An idle analysis system and analysis method for assets

By designing an asset idleness analysis system, which automatically matches and manually verifies asset documents, and uses a report analysis model for threshold correction, the system solves the problems of insufficient data and human interference in traditional asset idleness analysis, and achieves accurate judgment and optimized management of asset idleness status.

CN117216592BActive Publication Date: 2024-11-19QINGDAO PORT INT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311464583.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-11-07
Publication Date
2024-11-19
Estimated Expiration
2043-11-07

AI Technical Summary

Technical Problem

Traditional asset idleness analysis results are often based on insufficient data and are prone to bias due to human intervention, making it difficult to guarantee the authenticity and accuracy of the analysis results, especially when the company expands and the number of assets increases.

Method used

Design an asset idleness analysis system, including an idleness rule definition module, an asset document storage module, a usage document calculation module, and an idleness rule correction module. The system generates an automatic idleness analysis report through automatic matching and manual verification, and uses a report analysis model to perform deviation analysis and threshold correction to reduce human intervention.

Benefits of technology

It enables accurate and error-free judgment of asset idle status, improves the authenticity and accuracy of analysis results, reduces human interference, optimizes asset management and utilization, and reduces waste and losses.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117216592B_ABST
    Figure CN117216592B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of data processing, and discloses an idle analysis system and analysis method for assets, wherein the analysis system comprises: an idle rule definition module, which is used to define the threshold of the idle rule; an asset document storage module; a usage document calculation module, which is used to automatically match and calculate the original document with the threshold to generate an idle automatic analysis report; and is also used to manually verify the idle automatic analysis report to obtain an idle extension application report for assets; an idle rule correction module, which is communicatively connected with the usage document calculation module, and is used to feed back the idle automatic analysis report and the idle extension application report for assets into a report analysis model; and the report analysis model is used to output a deviation analysis to correct the threshold. The present invention can intelligently judge the management, use, maintenance, repair and other information of assets, so that the idle analysis process is more accurate; and the idle status result is more accurate.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of asset management, and in particular to an asset idle analysis system and analysis method. Background Art

[0002] Idle assets refer to assets in a company or organization that have not been utilized or used for a period of time, resulting in waste of resources and financial losses. For enterprises, asset idleness analysis is an important part of asset management. In recent years, with the continuous increase in the scale of enterprises and the number of assets, the use and configuration distribution of assets have become more and more complicated. Traditional analysis of whether assets are idle requires a lot of manpower and material resources, and the authenticity of the analysis results is difficult to guarantee.

[0003] Traditional asset idleness analysis is subjective and one-dimensional. It cannot achieve objective, true and effective asset inventory and counting. Especially with the continuous increase in enterprise scale and the continuous increase in the number of assets, asset equipment is diversified, widely distributed, and the density is not uniform. The business knowledge requirements for asset idleness analysts are high, and the timeliness of asset idleness analysis and personnel shortages have resulted in insufficient data to support the analysis of asset idleness results, and the data is mixed with high subjective consciousness and behavior data.

[0004] In summary, it is now necessary to design an asset idle analysis system and analysis method to solve the above-mentioned problems in the prior art. Summary of the invention

[0005] In order to solve the above-mentioned problems in the prior art, the present invention provides an asset idle analysis system and analysis method, which solves the problem that the traditional asset idle analysis result data is insufficient and the human subjective consciousness behavior data is too high.

[0006] In order to achieve the above object, the present invention adopts the following technical scheme:

[0007] An asset idle analysis system, comprising:

[0008] An idle rule definition module, which is used to define the threshold of the idle rule;

[0009] An asset document storage module is used to collect original documents, including energy consumption documents of assets and operation business documents of assets;

[0010] Using a document calculation module, which is in communication with the idle rule definition module and the asset document storage module, for automatically matching and calculating the original document with the threshold value to generate an idle automatic analysis report;

[0011] Wherein, the usage document calculation module is also used to manually verify the idle automatic analysis report to obtain an asset idle extension application report;

[0012] The idle rule correction module is in communication with the usage document calculation module and is used to feed back the idle automatic analysis report and the asset idle extension application report to the report analysis model; the report analysis model is used to output the deviation analysis to correct the threshold.

[0013] In some embodiments of the present invention, the idle rule includes an energy consumption rule and a business record rule; the granularity of the time inventory condition of the energy consumption rule is monthly, and the granularity of the time inventory condition of the business record rule is daily.

[0014] In some embodiments of the present invention, the energy consumption rules include electricity, gasoline, diesel, liquefied natural gas, compressed natural gas, liquefied petroleum gas, and hydrogen.

[0015] In some embodiments of the present invention, the business record rules include operation records, maintenance records, outsourced maintenance applications, inspection records, measurement records, insurance records, and test records.

[0016] In some embodiments of the present invention, the idle analysis system also includes a scheduled task module, which is used to execute scheduled tasks, that is, to perform idle analysis on assets that have passed the review and are in the "in use" status in the system at a fixed time point every day; after each scheduled task is completed, an updated idle automatic analysis report is obtained and saved as a saved document.

[0017] In some embodiments of the present invention, the idleness analysis method of the idleness analysis system comprises the following steps:

[0018] S1. storing the energy consumption receipt and the service receipt of the asset in the asset receipt storage module;

[0019] S2. Define an idle rule threshold, automatically match and calculate each document in step S1 with the threshold, and then generate an idle automatic analysis report;

[0020] S3, manually checking the idle automatic analysis report to generate an idle asset extension application report; inputting the idle automatic analysis report and the idle asset extension application report into a report analysis model, and the report analysis model outputs a deviation analysis;

[0021] S4. Correct the threshold in step S2 according to the deviation analysis.

[0022] In some embodiments of the present invention, the idle rules in step S2 include energy consumption rules and business record rules;

[0023] The logic of automatic matching calculation is:

[0024] For the energy consumption rule: compare the energy consumption and the number of invoices in the period from N months before the current month to the previous month of the current month with the threshold value;

[0025] For the business record rule: the number of documents from N days before the current day to the day before the current day is compared with the threshold.

[0026] In some embodiments of the present invention, the calculation logic in step S2 further includes:

[0027] As long as the asset has any energy consumption document or business document greater than the threshold within the threshold, it is judged to be in operation; if the energy consumption document quantity or business document quantity is less than the threshold for N consecutive days / months, and there is no associated idle analysis extension application form or the grace period field in the idle analysis extension application form is less than the current date, it is judged to be idle.

[0028] In some embodiments of the present invention, the idle automatic analysis report displays the analysis conclusions and idle basis of the assets; the asset idle extension application report displays the extension basis; the idle analysis model uses the idle basis and the extension basis to establish a mapping relationship set, and uses the mapping relationship set to generate a deviation analysis.

[0029] In some embodiments of the present invention, step S2 also includes sending a message notification to the user after the idle automatic analysis report is generated, and the message notification sending rule is: if (current date-start date) ÷ message sending interval = non-zero positive integer, then the start time's hours, minutes and seconds are used as the time for sending the notification to the user on that day.

[0030] In some embodiments of the present invention, the fields of the report analysis model include management unit, asset code, asset name, error cause, electricity (kWh), gasoline (liter), diesel (liter), liquefied natural gas (kg), compressed natural gas (kg), liquefied petroleum gas (kg), hydrogen (kg), operation record, maintenance plan, measurement record, outsourced maintenance application, and inspection record.

[0031] The technical solution of the present invention has the following technical effects compared with the prior art:

[0032] The present invention collects the document data corresponding to the assets by setting up an asset document storage module, and performs statistical analysis. The statistical analysis rules are based on the pre-set idle rules of the system. The statistical data is subjected to numerical matching analysis. All those that meet the threshold rules are judged to have idle risks. If there is one that does not meet the threshold rule, it is judged to be in operating state. It can intelligently analyze and judge the information such as asset management, use, maintenance, and repair, making the idle state results more accurate.

[0033] The basic information and characteristics of the asset objects of idle analysis are maintained in the system information. The business documents retained by operators, maintainers, and users in the system during daily asset operation can effectively support the status of asset operation and be archived as "virtual asset operation witnesses". Compared with the traditional output of corresponding results by asset analysis participants, it reduces the interference of human manipulation and improves the authenticity and accuracy of the analysis results.

[0034] The idle rules are used for calculation and analysis in the background, without the need for human intervention. The authenticity of the automatic idle analysis results is guaranteed, which helps to better manage and utilize assets and reduce waste and losses caused by idleness. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.

[0036] Figure 1 This is a schematic diagram of the structure of an idle analysis system for an asset in Example 1.

[0037] Figure 2 This is a flow chart of an idle analysis method for an asset in Example 2. DETAILED DESCRIPTION

[0038] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0039] In the description of the present application, it should be understood that the terms "center", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0040] The terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, unless otherwise specified, "plurality" means two or more.

[0041] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection, a direct connection, or an indirect connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0042] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.

[0043] The disclosure below provides many different embodiments or examples to implement different structures of the present invention. In order to simplify the disclosure of the present invention, the parts and settings of specific examples are described below. Of course, they are only examples, and the purpose is not to limit the present invention. In addition, the present invention can repeat reference numbers and / or reference letters in different examples, and this repetition is for the purpose of simplification and clarity, which itself does not indicate the relationship between the various embodiments and / or settings discussed.

[0044] Example 1: Reference Figure 1 As shown, an idle analysis system for assets includes:

[0045] An idle rule definition module, which is used to define the threshold of the idle rule;

[0046] An asset document storage module is used to collect original documents, including energy consumption documents of assets and operation business documents of assets;

[0047] Using a document calculation module, which is in communication with the idle rule definition module and the asset document storage module, for automatically matching and calculating the original document with the threshold value to generate an idle automatic analysis report;

[0048] Wherein, the usage document calculation module is also used to manually verify the idle automatic analysis report to obtain an asset idle extension application report;

[0049] The idle rule correction module is in communication with the usage document calculation module and is used to feed back the idle automatic analysis report and the asset idle extension application report to the report analysis model; the report analysis model is used to output the deviation analysis to correct the threshold.

[0050] For the idle rule definition module, the idle rule includes an energy consumption rule and a business record rule; the granularity of the time inventory condition of the energy consumption rule is monthly, and the granularity of the time inventory condition of the business record rule is daily.

[0051] The energy consumption rules include electricity (kWh), gasoline (liters), diesel (liters), liquefied natural gas (kg), compressed natural gas (kg), liquefied petroleum gas (kg), and hydrogen (kg).

[0052] The business record rules include operation records, maintenance records, outsourced maintenance applications, inspection records, measurement records, insurance records, and test records.

[0053] That is to say, the thresholds for setting asset automatic idle analysis rules include: electricity (kWh), gasoline (liter), diesel (liter), liquefied natural gas (kg), compressed natural gas (kg), liquefied petroleum gas (kg), hydrogen (kg), operation records, maintenance plans, measurement records, outsourced maintenance applications, inspection records, etc. Check the conditions that need to participate in the rule judgment. If not checked, it will not be included in the idle judgment rule. Setting conditions include: electricity (kWh), gasoline (liter), diesel (liter), liquefied natural gas (kg), compressed natural gas (kg), liquefied petroleum gas (kg), hydrogen (kg), operation records, maintenance plans, measurement records, outsourced maintenance, and inspection records.

[0054] Obtain electricity consumption records from the energy system or financial system energy consumption record document field content electricity (kWh), obtain fuel consumption records from gasoline (liters), obtain compressed natural gas records from compressed natural gas (kg), obtain liquefied natural gas records from liquefied natural gas (kg), obtain liquefied petroleum gas records from liquefied petroleum gas (kg), and obtain hydrogen consumption records from hydrogen (kg). Obtain asset operation record data, maintenance plan data, energy consumption record data, outsourced maintenance plan, and inspection record data from the asset management system. The data source is obtained through the daily zero-hour scheduled task background, and the data in the report is updated after acquisition.

[0055] The usage document calculation module matches and calculates the usage documents according to the idle rules, and determines that the status of the assets is idle for all documents that meet the idle rule threshold. In the generated idle automatic analysis report, only assets with a status of "idle" are displayed, and the idle basis is also displayed to facilitate later verification and correction.

[0056] For the idle rule correction module, since the idle automatic analysis report generated by the usage document calculation module is automatically generated based on the comparison of the idle rule threshold, errors will occur and need to be corrected manually. That is, on the one hand, the status of assets determined to be "idle" needs to be modified, and on the other hand, it is also necessary to check whether the "idle" assets meet the conditions for idle extension. If so, an idle extension application report is generated.

[0057] In some embodiments of the present invention, the idle analysis system also includes a scheduled task module, which is used to execute scheduled tasks, that is, to perform idle analysis on assets that have passed the review and are in the "in use" status in the system at a fixed time point every day; after each scheduled task is completed, an updated idle automatic analysis report is obtained and saved as a saved document.

[0058] Specifically, the saved document is the idle history analysis basis report, which has a query function. The data source is the updated data of the asset idle analysis report after executing the scheduled task, which is transferred to the idle history analysis basis report to facilitate comparative analysis of historical data.

[0059] Example 2: Reference Figure 2 As shown, a method for analyzing idle assets is provided, comprising the following steps:

[0060] S1. storing the energy consumption receipt and the service receipt of the asset in the asset receipt storage module;

[0061] In daily work, operators can upload the documents generated by operations to the system in real time for storage. During the inventory process, a large number of documents can be retrieved in real time.

[0062] For example, the idle determination scope is the assets in the audited "in use" status. The query conditions include: management unit, asset code, and internal code. Obtain gasoline records from the gasoline (liter) in the operation record table, and diesel consumption records from diesel (liter). Obtain electricity consumption records from electricity (kWh), compressed natural gas records from compressed natural gas (kg), liquefied natural gas records from liquefied natural gas (kg), liquefied petroleum gas records from liquefied petroleum gas (kg), and hydrogen consumption records from hydrogen (kg). Obtain the asset's operation records, maintenance records, energy consumption records, associated work order records, outsourced maintenance records, inspection records, measurement records, insurance records, and inspection record document numbers from the EAM system.

[0063] S2. Define an idle rule threshold, automatically match and calculate each document in step S1 with the threshold, and then generate an idle automatic analysis report;

[0064] Specifically, the calculation logic for setting the threshold value of electricity (kWh), gasoline (liter), diesel (liter), liquefied natural gas (kg), compressed natural gas (kg), liquefied petroleum gas (kg), hydrogen (kg), and operation record is as follows: compare the energy consumption and the number of documents in the time period from the N months before the current year and month to the previous month of the current year and month with the threshold value;

[0065] Maintenance records, outsourced maintenance applications, inspection records, measurement records, insurance records, and test records are compared with the threshold value for the number of documents from the N days before the current day to the day before the current day.

[0066] As long as the asset has any energy consumption document or business document greater than the threshold within the threshold, it is judged to be in operation; if the energy consumption document quantity or business document quantity is less than the threshold for N consecutive days / months, and there is no associated idle analysis extension application form or the grace period field in the idle analysis extension application form is less than the current date, it is judged to be idle.

[0067] That is to say, in the idle automatic analysis report, the system obtains and presents data sets of each asset's operation record, maintenance plan, energy consumption record, outsourced maintenance plan, and inspection record; the system gives a reference conclusion on whether the asset is idle based on the threshold set by the user. The idle judgment rule for assets whose asset status is displayed as "in use" is that as long as there is a data that meets the predetermined value, the asset is judged to be in operation. Assets in the operating state will not be displayed in the idle report. Only assets with the analysis conclusion of "idle" will be displayed in the report. The system judges the "in use" assets that have been approved in the system at midnight every day through a scheduled task.

[0068] In some embodiments of the present invention, step S2 also includes sending a message notification to the user after the idle automatic analysis report is generated, and the message notification sending rule is: if (current date-start date) ÷ message sending interval = non-zero positive integer, then the start time's hours, minutes and seconds are used as the time for sending the notification to the user on that day.

[0069] In addition, the filtering condition for sending message notifications is to verify whether the organization using the idle assets is consistent with the primary organization of the employee bound to the user. If they are consistent, a notification is sent, otherwise no notification is sent. The notification content is the content in the notification content field in the pop-up window. Among them, only the analysis results are sent to the user if the consistency between the idle status and the idle status is no.

[0070] S3, manually checking the idle automatic analysis report to generate an idle asset extension application report; inputting the idle automatic analysis report and the idle asset extension application report into a report analysis model, and the report analysis model outputs a deviation analysis;

[0071] Specifically, the input of the report analysis model is the idle automatic analysis report and the asset idle extension application report, and the output is the deviation analysis; that is, the idle automatic analysis report displays the analysis conclusion and idle basis of the assets; the asset idle extension application report displays the extension basis; the idle analysis model uses the idle basis and the extension basis to establish a mapping relationship set, and uses the mapping relationship set to generate a deviation analysis.

[0072] The function of the asset idle extension application report is to meet the needs of very few assets that cannot meet the threshold rules of not being idle in the system due to technical transformation and some other reasons within a period of time. Therefore, the asset idle extension application report is generated. If the relevant asset management unit confirms that the asset needs to be excluded from the idle analysis scope within a period of time, the reason for not being included in the idle analysis scope and the grace period must be stated through the idle analysis extension application. After the system confirms, the asset will no longer be included in the idle analysis scope within the predetermined period of time.

[0073] The fields of the report analysis model include management unit, asset code, asset name, error cause, electricity (kWh), gasoline (liter), diesel (liter), liquefied natural gas (kg), compressed natural gas (kg), liquefied petroleum gas (kg), hydrogen (kg), operation record, maintenance plan, measurement record, outsourced maintenance application, and inspection record.

[0074] S4. Correct the threshold in step S2 according to the deviation analysis.

[0075] Specifically, after the analysis is completed, the threshold value set for the asset idle rule is modified to achieve the self-learning function.

[0076] The technical solution of the present invention has the following technical effects compared with the prior art:

[0077] The present invention collects corresponding document data by setting up an asset document storage module and performs statistical analysis. The conditions of the statistical data are diversified and can be obtained from big data, Internet of Things technology and system function nodes;

[0078] The statistical analysis rules are based on the pre-set idle rules of the system. The statistical data is matched and analyzed by numerical values. If all the threshold rules are met, it is judged to be at risk of idleness. If there is one rule that does not meet the threshold rule, it is judged to be in operation. It can intelligently analyze and judge the management, use, maintenance, and repair of assets, making the idle status results more accurate.

[0079] The basic information and characteristics of the asset objects of idle analysis are maintained in the system information. The business documents retained by operators, maintainers, and users in the system during daily asset operation can effectively support the status of asset operation and be archived as "virtual asset operation witnesses". Compared with the traditional output of corresponding results by asset analysis participants, it reduces the interference of human manipulation and improves the authenticity and accuracy of the analysis results.

[0080] The idle rules are used for calculation and analysis in the background, without the need for human intervention. The authenticity of the automatic idle analysis results is guaranteed, which helps to better manage and utilize assets and reduce waste and losses caused by idleness.

[0081] In the description of the above embodiments, specific features, structures, materials or characteristics may be combined in a suitable manner in any one or more embodiments or examples.

[0082] The above are only specific embodiments of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily thought of by a person skilled in the art within the technical scope disclosed by the present invention should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.

Claims

1. An asset idle analysis system, characterized in that: include: An idle rule definition module, which is used to define the threshold of the idle rule; An asset document storage module is used to collect original documents, including energy consumption documents of assets and operation business documents of assets; Using a document calculation module, which is in communication with the idle rule definition module and the asset document storage module, for automatically matching and calculating the original document with the threshold value to generate an idle automatic analysis report; Wherein, the usage document calculation module is also used to manually verify the idle automatic analysis report to obtain an asset idle extension application report; An idle rule correction module, which is in communication with the usage document calculation module and is used to feed back the idle automatic analysis report and the asset idle extension application report to the report analysis model; the report analysis model is used to output a deviation analysis to correct the threshold; The input of the report analysis model is the idle automatic analysis report and the asset idle extension application report, and the output is the deviation analysis; the idle automatic analysis report displays the analysis conclusion and idle basis of the asset; the asset idle extension application report displays the extension basis; the report analysis model uses the idle basis and the extension basis to establish a mapping relationship set, and uses the mapping relationship set to generate the deviation analysis; For the idle rule definition module, the idle rule includes an energy consumption rule and a business record rule; the granularity of the time inventory condition of the energy consumption rule is monthly, and the granularity of the time inventory condition of the business record rule is daily; The energy consumption rules include electricity, gasoline, diesel, liquefied natural gas, compressed natural gas, liquefied petroleum gas, and hydrogen; The business record rules include operation records, maintenance records, outsourced maintenance applications, inspection records, measurement records, insurance records, and test records; The thresholds for setting asset automatic idle analysis rules include: electricity, gasoline, diesel, liquefied natural gas, compressed natural gas, liquefied petroleum gas, hydrogen, operation records, maintenance plans, measurement records, outsourced maintenance applications, and inspection records. Check the conditions that need to participate in the rule judgment in the record field. If not checked, it will not be listed as an idle judgment rule; Setting conditions include: electricity, gasoline, diesel, liquefied natural gas, compressed natural gas, liquefied petroleum gas, hydrogen, operation records, maintenance plans, measurement records, outsourced maintenance, and inspection records; Obtain electricity consumption records from the energy system or financial system energy consumption record document field content electricity, obtain oil consumption records from gasoline, obtain compressed natural gas records from compressed natural gas, obtain liquefied natural gas records from liquefied natural gas, obtain liquefied petroleum gas records from liquefied petroleum gas, and obtain hydrogen consumption records from hydrogen; The units of electricity, gasoline, diesel, liquefied natural gas, compressed natural gas, liquefied petroleum gas, and hydrogen are: kWh, liter, liter, kg, kg, kg, kg, respectively; Obtain asset operation record data, maintenance plan data, energy consumption record data, outsourced maintenance plan, and inspection record data from the asset management system; The data source is obtained through the daily zero-hour scheduled task background, and the data in the report is updated after the data is obtained; The usage document calculation module matches and calculates the usage documents according to the idle rules, and determines that the status of the asset is idle for the documents that fully meet the idle rule threshold. In the generated idle automatic analysis report, only the assets with the status of "idle" are displayed, and the idle basis is also displayed to facilitate later verification and correction; The idle automatic analysis report is automatically generated based on the idle rule threshold comparison, and the errors generated need to be manually corrected, that is, on the one hand, the status of the assets determined to be "idle" needs to be modified, and on the other hand, it is also necessary to check whether the "idle" assets meet the idle extension conditions. If they meet the conditions, an asset idle extension application report is generated; The idle analysis system also includes a scheduled task module, which is used to execute scheduled tasks and perform idle analysis on assets that have passed the review and are in the "in use" state in the system at a fixed time point every day; after each scheduled task is completed, the updated idle automatic analysis report is obtained and saved as a saved state document; The saved document is an idle history analysis basis report with a query function. The data source is the updated data of the asset idle analysis report after executing the scheduled task, which is transferred to the idle history analysis basis report to facilitate comparative analysis of historical data.

2. An idle analysis method for an asset idle analysis system, characterized in that: The following steps are involved: S1. storing the energy consumption receipt and the service receipt of the asset in the asset receipt storage module; In daily work, operators upload the documents generated by operations to the system in real time for storage; Retrieve saved documents in real time during idle analysis; The idle determination scope is the assets in the audited "in use" status. The query conditions include: management unit, asset code, internal code; obtain gasoline records from gasoline in the operation record table body, obtain diesel consumption records from diesel; obtain electricity consumption records from electricity, obtain compressed natural gas records from compressed natural gas, obtain liquefied natural gas records from liquefied natural gas, obtain liquefied petroleum gas records from liquefied petroleum gas, and obtain hydrogen consumption records from hydrogen; obtain the asset's operation records, maintenance records, energy consumption records, work order records associated with the records, outsourced maintenance records, inspection records, measurement records, insurance records, and inspection records from the EAM system. S2. Define an idle rule threshold, automatically match and calculate each document in step S1 with the threshold, and then generate an idle automatic analysis report; The calculation logic for setting the threshold value of electricity, gasoline, diesel, liquefied natural gas, compressed natural gas, liquefied petroleum gas, hydrogen and operation record is as follows: compare the energy consumption and the number of documents in the period from the N months before the current month to the previous month of the current month with the threshold value; Maintenance records, outsourced maintenance applications, inspection records, measurement records, insurance records, and test records are compared with the threshold for the number of documents from the N days before the current day to the day before the current day. If the asset has any energy consumption bill or business bill greater than the threshold within the threshold, it is judged to be in operation; if the energy consumption bill quantity or business bill quantity is less than the threshold for N consecutive days / months, and there is no associated idle analysis extension application form or the grace period field in the idle analysis extension application form is less than the current date, it is judged to be idle; In the idle automatic analysis report, the system obtains and presents data sets of operation records, maintenance plans, energy consumption records, outsourced maintenance plans, and inspection records of each asset; the system gives a reference conclusion on whether an asset is an idle asset based on the threshold set by the user; the idle judgment rule for assets whose asset status is displayed as "in use" is that as long as there is a data that meets the predetermined value, the asset is judged to be in operation, and assets in the operating state will not be displayed in the idle report, and the report will display assets with the analysis conclusion of "idle"; the system judges the "in use" assets that have been reviewed and approved in the system at zero o'clock every day through a scheduled task; The step S2 also includes sending a message notification to the user after the idle automatic analysis report is generated, and the sending rule of the message notification is: if (current date-start date) ÷ message sending interval = non-zero positive integer, then the start time hours, minutes and seconds are used as the time to send the notification to the user on that day; The filtering condition for sending message notifications is to verify whether the using organization of idle assets is consistent with the primary organization of the employee bound to the user. If they are consistent, a notification is sent; otherwise, no notification is sent. The notification content is the content in the Notification Content field in the pop-up window. Among them, only the analysis result is sent to the user if the result is not consistent with the idle status. S3, manually checking the idle automatic analysis report to generate an idle asset extension application report; inputting the idle automatic analysis report and the idle asset extension application report into a report analysis model, and the report analysis model outputs a deviation analysis; The input of the report analysis model is the idle automatic analysis report and the asset idle extension application report, and the output is the deviation analysis; the idle automatic analysis report displays the analysis conclusion and idle basis of the asset; the asset idle extension application report displays the extension basis; the report analysis model uses the idle basis and the extension basis to establish a mapping relationship set, and uses the mapping relationship set to generate the deviation analysis; The function of the asset idle extension application report is to meet the requirements of assets that cannot meet the threshold rule of not being idle in the system within a period of time due to technical transformation or some other reasons; when an asset needs to be excluded from the idle analysis scope within a period of time, the reason for not being included in the idle analysis scope and the grace period need to be stated through the idle analysis extension application; after the system confirms, the asset will no longer be included in the idle analysis scope within the predetermined period of time; The fields of the report analysis model include management unit, asset code, asset name, error reason, electricity, gasoline and diesel, liquefied natural gas, compressed natural gas, liquefied petroleum gas, hydrogen, operation record, maintenance plan, measurement record, outsourcing maintenance application, and inspection record; S4, correcting the threshold in step S2 according to the deviation analysis; After the analysis is completed, the thresholds set for asset idleness rules are modified to achieve the self-learning function; The units of electricity, gasoline, diesel, liquefied natural gas, compressed natural gas, liquefied petroleum gas and hydrogen in step S1, step S2 and step S3 are kWh, liter, liter, kg, kg, kg, kg respectively.