A trenching method for locally dipping the hanging wall of a steeply dipping thick ore body
By employing a combined longitudinal and transverse trenching method when the hanging wall of a steeply inclined thick ore body partially changes its inclination, the trenching orientation and parameters are altered, and a reasonable engineering layout and ore recovery sequence are designed. This solves the problem of large amounts of waste rock mixed in, and improves the ore grade and economic benefits.
Patent Information
- Application Number
- CN202311529430.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-16
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2043-11-16
AI Technical Summary
When the hanging wall of a steeply dipping thick ore body becomes locally dipping, the amount of waste rock generated by dredging increases, leading to a decrease in ore grade and an increase in dilution rate, which reduces the economic benefits of the ore deposit.
The combined longitudinal and transverse slotting method is adopted. By changing the slotting orientation and parameters, a reasonable engineering layout and ore recovery sequence are designed, including the construction of the upper cutting roadway, deep hole face-out in the longitudinal and transverse slotting, and the ore recovery by blasting in batches to ensure that the ore body boundary line is designed as an irregular face-out.
This effectively reduced the amount of waste rock mixed in, improved the grade of the ore, increased the profit per unit of ore, significantly improved economic efficiency, and ensured the reasonable depth of mining in the next layer.
Smart Images

Figure CN117386369B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of mining technology, and in particular to a method for trenching a steeply inclined thick ore body with localized dipping of the hanging wall. Background Technology
[0002] In the mining of a steeply dipping, thick ore body in a lead-zinc mine, the surrounding rock is relatively stable. The sublevel stope mining method is typically used. During inter-layer mining, slotting is generally carried out between the boundaries of the current and upper ore layers' hanging walls, using raises and deep holes for cutting the slots. Because the hanging wall angle of the steeply dipping ore body is greater than 55°, the amount of waste rock generated during slotting is generally small. However, when the hanging wall angle changes from steep to dipping (30°~55°), the amount of waste rock generated by slotting increases significantly, leading to a large amount of waste rock. This causes a sharp drop in ore grade and a sharp increase in dilution rate during slotting, thereby reducing the economic benefits of the mine.
[0003] Therefore, there is an urgent need for a trenching method for locally dipping the hanging wall of a steeply inclined thick ore body. Summary of the Invention
[0004] The technical problem to be solved by the present invention is to provide a trenching method for locally dipping the hanging wall of a steeply dipping thick ore body to improve the ore grade and reduce the dilution rate.
[0005] To solve the above problems, the present invention provides a method for trenching a locally dipping upper section of a steeply inclined thick ore body, comprising the following steps: (1) Based on the changes in ore body thickness and stratification height in the engineering layout plan of steeply inclined thick ore body, and in combination with the ore body thickness, design the access road, the drilling tunnel inside the vein, and the transportation tunnel outside the vein; (2) Draw a cross section based on the middle section of the ore body boundary line and the two layers above it in the plan view, determine the distance of the slotting space, and combine it with the cross section of other routes to comprehensively determine the construction position of the hanging wall cutting tunnel; (3) After the upper cutting tunnel is completed, the cutting well is constructed according to the design. Then, the deep hole surface is constructed in the longitudinal cutting groove along the approach first, and then the deep hole surface is constructed in the transverse cutting groove along the upper cutting tunnel. (4) After the construction of the deep hole layout in the longitudinal and transverse slots is completed, the deep hole design for mining is carried out, and the deep hole layout is formed; the deep hole construction of the normal approach is carried out according to conventional methods. (5) After all the preparatory mining works are completed, the longitudinally cut deep hole area will be blasted and recovered in batches using the cutting well as the compensation space. Then, the transversely cut deep hole area will be blasted and recovered in batches using the longitudinal cutting space as the compensation space, and the cutting work will be completed in the end.
[0006] In step (3), the deep hole arrangement in the transverse groove is designed within the ore body according to the boundary line of the hanging wall ore body, and is an irregular arrangement.
[0007] Compared with the prior art, the present invention has the following advantages: This invention creatively applies a combined longitudinal and transverse trenching method by altering the trenching orientation and parameters of traditional mining methods. It employs a more rational engineering layout and ore recovery sequence, solving the problem of excessive surrounding rock intrusion caused by localized changes in the dip of the hanging wall of a steeply dipping thick ore body. This achieves the goal of low dilution in the hanging wall trenching, improving ore grade and increasing unit ore yield, resulting in significant economic benefits. Simultaneously, it ensures that the next layer of mining depth remains within the reasonable depth of medium-deep hole drilling. Attached Figure Description
[0008] The specific embodiments of the present invention will be described in further detail below with reference to the accompanying drawings.
[0009] Figure 1 This is a planar schematic diagram of the present invention.
[0010] Figure 2 This is a schematic diagram of the CC profile of the original three-round mining route.
[0011] Figure 3 This is a schematic diagram of the CC cross-section of the three-round mining route of the present invention.
[0012] Figure 4 This is a schematic diagram of the AA profile of the original route.
[0013] Figure 5 This is a schematic diagram of the AA cross-section of the first pass of the present invention.
[0014] In the diagram: 1—External transport roadway; 2—Entry roadway; 3—Hanging wall cutting roadway; 4—Ore and rock boundary line; 5—Cutting riser; 6—Medium-deep hole face; 7—Longitudinal groove medium-deep hole face; 8—Transverse groove medium-deep hole face. Detailed Implementation
[0015] A trenching method for locally varying the inclination of the hanging wall of a steeply dipping thick ore body includes the following steps: (1) For example Figure 1 As shown, based on the changes in ore body thickness and stratification height in the engineering layout plan of the steeply inclined thick ore body, and in combination with the ore body thickness, the design of approach 2, the in-vein drilling tunnel and the external transport tunnel 1 are carried out.
[0016] (2) Based on the middle section of the ore body boundary line 4 in the plan view and the two layers above it, draw a cross-sectional view to determine a reasonable slotting space distance. Combined with the cross-sectional views of other access routes 2, determine the construction position of the hanging wall cutting roadway 3 to ensure that the slotting space along the ore body can meet the blasting compensation space of the subsequent deep holes in the vertical access routes. This step is crucial for determining the hanging wall cutting roadway 3 and has a decisive impact on the detailed design of the subsequent deep holes, so it must be considered thoroughly.
[0017] (3) After the upper plate cutting tunnel 3 is completed, the cutting well 5 is constructed according to the design. Then, the deep hole surface 7 of the longitudinal cutting groove is constructed along the access road 2, and the deep hole surface 8 of the transverse cutting groove is constructed along the upper plate cutting tunnel 3.
[0018] The deep hole face 8 in the transverse groove is designed in the ore body according to the ore body boundary line 4 on the hanging wall. It is an irregular face, which changes the previous regular face design, but the ore and rock mixed mining will lead to high dilution.
[0019] (4) After the construction of the deep hole layout 7 in the longitudinal groove and the deep hole layout 8 in the transverse groove is completed, the deep hole design for mining is carried out, and the deep hole positive layout 6 is formed; the deep hole construction of the normal approach 2 is carried out according to the conventional method. (5) After all the preparatory mining works are completed, the longitudinally cut deep hole area will be blasted and recovered in batches using the cutting well 5 as the compensation space. Then, the transversely cut deep hole area will be blasted and recovered in batches using the longitudinally cut space as the compensation space, and the cutting project will be completed in the end.
[0020] The parameters such as the bottom distance and spacing of the medium-deep holes required for the design of the drainage face in this invention need to be combined with the surrounding rock and selected equipment in different mines, and designed and implemented in accordance with relevant specifications and design manuals. This invention will not elaborate further.
[0021] Given that segmented open-pit mining followed by backfilling is a commonly used mining method, this invention only describes the newly adopted longitudinal and transverse combined grooving method when grooving the hanging wall, and will not elaborate on other engineering contents.
[0022] An embodiment of a trenching method for locally dipping the hanging wall of a steeply dipping thick ore body includes the following steps: (1) For example Figure 1 As shown, based on the changes in ore body thickness and stratification height in the engineering layout plan of the steeply inclined thick ore body, and in combination with the ore body thickness, the design of approach 2, the in-vein drilling tunnel and the external transport tunnel 1 are carried out.
[0023] (2) Draw the CC profile based on the three access routes of the ore body boundary line 4 in the plan view and the two layers above it, as shown in the figure. Figure 3 As shown, a reasonable groove spacing is determined, and the construction position of the upper cutting lane 3 is determined by combining the cross-sectional views of other access routes 2.
[0024] (3) After the upper cutting tunnel 3 is completed, the cutting well 5 is constructed according to the design. Then, the deep hole layout 7 of the longitudinal cutting groove is constructed first along the access road 2, and the deep hole layout 8 of the transverse cutting groove is constructed along the upper cutting tunnel 3. Figure 5 As shown.
[0025] The deep hole face 8 in the transverse groove is designed within the ore body according to the boundary between the ore and rock in the hanging wall. It is an irregular face, which changes the unfavorable situation of the previous regular face design, which would lead to high dilution due to mixed mining of ore and rock.
[0026] (4) After the construction of the deep hole layout 7 in the longitudinal groove and the deep hole layout 8 in the transverse groove is completed, the deep hole design for mining is carried out, and the deep hole layout 6 is formed; the deep hole construction of the normal approach 2 is carried out according to the conventional method.
[0027] (5) After all the preparatory mining works are completed, the longitudinally cut deep hole area will be blasted and recovered in batches using the cutting well 5 as the compensation space. Then, the transversely cut deep hole area will be blasted and recovered in batches using the longitudinally cut space as the compensation space, and the cutting project will be completed in the end.
[0028] The grooving process is performed using conventional methods on the proportions. For example... Figure 2 This is a schematic diagram of the CC profile of the original three-round mining route. Figure 4 This is a schematic diagram of the AA profile of the original route.
[0029] in: Figure 4 The filling area is the most commonly used cutting area. When using it, regular cutting is used to meet the compensation space required for normal drainage and mining in the later stage. Designers usually design it this way, which reduces the design workload and simplifies the construction organization. However, after the ore body becomes inclined, the amount of waste rock mixed in by blasting is obviously large, and the ore is severely diluted.
[0030] After improvement by the present invention Figure 5 The filling area showed no waste rock contamination, which increased the width of the cut and allowed for the mining of part of the hanging wall ore body, facilitating ore recovery in the lower and middle sections. Therefore, through... Figure 4 and Figure 5 By comparing the grooved areas, it is clear that the method of the present invention will not mix into the surrounding rock.
[0031] In summary, although the construction method of this invention increases the difficulty of construction organization and slightly increases construction costs compared to the original method, it can effectively change the phenomenon of high ore dilution caused by fixed and regular grooving in the original method. The economic benefits of reducing ore dilution far outweigh the increased costs.
Claims
1. A method for trenching a steeply dipping thick ore body with localized dipping in the hanging wall, comprising the following steps: (1) Based on the changes in ore body thickness and stratification height in the engineering layout plan of steeply inclined thick ore body, and in combination with the ore body thickness, design the approach (2), the drilling tunnel inside the vein and the transportation tunnel outside the vein (1). (2) Draw a cross section based on the middle section of the ore body boundary line (4) in the plan view and the two layers above it to determine the distance of the slotting space, and combine the cross section of other access routes (2) to comprehensively determine the construction position of the upper cutting tunnel (3); (3) After the upper cutting tunnel (3) is completed, the cutting riser (5) is constructed according to the design. Then, the deep hole layout (7) of the longitudinal cutting groove is constructed along the access road (2), and the deep hole layout (8) of the transverse cutting groove is constructed along the upper cutting tunnel (3). The deep hole layout (8) of the transverse cutting groove is designed in the ore body according to the boundary line (4) of the ore body upper hanging wall and is an irregular layout. (4) After the construction of the deep hole layout in the longitudinal groove (7) and the deep hole layout in the transverse groove (8) is completed, the deep hole design for mining is carried out, and the deep hole layout is formed (6); the deep hole construction of the normal approach (2) is carried out according to the conventional method; (5) After all the preparatory mining works are completed, the longitudinal cutting deep hole area is blasted and recovered in batches using the cutting well (5) as the compensation space. Then, the transverse cutting deep hole is blasted and recovered in batches using the longitudinal cutting space as the compensation space, and finally the cutting works are completed.
Citation Information
Patent Citations
Mining method for thickness change of steeply inclined thick ore body before pinching out
CN116220686A