effect and improve the quality and safety of the project. The present invention improves the pertinence and safety of foundation reinforcement by carefully analyzing the geotechnical characteristics, void size and shape of goafs in different layers, selecting suitable grouting materials and key positions. The finite element analysis is used to establish a geological model, and the deformation and stress distribution of the goaf are calculated, so as to determine the key position of the grouting hole, so that the grouting hole arrangement is more accurate and reasonable. During the grouting process, the hole mouth is reinforced to prevent collapse to ensure construction safety. At the same time, the pressure change and the surrounding environment are monitored during the grouting process to ensure the grouting effect and safety. The whole process is systematized and scientific, which is helpful to accurately and quickly formulate grouting plans and improve construction efficiency. The high-precision measuring equipment of the present invention can monitor the size of the voids in the goaf in real time, and obtain the size, depth and morphology of the voids in time, which is helpful to timely discover potential safety hazards. Through accurate measurement of the void size and analysis of soil geological conditions, it can provide a basis for selecting suitable grouting materials and grouting equipment, improve the accuracy of foundation reinforcement projects, and evaluate the stability of the voids by numerical simulation, which is helpful to identify the stress distribution, deformation characteristics and potential unstable areas of the voids and their surrounding soils, so as to optimize the grouting plan and reduce safety risks. By optimizing the grouting plan and selecting suitable grouting equipment, the grouting speed and effect can be improved, the engineering time can be shortened, and the project cost can be reduced.

[0164] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A construction method for a highway passing through a coal seam goaf section, characterized in that: The construction method comprises the following steps: S1. According to the geological survey results, the depth, range and geotechnical characteristics of multi-layer goaf are analyzed to obtain the size and shape of the cavities in different layers of goaf; S2. According to the size and shape of the cavities in different layers of goaf, select grouting materials suitable for the conditions of the goaf, use professional drilling rigs to set up grouting holes at key locations in different layers of goaf, and reinforce the openings of the grouting holes; S3. Use high-precision measuring equipment to monitor the size of the voids in the goaf in real time, and select grouting equipment based on soil geological conditions and grouting materials; S4, using the grouting equipment to perform layered three-dimensional cross grouting, and using a grouting pipeline to transport the slurry to the grouting hole; S5. Use valves to adjust the inflow and outflow of slurry, monitor the potential dangerous phenomena inside the foundation in real time, and adjust the grouting parameters; S6. Use geological radar to detect the grouting effect, analyze the test data, and evaluate the reinforcement effect; S7. Based on the grouting reinforcement results and geological conditions, evaluate whether it is necessary to combine other foundation reinforcement technologies; The analysis of the depth, range and geotechnical characteristics of multi-layer goaf areas according to the geological survey results to obtain the size and shape of the cavities in different layers of goaf areas includes the following steps: S11. Set up the mining plan according to the project requirements and collect geological survey data of the construction site of the goaf section; S12, analyzing the geological survey data to obtain basic information of the goaf; S13, according to the basic situation of the goaf and the mining plan, identify the specific location, depth and range of the multi-layer goaf, and analyze the foundation deformation and stability problems caused by the mining process; S14, studying the geotechnical characteristics of different layers of goaf according to the basic conditions of the goaf, and calculating the size and shape of the cavities in different layers of goaf; The method of selecting grouting materials suitable for the conditions of the goaf according to the size and shape of the cavities in different layers of goaf, and using a professional drilling rig to set up grouting holes at key locations in different layers of goaf to reinforce the orifices to prevent collapse includes the following steps: S21. Select appropriate grouting materials according to the geotechnical characteristics, cavity size and shape of different layers of goaf; S22. Analyze the structural characteristics of goafs at different layers and determine the key locations of grouting holes; S23, using a professional drilling rig to drill grouting holes at key locations, and reinforcing the openings of the grouting holes; S24. Formulate a grouting plan based on the specific conditions of the key locations of the grouting holes; S25, according to the grouting scheme, using professional grouting equipment to perform grouting treatment on each of the grouting holes; Analyzing the structural characteristics of goafs at different layers and determining the key positions of grouting holes comprises the following steps: S221. Obtain geological survey data, mining history and monitoring data of different goaf areas; S222. Determine the geometry, rock structure and material properties of different goafs based on geological survey data, mining history and monitoring data; S223, dividing the grid according to the geometric shapes, rock structure and material properties of different goafs, and assigning corresponding material properties to each unit in the grid; S224, setting boundary conditions and loads, using a solver to solve the finite element model, and obtaining the deformation and stress distribution of the goaf; S225, inputting the deformation and stress distribution of the goaf into a finite element model, and calculating key locations where collapse occurs, where cavities are densely connected, and where leakage is likely to occur; S226. Based on the calculation results and the actual project situation, comprehensively judge the positions of the grouting holes and determine the key positions of the grouting holes; The method of using high-precision measuring equipment to monitor the size of the voids in the goaf in real time and selecting grouting equipment according to soil geological conditions and grouting materials includes the following steps: S31. Use high-precision measuring equipment to monitor the size of the voids in the goaf in real time and obtain information on the size, depth and shape of the voids; S32. Analyze the stability of the cavity, the risks involved, and the surrounding soil geological conditions based on the monitoring data; S33, using numerical simulation method to evaluate the stability of voids; S34. Select appropriate grouting materials according to soil geological conditions and cavity characteristics; S35. Comprehensively consider the soil geological conditions, cavity characteristics and performance of grouting materials, and establish an equipment selection optimization model with the lowest comprehensive loss value of the construction project as the optimization goal, so as to obtain the optimal grouting equipment for each construction process in the construction project; S36. According to the specific conditions of the cavity and the grouting plan, deploy the optimal grouting equipment and carry out construction, monitor the grouting effect, and ensure the stability and safety of the goaf.

2. The construction method for a highway passing through a coal seam goaf section according to claim 1 is characterized in that: The method of evaluating the cavity stability by numerical simulation comprises the following steps: S331, creating a three-dimensional geometric model of the cavity based on the geological survey data, mining history and monitoring data of the goaf area; S332, based on the three-dimensional geometric model of the cavity and in combination with the surrounding soil geological conditions, a numerical simulation method is used to perform mechanical analysis on the cavity and its surrounding soil to obtain stress distribution, deformation characteristics and potential instability areas of the cavity and its surrounding soil; S334. Determine whether the cavity has stability risk based on the stress distribution, deformation characteristics and potential instability area of ​​the cavity and its surrounding soil. If there is stability risk, further optimize the grouting scheme; S335. Re-evaluate the cavity stability based on the cavity stability analysis and optimized grouting scheme; S336. Repeat S331-S335 until a grouting scheme that meets the construction requirements and ensures the stability of the cavity is finally generated.

3. The construction method of a highway passing through a coal seam goaf section according to claim 1 is characterized in that: The formula of the equipment selection optimization model is as follows: ; In the formula, is the comprehensive loss value of the project; is the name of the construction project; The cost of the construction project; The duration of the construction project; and are the weights of the construction project cost and the construction project duration respectively.

4. The construction method of a highway passing through a coal seam goaf section according to claim 2 is characterized in that: The method of using a valve to adjust the inflow and outflow of slurry, real-time monitoring of potential dangerous phenomena inside the foundation, and adjusting the grouting parameters includes the following steps: S51. Use IoT sensor technology to collect construction parameter data during grouting; S52, using the three-dimensional geometric model of the cavity and the numerical simulation method to analyze the real-time construction parameter data to evaluate the potential dangerous phenomena inside the foundation; S53. According to the analysis results, adjust the valve to control the inflow and outflow of slurry, and adjust the grouting parameters accordingly to ensure the foundation reinforcement effect.

5. The construction method of a highway passing through a coal seam goaf section according to claim 1 is characterized in that: The evaluation of whether other foundation reinforcement technologies need to be combined based on the grouting reinforcement results and geological conditions to improve the overall stability of the multi-layer goaf foundation includes the following steps: S71. Compare the stress distribution, deformation characteristics and characteristic changes of the potential unstable area of ​​the cavity and its surrounding soil before and after grouting reinforcement to evaluate the grouting reinforcement effect; S72. Analyze whether the foundation stability meets the engineering requirements based on the geological conditions of the goaf and the construction environment; S73. If the grouting reinforcement effect is not ideal or the foundation stability still does not meet the engineering requirements, consider using other foundation reinforcement technologies; S74. Select appropriate foundation reinforcement technology and formulate corresponding construction plan according to specific conditions; S75. Implement the corresponding construction plan, monitor the foundation reinforcement effect, and evaluate the overall stability of the foundation after multiple reinforcements.

6. A construction system for a highway crossing a coal seam goaf section, used to implement the construction method for a highway crossing a coal seam goaf section as described in any one of claims 1 to 5, characterized in that: The system includes: geological survey and analysis module, material selection and grouting hole arrangement module, cavity monitoring and equipment selection module, grouting construction module, slurry adjustment and monitoring module, grouting effect evaluation module and comprehensive foundation reinforcement technology evaluation module; The geological survey and analysis module is used to analyze the depth, range and geotechnical characteristics of multi-layer goafs according to the geological survey results, and obtain the size and shape of the cavities in different layers of goafs; The material selection and grouting hole arrangement module is used to select grouting materials suitable for the conditions of the goaf according to the size and shape of the cavities in different layers of goaf, use professional drilling rigs to set up grouting holes at key locations in different layers of goaf, and reinforce the openings of the grouting holes; The cavity monitoring and equipment selection module is used to use high-precision measurement equipment to monitor the cavity size of the goaf in real time and select grouting equipment according to soil geological conditions and grouting materials; The grouting construction module is used to perform layered three-dimensional cross grouting using the grouting equipment, and use the grouting pipeline to transport the slurry to the grouting hole; The slurry regulating and monitoring module is used to regulate the inlet and outlet of slurry by using valves, monitor the potential dangerous phenomena inside the foundation in real time, and adjust the grouting parameters; The grouting effect evaluation module is used to detect the grouting effect using geological radar, analyze the detection data, and evaluate the reinforcement effect; The comprehensive foundation reinforcement technology evaluation module is used to evaluate whether it is necessary to combine other foundation reinforcement technologies based on the grouting reinforcement results and geological conditions.