Active and passive scour protection structure for offshore structures and construction method

By forming a fixed structure of cemented stone-throwing clusters and bionic turf around the offshore structure, the problem that a single stone-throwing body is easily washed away by the water flow is solved, and the double protection effect of the offshore structure is achieved, which enhances the stability and anti-shrinkage of the structure. ability.

CN117536163BActive Publication Date: 2024-11-08CHINA THREE GORGES CORPORATION
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311397878.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-10-24
Publication Date
2024-11-08
Estimated Expiration
2043-10-24

AI Technical Summary

Technical Problem

The single stone throwing body around existing offshore structures is easily washed away by water flow, resulting in structural instability and affecting the protective effect of the structure.

Method used

Adopt active passive erosion protection structure including stone throwing bodies, cemented stone throwing clusters and bionic turf. The stone throwing bodies and bionic turf are fixed to the seabed through cementing materials to form a stable polymer space flexible grid and cemented stone throwing cluster. Clusters, combined with the construction method of explosive blocks and explosive packs, form a uniform and stable anti-swage structure of rock throwing body.

Benefits of technology

Effectively avoid instability and shear damage of the rock-throwing body under the action of water flow, providing passive protection, and at the same time, the water flow speed is reduced through bionic turf, increasing the overall stiffness and protective effect of the rock-throwing body, realizing active protection, and enhancing single The bearing capacity of pile foundation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117536163B_ABST
    Figure CN117536163B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of offshore wind power technology, and in particular to an active and passive scour protection structure and construction method for an offshore structure. An active and passive scour protection structure for an offshore structure comprises: a riprap body, which is suitable for surrounding a scour pit or seabed around the periphery of the structure; a cemented riprap cluster, which is formed on the middle and upper layers of the riprap body by a cementing material; and a bionic turf, which is fixed on top of the cemented riprap cluster by a cementing material. The present invention solves the problem that a single riprap body is easily washed away by water flow on the seabed and faces the defect of structural instability, thereby providing an active and passive scour protection structure and construction method for an offshore structure.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of offshore wind power, and in particular to an active and passive scour protection structure of an offshore structure and a construction method. Background Art

[0002] Offshore wind power is a clean energy source that is increasingly receiving attention from society. The environment in which offshore structures such as the monopile foundation of offshore wind turbines are located is very complex, with rough seabeds. Sediments around monopile foundations and other offshore structures are easily washed away by seabed currents to form scour pits, which in turn affects the bearing capacity of the monopile foundation and the stability of the superstructure.

[0003] In order to stabilize the structure, engineers placed riprap around the structure to resist the scouring of the seabed outside the structure by the water flow, and at the same time play a role in lateral stability and support for the structure. The existing single riprap is composed of granular block particles, which have weak ability to resist water flow, and the overall stability of the block accumulation is insufficient. It faces structural instability on the seabed and is easily washed away by the seabed water flow, affecting the protection of the structure. Summary of the invention

[0004] Therefore, the technical problem to be solved by the present invention is to overcome the defect that the single riprap body around the structure in the prior art is easily washed away by the water flow on the seabed and faces structural instability, thereby providing an active and passive scour protection structure and construction method for offshore structures.

[0005] In order to solve the above problems, the present invention provides an active and passive scour protection structure for offshore structures, comprising:

[0006] A riprap body, wherein the riprap body is suitable for being placed in a scour pit surrounding the periphery of the structure or on the seabed;

[0007] Cemented riprap clusters, wherein the cemented riprap clusters are formed in the middle and upper layers of the riprap body by cementing materials;

[0008] The bionic turf is fixed on the top of the cemented riprap clusters by a cementing material.

[0009] Optionally, the adhesive material is poured into a sealing bag, the adhesive material is liquid, the bionic turf is fixed on the top of the sealing bag, and a first sealing port is provided at the bottom of the sealing bag.

[0010] Optionally, a subsidiary bag is provided on the side of the sealing bag, and a liquid protective agent is filled in the subsidiary bag.

[0011] Optionally, it also includes a first explosive package, which is respectively arranged at the first sealing opening of the sealing bag and the second sealing opening of the auxiliary bag.

[0012] Optionally, the first sealing opening of the sealed bag is located at the bottom, the second sealing opening of the subsidiary bag is located at the bottom, and the first sealing opening of the sealed bag is lower than the second sealing opening of the subsidiary bag.

[0013] Optionally, it also includes an explosive block, which includes a rubble block and a second explosive package placed in the rubble block, and the explosive block is suitable for communication connection with a construction ship on the sea surface.

[0014] Optionally, the particle size of the riprap body is 5-20 cm.

[0015] Optionally, the expansion degree of the bonding material is 600-750 mm, the V-funnel time is 10-20 s, the plasticity retention performance is preferably 15-60 min, the initial setting time is 100-200 min, and the final setting time is 300-400 min.

[0016] Optionally, the detonation time interval between the first explosive packs in adjacent sealed bags is 5-15 minutes.

[0017] Optionally, the cementing material, the riprap bodies below the sealing bag and the surrounding areas form a cementing riprap cluster, and the cementing riprap cluster is a non-uniform cementing block.

[0018] Optionally, the cemented riprap clusters are arranged outside the structure in a scattered pattern.

[0019] Optionally, the sealing bag is made of polypropylene.

[0020] Optionally, a locator is provided in the sealing bag, and the construction vessel is provided with a stone throwing device and a controller, and the controller is communicatively connected with the locator.

[0021] A construction method for an active and passive scour protection structure of an offshore structure comprises the following steps: firstly throwing a riprap body into a scour pit or a preset position on a seabed surface, then placing a cementing material into the middle and upper layers of the riprap body to form a cementing riprap cluster, and finally fixing a bionic turf on top of the cementing riprap cluster by the cementing material.

[0022] Optionally, the following steps are included:

[0023] 1) The second explosive package is placed inside a small portion of the rubble, and the rubble containing the second explosive package is thrown into the scouring pit by the riprap device of the construction ship to form a peak-and-valley shaped rubble accumulation body around the single pile foundation;

[0024] 2) On the construction ship, the controller controls the remote detonation of the second explosive pack in the rubble in batches. The energy of the explosive causes vibration in the peak-valley shaped rubble accumulation body. By cutting the peaks and filling the valleys, the riprap body and rubble are exploded to form rubble particles that are evenly thrown into the scouring pit, so as to form a uniform and stable riprap anti-scouring structure;

[0025] 3) In the construction ship, the cementing material is poured into the sealing bag and the protective agent is poured into the auxiliary bag respectively, and then the explosive block is arranged at the first sealing port of the sealing bag and the second sealing port of the auxiliary bag, and the bionic turf is fixed on the top of the sealing bag;

[0026] 4) According to the design requirements, the construction vessel places the sealing bag and the auxiliary bag in sequence at the preset positions on the scouring pit or seabed surface;

[0027] 5) On the construction ship, the first explosive pack at the second sealing port of an auxiliary bag is remotely detonated through the controller, and the second sealing port is opened to allow the protective agent to flow out under the action of its own weight, and a stable polymer space flexible grid protection area is formed on the periphery of the cementing fixed structure and the local area on the surface of the riprap body through the action of water flow, and then the first explosive pack at the first sealing port of the sealing bag connected to the auxiliary bag is detonated, and the first sealing port is opened to allow the cementing material to continuously flow out under the action of its own weight into the riprap particles on the surface of the riprap body, the gaps between the riprap body and the rubble particles after the explosion of the rubble blocks, and the gaps between the rubble particles after the explosion of the rubble blocks, and flow downward and around to expand, adhere, and fill, and after solidification, a cemented riprap cluster composed of the cementing material, the rubble particles after the explosion of the rubble blocks, and the riprap body is formed, and at the same time, the cementing material remaining in the sealing bag is hydrated and hardened to fix the bionic turf on the surface of the cemented riprap cluster;

[0028] 6) Repeat step 5) to detonate the first explosive packs in other sealed bags one by one, wherein the detonation interval between adjacent sealed bags is 5-15 minutes.

[0029] The technical solution of the present invention has the following advantages:

[0030] 1. The active and passive scour protection structure of the offshore structure provided by the present invention comprises: a riprap body, which is suitable for surrounding the scour pit or the seabed outside the structure; a cemented riprap cluster, which is formed in the middle and upper layers of the riprap body by a cementing material; and a bionic turf, which is fixed on the top of the cemented riprap cluster by a cementing material. After the riprap body is sunk in a preset position on the scour pit or the seabed surface, the cementing material is then placed on the middle and upper layers of the riprap body to form a cemented riprap cluster, and finally the bionic turf is fixed on the top of the cemented riprap cluster by the cementing material. The active and passive scour protection structure provided by the present application forms multiple riprap bodies into cemented riprap clusters. The cemented riprap clusters effectively restrict the movement of surrounding gravel particles and riprap bodies to avoid instability or shear damage under the action of water flow, and play a passive protective role for the structure, even if it is subjected to long-term water scour. At the same time, the bionic turf is fixed to the cemented riprap clusters. The bionic turf has a slowing effect on the wake and vortex of the water flow around the structure, and plays an active protective role for the structure, reducing the speed of the impact water flow, so that the sand particles in the water flow are gradually deposited on the surface of the riprap body and the cemented riprap cluster, filling the gaps in the riprap body, and enhancing the overall stiffness of the riprap body. It has the dual advantages of active protection and passive protection. In addition, the placement of the bionic turf in the present invention makes full use of the integrated construction process of the cemented riprap body, and has the advantages of simple process and high stability after fixation.

[0031] 2. The active and passive scour protection structure of the offshore structure provided by the present invention comprises a bonding material poured into a sealing bag, the bonding material is in liquid state, the bionic turf is fixed on the top of the sealing bag, a first sealing port is provided on the bottom of the sealing bag, the bonding material flows out from the first sealing port in liquid form to bond the bionic turf, the sealing bag and the riprap body together, so that the bionic turf is stably fixed on the bonded riprap cluster.

[0032] 3. The active and passive scour protection structure of the offshore structure provided by the present invention has an auxiliary bag on the side of the sealing bag, and the auxiliary bag is filled with a liquid protective agent. The protective agent forms a stable polymer space flexible grid protection area on the periphery of the sealing bag, which is convenient for the bonding process of the bonding material.

[0033] 4. The active and passive scour protection structure for offshore structures provided by the present invention also includes a first explosive package, which is respectively arranged at the first sealing port of the sealing bag and the second sealing port of the auxiliary bag. The sealing port is opened by the explosion action of the explosive block to facilitate the outflow of the bonding material and the protective agent.

[0034] 5. In the active and passive scour protection structure for offshore structures provided by the present invention, the first sealing opening of the sealing bag is located at the bottom, the second sealing opening of the auxiliary bag is located at the bottom, the first sealing opening of the sealing bag is lower than the second sealing opening of the auxiliary bag. The second sealing opening of the auxiliary bag is higher than the first sealing opening of the sealing bag, and the protective agent flowing out of the auxiliary bag forms a protection area, so that the cementing material is completely in the protection area.

[0035] 6. The active and passive scour protection structure for offshore structures provided by the present invention also includes an explosive block, which includes a rubble block and a second explosive package placed in the rubble block. The explosive block is suitable for communication connection with a construction ship on the sea surface, and the explosion time of the explosive package is controlled by the construction ship.

[0036] 7. In the active and passive scour protection structure for offshore structures provided by the present invention, the particle size of the riprap is 5-20 cm, so that the riprap can be driven to move after the explosion of the explosive block.

[0037] 8. In the active and passive scour protection structure for offshore structures provided by the present invention, the detonation time interval of the first explosive packs of adjacent sealed bags is 5-15 minutes to form cemented riprap clusters.

[0038] 9. The active and passive scour protection structure of the offshore structure provided by the present invention has cemented riprap clusters arranged outside the structure in a scattered pattern to simulate the distribution of real seabed water plants, thereby providing a protective effect and reducing the amount of cementing materials and construction difficulty.

[0039] 10. The active and passive scour protection structure of the offshore structure provided by the present invention has a locator in the sealing bag, a stone throwing device and a communicator in the construction ship, and the communicator and the locator are communicatively connected. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0041] Figure 1 A front view of an active and passive scour protection structure of an offshore structure provided in an embodiment of the present invention;

[0042] Figure 2 A top view of an active and passive scour protection structure of an offshore structure provided in an embodiment of the present invention;

[0043] Figure 3 A schematic diagram of an explosion block provided in an embodiment of the present invention;

[0044] Figure 4 A schematic diagram of the connection between the adhesive fixing structure and the bionic turf provided in an embodiment of the present invention;

[0045] Figure 5 It is a schematic diagram of a cemented riprap cluster provided in an embodiment of the present invention.

[0046] Explanation of the accompanying reference numerals: 1. structure; 2. riprap body; 21. crushed stone; 22. second explosive pack; 3. cemented riprap cluster; 4. bionic turf; 5. cemented fixed structure; 51. sealing bag; 52. auxiliary bag; 53. first sealing port; 54. second sealing port; 6. sand and gravel. DETAILED DESCRIPTION

[0047] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0048] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0049] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0050] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.

[0051] like Figure 1A specific implementation of the active and passive scour protection structure of the offshore structure shown in Figure 5 includes: a plurality of riprap bodies 2 in the scour pit or on the seabed surface surrounding the structure 1, and a plurality of cemented riprap clusters 3 formed by the riprap bodies 2 and the cementing material, and the cemented riprap clusters 3 are arranged in a scattered pattern, wherein the top of each cemented riprap cluster 3 is fixedly connected with a bionic turf 4. Specifically, the particle size of the riprap body 2 is 5-20 cm, and the structure 1 is a single pile foundation.

[0052] like Figure 4 As shown, it is a pouring adhesive material, and also includes a plurality of adhesive fixing structures 5, each of which includes a sealing bag 51 and an auxiliary bag 52 arranged on the periphery of the sealing bag 51, wherein the sealing bag 51 is filled with liquid adhesive material, and the auxiliary bag 52 is filled with liquid protective agent. Specifically, the sealing bag 51 and the auxiliary bag 52 are made of polypropylene, that is, the sealing bag 51 and the auxiliary bag 52 form a ton bag and are placed at a preset position. The adhesive material is a formulated cement-based adhesive material, and its flowability and adhesion filling properties are between those of traditional self-compacting cement mortar and traditional self-compacting concrete, and it has the advantages of high flowability, high plasticity, super early strength, and non-dispersion. In addition, the expansion of the adhesive material is 600-750mm, the V funnel time is 10-20s, the plasticity performance is preferably 15-60min, the initial setting time is 100-200min, and the final setting time is 300-400min. To facilitate the outflow of the adhesive material or protective agent, a first sealing opening 53 is provided on the side of the bottom of the sealing bag 51, and a second sealing opening 54 is provided on the bottom of the auxiliary bag 52, and the first sealing opening 53 of the sealing bag 51 is lower than the second sealing opening 54 of the auxiliary bag 52. Figure 4 As shown, the first sealed opening 53 of the sealed bag 51 and the second sealed opening 54 of the auxiliary bag 52 are evenly provided with first explosive packages. Figure 3 As shown, it also includes an explosive block, which includes a rubble block 21 and a second explosive package 22 placed in the rubble block 21, and the explosion energy of the first explosive package is less than the explosion energy of the second explosive package 22, and the explosion energy of the first explosive package can only explode an opening at the set position of the sealing bag 51 and the auxiliary bag 52.

[0053] It is worth mentioning that the first sealing port 53 and the second sealing port 54 can also be sealed with a self-dissolving film. The self-dissolving film begins to gradually decompose when it comes into contact with seawater. After a period of time, the film is dissolved and destroyed, releasing the protective agent and the bonding material. The self-dissolving film is made of renewable polyester and polyvinyl alcohol film. The time required for dissolution is controlled according to the material, manufacturing process, thickness and marine environment of the dissolving bag. After dissolution, it decomposes into carbon dioxide and water, and does not pollute the marine environment. The dissolution time of the self-dissolving film at the first sealing port 53 is longer than that of the self-dissolving film at the second sealing port 54. After using the self-dissolving film, the placement of explosive packs at the sealing port is eliminated.

[0054] For the convenience of control, a construction vessel is also included, wherein a riprap device and a controller are arranged on the construction vessel, a positioner is arranged in the sealing bag 51, and the controller is respectively connected to the positioner and the second explosive package 22 for communication.

[0055] A construction method for an active and passive scour protection structure of an offshore structure comprises the following steps:

[0056] 1) The second explosive pack 22 is embedded in a small portion of the rubble 21, and the rubble 21 containing the second explosive pack 22 is thrown into the scouring pit by the riprap device of the construction ship to form a peak-and-valley shaped rubble accumulation body surrounding the structure 1;

[0057] 2) On-site personnel are on the construction ship, and the controller controls the remote detonation of the second explosive packs 22 in the rubble blocks 21 in batches. The energy of the explosives causes vibrations in the peak-valley shaped rubble accumulation body, and the riprap body 2 and the rubble blocks 21 are exploded by cutting the peaks and filling the valleys to form rubble particles that are evenly thrown into the scouring pit, so as to form a uniform and stable riprap anti-scouring structure;

[0058] 3) In the construction ship, the cementing material is poured into the sealing bag 51 and the protective agent is poured into the auxiliary bag 52 respectively, and then the explosive block is arranged at the first sealing port 53 of the sealing bag 51 and the second sealing port 54 of the auxiliary bag 52, and the bionic turf 4 is fixed on the top of the sealing bag 51;

[0059] 4) According to the design requirements, the construction vessel places several cementing fixed structures 5 in sequence at preset positions on the scouring pit or seabed surface;

[0060] 5) On the construction ship, a first explosive pack at a second sealing opening 54 of an auxiliary bag 52 of a cementing fixed structure 5 is remotely detonated through a controller, and the second sealing opening 54 is opened to allow the protective agent to flow out under the action of its own weight, and a stable polymer space flexible grid protection area is formed on the periphery of the cementing fixed structure 5 and the local area on the surface of the riprap body 2 through the action of water flow, and then the first explosive pack at the first sealing opening 53 of the sealing bag 51 of the cementing fixed structure 5 is detonated, and the first sealing opening 53 is opened to allow the cementing material to continuously flow out under the action of its own weight and enter the riprap particles on the surface of the riprap body 2, The riprap body 2 flows into the gaps between the crushed stone particles after the explosion of the crushed stone block 21 and the crushed stone particles after the explosion of the crushed stone block 21, and flows downward, expands, adheres, and fills the gaps. After solidification, a cemented riprap cluster 3 composed of the cementing material, the crushed stone particles after the explosion of the crushed stone block 21, and the riprap body 2 is formed. Since the cementing material flows out from the first sealing port 53 at the bottom of the sealing bag 51, residual cementing material remains in the sealing bag 51. At the same time, the residual cementing material in the sealing bag 51 is hydrated and hardened to cement the inside of the sealing bag 51, thereby fixing the bionic turf 4 on the surface of the cemented riprap cluster 3.

[0061] 6) Repeat step 5) to detonate the first explosive packs in other cemented fixed structures 5 one by one, wherein the detonation interval between the cemented fixed structures 5 is 5-15 minutes, preferably 8 minutes, and finally obtain a plurality of riprap clusters 3 arranged in a scattered pattern with the structure 1 as the center.

[0062] The active and passive scour protection structure of the offshore structure provided by the present invention has the following advantages: (1) the movement of the surrounding gravel particles can be effectively restricted by the super-large diameter cemented riprap clusters 3 formed in the riprap body 2, which significantly improves the anti-scour ability of the gravel particles on the surface of the riprap body 2, and avoids the gravel particles on the surface of the riprap body 2 from being unstable or sheared under the action of water flow; (2) a plurality of non-continuous super-large diameter cemented riprap clusters 3 are formed in the local area inside the scour pit of the structure, thereby forming an anti-scour structure composed of the cemented riprap clusters 3 and gravel particles, which basically maintains the deformation of the riprap body 2 itself and the ability to adapt to the deformation of the seabed foundation; (3) the super-large diameter cemented riprap clusters 3 formed in the scour pit can improve The high overall stiffness of the riprap body 2 can increase the horizontal bearing capacity of structures 1 such as single pile foundations and barrel foundations compared to the original riprap body 2; (4) The bionic turf 4 and the cemented riprap clusters 3 are constructed in an integrated manner, wherein the cemented riprap clusters 3 improve the overall stability of the anti-scour structure, that is, solve the problem that the single riprap body 2 protective structure is prone to instability due to the fast seabed flow velocity, and the single bionic turf 4 cannot maintain stability and sand cannot be deposited; (5) On the one hand, the bionic turf 4 can reduce the water flow velocity on the surface of the riprap body 2 and avoid erosion of the seabed at the bottom of the riprap body 2, playing an active protective role; on the other hand, the sand and gravel 6 carried in the water flow are continuously deposited on the bionic turf 4 and the surface of the riprap body 2, further protecting the seabed.

[0063] As an alternative embodiment, the cementing material and the protective agent may also be in a solid state and become liquid by reacting with seawater.

[0064] Obviously, the above embodiments are merely examples for clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived from them are still within the protection scope of the invention.

Claims

1. An active and passive scour protection structure for an offshore structure, characterized in that: include: A riprap body (2), wherein the riprap body (2) is suitable for being placed in a scour pit or on the seabed surrounding the structure (1); Cemented riprap clusters (3), wherein the cemented riprap clusters (3) are formed in the middle and upper layers of the riprap body (2) by means of a cementing material; A bionic turf (4), wherein the bionic turf (4) is fixed on top of the cemented riprap cluster (3) by means of a cementing material; The adhesive material is poured into the sealing bag (51), the adhesive material is liquid, the bionic turf (4) is fixed on the top of the sealing bag (51), and the bottom of the sealing bag (51) is provided with a first sealing opening (53); An auxiliary bag (52) is provided on the side of the sealing bag (51), and a liquid protective agent is poured into the auxiliary bag (52); It also includes a first explosive pack, which is respectively arranged at a first sealing opening (53) of the sealing bag (51) and a second sealing opening (54) of the auxiliary bag (52); The first sealing opening (53) of the sealing bag (51) is located at the bottom, the second sealing opening (54) of the subsidiary bag (52) is located at the bottom, and the first sealing opening (53) of the sealing bag (51) is lower than the second sealing opening (54) of the subsidiary bag (52).

2. The active and passive scour protection structure for offshore structures according to claim 1, characterized in that: It also includes an explosive block, which includes a rubble block (21) and a second explosive pack (22) placed in the rubble block (21), and the explosive block is suitable for communication connection with a construction ship on the sea surface.

3. The active and passive scour protection structure for offshore structures according to claim 1, characterized in that: The particle size of the riprap (2) is 5-20 cm.

4. The active and passive scour protection structure for offshore structures according to claim 1, characterized in that: The expansion degree of the bonding material is 600-750mm, the V-funnel time is 10-20s, the plasticity retention performance is 15-60min, the initial setting time is 100-200min, and the final setting time is 300-400min.

5. The active and passive scour protection structure for offshore structures according to claim 2, characterized in that: The detonation time interval of the first explosive packs of adjacent sealed bags (51) is 5-15 minutes.

6. The active and passive scour protection structure for offshore structures according to claim 5, characterized in that: The riprap body (2) below the cementing material and the sealing bag (51) and in the surrounding area forms a cemented riprap cluster (3), and the cemented riprap cluster (3) is a non-uniform cemented block.

7. The active and passive scour protection structure for offshore structures according to claim 6, characterized in that: The cemented riprap clusters (3) are arranged outside the structure (1) in a scattered pattern.

8. The active and passive scour protection structure for offshore structures according to claim 1, characterized in that: The sealing bag (51) is made of polypropylene.

9. The active and passive scour protection structure for offshore structures according to claim 6, characterized in that: A locator is provided in the sealing bag (51), and the construction vessel is provided with a riprap device and a controller, wherein the controller is communicatively connected with the locator.

10. A construction method for an active and passive scour protection structure of an offshore structure, used to form the active and passive scour protection structure of an offshore structure according to claim 1, characterized in that: After the riprap body (2) is dumped at a preset position on the scouring pit or the seabed surface, a cementing material is placed on the middle and upper layers of the riprap body (2) to form a cemented riprap cluster (3), and finally the bionic turf (4) is fixed on the top of the cemented riprap cluster (3) by the cementing material; 1) embedding a second explosive pack (22) in a small portion of the rubble (21), and using a rock throwing device of a construction vessel to throw the rubble (21) containing the second explosive pack (22) into the scouring pit, thereby forming a peak-and-valley shaped rubble accumulation body surrounding the structure (1); 2) On the construction vessel, the controller controls the remote detonation of the second explosive pack (22) in the rubble (21) in batches, and the energy of the explosive causes vibration in the peak-valley shaped rubble accumulation body, so that the riprap body (2) and the rubble (21) are exploded by cutting the peaks and filling the valleys, and the rubble particles formed after the explosion are evenly thrown into the scouring pit, so as to form a uniform and stable riprap anti-scouring structure; 3) Inside the construction vessel, the cementing material is poured into the sealing bag (51), and the protective agent is poured into the auxiliary bag (52), and then the explosive block is arranged at the first sealing opening (53) of the sealing bag (51) and the second sealing opening (54) of the auxiliary bag (52), and the bionic turf (4) is fixed to the top of the sealing bag (51); 4) According to the design requirements, the construction vessel places the sealing bag (51) and the auxiliary bag (52) in sequence at the preset positions of the scouring pit or the seabed surface; 5) On the construction ship, a first explosive pack at a second sealing opening (54) of an auxiliary bag (52) is remotely detonated by a controller, the second sealing opening (54) is opened to allow the protective agent to flow out under the action of its own weight, and a stable polymer space flexible grid protection area is formed on the periphery of the cementing fixed structure (5) and a local area on the surface of the riprap body (2) through the action of water flow, and then the first explosive pack at the first sealing opening (53) of the sealing bag (51) connected to the auxiliary bag (52) is detonated, and the first sealing opening (53) is opened to allow the cementing material to flow out under the action of its own weight. The material continuously flows out into the riprap particles on the surface of the riprap body (2), the gaps between the riprap body (2) and the rubble particles after the explosion of the rubble block (21), and the gaps between the rubble particles after the explosion of the rubble block (21), and flows downward and around to expand, adhere, and fill, and after solidification, forms a cemented riprap cluster (3) composed of the cementing material, the rubble particles after the explosion of the rubble block (21), and the riprap body (2), and at the same time, the cementing material remaining in the sealing bag (51) is hydrated and hardened to fix the bionic turf (4) on the surface of the cemented riprap cluster (3); 6) Repeat step 5) to detonate the first explosive packs in other sealed bags (51) one by one, wherein the detonation interval between adjacent sealed bags (51) is 5-15 minutes.