A multi-objective optimization scheduling method for integrated energy systems of highways
Through the multi-objective optimal dispatching method of the highway integrated energy system, the problems of high energy consumption and high carbon emissions on highways are solved, the effective utilization of new energy and the balance between electric energy supply and demand are achieved, ensuring economy and environmental protection.
Patent Information
- Application Number
- CN202311325924.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-10-12
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2043-10-12
AI Technical Summary
Expressways have high energy consumption and high carbon emissions. The application of new energy on expressways is insufficient, making it difficult to achieve the comprehensive optimal effect of balancing power supply and demand and environmental factors.
The multi-objective optimization dispatching method of the highway integrated energy system is adopted, and the economic and environmental protection objective functions are constructed by obtaining new energy types, electric loads and electric energy storage equipment models, and the improved non-dominated genetic sorting algorithm and VIKOR method are used to conduct multi-objective optimization. Target optimization, predicting new energy power generation and generating dispatch plans.
It achieves the optimal solution to the economy and environmental protection of energy dispatch on highways, ensures the balance between power supply and demand, reduces carbon emissions, and provides a reliable energy management solution.
Smart Images

Figure CN117474231B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of highway energy dispatch optimization, and in particular relates to a multi-objective optimization dispatch method for a highway integrated energy system. Background Art
[0002] To meet the demand for convenient transportation, the scale of highways has developed rapidly in terms of speed and quality. However, as the scale of highways expands, on the one hand, the energy consumption of highways and their servers is becoming increasingly serious, and the demand for energy, especially electric energy, is very high, which puts great pressure on the power system and often leads to a phenomenon of supply exceeding demand. On the other hand, the large amount of energy consumption of highways leads to large carbon emissions and serious environmental pollution.
[0003] Since highways are relatively long, there are a lot of new energy conditions, such as wind energy and solar energy. Although new energy power generation has been applied to a certain extent, there has not been a special application for the power supply system of highways. In addition, since new energy is unstable, it cannot completely replace traditional power supply. How to balance between new energy and traditional power supply to ensure the lowest energy consumption is a difficult problem that needs to be solved. Even if the supply and demand of energy is balanced, it cannot guarantee the lowest impact on the environment. In other words, it is currently impossible to achieve the optimal comprehensive impact of electricity supply and demand and environmental factors.
[0004] In summary, the development of highways brings about the problems of high energy consumption, especially electricity consumption, and high carbon emissions. New energy cannot be fully applied on highways, and even if it is applied, it is difficult to achieve a balanced electricity supply and minimize the combined impact of environmental factors.
[0005] This is the deficiency of the prior art. Therefore, it is very necessary to provide a multi-objective optimization scheduling method for a highway integrated energy system in view of the above-mentioned defects in the prior art. Summary of the invention
[0006] In view of the problems of high energy consumption, especially electricity consumption, and high carbon emissions brought about by the development of the above-mentioned highways in the prior art, new energy cannot be fully applied on highways, and even if it is applied, it is difficult to achieve the effect of balancing the electricity supply and minimizing the comprehensive impact of environmental factors. The present invention provides a multi-objective optimization scheduling method for a highway integrated energy system to solve the above-mentioned technical problems.
[0007] The present invention provides a multi-objective optimization scheduling method for a highway integrated energy system, comprising the following steps:
[0008] S1. Obtain the new energy type, electric load and electric energy storage equipment of the target highway, and establish a load side model, electric energy storage equipment model and various types of new energy power generation models for the target highway;
[0009] S2. Select the unit energy storage capacity of the energy storage device as the decision variable, construct the economic objective function and the environmental objective function, define the constraints of the energy storage device operation, power balance, energy storage balance and the city power supply network balance, and complete the construction of the multi-objective optimization model;
[0010] S3. Improve the non-dominated genetic sorting algorithm to obtain a multi-objective optimization algorithm, use the multi-objective optimization algorithm to optimize and solve the economic objective function and the environmental objective function, obtain the set of optimal solutions of the two objective functions, and then use the VIKOR method to screen out the multi-objective optimization model as the optimal solution;
[0011] S4. Build a new energy power generation prediction model, collect data on power generation and power load of various types of new energy, process the collected data, use the processed data to train and test the new energy power generation prediction model, and use the trained and tested new energy power generation prediction model to predict the power generation and power load of various types of new energy;
[0012] S5. Input the predicted renewable energy power generation and electricity load data into the multi-objective optimization model of the optimal solution to obtain the predicted renewable energy dispatch plan and electricity purchase plan.
[0013] Furthermore, the specific steps of step S1 are as follows:
[0014] S11. Obtain the types of new energy within the set range of the target highway, and create a power generation model for each type of new energy;
[0015] S12. Obtain various forms of electrical loads within a set range of the target highway, sum the various forms of electrical loads, and construct a load side model;
[0016] S13. Construct an electric energy storage device model for calculating the energy storage capacity based on the charging and discharging power and charging and discharging efficiency of the electric energy storage device, and set constraints on the electric energy storage device model.
[0017] Furthermore, in step S11, when there is a photovoltaic power generation system within the set range of the target highway, a photovoltaic power generation system model is established, and the specific steps are as follows:
[0018] Distributed photovoltaics are designed in the central isolation zone of the solar power generation device, and the photovoltaic power generation system model is constructed as follows:
[0019]
[0020] Among them, P PV,t Indicates the actual output power of the photovoltaic cell, P PVstc It represents the output power of photovoltaic cells under standard test conditions, L represents the actual solar radiation illumination, L stc Indicates the solar radiation illuminance under standard conditions; T and Tstc represent the ambient temperature under actual conditions and standard conditions respectively, and γ represents the temperature attenuation coefficient of the photovoltaic cell;
[0021] In step S11, when there is a wind power generation system within the target highway setting range, a wind power generation model is constructed as follows:
[0022]
[0023] Among them, P wind is the wind power output power; ρ is the air density corresponding to the region; K is the performance parameter of the wind power generation equipment; S is the area swept by the wind turbine blades; ν is the wind speed;
[0024] In step S12, the load side model is constructed as follows:
[0025] P load =P light +P fire +P moni +P else
[0026]
[0027] P load The total load, P light Indicates lighting load, P fire Indicates the fire load, P moni Indicates the monitoring equipment load, P else Indicates other forms of load, P sin Indicates the power of the lighting source;
[0028] In step S13, the electric energy storage device model is constructed as follows:
[0029] E S (t) = (1-λ s )E S (t-1)+Δt[η charge P charge (t)-P discharge (t) / η discharge ];
[0030] Among them, E S (t) represents the electrical energy storage capacity at time t, η charge Represents the charging efficiency of the electric energy storage device, P charge (t) represents the charging power of the electric energy storage device, P discharge (t) represents the discharge power of the electric energy storage device, η discharge Represents the discharge efficiency of the electrical energy storage device, λ s Indicates the self-loss coefficient of the battery;
[0031] In step S13, the constraints of the electric energy storage model are set as follows:
[0032] 0≤P discharge ≤ε discharge E max
[0033] 0≤P charge ≤ε charge E max
[0034] β min E max ≤E S (t)≤β max E max
[0035] Among them, ε charge is the maximum charging rate of the energy storage device, ε discharge is the maximum discharge rate of the energy storage device, β min is the minimum energy storage coefficient, β max is the maximum energy storage factor.
[0036] Furthermore, the specific steps of step S2 are as follows:
[0037] S21. Using batteries used on highways as electrical energy storage devices;
[0038] S22. The energy storage of the battery in each period of a cycle is used as a decision variable, and the unit time within the cycle is used as the dimension of the decision variable;
[0039] S23. Construct an economic objective function with the sum of the cost of renewable energy power generation, the cost of operation and maintenance of energy storage equipment, and the cost of purchasing electricity as the target;
[0040] S24. Construct an environmental protection objective function with the sum of carbon emissions generated by electricity purchase, electricity storage balance constraints and electricity consumption balance constraints as the target;
[0041] S25. Define the charging power constraint condition, the discharging power constraint condition and the energy storage capacity constraint condition required for the operation of the energy storage device as the first constraint condition of the multi-objective optimization model;
[0042] S26. Define the penalty term of the energy storage balance constraint and the power consumption balance constraint of the environmental protection objective function as the second constraint condition of the multi-objective optimization model;
[0043] S27. Define the node power balance, upper and lower limit balance of power output, node voltage balance, and line transmission power balance of the municipal power supply network as the third constraint condition of the target optimization model.
[0044] Furthermore, the economic objective function constructed in step S23 is as follows:
[0045]
[0046] Among them, C PV is the photovoltaic operation and maintenance cost, which is related to the power of photovoltaic power generation. PV (t) is the photovoltaic power generation power at time t, C SOC is the operation and maintenance cost of the battery, |P ES (t)| is the battery charge / discharge power at time t, with negative power for charging and positive power for discharging, S E (t) is the city electricity price, which is divided into three price segments: flat, peak and valley. The unit is RMB / kwh. grid (t) is the amount of electricity purchased by the system from the grid, and its calculation formula is as follows:
[0047] P grid (t)=max(0,min(P buy (t),P load (t)-(P PV (t)+P ES (t))))
[0048] Among them, P buy (t) indicates the maximum value of the total amount of electricity purchased, P load (t) represents the total power of the electrical load.
[0049] Furthermore, the environmental protection objective function constructed in step S24 is as follows:
[0050]
[0051] λt is the unit carbon emission coefficient corresponding to the amount of electricity purchased, Ees fa is the penalty term for the consistency between the initial and final states of the battery, P fa (t) is the penalty term for maintaining energy conservation in each time period;
[0052] P fa (t) is calculated as follows:
[0053]
[0054] Among them, P PV (t) is the photovoltaic power generation power at time t, P ES (t) is the battery charge / discharge power at time t, and is the amount of electricity purchased by the system from the grid. load (t) represents the total power of the electrical load.
[0055] Furthermore, in step S25, the first constraint condition is an electric energy storage model constraint condition:
[0056] 0≤Pdischarge ≤ε discharge E max
[0057] 0≤P charge ≤ε charge E max
[0058] β min E max ≤E S (t)≤β max E max
[0059] Among them, ε charge is the maximum charging rate of the energy storage device, ε discharge is the maximum discharge rate of the energy storage device, β min is the minimum energy storage coefficient, β max is the maximum energy storage coefficient;
[0060] The node power balance constraint in the third constraint condition in step S27 is as follows:
[0061]
[0062] Among them, P i,M Identifies the active power of the grid node, Q i,M Represents the reactive power of the grid node, P i,N Identifies the active load of the grid node, Q i,N represents the reactive load of the grid node, Ui represents the voltage amplitude, θ ij represents the voltage phase angle, S(j) represents the set connected to point i, G ij represents the real part of the admittance matrix, B ij represents the imaginary part of the admittance matrix;
[0063] The power output balance constraint in step S27 is as follows:
[0064]
[0065] Among them, P S,min Indicates the lower limit of active power, P S,max Indicates the upper limit of active power, Q S,min Indicates the lower limit of reactive power, Q S,max Indicates the upper limit of reactive power;
[0066] The node voltage balance constraint in step S27 is as follows:
[0067] U min ≤U I ≤U max
[0068] Among them, Umin Indicates the lower limit of the node voltage, U max Indicates the upper limit of the node voltage;
[0069] The line transmission power balance constraint in step S27 is as follows:
[0070]
[0071] Among them, P l,max represents the upper limit of the transmission power of line l, P l,min Indicates the lower limit of the transmission power of line 1.
[0072] Furthermore, the specific steps of step S3 are as follows:
[0073] S31. Introducing a differential operator as a repair constraint condition, and adjusting the position parameter and the discrete degree parameter based on a scaling factor of a normal distribution to achieve optimization of the non-dominated genetic sorting algorithm;
[0074] S32. Using the optimized non-dominated genetic sorting algorithm as a multi-objective optimization algorithm;
[0075] S33. Initialize the evolutionary algebra, take the parameter scale of the economic objective function and the environmental objective function as the population scale N, and randomly generate the initialization population;
[0076] S34. Taking the evolutionary generation as the number of iterations, in each iteration, each solution of the population is quickly non-dominated sorted according to the fitness of the economic objective function and the environmental objective function, and the individuals in the sorted population are allocated to different non-dominated sets according to the hierarchy;
[0077] S35. Duplicate the non-dominated set to generate a duplicate set, and make the space size of the duplicate set and the non-dominated set larger than the population size;
[0078] S36. Calculate the crowding distance of the individuals in the replication set, take out m individuals with the largest crowding distance, and merge the m individuals into the replication set, where m is smaller than the size of the non-dominated set;
[0079] S37. Perform mutation operation on individuals in the replication set using constraint conditions as differential operators, and use random repair to repair abnormal chromosomes in the mutated individuals that exceed the constraint conditions, and then perform binomial distribution crossover and tournament selection on the repaired mutated individuals to obtain a new population with a population size of N;
[0080] S38. The new population generated in the iterative process is used as the optimal solution set of the economic objective function and the environmental objective function. The VIKOR method is used to screen the positive indicators of the economic objective function and the negative indicators of the environmental objective to obtain a multi-objective optimization model as the optimal solution.
[0081] Furthermore, the repair formula using the difference operator as a constraint condition in step S31 is as follows:
[0082] x n =rand(0,1)(x n max -x n min )+x n min
[0083] Among them, x n Represents individual X i The nth gene, x n max represents the upper bound of the gene, x n min represents the lower bound of the gene;
[0084] Using the scaling factor of the normal distribution, when the individual Xi mutates, the mutation process satisfied is as follows:
[0085]
[0086] Among them, X is a random variable with a value range of (-∞, +∞), Gi is the individual X i The target gene during crossover; M1, M2, and M3 are individual X i Three individuals are randomly selected during mutation, μ determines the position of the scaling factor, σ determines the discrete degree of the scaling factor, and μ and σ are adjusted according to the actual problem.
[0087] Furthermore, the specific steps of step S4 are as follows:
[0088] S41. Collecting renewable energy power generation data within a set range and a set time period of the target highway;
[0089] S42. Collect data on various forms of electrical loads within a set range and a set time period of the target highway;
[0090] S43. Clean the collected renewable energy power generation data and power load data, normalize them, scale them to a uniform range, generate a data set, and divide the data set into a training set and a test set;
[0091] S44. Initialize random hidden layer weights and biases, calculate hidden layer outputs according to the training set, use the least squares method to minimize the error between the hidden layer output and the training set output, and obtain output layer weights;
[0092] S45. Input the training set output into the ELM model to calculate the output, update the ELM model parameters according to the error between the output and the actual value of the training set, and complete the ELM model training;
[0093] S46. Input the test set into the trained ELM model, output the predicted data of renewable energy power generation, and compare it with the actual value of renewable energy power generation data in the test set to determine whether the error between the two meets the evaluation index requirements;
[0094] If yes, go to step S47;
[0095] If not, adjust the ELM model parameters, re-train the model, and return to step S45;
[0096] S47. The ELM model that has passed the test is used as a new energy power generation prediction model, and the new energy power generation prediction model is used to predict the corresponding type of new energy power generation and electric load within the set range of the target highway.
[0097] The beneficial effects of the present invention are:
[0098] The multi-objective optimization scheduling method for the highway integrated energy system provided by the present invention links the new energy power generation, energy storage equipment and electric load of the highway, obtains the energy scheduling method with the lowest total cost through multi-objective optimization, and obtains the hourly electricity purchase plan within the cycle, thereby ensuring the optimal economic and environmental solution under the normal operating conditions of the highway.
[0099] In addition, the invention has a reliable design principle, a simple structure and a very broad application prospect.
[0100] It can be seen that compared with the prior art, the present invention has outstanding substantive features and significant progress, and the beneficial effects of its implementation are also obvious. BRIEF DESCRIPTION OF THE DRAWINGS
[0101] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0102] Figure 1 It is a flow chart of an embodiment of the multi-objective optimization scheduling method of the highway integrated energy system of the present invention.
[0103] Figure 2 This is a flow chart of another embodiment of the multi-objective optimization scheduling method for the highway integrated energy system of the present invention. Figure 1 part.
[0104] Figure 3 It is another part of the flow chart of another embodiment of the multi-objective optimization scheduling method of the highway integrated energy system of the present invention. DETAILED DESCRIPTION
[0105] In order to enable those skilled in the art to better understand the technical solutions in the present invention, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0106] Embodiment 1:
[0107] like Figure 1 As shown, the present invention provides a multi-objective optimization scheduling method for a highway integrated energy system, comprising the following steps:
[0108] S1. Obtain the new energy type, electric load and electric energy storage equipment of the target highway, and establish a load side model, electric energy storage equipment model and various types of new energy power generation models for the target highway;
[0109] S2. Select the unit energy storage capacity of the energy storage device as the decision variable, construct the economic objective function and the environmental objective function, define the constraints of the energy storage device operation, power balance, energy storage balance and the city power supply network balance, and complete the construction of the multi-objective optimization model;
[0110] S3. Improve the non-dominated genetic sorting algorithm to obtain a multi-objective optimization algorithm, use the multi-objective optimization algorithm to optimize and solve the economic objective function and the environmental objective function, obtain the set of optimal solutions of the two objective functions, and then use the VIKOR method to screen out the multi-objective optimization model as the optimal solution;
[0111] S4. Build a new energy power generation prediction model, collect data on power generation and power load of various types of new energy, process the collected data, use the processed data to train and test the new energy power generation prediction model, and use the trained and tested new energy power generation prediction model to predict the power generation and power load of various types of new energy;
[0112] S5. Input the predicted renewable energy power generation and electricity load data into the multi-objective optimization model of the optimal solution to obtain the predicted renewable energy dispatch plan and electricity purchase plan.
[0113] Embodiment 2:
[0114] like Figure 2 and Figure 3 As shown, the present invention provides a multi-objective optimization scheduling method for a highway integrated energy system, comprising the following steps:
[0115] S1. Obtain the new energy type, electric load and electric energy storage equipment of the target highway, and establish a load side model, an electric energy storage equipment model and various types of new energy power generation models for the target highway; the specific steps of step S1 are as follows:
[0116] S11. Obtain the types of new energy within the set range of the target highway, and create a power generation model for each type of new energy;
[0117] When there is a photovoltaic power generation system within the set range of the target highway, a photovoltaic power generation system model is established. The specific steps are as follows:
[0118] Distributed photovoltaics are designed in the central isolation zone of the solar power generation device, and the photovoltaic power generation system model is constructed as follows:
[0119]
[0120] Among them, P PV,t Indicates the actual output power of the photovoltaic cell, P PVstc It represents the output power of photovoltaic cells under standard test conditions, L represents the actual solar radiation illumination, L stc Indicates the solar radiation illuminance under standard conditions; T and T stc represent the ambient temperature under actual conditions and standard conditions respectively, and γ represents the temperature attenuation coefficient of the photovoltaic cell;
[0121] When there is a wind power generation system within the target highway setting range, the wind power generation model is constructed as follows:
[0122]
[0123] Among them, P wind is the wind power output power; ρ is the air density corresponding to the region; K is the performance parameter of the wind power generation equipment; S is the area swept by the wind turbine blades; ν is the wind speed;
[0124] S12. Obtain various forms of electrical loads within a set range of the target highway, sum the various forms of electrical loads, and construct a load side model;
[0125] The load side model is constructed as follows:
[0126] P load =P light +Pfire +P moni +P else
[0127]
[0128] P load The total load, P light Indicates lighting load, P fire Indicates the fire load, P moni Indicates the monitoring equipment load, P else Indicates other forms of load, P sin Indicates the power of the lighting source;
[0129] It should be noted that the lighting load needs to be calculated based on the number of lighting devices N and the power P of the lighting point light source. sin Calculate the power of a single lighting device and then perform superposition calculations. Other types of electrical loads can be calculated according to the power of normal electrical equipment.
[0130] S13. Constructing an electric energy storage device model for calculating the energy storage capacity based on the charge and discharge power and charge and discharge efficiency of the electric energy storage device, and setting constraints of the electric energy storage device model;
[0131] The electric energy storage device model is constructed as follows:
[0132] E S (t) = (1-λ s )E S (t-1)+Δt[η charge P charge (t)-P discharge (t) / η discharge ];
[0133] Among them, E S (t) represents the electrical energy storage capacity at time t, η charge Represents the charging efficiency of the electric energy storage device, P charge (t) represents the charging power of the electric energy storage device, P discharge (t) represents the discharge power of the electric energy storage device, η discharge Represents the discharge efficiency of the electrical energy storage device, λ s Indicates the self-loss coefficient of the battery;
[0134] It should be noted that the role of electric energy storage equipment is to level out the fluctuations of renewable energy and to achieve peak-shaving and valley-filling of electricity prices;
[0135] In step S13, the electric energy storage model has unified constraints, including theoretical constraints on charging and discharging power and electric energy storage capacity; the constraints of the electric energy storage model are set as follows:
[0136] 0≤Pdischarge ≤ε discharge E max
[0137] 0≤P charge ≤ε charge E max
[0138] β min E max ≤E S (t)≤β max E max
[0139] Among them, ε charge is the maximum charging rate of the energy storage device, ε discharge is the maximum discharge rate of the energy storage device, β min is the minimum energy storage coefficient, β max is the maximum energy storage coefficient;
[0140] It should be noted that in a complete scheduling cycle, the system satisfies E S (0) = E S (end), that is, the capacity of the energy storage device at the last scheduling moment is equal to the initial capacity, satisfying the intra-cycle balance of the energy storage device;
[0141] S2. Select the unit energy storage capacity of the energy storage device as the decision variable, construct the economic objective function and the environmental objective function, define the constraints of the energy storage device operation, energy balance, energy storage balance and mains power supply network balance, and complete the construction of the multi-objective optimization model; the specific steps of step S2 are as follows:
[0142] S21. Using batteries used on highways as electrical energy storage devices;
[0143] S22. The energy storage of the battery in each period of a cycle is used as the decision variable, and the unit time within the cycle is used as the dimension of the decision variable; for example, if daily operation cycle is selected, the decision variables can be X1, X2, ..., X 24 , the dimension of decision variables is 24;
[0144] S23. The economic objective function is constructed with the sum of the cost of renewable energy power generation, the cost of operation and maintenance of energy storage equipment, and the cost of purchasing electricity as the target; the expressway needs to achieve the lowest operating cost, that is, the best economic index. This application considers the impact of time-of-use electricity prices and sells and purchases electricity according to the peak and valley differences in electricity prices;
[0145] The constructed economic objective function is as follows:
[0146]
[0147] Among them, C PVis the photovoltaic operation and maintenance cost, which is related to the power of photovoltaic power generation, P PV (t) is the photovoltaic power generation power at time t, C SOC is the operation and maintenance cost of the battery, |P ES (t)| is the battery charge / discharge power at time t, with negative power for charging and positive power for discharging, S E (t) is the city electricity price, which is divided into three price segments: flat, peak and valley. The unit is RMB / kwh. grid (t) is the amount of electricity purchased by the system from the grid, and its calculation formula is as follows:
[0148] P grid (t)=max(0,min(P buy (t),P load (t)-(P PV (t)+P ES (t))))
[0149] Among them, P buy (t) indicates the maximum value of the total amount of electricity purchased, P load (t) represents the total power of the electrical load;
[0150] It should be noted that P grid (t) represents the dispatching method of purchasing electricity from the power grid, that is, if the load power in a certain period is lower than the sum of the photovoltaic power generation power and the battery discharge power in that period, and the discharge power is negative during charging, then P grid (t) value is 0, at this time, there is no need to purchase electricity from the grid; if the load power during this period is higher than the sum of the photovoltaic power generation power and the battery discharge power, the difference between the two is the amount of electricity purchased from the grid; in addition, there is an extreme case, namely P grid (t) higher than P buy (t), at this time, the amount of electricity purchased by the power grid can only be limited to P buy The setting value of (t) cannot be higher than this value;
[0151] S24. Construct an environmental protection objective function with the sum of carbon emissions generated by electricity purchase, electricity storage balance constraints and electricity consumption balance constraints as the target;
[0152] The constructed environmental protection objective function is as follows:
[0153]
[0154] λc is the unit carbon emission coefficient corresponding to the amount of electricity purchased, λc = 0.96 kg / kwh. The last two terms in the formula represent the power storage balance constraint and the power balance constraint in a day. These two terms are the penalty terms of the function, and ideally they are 0; Ees faIt is a penalty term for the battery's initial and final states to be consistent. In a cycle, the calculation formula for this term is equal to the energy stored at the end minus the energy stored at the initial time.
[0155] Ees fa =E END -E0
[0156] P fa (t) is the penalty term for energy conservation in each period, and its value is equal to the power supply on the load side minus its power consumption, ignoring the internal energy loss of the load. This value is 0 under normal circumstances;
[0157] P fa (t) is calculated as follows:
[0158]
[0159] Among them, P PV (t) is the photovoltaic power generation power at time t, P ES (t) is the battery charge / discharge power at time t, and is the amount of electricity purchased by the system from the grid. load (t) represents the total power of the electrical load;
[0160] S25. Define the charging power constraint condition, the discharging power constraint condition and the energy storage capacity constraint condition required for the operation of the energy storage device as the first constraint condition of the multi-objective optimization model;
[0161] The first constraint is the energy storage model constraint:
[0162] 0≤P discharge ≤ε discharge E max
[0163] 0≤P charge ≤ε charge E max
[0164] β min E max ≤E S (t)≤β max E max
[0165] Among them, ε charge is the maximum charging rate of the energy storage device, ε discharge is the maximum discharge rate of the energy storage device, β min is the minimum energy storage coefficient, β max is the maximum energy storage coefficient;
[0166] S26. Define the penalty term of the energy storage balance constraint and the power consumption balance constraint of the environmental protection objective function as the second constraint condition of the multi-objective optimization model;
[0167] Energy balance means that the power supply and power consumption in the system are in a balanced state. If the loss in the intermediate process is not considered, the photovoltaic power generation, energy storage discharge and power purchase by the power grid should be equal to the load-side power consumption at any sampling time, as shown in the following formula:
[0168] P load (t) = P grid (t)+P PV (t)+P ES (t)
[0169] The energy storage balance of the system is a constraint on the energy storage device itself, that is, within a 24-hour cycle, the final state energy minus the initial state energy is 0, as shown in the following formula:
[0170] E END -E0=0
[0171] S27. Define the node power balance of the municipal power supply network, the upper and lower limits of the power output balance, the node voltage balance, and the line transmission power balance as the third constraint of the target optimization model;
[0172] The node power balance constraint in the third constraint condition is as follows:
[0173]
[0174] Among them, P i,M Identifies the active power of the grid node, Q i,M Represents the reactive power of the grid node, P i,N Identifies the active load of the grid node, Q i,N represents the reactive load of the grid node, Ui represents the voltage amplitude, θ ij represents the voltage phase angle, S(j) represents the set connected to point i, G ij represents the real part of the admittance matrix, B ij represents the imaginary part of the admittance matrix;
[0175] The power output balance constraints are as follows:
[0176]
[0177] Among them, P S,min Indicates the lower limit of active power, P S,max Indicates the upper limit of active power, Q S,min Indicates the lower limit of reactive power, Q S,max Indicates the upper limit of reactive power;
[0178] The node voltage balance constraints are as follows:
[0179] U min ≤U I ≤U max
[0180] Among them, U min Indicates the lower limit of the node voltage, U max Indicates the upper limit of the node voltage;
[0181] The line transmission power balance constraints are as follows:
[0182]
[0183] Among them, P l,max represents the upper limit of the transmission power of line l, P l,min Indicates the lower limit of the transmission power of line l;
[0184] S3. The non-dominated genetic sorting algorithm is improved to obtain a multi-objective optimization algorithm, and the economic objective function and the environmental objective function are optimized and solved using the multi-objective optimization algorithm to obtain a set of optimal solutions of the two objective functions, and then the VIKOR method is used to screen out the multi-objective optimization model as the optimal solution; the specific steps of step S3 are as follows:
[0185] S31. Introducing a differential operator as a repair constraint condition, and adjusting the position parameter and the discrete degree parameter based on a scaling factor of a normal distribution to achieve optimization of the non-dominated genetic sorting algorithm;
[0186] The repair formula using the difference operator as a constraint is as follows:
[0187] x n =rand(0,1)(x n max -x n min )+x n min
[0188] Among them, x n Represents individual X i The nth gene, x n max represents the upper bound of the gene, x n min represents the lower bound of the gene;
[0189] Using the scaling factor of the normal distribution, when the individual Xi mutates, the mutation process satisfied is as follows:
[0190]
[0191] Among them, X is a random variable with a value range of (-∞, +∞), Gi is the individual X i The target gene during crossover; M1, M2, and M3 are individual X i Three individuals are randomly selected during mutation, μ determines the position of the scaling factor, σ determines the discrete degree of the scaling factor, and μ and σ are adjusted according to the actual problem;
[0192] S32. Using the optimized non-dominated genetic sorting algorithm as a multi-objective optimization algorithm;
[0193] S33. Initialize the evolutionary algebra, take the parameter scale of the economic objective function and the environmental objective function as the population scale N, and randomly generate the initialization population;
[0194] S34. Taking the evolutionary generation as the number of iterations, in each iteration, each solution of the population is quickly non-dominated sorted according to the fitness of the economic objective function and the environmental objective function, and the individuals in the sorted population are allocated to different non-dominated sets according to the hierarchy;
[0195] S35. Duplicate the non-dominated set to generate a duplicate set, and make the space size of the duplicate set and the non-dominated set larger than the population size;
[0196] S36. Calculate the crowding distance of the individuals in the replication set, take out m individuals with the largest crowding distance, and merge the m individuals into the replication set, where m is smaller than the size of the non-dominated set;
[0197] S37. Perform mutation operation on individuals in the replication set using constraint conditions as differential operators, and use random repair to repair abnormal chromosomes in the mutated individuals that exceed the constraint conditions, and then perform binomial distribution crossover and tournament selection on the repaired mutated individuals to obtain a new population with a population size of N;
[0198] S38. Taking the new population generated in the iterative process as the optimal solution set of the economic objective function and the environmental objective function, the VIKOR method is used to screen the positive index of the economic objective function and the negative index of the environmental objective to obtain a multi-objective optimization model as the optimal solution;
[0199] The specific implementation process of improving and using the NSGA2 algorithm in actual use can be carried out in the following steps:
[0200] Step 1: Initialize the population, set the algorithm parameters and variable range. Assume that the evolutionary generation gen = 0, the population size is N, and randomly generate an initial population R of size 2N. gen ;
[0201] Step 2: When the number of iterations gen reaches the maximum, the Pareto optimal solution set is returned. If it is not reached, execute Step 3;
[0202] Step 3: For population R gen Perform ENS-SS fast non-dominated sorting and assign the sorted individuals to different non-dominated sets F according to their levels;
[0203] Step 4: Define an empty set P gen+1 , merge F into P gen+1 , so that |P gen+1 |+|F|>N;
[0204] Step 5: Calculate the crowding distance of individuals in F, and sort them from large to small according to the crowding distance, and finally advance N-|P gen+1 | individuals, merged into the set P gen+1 ;
[0205] Step 6: First, gen+1 The individuals in the mutated population are mutated and the chromosomes are randomly repaired. Then, the mutated individuals are crossovered using binomial distribution. Finally, the crossover individuals are selected through tournament selection to obtain a new population Q with a size of N. T ;
[0206] Step 7: Let R t =P t +Q t , gen=gen+1, and go to Step 2;
[0207] S4. Construct a new energy power generation prediction model, collect various types of new energy power generation data and power load data, process the collected data, use the processed data to train and test the new energy power generation prediction model, and use the trained and tested new energy power generation prediction model to predict various types of new energy power generation and power load; the specific steps of step S4 are as follows:
[0208] S41. Collecting renewable energy power generation data within a set range and a set time period of the target highway;
[0209] S42. Collect data on various forms of electrical loads within a set range and a set time period of the target highway;
[0210] S43. Clean the collected renewable energy power generation data and power load data, normalize them, scale them to a uniform range, generate a data set, and divide the data set into a training set and a test set;
[0211] S44. Initialize random hidden layer weights and biases, calculate hidden layer outputs according to the training set, use the least squares method to minimize the error between the hidden layer output and the training set output, and obtain output layer weights;
[0212] S45. Input the training set output into the ELM model to calculate the output, update the ELM model parameters according to the error between the output and the actual value of the training set, and complete the ELM model training;
[0213] S46. Input the test set into the trained ELM model, output the predicted data of renewable energy power generation, and compare it with the actual value of renewable energy power generation data in the test set to determine whether the errors between the two meet the evaluation index requirements; the root mean square error or the mean absolute error can be used as the evaluation index;
[0214] If yes, go to step S47;
[0215] If not, adjust the ELM model parameters, re-train the model, and return to step S45; the adjustable ELM model parameters include the number of hidden nodes or regularization parameters;
[0216] S47. The ELM model that has passed the test is used as a new energy power generation prediction model, and the new energy power generation prediction model is used to predict the corresponding type of new energy power generation and electric load within the set range of the target highway;
[0217] S5. Input the predicted renewable energy power generation and electricity load data into the multi-objective optimization model of the optimal solution to obtain the predicted renewable energy dispatch plan and electricity purchase plan.
[0218] Although the present invention has been described in detail by referring to the accompanying drawings and in combination with the preferred embodiments, the present invention is not limited thereto. Without departing from the spirit and essence of the present invention, a person of ordinary skill in the art may make various equivalent modifications or substitutions to the embodiments of the present invention, and these modifications or substitutions shall be within the scope of the present invention. Any person of ordinary skill in the art may easily think of changes or substitutions within the technical scope disclosed by the present invention, and these shall be within the scope of protection of the present invention. Therefore, the scope of protection of the present invention shall be subject to the scope of protection of the claims.
Claims
1. A multi-objective optimization scheduling method for a highway integrated energy system, characterized in that: The steps include: S1. Obtain the new energy type, electric load and electric energy storage equipment of the target highway, and establish a load side model, an electric energy storage equipment model and various types of new energy power generation models for the target highway; S2. Select the unit energy storage capacity of the energy storage device as the decision variable, construct the economic objective function and the environmental objective function, define the constraints of the energy storage device operation, power balance, energy storage balance and the city power supply network balance, and complete the construction of the multi-objective optimization model; S3. Improve the non-dominated genetic sorting algorithm to obtain a multi-objective optimization algorithm, use the multi-objective optimization algorithm to optimize and solve the economic objective function and the environmental objective function, obtain the set of optimal solutions of the two objective functions, and then use the VIKOR method to screen out the multi-objective optimization model as the optimal solution; S4. Build a new energy power generation prediction model, collect data on power generation and power load of various types of new energy, process the collected data, use the processed data to train and test the new energy power generation prediction model, and use the trained and tested new energy power generation prediction model to predict the power generation and power load of various types of new energy; S5. Input the predicted renewable energy power generation and electricity load data into the multi-objective optimization model of the optimal solution to obtain the predicted renewable energy dispatching plan and electricity purchase plan; The specific steps of step S1 are as follows: S11. Obtain the types of new energy within the set range of the target highway, and create a power generation model for each type of new energy; S12. Obtain various forms of electrical loads within a set range of the target highway, sum the various forms of electrical loads, and construct a load side model; S13. Constructing an electric energy storage device model for calculating the energy storage capacity based on the charge and discharge power and charge and discharge efficiency of the electric energy storage device, and setting constraints of the electric energy storage device model; In step S11, when there is a photovoltaic power generation system within the set range of the target highway, a photovoltaic power generation system model is established. The specific steps are as follows: Distributed photovoltaics are designed in the central isolation zone of the solar power generation device, and the photovoltaic power generation system model is constructed as follows: in, Indicates the actual output power of the photovoltaic cell. It represents the output power of photovoltaic cells under standard test conditions, L represents the solar radiation illumination under actual conditions, Indicates the solar radiation illuminance under standard conditions; Respectively represent the ambient temperature under actual conditions and standard conditions, Represents the temperature attenuation coefficient of the photovoltaic cell; In step S11, when there is a wind power generation system within the set range of the target highway, a wind power generation model is constructed as follows: in, Output power for wind power generation; is the air density corresponding to the region; The performance parameters of wind power generation equipment; is the area swept by the fan blades; is the wind speed; In step S12, the load side model is constructed as follows: The total load, Represents the lighting load, Indicates the fire load, Indicates the monitoring equipment load. Indicates other forms of load, Indicates the power of the lighting source; In step S13, the electric energy storage device model is constructed as follows: ; in, represents the electrical energy storage capacity at time t, Indicates the charging efficiency of the energy storage device. Indicates the charging power of the electric energy storage device, Indicates the discharge power of the electric energy storage device, Represents the discharge efficiency of the electrical energy storage device, Indicates the self-loss coefficient of the battery; In step S13, the constraints of the electric energy storage model are set as follows: in, is the maximum charging rate of the energy storage device, is the maximum discharge rate of the energy storage device, is the minimum energy storage coefficient, is the maximum energy storage coefficient; The specific steps of step S2 are as follows: S21. Using batteries used on highways as electrical energy storage devices; S22. The energy storage of the battery in each period of a cycle is used as a decision variable, and the unit time within the cycle is used as the dimension of the decision variable; S23. Construct an economic objective function with the sum of the cost of renewable energy power generation, the cost of operation and maintenance of energy storage equipment, and the cost of purchasing electricity as the target; S24. Construct an environmental protection objective function with the sum of carbon emissions generated by electricity purchase, electricity storage balance constraints and electricity consumption balance constraints as the target; S25. Define the charging power constraint condition, the discharging power constraint condition and the energy storage capacity constraint condition required for the operation of the energy storage device as the first constraint condition of the multi-objective optimization model; S26. Define the penalty term of the energy storage balance constraint and the power consumption balance constraint of the environmental protection objective function as the second constraint condition of the multi-objective optimization model; S27. Define the node power balance of the municipal power supply network, the upper and lower limits of the power output balance, the node voltage balance, and the line transmission power balance as the third constraint of the target optimization model; The economic objective function constructed in step S23 is as follows: in, is the photovoltaic operation and maintenance cost, which is related to the power of photovoltaic power generation. is the photovoltaic power generation power at time t, is the operation and maintenance cost of the battery, is the battery charge / discharge power at time t, with negative power for charging and positive power for discharging. It is the city electricity price, which is divided into three price segments: flat, peak and valley. The unit is RMB / kwh. It is the amount of electricity purchased by the system from the power grid, and its calculation formula is as follows: in, Indicates the maximum value of the total amount of electricity purchased. Indicates the total power of the electrical load; The environmental protection objective function constructed in step S24 is as follows: is the unit carbon emission coefficient corresponding to the amount of electricity purchased, is the penalty term for the consistency between the initial and final states of the battery, is the penalty term for maintaining energy conservation in each period; The calculation formula is as follows: in, is the photovoltaic power generation power at time t, is the battery charge / discharge power at time t, is the amount of electricity purchased by the system from the grid, Indicates the total power of the electrical load; In step S25, the first constraint condition is the electric energy storage model constraint condition: in, is the maximum charging rate of the energy storage device, is the maximum discharge rate of the energy storage device, is the minimum energy storage coefficient, is the maximum energy storage coefficient; The node power balance constraint in the third constraint condition in step S27 is as follows: in, Identify the active power of the grid node, Represents the reactive power of the grid node, Identify the active load of the grid node, represents the reactive load of the grid node, Indicates the voltage amplitude, represents the voltage phase angle, represents the set connected to point i, represents the real part of the admittance matrix, represents the imaginary part of the admittance matrix; The power output balance constraint in step S27 is as follows: in, Indicates the lower limit of active power. Indicates the upper limit of active power. Indicates the lower limit of reactive power, Indicates the upper limit of reactive power; The node voltage balance constraint in step S27 is as follows: in, represents the lower limit of the node voltage, Indicates the upper limit of the node voltage; The line transmission power balance constraint in step S27 is as follows: in, represents the upper limit of the transmission power of line l, Indicates the lower limit of the transmission power of line l; The specific steps of step S3 are as follows: S31. Introducing a differential operator as a repair constraint condition, and adjusting the position parameter and the discrete degree parameter based on a scaling factor of a normal distribution to achieve optimization of the non-dominated genetic sorting algorithm; S32. Using the optimized non-dominated genetic sorting algorithm as a multi-objective optimization algorithm; S33. Initialize the evolutionary algebra, take the parameter scale of the economic objective function and the environmental objective function as the population scale N, and randomly generate the initialization population; S34. Taking the evolutionary generation as the number of iterations, in each iteration, each solution of the population is quickly non-dominated sorted according to the fitness of the economic objective function and the environmental objective function, and the individuals in the sorted population are allocated to different non-dominated sets according to the hierarchy; S35. Duplicate the non-dominated set to generate a duplicate set, and make the space size of the duplicate set and the non-dominated set larger than the population size; S36. Calculate the crowding distance of the individuals in the replication set, take out m individuals with the largest crowding distance, and merge the m individuals into the replication set, where m is smaller than the size of the non-dominated set; S37. Perform mutation operation on individuals in the replication set using constraint conditions as differential operators, and use random repair to repair abnormal chromosomes in the mutated individuals that exceed the constraint conditions, and then perform binomial distribution crossover and tournament selection on the repaired mutated individuals to obtain a new population with a population size of N; S38. Taking the new population generated in the iterative process as the optimal solution set of the economic objective function and the environmental objective function, the VIKOR method is used to screen the positive index of the economic objective function and the negative index of the environmental objective to obtain a multi-objective optimization model as the optimal solution; The repair formula using the difference operator as a constraint condition in step S31 is as follows: in, represents the nth gene of individual Xi, represents the upper bound of the gene, represents the lower bound of the gene; Using the scaling factor of the normal distribution, when the individual Xi mutates, the mutation process satisfied is as follows: Among them, X is a random variable with a value range of (-∞, +∞), is the target gene when individual Xi crosses; M1, M2 and M3 are three individuals randomly selected when individual Xi mutates, and μ determines the position of the scaling factor. Determines the discreteness of the scaling factor, μ and Adjust according to actual problems.
2. The multi-objective optimization scheduling method for the highway integrated energy system according to claim 1, characterized in that: The specific steps of step S4 are as follows: S41. Collecting renewable energy power generation data within a set range and a set time period of the target highway; S42. Collect data on various forms of electrical loads within a set range and a set time period of the target highway; S43. Clean the collected renewable energy power generation data and power load data, normalize them, scale them to a uniform range, generate a data set, and divide the data set into a training set and a test set; S44. Initialize random hidden layer weights and biases, calculate hidden layer outputs according to the training set, use the least squares method to minimize the error between the hidden layer output and the training set output, and obtain output layer weights; S45. Input the training set output into the ELM model to calculate the output, update the ELM model parameters according to the error between the output and the actual value of the training set, and complete the ELM model training; S46. Input the test set into the trained ELM model, output the predicted data of renewable energy power generation, and compare it with the actual value of renewable energy power generation data in the test set to determine whether the error between the two meets the evaluation index requirements; If yes, go to step S47; If not, adjust the ELM model parameters, re-train the model, and return to step S45; S47. The ELM model that has passed the test is used as a new energy power generation prediction model, and the new energy power generation prediction model is used to predict the corresponding type of new energy power generation and electric load within the set range of the target highway.