A power system early warning method and system
By monitoring the environmental interference and power quality of the power transmission lines of the power system and calculating the abnormal evaluation index, accurate positioning and early warning of transmission line faults is achieved, and the problems of incomplete monitoring and low fault positioning efficiency in the existing technology are solved, and the power is improved System reliability and efficiency.
Patent Information
- Application Number
- CN202311412465.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-10-26
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2043-10-26
AI Technical Summary
The existing power system early warning methods are not comprehensive enough in power transmission line monitoring, resulting in the inability to detect potential faults in time, affecting the reliability and efficiency of the power system, and the fault positioning efficiency is low, increasing maintenance costs and downtime.
By conducting comprehensive monitoring of environmental interference and power quality of transmission lines, calculating abnormality evaluation index, screening abnormal operation and maintenance lines and power equipment, and using patrol drones to conduct subcombination link inspections to achieve accurate positioning and early warning of fault locations.
It improves the safety and stability of the power system, shortens the fault response time, reduces maintenance costs, enhances the environmental monitoring capabilities of transmission lines, discovers potential risks in advance, and reduces power outage time.
Smart Images

Figure CN117477769B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power system early warning, and in particular to a power system early warning method and system thereof. Background Art
[0002] The power system is one of the indispensable infrastructures in modern society. It provides electricity to homes, businesses, medical institutions, industrial facilities, etc., and supports the normal operation of the economy and life. The power system early warning method is a technology and strategy used to monitor, identify and predict power system problems. With the advancement of technology and data science, the instability of the power system continues to increase. At the same time, the rise of energy efficiency and renewable energy has made the demand for power system management more complex. Therefore, in order to better monitor and manage the power system, it is necessary to improve the power system early warning method to ensure the reliability and stability of power supply.
[0003] For example, the invention patent with announcement number: CN106033890B discloses a spatial early warning method for critical phase change of power system, which uses the spatial autocorrelation and spatial variance indicators of the power system line load rate to capture the imbalance of power flow distribution and the distribution pattern of transmission capacity, and uses the spatial autocorrelation and spatial variance trend line changes of the line load rate to reach the system early warning threshold as an early warning signal to warn that the power system enters a critical state. The spatial autocorrelation and spatial variance of the line load rate of the invention system have good early warning characteristics and can be used as an early warning signal that the system is approaching a critical phase change.
[0004] For example, the invention patent with announcement number: CN102707178B discloses a method for early warning and monitoring of secondary equipment faults in a power system. It is based on the real-time collection of power consumption data information of secondary equipment and the collection and sharing of data on the data communication network. It predicts and judges the alarm fault status of secondary equipment through the local and master station system logic. The results can be provided to dispatchers, protection personnel and maintenance personnel as the basis for the next step of operation and maintenance. The method provided by this invention can improve the method of monitoring the operation of secondary equipment, no longer rely entirely on the alarm information of the secondary equipment itself, provide auxiliary monitoring measures, introduce new management basis, and improve the secondary equipment management and maintenance of the entire system.
[0005] However, there are still some deficiencies in power system early warning, which are specifically reflected in the following aspects: (1) The current monitoring of transmission lines for power system early warning is not comprehensive enough. Transmission lines are one of the core components of the power system and are more susceptible to weather and environmental factors. For example, wind speed and corrosive substances will accelerate the aging and damage of transmission lines. Incomplete monitoring of transmission lines may prevent potential problems or faults from being discovered in time, affecting the effectiveness of the early warning system and thus causing a decrease in the reliability of the power system.
[0006] (2) Currently, power system early warning mainly relies on monitoring the electrical parameters of each device in the power system to make fault judgments. This is inefficient and cannot accurately locate the fault. When a fault occurs, the maintenance team may need more time to find the source of the fault, which leads to delays in fault handling and increases the downtime of the power system, thus affecting the reliability of the power system. It also causes a lot of waste of resources and increases the cost of fault repair. Summary of the invention
[0007] In view of the deficiencies in the prior art, the present invention provides a power system early warning method and system thereof, which can effectively solve the problems involved in the above-mentioned background technology.
[0008] To achieve the above objectives, the present invention is implemented through the following technical solutions: The first aspect of the present invention provides a power system early warning method, including: step one, analyzing the abnormal conditions of each target transmission line, and comprehensively calculating the abnormal evaluation index of each target transmission line, thereby screening each abnormal operation and maintenance line.
[0009] Step 2: Analyze the abnormal conditions of each power equipment in each abnormal operation and maintenance line, and comprehensively calculate the abnormal evaluation index of each power equipment in each abnormal operation and maintenance line.
[0010] Step 3: Divide each abnormal operation and maintenance line into equal intervals, inspect and patrol each sub-combination link of each abnormal operation and maintenance line, and calculate the abnormal situation value of each sub-combination link of each abnormal operation and maintenance line.
[0011] Step 4: Through data integration processing, the power equipment and sub-combination links of the abnormal operation and maintenance lines are located and warned in turn.
[0012] As a further method, the abnormal conditions of each target transmission line are analyzed. The specific analysis process is: monitoring the working environment of each target transmission line to obtain the wind direction, wind force level, air density ρ of the working environment of each target transmission line i and the comprehensive wind speed V i , and obtain the length of each target transmission line from the power system information database, and obtain the volume surface area of each target transmission line as the surface area A of each target transmission line exposed to wind i At the same time, according to the wind direction and wind force level of the working environment of each target transmission line, the resistance coefficient Cd of each target transmission line is matched from the power system information database. i , comprehensively calculate the wind load F of each target transmission line i , its calculation expression is: Wherein, i represents the serial number of each target transmission line, i=1, 2, 3, ..., n, and n represents the total number of target lines.
[0013] Deploy several monitoring points to monitor the corrosiveness of the working environment of each target transmission line, and obtain the humidity W of each monitoring point in the working environment of each target transmission line. ij , sulfide concentration S ij and chloride concentration Cl ij At the same time, the appropriate working humidity range of the target line is obtained from the power system information database, and the middle value of the range is extracted as the reference standard working humidity of the target line, recorded as W0, and the corrosion risk assessment index of the working environment of each target transmission line is comprehensively calculated. Wherein △W represents the set reference allowable deviation humidity, S0 and Cl0 represent the critical sulfide concentration and critical chloride concentration of the set target line working environment, ζ1, ζ2 and ζ3 represent the corrosion hazard influencing factors corresponding to the set humidity, sulfide concentration and chloride concentration, respectively, j represents the number of each monitoring point, j=1, 2, 3, ..., m, m represents the total number of monitoring points.
[0014] Obtain the maximum wind load F0 of the target line from the power system information database, and comprehensively calculate the environmental interference value α of each target transmission line i , its calculation expression is: Where ψ1 and ψ2 represent the interference weight factors corresponding to the set wind load and corrosion risk level, respectively.
[0015] The operating parameters of each target transmission line are monitored, and the power quality assessment index of each target transmission line is calculated.
[0016] As a further method, the power quality evaluation index of each target transmission line is calculated. The specific analysis and calculation process is: the operating parameters of each target transmission line are monitored at a set monitoring cycle, and the monitoring time points are divided into set time intervals to obtain the grounding resistance R of each target transmission line at each monitoring time point. iq And the number of voltage sags N during the monitoring period i , according to the numerical expression Calculate the average grounding resistance of each target transmission line Wherein, q represents the number of each monitoring time point, q=1, 2, 3, ..., k, and k represents the total number of monitoring time points.
[0017] Comprehensively calculate the power quality evaluation index β of each target transmission line i , its calculation expression is: Among them, R0 and N0 represent the maximum allowable grounding resistance of the transmission line and the maximum allowable voltage sag times of the transmission line, respectively, and ξ1 and ξ2 represent the power quality impact factors corresponding to the set grounding resistance and voltage sag times, respectively.
[0018] As a further method, the comprehensive calculation of the abnormal evaluation index χ of each target transmission line i , its calculation expression is: Where e represents a natural constant, ω1 and ω2 represent the set environmental interference value and the weight of the power quality assessment index, respectively.
[0019] The transmission line abnormality assessment index threshold is obtained from the power system information database, and the abnormality assessment index of each target transmission line is compared with the transmission line abnormality assessment index threshold. If the abnormality assessment index of a target transmission line is higher than the transmission line abnormality assessment index threshold, the transmission line is recorded as an abnormal operation and maintenance line.
[0020] As a further method, the abnormal conditions of each power device of each abnormal operation and maintenance line are analyzed. The specific analysis process is: statistics of each abnormal operation and maintenance line, and monitoring of the vibration signal of each power device, obtaining the vibration signal waveform of each power device of each abnormal operation and maintenance line, and extracting the vibration frequency E of each power device of each abnormal operation and maintenance line rt , and at the same time obtain the reference standard vibration frequency E0 of the power equipment from the power system information database.
[0021] Obtain the standard vibration signal waveform of the power equipment from the power system information library and extract the standard vibration signal waveform length The vibration signal waveforms of each power equipment in each abnormal operation and maintenance line are overlapped and compared with the standard vibration signal waveforms, and then the overlap length of the vibration signal waveforms of each power equipment in each abnormal operation and maintenance line is obtained.
[0022] Comprehensively calculate the vibration signal abnormality index of each power equipment in each abnormal operation and maintenance line Its calculation expression is: Wherein, △E represents the set allowable deviation vibration frequency, υ1 and υ2 represent the correction factors corresponding to the set vibration frequency and the overlap length of the vibration signal waveform, respectively, r represents the number of each abnormal operation and maintenance line, r = 1, 2, 3, ..., h, h represents the total number of abnormal operation and maintenance lines, t represents the number of each power equipment, t = 1, 2, 3, ..., S, S represents the total number of power equipment.
[0023] Identify and extract the partial discharge times of each power equipment in each abnormal operation and maintenance line during the monitoring period As well as the current signal waveform and voltage signal waveform of each partial discharge, the average amplitude of the current signal of each partial discharge is obtained by analysis. And the average amplitude of the voltage signal
[0024] Obtaining the critical amplitude of the current signal of partial discharge of power equipment from the power system information database and voltage signal critical amplitude Comprehensively calculate the partial discharge abnormality index of each power equipment in each abnormal operation and maintenance line Its calculation expression is: Wherein τ1 represents the abnormal influence factor corresponding to the set number of unit partial discharges, τ2 and τ3 represent the correction factors corresponding to the set average amplitude of the current signal and the average amplitude of the voltage signal of the partial discharge, respectively, d represents the number of partial discharges, d=1, 2, 3, ..., g, g represents the number of partial discharges.
[0025] As a further method, the comprehensive calculation of the abnormal evaluation index ε of each power equipment of each abnormal operation and maintenance line rt , its calculation expression is: in and They are respectively represented as the influencing factors corresponding to the set vibration signal abnormality index and partial discharge abnormality index.
[0026] As a further method, the sub-combination links of each abnormal operation and maintenance line are inspected and patrolled. The specific analysis process is as follows: a number of inspection points are deployed for each sub-combination link of each abnormal operation and maintenance line, and a patrol drone is used to observe the current position of each inspection point of each sub-combination link, and the initial patrol position of each inspection point is extracted, so as to obtain the offset straight-line distance of each sub-combination link of each abnormal operation and maintenance line at each inspection point.
[0027] Taking clockwise as the angle measurement direction, monitor the angle between the line tangent of each inspection point and the horizontal ground, and obtain the tangent angle of each inspection point of each sub-combination link of each abnormal operation and maintenance line At the same time, get the tangent angle of the original inspection point Comprehensively calculate the position deviation anomaly index of each sub-combination link of each abnormal operation and maintenance line Its calculation expression is: Wherein △θ represents the set allowable deviation tangent angle, σ1 represents the correction factor corresponding to the set tangent angle, σ2 represents the position offset influence factor of the set unit distance, z represents the number of each sub-combination link, z = 1, 2, 3, ..., u, u represents the total number of sub-combination links, b represents the number of each inspection point, b = 1, 2, 3, ..., c, c represents the total number of inspection points.
[0028] Monitor the vertical height of the lowest point of each sub-combination link of each abnormal operation and maintenance line to obtain the vertical height T of the lowest point of each sub-combination link rz , and at the same time obtain the critical to low point vertical height T0 of the transmission line from the power system information database.
[0029] As a further method, the abnormal situation value of each sub-combination link of each abnormal operation and maintenance line is calculated. Its calculation expression is: Among them, θ1 and θ2 represent the abnormal situation influencing factors corresponding to the set position deviation anomaly index and the vertical height to the lowest point, respectively.
[0030] As a further method, the power equipment and sub-combination links of the abnormal operation and maintenance lines are located and warned in turn. The specific analysis process is: obtaining the power equipment abnormal evaluation index threshold from the power system information library, and comparing the abnormal evaluation index of each power equipment of each abnormal operation and maintenance line with the power equipment abnormal evaluation index threshold. If the abnormal evaluation index of a certain power equipment is higher than the power equipment abnormal evaluation index threshold, the abnormal operation and maintenance line where the power equipment is located is fed back, and the power equipment is located and warned.
[0031] Similarly, abnormal situations of sub-combination links are located and warned.
[0032] A second aspect of the present invention provides a power system early warning system, comprising: a transmission line abnormality assessment module, for analyzing the abnormal conditions of each target transmission line, comprehensively calculating the abnormality assessment index of each target transmission line, and thereby screening each abnormal operation and maintenance line.
[0033] The power equipment abnormality assessment module is used to analyze the abnormal conditions of each power equipment in each abnormal operation and maintenance line, and comprehensively calculate the abnormality assessment index of each power equipment in each abnormal operation and maintenance line.
[0034] The sub-combination link abnormality assessment module is used to divide each abnormal operation and maintenance line into equal intervals, inspect and patrol each sub-combination link of each abnormal operation and maintenance line, and calculate the abnormal situation value of each sub-combination link of each abnormal operation and maintenance line.
[0035] The data integration and processing module is used to carry out positioning and early warning of the power equipment and sub-combination links of the abnormal operation and maintenance lines through data integration and processing.
[0036] Compared with the prior art, the embodiments of the present invention have at least the following advantages or beneficial effects: (1) The present invention provides an electric power system early warning method and system thereof, monitors the environmental interference and power quality conditions of the transmission lines, and then screens the abnormal operation and maintenance lines, and realizes accurate positioning of the fault location by monitoring the abnormal conditions of the power equipment and sub-combination links of the abnormal operation and maintenance lines. By real-time monitoring and timely early warning of the electric power system early warning system, it helps to improve the safety and stability of the electric power system and reduce the maintenance cost of the electric power system faults.
[0037] (2) The present invention monitors the working environment of the transmission line, including the ambient wind speed and the environmental corrosiveness. Monitoring the working environment of the transmission line can help detect potential dangerous factors, help to discover potential risks in advance, and take preventive measures, thereby improving the safety and reliability of the power system. At the same time, monitoring the environment can better understand the operating status of the equipment, adjust the load of the transmission line according to weather conditions, and improve energy efficiency.
[0038] (3) The present invention monitors the environmental interference and power quality of the transmission lines, and then screens out abnormal operation and maintenance lines to accurately locate the fault location, which helps to shorten the fault response time and thus reduce the impact of the fault on the normal operation of the system. At the same time, by quickly locating the fault, repair measures can be taken more quickly, reducing power outage time, improving the reliability of the power system, and reducing operation and maintenance costs.
[0039] (4) The present invention monitors the position and vertical height of the sub-combination line of the abnormal operation and maintenance line to obtain the operating status of the transmission line in real time, thereby avoiding line disconnection or other faults caused by the vertical height of the lowest point being too low. At the same time, by monitoring the position of the transmission line, the abnormal condition of the transmission line can be discovered, and further investigation and maintenance of the transmission line can be carried out to avoid the occurrence of potential faults, thereby improving the safety of the power system. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] The present invention is further described using the accompanying drawings, but the embodiments in the accompanying drawings do not constitute any limitation to the present invention. A person skilled in the art can obtain other drawings based on the following drawings without creative work.
[0041] Figure 1 It is a schematic diagram of the method flow of the present invention.
[0042] Figure 2 It is a schematic diagram of system module connection of the present invention. DETAILED DESCRIPTION
[0043] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0044] Reference Figure 1As shown, the first aspect of the present invention provides a power system early warning method, including: step one, analyzing the abnormal conditions of each target transmission line, comprehensively calculating the abnormal evaluation index of each target transmission line, and thereby screening each abnormal operation and maintenance line.
[0045] Specifically, the abnormal conditions of each target transmission line are analyzed, and the specific analysis process is: monitoring the working environment of each target transmission line to obtain the wind direction, wind force level, air density ρ of the working environment of each target transmission line i and the comprehensive wind speed V i , and obtain the length of each target transmission line from the power system information database, and obtain the volume surface area of each target transmission line as the surface area A of each target transmission line exposed to wind i At the same time, according to the wind direction and wind force level of the working environment of each target transmission line, the resistance coefficient Cd of each target transmission line is matched from the power system information database. i , comprehensively calculate the wind load F of each target transmission line i , its calculation expression is: Wherein, i represents the serial number of each target transmission line, i=1, 2, 3, ..., n, and n represents the total number of target lines.
[0046] It should be explained that in this embodiment, an anemometer and a wind vane are used to monitor the wind speed and wind direction of the working environment of the transmission line respectively, and then the wind load of the transmission line is systematically analyzed. By monitoring the wind load, the changes in wind force can be understood in a timely manner, the impact of the wind load on the transmission line can be judged, and the stability of the line structure can be evaluated. At the same time, the monitoring of the wind load can take corresponding measures to strengthen the line, reduce the impact of strong winds on the transmission line, and improve the reliability of the power system.
[0047] Deploy several monitoring points to monitor the corrosiveness of the working environment of each target transmission line, and obtain the humidity W of each monitoring point in the working environment of each target transmission line. ij , sulfide concentration S ij and chloride concentration Cl ij At the same time, the appropriate working humidity range of the target line is obtained from the power system information database, and the middle value of the range is extracted as the reference standard working humidity of the target line, recorded as W0, and the corrosion risk assessment index of the working environment of each target transmission line is comprehensively calculated. Wherein △W represents the set reference allowable deviation humidity, S0 and Cl0 represent the critical sulfide concentration and critical chloride concentration of the set target line working environment, ζ1, ζ2 and ζ3 represent the corrosion hazard influencing factors corresponding to the set humidity, sulfide concentration and chloride concentration, respectively, j represents the number of each monitoring point, j=1, 2, 3, ..., m, m represents the total number of monitoring points.
[0048] It should be explained that in this embodiment, humidity sensors and gas sensors are used to monitor the humidity and acid gas concentration of the working environment of the transmission line respectively, and then the corrosiveness of the working environment of the transmission line is evaluated. By monitoring the corrosiveness of the working environment of the transmission line, preventive measures can be taken in time to effectively extend the service life of the transmission line and reduce maintenance costs. At the same time, reducing the damage to the transmission line caused by corrosion can reduce the failure rate of the power system and ensure the reliability of power transmission.
[0049] Obtain the maximum wind load F0 of the target line from the power system information database, and comprehensively calculate the environmental interference value α of each target transmission line i , its calculation expression is: Where ψ1 and ψ2 represent the interference weight factors corresponding to the set wind load and corrosion risk level, respectively.
[0050] The operating parameters of each target transmission line are monitored, and the power quality assessment index of each target transmission line is calculated.
[0051] Furthermore, the power quality evaluation index of each target transmission line is calculated, and the specific analysis and calculation process is as follows: the working parameters of each target transmission line are monitored at a set monitoring period, and the monitoring time points are divided into set time intervals to obtain the grounding resistance R of each target transmission line at each monitoring time point. iq And the number of voltage sags N during the monitoring period i , according to the numerical expression Calculate the average grounding resistance of each target transmission line Wherein, q represents the number of each monitoring time point, q=1, 2, 3, ..., k, and k represents the total number of monitoring time points.
[0052] It should be explained that in this embodiment, a ground resistance tester is used to monitor the ground resistance of the transmission line. The ground resistance is an important parameter in the grounding system, which affects the performance and safety of the power system. By monitoring the ground resistance, potential problems can be discovered as early as possible to ensure that the system can effectively eliminate current in the event of ground current or fault, thereby reducing the risk of electric shock and ensuring the stability of the power system.
[0053] Comprehensively calculate the power quality evaluation index β of each target transmission line i , its calculation expression is: Among them, R0 and N0 represent the maximum allowable grounding resistance of the transmission line and the maximum allowable voltage sag times of the transmission line, respectively, and ξ1 and ξ2 represent the power quality impact factors corresponding to the set grounding resistance and voltage sag times, respectively.
[0054] In a specific embodiment, by monitoring the working environment of the transmission line, including the ambient wind speed and the environmental corrosiveness, monitoring the working environment of the transmission line can help detect potential dangerous factors, help to discover potential risks in advance, and take preventive measures, thereby improving the safety and reliability of the power system. At the same time, monitoring the environment can better understand the operating status of the equipment, adjust the load of the transmission line according to weather conditions, and improve energy efficiency.
[0055] Specifically, the comprehensive calculation of the abnormal evaluation index χ of each target transmission line i , its calculation expression is: Where e represents a natural constant, ω1 and ω2 represent the set environmental interference value and the weight of the power quality assessment index respectively;
[0056] The transmission line abnormality assessment index threshold is obtained from the power system information database, and the abnormality assessment index of each target transmission line is compared with the transmission line abnormality assessment index threshold. If the abnormality assessment index of a target transmission line is higher than the transmission line abnormality assessment index threshold, the transmission line is recorded as an abnormal operation and maintenance line.
[0057] In a specific embodiment, by monitoring the environmental interference and power quality of the transmission lines and then screening out abnormal operation and maintenance lines, the fault location can be accurately located, which helps to shorten the fault response time and thus reduce the impact of the fault on the normal operation of the system. At the same time, by quickly locating the fault, repair measures can be taken more quickly, reducing power outage time, improving the reliability of the power system, and reducing operation and maintenance costs.
[0058] Step 2: Analyze the abnormal conditions of each power equipment in each abnormal operation and maintenance line, and comprehensively calculate the abnormal evaluation index of each power equipment in each abnormal operation and maintenance line.
[0059] Specifically, the abnormal conditions of each power device of each abnormal operation and maintenance line are analyzed. The specific analysis process is: statistics of each abnormal operation and maintenance line, and monitoring of the vibration signal of each power device to obtain the vibration signal waveform of each power device of each abnormal operation and maintenance line, and extracting the vibration frequency E of each power device of each abnormal operation and maintenance line rt , and at the same time obtain the reference standard vibration frequency E0 of the power equipment from the power system information database.
[0060] It should be explained that in this embodiment, a vibration sensor is used to monitor the vibration signal of the power equipment. By monitoring the vibration of the power equipment, potential problems can be identified and solved, thereby improving the reliability of the equipment, helping to avoid sudden failures, and improving the stability and reliability of the power system.
[0061] Obtain the standard vibration signal waveform of the power equipment from the power system information library and extract the standard vibration signal waveform length The vibration signal waveforms of each power equipment in each abnormal operation and maintenance line are overlapped and compared with the standard vibration signal waveforms, and then the overlap length of the vibration signal waveforms of each power equipment in each abnormal operation and maintenance line is obtained.
[0062] Comprehensively calculate the vibration signal abnormality index of each power equipment in each abnormal operation and maintenance line Its calculation expression is: Wherein, △E represents the set allowable deviation vibration frequency, υ1 and υ2 represent the correction factors corresponding to the set vibration frequency and the overlap length of the vibration signal waveform, respectively, r represents the number of each abnormal operation and maintenance line, r = 1, 2, 3, ..., h, h represents the total number of abnormal operation and maintenance lines, t represents the number of each power equipment, t = 1, 2, 3, ..., s, s represents the total number of power equipment.
[0063] Identify and extract the partial discharge times of each power equipment in each abnormal operation and maintenance line during the monitoring period As well as the current signal waveform and voltage signal waveform of each partial discharge, the average amplitude of the current signal of each partial discharge is obtained by analysis. And the average amplitude of the voltage signal
[0064] It should be explained that in this embodiment, current sensors and voltage sensors are used to monitor the current signal and voltage signal of partial discharge respectively. Partial discharge is a local discharge phenomenon that occurs in an electrical insulation system when the electric field strength reaches a certain critical value. It may be a sign that the insulation system is damaged or has problems. By monitoring and analyzing the partial discharge phenomenon of power equipment, potential problems can be discovered as early as possible to prevent equipment damage and power outages.
[0065] Obtaining the critical amplitude of the current signal of partial discharge of power equipment from the power system information database and voltage signal critical amplitude Comprehensively calculate the partial discharge abnormality index of each power equipment in each abnormal operation and maintenance line Its calculation expression is: Wherein τ1 represents the abnormal influence factor corresponding to the set number of unit partial discharges, τ2 and τ3 represent the correction factors corresponding to the set average amplitude of the current signal and the average amplitude of the voltage signal of the partial discharge, respectively, d represents the number of partial discharges, d=1, 2, 3, ..., g, g represents the number of partial discharges.
[0066] Furthermore, the comprehensive calculation of the abnormal evaluation index ε of each power equipment of each abnormal operation and maintenance linert , its calculation expression is: in and They are respectively represented as the influencing factors corresponding to the set vibration signal abnormality index and partial discharge abnormality index.
[0067] Step 3: Divide each abnormal operation and maintenance line into equal intervals, inspect and patrol each sub-combination link of each abnormal operation and maintenance line, and calculate the abnormal situation value of each sub-combination link of each abnormal operation and maintenance line.
[0068] Specifically, the inspection and patrol of each sub-combination link of each abnormal operation and maintenance line is carried out, and the specific analysis process is: deploying a number of inspection points for each sub-combination link of each abnormal operation and maintenance line, using a patrol drone to observe the current position of each inspection point of each sub-combination link, and extracting the initial patrol position of each inspection point, thereby obtaining the offset straight-line distance of each sub-combination link of each abnormal operation and maintenance line at each inspection point
[0069] Taking clockwise as the angle measurement direction, monitor the angle between the line tangent of each inspection point and the horizontal ground, and obtain the tangent angle of each inspection point of each sub-combination link of each abnormal operation and maintenance line At the same time, get the tangent angle of the original inspection point Comprehensively calculate the position deviation anomaly index of each sub-combination link of each abnormal operation and maintenance line Its calculation expression is: Wherein △θ represents the set allowable deviation tangent angle, σ1 represents the correction factor corresponding to the set tangent angle, σ2 represents the position offset influence factor of the set unit distance, z represents the number of each sub-combination link, z = 1, 2, 3, ..., u, u represents the total number of sub-combination links, b represents the number of each inspection point, b = 1, 2, 3, ..., c, c represents the total number of inspection points.
[0070] It should be explained that the angle measurement in this embodiment is the angle measurement in the side view direction, and the tangent angle is the minimum angle between the line tangent and the horizontal ground.
[0071] Monitor the vertical height of the lowest point of each sub-combination link of each abnormal operation and maintenance line to obtain the vertical height T of the lowest point of each sub-combination link rz , and at the same time obtain the critical to low point vertical height T0 of the transmission line from the power system information database.
[0072] It needs to be explained that in this embodiment, the vertical height of the lowest point of the transmission line is monitored by a patrol drone. If the vertical height of the lowest point of the transmission line is too small, it may cause the line to be broken or other faults to occur, increasing the risk of accidents such as electric shock and fire. By monitoring the vertical height of the transmission line to the lowest point, it is possible to promptly detect whether the line is sagging, thereby avoiding safety accidents caused by line sagging.
[0073] Further, the abnormal situation value of each sub-combination link of each abnormal operation and maintenance line is calculated Its calculation expression is: Among them, θ1 and θ2 represent the abnormal situation influencing factors corresponding to the set position deviation anomaly index and the vertical height to the lowest point, respectively.
[0074] In a specific embodiment, by monitoring the position and vertical height to the lowest point of the sub-combination line of the abnormal operation and maintenance line, the operating status of the transmission line is obtained in real time to avoid line disconnection or other faults due to the vertical height to the lowest point being too low. At the same time, by monitoring the position of the transmission line, the abnormal condition of the transmission line can be discovered, and then the transmission line can be further investigated and maintained to avoid the occurrence of potential faults and improve the safety of the power system.
[0075] Step 4: Through data integration processing, the power equipment and sub-combination links of the abnormal operation and maintenance lines are located and warned in turn.
[0076] Specifically, the power equipment and sub-combination links of the abnormal operation and maintenance lines are located and warned in turn. The specific analysis process is: obtaining the power equipment abnormal evaluation index threshold from the power system information library, and comparing the abnormal evaluation index of each power equipment of each abnormal operation and maintenance line with the power equipment abnormal evaluation index threshold. If the abnormal evaluation index of a certain power equipment is higher than the power equipment abnormal evaluation index threshold, the abnormal operation and maintenance line where the power equipment is located is fed back, and the power equipment is located and warned.
[0077] Similarly, abnormal situations of sub-combination links are located and warned.
[0078] It needs to be explained that the above-mentioned positioning and early warning of abnormal conditions of sub-combination links include the following specific steps: obtaining the abnormal situation value threshold of the sub-combination link from the power system information database, and comparing the abnormal situation value of each sub-combination link of each abnormal operation and maintenance line with the abnormal situation value threshold of the sub-combination link; if the abnormal situation value of a sub-combination link is higher than the abnormal situation value threshold of the sub-combination link, the abnormal operation and maintenance line where the sub-combination link is located is fed back, and the sub-combination link is located.
[0079] Reference Figure 2As shown, the second aspect of the present invention provides a power system early warning system, including: a transmission line abnormality assessment module, a power equipment abnormality assessment module, a sub-combination link abnormality assessment module, a data integration processing module and a power system information library.
[0080] The transmission line abnormality assessment module is respectively connected to the power equipment abnormality assessment module and the sub-combination link abnormality assessment module, the power equipment abnormality assessment module and the sub-combination link abnormality assessment module are connected to the data integration processing module, and the transmission line abnormality assessment module, the power equipment abnormality assessment module, the sub-combination link abnormality assessment module and the data integration processing module are all connected to the power system information database.
[0081] The transmission line abnormality assessment module is used to analyze the abnormal conditions of each target transmission line, comprehensively calculate the abnormality assessment index of each target transmission line, and thus screen out each abnormal operation and maintenance line.
[0082] The power equipment abnormality assessment module is used to analyze the abnormal conditions of each power equipment in each abnormal operation and maintenance line, and comprehensively calculate the abnormality assessment index of each power equipment in each abnormal operation and maintenance line.
[0083] The sub-combination link abnormality assessment module is used to divide each abnormal operation and maintenance line into equal intervals, inspect and patrol each sub-combination link of each abnormal operation and maintenance line, and calculate the abnormal situation value of each sub-combination link of each abnormal operation and maintenance line.
[0084] The data integration and processing module is used to carry out positioning and early warning of the power equipment and sub-combination links of the abnormal operation and maintenance lines through data integration and processing.
[0085] It needs to be explained that the above-mentioned power system information database is used to store the length and surface area of each target transmission line, the resistance coefficient of each target transmission line corresponding to different wind force levels under each wind direction working environment, the suitable working humidity range and the maximum wind load of the target line, the transmission line abnormality assessment index threshold, the reference standard vibration frequency and standard vibration signal waveform of the power equipment, the critical amplitude of the current signal and the critical amplitude of the voltage signal of the partial discharge of the power equipment, the linear density per unit length of the transmission line and the vertical height from the critical to the low point, the power equipment abnormality assessment index threshold, and the abnormal situation value threshold of the sub-combination link.
[0086] The above contents are merely examples and explanations of the structure of the present invention. The technicians in this technical field may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the structure of the invention or exceed the scope defined by the claims, they should all fall within the protection scope of the present invention.
Claims
1. A power system early warning method, characterized in that: include: Step 1: Analyze the abnormal conditions of each target transmission line, comprehensively calculate the abnormal evaluation index of each target transmission line, and screen out each abnormal operation and maintenance line; Step 2: Analyze the abnormal conditions of each power device in each abnormal operation and maintenance line, and comprehensively calculate the abnormality evaluation index of each power device in each abnormal operation and maintenance line; Step 3: Divide each abnormal operation and maintenance line into equal intervals, inspect and patrol each sub-combination link of each abnormal operation and maintenance line, and calculate the abnormal situation value of each sub-combination link of each abnormal operation and maintenance line; Step 4: Integrate the abnormal evaluation index of each power equipment of each abnormal operation and maintenance line and the abnormal situation value of each sub-combination link of each abnormal operation and maintenance line, and locate and warn the power equipment and sub-combination links of the abnormal operation and maintenance line based on the integration results; The formula used to calculate the abnormality assessment index of each target transmission line is: , Where, represents the abnormality assessment index of the target transmission line, Expressed as a natural constant, and They are respectively represented by the set environmental interference value and the weight of the power quality assessment index. represents the power quality assessment index of the target transmission line, It represents the number of each target transmission line. , Expressed as the total number of target lines, Indicates the environmental interference value of the target transmission line; The specific formula for the abnormal evaluation index of each power equipment in the abnormal operation and maintenance line is as follows: , Where, Indicates the abnormal evaluation index of each power equipment in the abnormal operation and maintenance line, and They are respectively expressed as the impact factors corresponding to the set vibration signal abnormality index and partial discharge abnormality index, The abnormal vibration signal index of each power equipment indicating abnormal operation and maintenance lines, Indicates the abnormal partial discharge index of each power equipment in the abnormal operation and maintenance line; The calculation expression for calculating the abnormal situation value of each sub-combination link of each abnormal operation and maintenance line is: , Where, Indicates the abnormal situation value of each sub-combination link of each abnormal operation and maintenance line, and They are respectively expressed as the abnormal situation impact factor corresponding to the set position deviation anomaly index and the vertical height to the lowest point, Indicates the position deviation anomaly index of each sub-combination link of the abnormal operation and maintenance line, Indicates the vertical height of the lowest point of the sub-assembly link, Indicates the vertical height from the critical point to the lowest point of the transmission line. Indicates the number of each sub-assembly link, , Expressed as the total number of sub-combination links; The specific analysis process of positioning and warning the power equipment and sub-combination links of abnormal operation and maintenance lines is as follows: The power equipment abnormality assessment index threshold and the abnormal situation value threshold of each sub-combination link are obtained from the power system information database, and the power equipment abnormality assessment index of each abnormal operation and maintenance line and the abnormal situation value of each sub-combination link are compared with the power equipment abnormality assessment index threshold and the abnormal situation value threshold of each sub-combination link respectively. If the abnormality assessment index of a certain power equipment is higher than the power equipment abnormality assessment index threshold, the abnormal operation and maintenance line where the power equipment is located is fed back, and the power equipment is positioned and warned. If the abnormal situation value of a sub-combination link is higher than the power equipment abnormality assessment index threshold, the abnormal operation and maintenance line where the sub-combination link is located is fed back, and the sub-combination link is positioned and warned.
2. The power system early warning method according to claim 1, characterized in that: The power quality evaluation index of the target transmission line and the environmental interference value of the target transmission line are calculated using the following formulas: The expression of the power quality assessment index of the target transmission line is: , The calculation expression of the environmental interference value of the target transmission line is: , Where, and They represent the maximum grounding resistance and the maximum voltage sag times allowed for the transmission line, respectively. and They are respectively expressed as the power quality impact factors corresponding to the set grounding resistance and voltage sag times; Indicates the number of voltage sags within the monitoring period. represents the average grounding resistance of the target transmission line, and They are respectively expressed as the interference weight factors corresponding to the set wind load and corrosion risk level; represents the wind load of the target transmission line, Indicates the corrosion risk assessment index of the target transmission line working environment, Indicates the maximum wind load that the target line can withstand.
3. The power system early warning method according to claim 2, characterized in that: The specific calculation method of the vibration signal abnormality index of each power equipment of the abnormal operation and maintenance line and the partial discharge abnormality index of each power equipment of the abnormal operation and maintenance line is as follows: Count each abnormal operation and maintenance line, monitor the vibration signal of each power equipment, obtain the vibration signal waveform of each power equipment on each abnormal operation and maintenance line, extract the vibration frequency of each power equipment on each abnormal operation and maintenance line, and obtain the reference standard vibration frequency of the power equipment from the power system information database; Obtain the standard vibration signal waveform of the power equipment from the power system information database, extract the standard vibration signal waveform length, overlap and compare the vibration signal waveform of each power equipment on each abnormal operation and maintenance line with the standard vibration signal waveform, obtain the vibration signal waveform overlap length of each power equipment on each abnormal operation and maintenance line, and comprehensively calculate the vibration signal abnormality index of each power equipment on each abnormal operation and maintenance line; Identify and extract the number of partial discharges of each power equipment on each abnormal operation and maintenance line during the monitoring period, as well as the current signal waveform and voltage signal waveform of each partial discharge, and analyze and obtain the average amplitude of the current signal and the average amplitude of the voltage signal of each partial discharge; Obtain the critical amplitude of the current signal and the critical amplitude of the voltage signal of the partial discharge of the power equipment from the power system information database, and comprehensively calculate the partial discharge abnormality index of each power equipment in each abnormal operation and maintenance line; The calculation formula for the vibration signal abnormality index of each power equipment in the abnormal operation and maintenance line is: , The calculation formula for the partial discharge abnormality index of each power equipment in the abnormal operation and maintenance line is: , Where, Indicates the abnormal vibration signal index of each power equipment in the abnormal operation and maintenance line; Indicates the set allowable deviation vibration frequency, and They are respectively expressed as the correction factors corresponding to the set vibration frequency and the overlap length of the vibration signal waveform, Indicates the number of each abnormal operation and maintenance line, , Expressed as the total number of abnormal operation and maintenance lines, Indicates the number of each power equipment, , Expressed as the total number of electrical equipment; Indicates the vibration frequency of each power equipment in the abnormal operation and maintenance line, Indicates the reference standard vibration frequency of power equipment; Indicates the standard vibration signal waveform length, Indicates the overlap length of the vibration signal waveform of the power equipment; It is expressed as the abnormal impact factor corresponding to the set number of unit partial discharges, and They are respectively expressed as the correction factors corresponding to the average amplitude of the current signal and the average amplitude of the voltage signal of the set partial discharge, Indicates the number of each partial discharge, , It is expressed as the number of partial discharges; Indicates the number of partial discharges of each power equipment on each abnormal operation and maintenance line during the monitoring period. Indicates the average amplitude of the discharge current signal, Indicates the average amplitude of the voltage signal; The critical amplitude of the current signal indicating partial discharge of power equipment, Indicates the critical amplitude of the voltage signal, Indicates the partial discharge anomaly index of each power equipment in the abnormal operation and maintenance line.
4. The power system early warning method according to claim 3, characterized in that: The position deviation anomaly index of each sub-combination link of the abnormal operation and maintenance line is obtained by a calculation formula, and the specific calculation process is as follows: Several inspection points are deployed for each sub-combination link of each abnormal operation and maintenance line. The current position of each inspection point of each sub-combination link is observed by patrol drones, and the initial inspection position of each inspection point is extracted to obtain the offset straight-line distance of each sub-combination link of each abnormal operation and maintenance line at each inspection point. Taking the clockwise direction as the angle measurement direction, the angle between the line tangent of each inspection point and the horizontal ground is monitored to obtain the tangent angle of each inspection point of each sub-combination link of each abnormal operation and maintenance line. At the same time, the tangent angle of the original inspection point is obtained, and the position offset anomaly index of each sub-combination link of each abnormal operation and maintenance line is comprehensively calculated. The calculation expression is: , Where, Indicates the position deviation anomaly index of each sub-combination link of the abnormal operation and maintenance line, Expressed as the set allowable deviation tangent angle, Expressed as the correction factor corresponding to the set tangent angle, It is expressed as the position offset influence factor of the set unit distance. Indicates the number of each inspection point. , It is expressed as the total number of inspection points; Indicates the offset straight-line distance of each sub-combination link of the regular operation and maintenance line at each inspection point; Indicates the tangent angle of each inspection point of each sub-combination link of the abnormal operation and maintenance line, Indicates the tangent angle of the original inspection point.
5. The power system early warning method according to claim 2, characterized in that: The calculation formula for the wind load of the target transmission line is as follows: , Where, represents the air density, Indicates the integrated wind speed, represents the surface area of the target transmission line exposed to wind, represents the resistance coefficient of the target transmission line, It represents the number of each target transmission line. , Expressed as the total number of target lines.
6. A system using the power system early warning method according to any one of claims 1 to 5, characterized in that: include: The transmission line abnormality assessment module is used to analyze the abnormal conditions of each target transmission line, comprehensively calculate the abnormality assessment index of each target transmission line, and thus screen out each abnormal operation and maintenance line; The power equipment abnormality assessment module is used to analyze the abnormal conditions of each power equipment in each abnormal operation and maintenance line and comprehensively calculate the abnormality assessment index of each power equipment in each abnormal operation and maintenance line; The sub-combination link abnormality assessment module is used to divide each abnormal operation and maintenance line into equal intervals, inspect and patrol each sub-combination link of each abnormal operation and maintenance line, and calculate the abnormal situation value of each sub-combination link of each abnormal operation and maintenance line; The data integration and processing module is used to locate and warn the power equipment and sub-combination links of abnormal operation and maintenance lines through data integration and processing.
Citation Information
Patent Citations
Method for prewarning and monitoring failures of secondary equipment of power system
CN102707178B
A Spatial Early Warning Method for Critical Phase Transition in Power System
CN106033890B
Intelligent evaluation method for power transmission and transformation operation safety quantification of smart grid power system
CN114611966A
Abnormality monitoring method and device for power transformation equipment and storage medium
CN116433009A