Infrastructure security perception system, electronic equipment and media based on power Beidou
Through the infrastructure security perception system based on the power Beidou, the construction data and personnel information are collected and uploaded in real time, the problem of high risks and labor dependence in infrastructure construction is solved, efficient construction management and safety monitoring are achieved, and construction quality and safety are improved. .
Patent Information
- Application Number
- CN202410052933.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-15
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-01-15
AI Technical Summary
In complex operating environments such as high altitude and deep foundation pits, infrastructure construction workers face high risks, existing management and monitoring methods cannot meet safety management requirements, traditional measurement methods rely on manual accuracy, long communication testing time, and monitoring equipment management is prone to occur Page stuttering problem.
Adopt the infrastructure security perception system based on power Beidou, through Beidou safety helmet, smart bracelet, compactor intelligent monitoring terminal and pile foundation operation intelligent monitoring terminal, the construction data and personnel information are collected and uploaded in real time to achieve accurate management and real-time monitoring. Reduce manual intervention and improve construction quality and safety.
Accurate management and real-time monitoring of the construction site are realized, construction safety and quality are improved, testing and testing costs are reduced, communication and testing time are shortened, page lag problems are alleviated, and construction efficiency and quality are improved.
Smart Images

Figure CN117592660B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of computer technology, and in particular to an infrastructure security perception system, electronic equipment and medium based on electric power Beidou. Background Art
[0002] Power transmission and transformation projects are mostly located in the wild, especially line projects are mostly located in high mountains and steep hills. There are many high-risk operations such as high altitude, deep foundation pits and temporary power supply. The working environment is complex and personnel management in the working area is difficult. At present, infrastructure informatization has realized the entry and exit records of personnel and the clocking in and out of the work site through mobile phone face recognition.
[0003] In the construction of high-altitude power transmission and transformation projects, the personnel involved in the construction are affected by factors such as high altitude, thin air, and strong ultraviolet rays. Acute mountain sickness has become the main threat to power grid construction personnel in high-altitude areas. Personnel working in deep foundation pits and at heights in conventional projects are deeply threatened by risks such as being hit by objects, gas poisoning, and falling from heights, and their lives and health are threatened. Problems are fed back through manual reports.
[0004] The possible consequences of the risk of internal suspension and internal tension pole disassembly and assembly are "object impact, mechanical injury, and falling from height", and the risk assessment value is D=3×2×40=240, which is a second-level risk. The preventive measures clearly state that if an intelligent construction method is used to monitor the lifting weight and the inclination of the pole, the risk can be controlled at the third level. A large number of projects use internal suspension and internal tension pole disassembly and assembly to save construction costs. However, due to the large amount of projects, there are many internal suspension and internal tension pole disassembly and assembly construction every day, and the existing management personnel cannot meet the safety management requirements of the second-level risk control.
[0005] In addition, during the backfill construction of the substation civil engineering project, the quality acceptance of the foundation construction has high requirements for indicators such as the backfill layer thickness, compaction coefficient, and moisture content (too high will form spring soil). At present, the construction site tests these indicators for every 30 centimeters of compacted backfill soil layer. A qualified laboratory is commissioned to take samples for testing. After the test is passed, the next layer of foundation backfill will be continued.
[0006] During the construction of the civil foundation of the substation, if the shallow soil of the foundation is poor and the bearing soil layer is buried deep, a deep foundation pit foundation is required to meet the requirements of the structure for foundation strength, deformation and stability, then a pile foundation is needed. At present, State Grid Corporation of China is promoting mechanized construction for pile foundation construction, and mechanical rotary drilling is widely used to form holes. The traditional method for surveying and positioning the foundation pile position is manual measurement. The accuracy of the measurement is highly dependent on the technical level of the surveyor, and the measurement accuracy requirements are very high, which is related to the success or failure of the entire project quality. There are two traditional measurement methods for the depth of foundation pit excavation. One is to use a heavy object to hang a rope down, and then lift it up to measure the length after reaching the bottom; the other is to use a ruler to measure the depth of the pile barrel into the soil.
[0007] Since the infrastructure involves a large number of monitoring devices, a third-party communication terminal is required to test whether the monitoring devices are connected successfully one by one, and the communication test time is relatively long.
[0008] In addition, since infrastructure involves a large number of monitoring devices, page freezes are likely to occur when managing each monitoring device, which is not conducive to real-time monitoring of the monitoring devices.
[0009] The above information disclosed in this Background section is only for enhancement of understanding of the background of the inventive concept and therefore it may contain information that does not form the prior art that is already known in this country to a person of ordinary skill in the art. Summary of the invention
[0010] The content of the present invention is used to introduce the concepts in a brief form, which will be described in detail in the detailed implementation section below. The content of the present invention is not intended to identify the key features or essential features of the technical solution claimed for protection, nor is it intended to limit the scope of the technical solution claimed for protection.
[0011] The present invention proposes an infrastructure security perception system, an electronic device and a computer-readable medium based on the Electric Power Beidou to solve one or more of the technical problems mentioned in the above background technology part.
[0012] In the first aspect, the present invention provides an infrastructure security perception system based on electric power Beidou, the system comprising: an electric power communication network system and an on-site communication network system, the electric power communication network system comprising: an infrastructure control system, a security access gateway, a Beidou communication front-end server, a serial port server and a Beidou control user terminal, the on-site communication network system comprising: an edge IoT proxy server, an access gateway and infrastructure on-site monitoring equipment, wherein the electric power communication network system is communicatively connected to the on-site communication network system via a remote communication network, and the Beidou control user terminal is communicatively connected to the Beidou satellite; the on-site communication network system is communicatively connected to the Beidou satellite via a Beidou satellite measurement and control center ground station; the infrastructure on-site The monitoring equipment includes: Beidou safety helmet, Beidou smart bracelet, compactor intelligent monitoring terminal, and pile foundation operation intelligent monitoring terminal; the above-mentioned Beidou safety helmet is used to collect infrastructure data collected at the infrastructure construction site, and upload the collected infrastructure data to the above-mentioned power communication network system; the above-mentioned Beidou smart bracelet is used to collect the physical information of the workers, and upload the collected physical information to the above-mentioned power communication network system; the above-mentioned compactor intelligent monitoring terminal is used to monitor the backfill construction, and upload the monitored backfill construction information to the above-mentioned power communication network system; the above-mentioned pile foundation operation intelligent monitoring terminal is used to monitor the pile foundation construction, and upload the monitored pile foundation construction information to the above-mentioned power communication network system.
[0013] In a second aspect, the present invention provides an electronic device comprising: one or more processors; a storage device on which one or more programs are stored, and when the one or more programs are executed by one or more processors, the one or more processors implement the method described in any implementation method of the above-mentioned first aspect.
[0014] In a third aspect, the present invention provides a computer-readable medium having a computer program stored thereon, wherein when the computer program is executed by a processor, the method described in any implementation of the first aspect is implemented.
[0015] The present invention has the following beneficial effects: through the infrastructure safety perception system based on electric power Beidou of the present invention, on-site workers can wear high-precision Beidou safety helmets to record the trajectories of all personnel during their work, thereby realizing precise management of on-site personnel's arrival at their posts, supervision, and performance of duties; through Beidou smart bracelets, real-time monitoring, early warning and health intervention of personnel in special construction environments are carried out, fully guaranteeing the health and life safety of construction workers; through the use of Beidou compactor intelligent monitoring terminal, real-time dynamic monitoring of the compactor rolling trajectory, number of passes, compaction degree and other information during the foundation backfilling process, the prefabricated rules are automatically calculated to obtain the backfill layer thickness and compaction coefficient , moisture content (too high will form spring soil), provide drivers with high-quality and efficient work guidance, detect while construction, improve compaction quality and construction efficiency; when problems are found, the problem area can be defined in time to reduce waste; it can also save the cost of test and inspection, inspection personnel and operators; by adding corresponding functions to the platform, the platform function of all-weather, intelligent, visual and information-based is realized, providing owners and supervisors with a powerful scientific guidance construction digital platform, and improving the quality of civil engineering backfill construction; through the use of pile foundation operation intelligent monitoring terminals, construction point navigation (no need to stake out), verticality detection, and automatic monitoring of buried depth (foundation pit depth) are realized, thereby improving the quality level of pile foundation construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] The above and other features, advantages and aspects of the embodiments of the present invention will become more apparent with reference to the following detailed description in conjunction with the accompanying drawings. Throughout the accompanying drawings, the same or similar reference numerals represent the same or similar elements. It should be understood that the drawings are schematic and that components and elements are not necessarily drawn to scale.
[0017] Figure 1 is a system architecture diagram of some embodiments of the infrastructure security perception system based on electric power Beidou according to the present invention;
[0018] Figure 2 It is a schematic diagram of the structure of an electronic device suitable for implementing some embodiments of the present invention. DETAILED DESCRIPTION
[0019] Embodiments of the present invention will be described in more detail below with reference to the accompanying drawings. Although certain embodiments of the present invention are shown in the accompanying drawings, it should be understood that the present invention can be implemented in various forms and should not be construed as being limited to the embodiments set forth herein. On the contrary, these embodiments are provided to provide a more thorough and complete understanding of the present invention. It should be understood that the drawings and embodiments of the present invention are only for exemplary purposes and are not intended to limit the scope of protection of the present invention.
[0020] It should also be noted that, for ease of description, only the parts related to the invention are shown in the drawings. In the absence of conflict, the embodiments of the present invention and the features in the embodiments can be combined with each other.
[0021] It should be noted that the concepts such as "first" and "second" mentioned in the present invention are only used to distinguish different devices, modules or units, and are not used to limit the order or interdependence of the functions performed by these devices, modules or units.
[0022] It should be noted that the modifications of "one" and "plurality" mentioned in the present invention are illustrative rather than restrictive, and those skilled in the art should understand that, unless otherwise clearly indicated in the context, it should be understood as "one or more".
[0023] The names of the messages or information exchanged between multiple devices in the embodiments of the present invention are only used for illustrative purposes, and are not used to limit the scope of these messages or information.
[0024] The present invention will be described in detail below with reference to the accompanying drawings and in conjunction with embodiments.
[0025] Figure 1 It is a system architecture diagram of some embodiments of the infrastructure security perception system based on electric power Beidou according to the present invention. It shows that the infrastructure security perception system based on electric power Beidou according to the present invention includes: an electric power communication network system 101 and an on-site communication network system 102. The above-mentioned electric power communication network system 101 includes: an infrastructure control system, a security access gateway, a Beidou communication front-end server, a serial port server and a Beidou control user terminal. The above-mentioned on-site communication network system 102 includes: an edge IoT proxy server, an access gateway and an infrastructure on-site monitoring device.
[0026] In some embodiments, the above-mentioned power communication network system is connected to the above-mentioned on-site communication network system through a remote communication network, and the above-mentioned Beidou control user terminal is connected to Beidou satellite communication. The infrastructure control system may be a distributed control system for monitoring the infrastructure site. For example, the infrastructure control system may include multiple computing devices. The secure access gateway may refer to a secure gateway. The Beidou communication front-end server may be a front-end server for relaying Beidou satellite communication. The Beidou control user terminal may be a user terminal that controls the communication connection with the Beidou satellite.
[0027] In some embodiments, the on-site communication network system is connected to the BeiDou satellite via a BeiDou satellite control center ground station. The BeiDou satellite control center ground station may refer to a BeiDou satellite navigation system base station. That is, the BeiDou satellite control center ground station may be used for signal relay.
[0028] In some embodiments, the above-mentioned infrastructure site monitoring equipment includes: Beidou safety helmet, Beidou smart bracelet, compactor intelligent monitoring terminal, and pile foundation operation intelligent monitoring terminal. Beidou safety helmet can be a safety helmet equipped with Beidou positioning chip. Beidou smart bracelet can refer to a smart bracelet equipped with Beidou positioning chip. Compactor intelligent monitoring terminal can refer to an intelligent terminal for monitoring compactor. For example, compactor intelligent monitoring terminal can include compaction sensor, GNSS antenna, and high-precision receiver. Pile foundation operation intelligent monitoring terminal can refer to a monitoring terminal for monitoring pile driver, which can include: inclination sensor, GNSS antenna, main control box, current sensor.
[0029] In some embodiments, the Beidou safety helmet is used to collect infrastructure data from the infrastructure construction site and upload the collected infrastructure data to the power communication network system. As an example, the construction workers can wear Beidou safety helmets equipped with smart chips to collect and transmit the data collected from the construction site and finally report it to the infrastructure control system. Finally, the infrastructure control system can organize and analyze the data in real time to clearly understand the workers' on-site distribution and personal attendance data.
[0030] In some embodiments, the Beidou smart bracelet is used to collect the physical information of the workers and upload the collected physical information to the power communication network system. For example, by wearing the Beidou smart bracelet, the construction workers can collect and transmit the data collected at the construction site, and finally report it to the infrastructure control system. Finally, the infrastructure control system can sort and analyze the data in real time to clearly understand the safety and health dynamics of the workers' blood oxygen. For example, by wearing the Beidou smart bracelet, the key information such as the heart rate and blood oxygen of the personnel can be automatically monitored, and the health status of the personnel can be automatically calculated by combining artificial intelligence technology. By improving the personnel management function, health monitoring type, air pressure detection statistical list, air pressure detection detailed information, blood oxygen detection statistical list, blood oxygen detection detailed information, heart rate detection statistical list, heart rate detection detailed information personnel health detection comprehensive analysis list, personnel health detection comprehensive analysis detailed information, personnel health abnormal alarm information, personnel health abnormal alarm information SMS reminder, personnel health abnormal alarm upgrade information SMS reminder and other functions, the construction personnel's personal health condition can be monitored, warned and intervened in health.
[0031] In some embodiments, the above-mentioned compactor intelligent monitoring terminal is used to monitor the earthwork backfill construction and upload the monitored earthwork backfill construction information to the above-mentioned power communication network system. For example, the data of the machine is collected and transmitted through the compactor intelligent monitoring terminal, and finally reported to the infrastructure control system. Finally, the real-time data is sorted and analyzed on the WEB side of the infrastructure control system to clearly understand the machine's rolling trajectory, rolling speed, number of passes, area, compaction quality and other engineering progress information. By using the compactor intelligent monitoring terminal combined with compaction area management, intelligent construction navigation, visual display of rolling passes, rolling equipment information display, rolling equipment monitoring and early warning, compaction quality prediction, rolling process playback function, detailed information display, construction unit results analysis report, comprehensive query and analysis and other functions, the cost and construction period of the earthwork backfill construction process of the substation civil engineering project can be saved, and the quality of the civil engineering backfill construction can be improved. The earthwork backfill construction information may include but is not limited to: construction area, number of constructed piles, number of unconstructed piles, foundation pit depth and other information.
[0032] In some embodiments, the above-mentioned intelligent monitoring terminal for pile foundation operation is used to monitor pile foundation construction and upload the monitored pile foundation construction information to the above-mentioned power communication network system. For example, by using the intelligent monitoring terminal for pile foundation operation in combination with pile point navigation management, pile foundation construction monitoring list, pile foundation construction monitoring detailed information, perfect construction plan management function, pile foundation quality prediction, detailed information display, comprehensive query and analysis and other functions, the substation civil construction foundation construction can be free of layout and automatic monitoring of verticality and burial depth (foundation pit depth) can be achieved, thereby improving the quality level of pile foundation construction. Pile foundation construction information can refer to the operating information of the monitored pile driver.
[0033] It should be noted that the infrastructure control system is connected to the Beidou communication front-end server through the secure access gateway. The Beidou communication front-end server is connected to the serial port server. The serial port server is connected to the Beidou control user terminal. The edge IoT proxy server is connected to the secure access gateway through a remote communication network. The edge IoT proxy server is connected to the access gateway.
[0034] In some embodiments, the infrastructure site monitoring device is configured to transmit the collected infrastructure site data to the edge IoT proxy server. The edge IoT proxy server may refer to an edge server. The infrastructure site data may include, but are not limited to, data collected by a Beidou safety helmet, data collected by a Beidou smart bracelet, data collected by a compactor smart monitoring terminal, and data collected by a pile foundation operation smart monitoring terminal.
[0035] In some embodiments, the edge IoT proxy server sends the received infrastructure site data to the infrastructure control system in response to receiving the infrastructure site data.
[0036] In some embodiments, the infrastructure control system analyzes and displays the received infrastructure site data in response to receiving the infrastructure site data.
[0037] In some embodiments, the infrastructure control system is configured to: in the edge generation equipment management page, the infrastructure site monitoring equipment is managed by equipment warehousing, equipment import function management, edge generation and perception equipment binding management, equipment list information management, equipment detailed information management, edge generation equipment and project binding management, equipment and operation part binding management, equipment online status management, equipment power management, and equipment alarm management; in the perception equipment management page, combined with the equipment monitoring list, equipment monitoring details, equipment monitoring graphic monitoring, single engineering equipment monitoring list, unit-level equipment monitoring list, threshold-exceeding alarm list, threshold-exceeding alarm details, the internal suspension internal wire pole disassembly group tower monitoring lifting weight and pole inclination angle; in the operation area management page, the operation digital fence is drawn through the engineering operation area, the important operation area of the project, the latitude and longitude import function, and the two-dimensional map. The edge generation equipment management page can be a page established to manage each edge IoT proxy server. For example, the edge generation device management page displays the information of each edge IoT proxy server, including: property management number, device serial number, device name, usage status, user name, user contact number, and number of bound sensors. The perception device management page can be a page for managing various infrastructure site monitoring equipment. For example, the perception device management page displays the monitoring information of each infrastructure site monitoring equipment, which may include: sensor type, property management code, device serial number, device name, user name, user contact number, device usage device, edge generation device number, and edge generation device name. The operation area management page can be a page for engineering operation areas, important engineering operation areas, longitude and latitude import functions, and two-dimensional map drawing, which can display the project name, electronic fence name, fence type, and fence status. Fence types can include: general operation areas, dangerous areas, and important areas.
[0038] In some embodiments, the power communication network system is configured to: send communication data to the access gateway included in the field communication network system to send to the field communication network system, wherein the communication data includes: the power communication network system address and the field communication network system address; in response to determining that the communication data is successfully written, generate communication information corresponding to the communication data; in response to reading feedback data from the access gateway, generate communication feedback information according to the feedback data; based on the communication information and the communication feedback information, determine whether the communication data is successfully sent to the field communication network system. The power communication network system address may refer to the IP address of the power communication network system. The field communication network system address may refer to the IP address of the field communication network system address. For example, a digest algorithm may be used to convert the content in the communication data to generate corresponding communication information. The digest algorithm may be an MD5 digest algorithm. Feedback data may refer to feedback data for communication data. The MD5 digest algorithm may be used to convert feedback data into communication feedback information. For another example, the Jaccard similarity coefficient may be used to determine whether the communication information matches the communication feedback information. If the coefficient is greater than or equal to the threshold, it can be said that the communication information matches the communication feedback information, indicating that the feedback data is sent successfully. Otherwise, it can be said that the sending fails.
[0039] The above-mentioned related content, as an inventive point of the present invention, solves the technical problem 2 mentioned in the background technology, "the communication test time is long". The factors for the long communication test time are often as follows: if the bidding document is too large, since the infrastructure involves more monitoring equipment, a third-party communication terminal is required to test whether the monitoring equipment is successfully connected one by one. If the above factors are solved, the effect of shortening the communication test time can be achieved. In order to achieve this effect, first, the communication data is sent to the access gateway included in the above-mentioned field communication network system to be sent to the above-mentioned field communication network system. Among them, the above-mentioned communication data includes: the address of the power communication network system and the address of the field communication network system. Then, in response to determining that the above-mentioned communication data is written successfully, the communication information corresponding to the above-mentioned communication data is generated. Then, in response to reading the feedback data from the above-mentioned access gateway, the communication feedback information is generated according to the above-mentioned feedback data. Finally, based on the above-mentioned communication information and the above-mentioned communication feedback information, it is determined whether the above-mentioned communication data is successfully sent to the above-mentioned field communication network system. Therefore, while sending the communication data to the field communication network system, a copy of the same communication data can be sent to oneself. The communication information is obtained by processing the content of the communication data, and the communication feedback information is obtained by processing the content of the communication feedback data. Then, the communication data and feedback data can be compared. If the comparison is successful, it means that the communication is successful. The communication test of multiple infrastructure site monitoring equipment can be completed through the communication test between the power communication network system and the field communication network system, thereby shortening the communication test time.
[0040] In some embodiments, the above-mentioned power communication network system is configured to: store the above-mentioned communication information and the above-mentioned communication feedback information in a local database respectively, and set the status of the above-mentioned communication information to a pending confirmation status; determine the time point of the local database according to the sending time of the above-mentioned communication information, wherein the initial value of the above-mentioned time point is the sending time of the earliest communication information sent in the local database. The initial value of the time point can be the sending time of the earliest communication information sent in the local database. The initial value is usually the first time point after the first storage of the message information or the data reset.
[0041] In some embodiments, the above-mentioned power communication network system is configured to: in response to determining to execute the task of confirming the transmission status, obtain the time point of the local database; according to the obtained time point, filter out the alternative communication information and the alternative communication feedback information from the local database, wherein the above-mentioned alternative communication information is the communication information whose sending time is not less than the above-mentioned time point and whose status is to be confirmed, and the above-mentioned alternative communication feedback information is the communication feedback information whose receiving time is not less than the above-mentioned time point; match the above-mentioned alternative communication information and the alternative communication feedback information, and adjust the status of the above-mentioned alternative communication information according to the matching result. For example, when it is determined that the alternative communication information and the alternative communication feedback information match successfully, the status of the alternative communication information can be adjusted to confirmation success. If it is determined that the match fails and the task execution time does not reach the set time, no processing can be performed. If it is determined that the match fails and the task execution time reaches the set time, the status of the alternative communication information can be adjusted to confirmation failure.
[0042] In some embodiments, the above-mentioned power communication network system is configured to: for each management page, perform the following processing steps:
[0043] The first step is to obtain the historical management page parameter information set and the front-end management page information corresponding to the above management page. The above front-end management page information may be the information of the management page to be rendered. For example, the above front-end management page information may be HTML (HyperText Markup Language) file information. The historical management page parameter information in the above historical management page parameter information set may be information of parameters that characterize changes in the front-end management page before the current time. The historical management page parameter information may include: the historical management page parameter name and the attribute value corresponding to the historical management page parameter name. For example, the above historical management page parameter information set may include but is not limited to at least one of the following: time parameter information for opening the management page, management page resource path parameter information, and front-end management page rendering abnormality parameter information. The above historical management page parameter information may be parameter information for storing the historical management page resource path required for displaying the front-end management page. The above historical management page resource path may be a path that is located before the current time and stores the page resources required for opening the management page. For example, the historical management page parameter may be a status parameter. The above front-end page rendering abnormality parameter information may characterize whether the historical front-end management page corresponding to the management page information has a page jam problem.
[0044] The second step is to determine the historical management scenario information according to the above-mentioned historical management page parameter information set. The above-mentioned historical management scenario information can represent the scenario information that appears when the front-end management page is rendering the page. For example, the above-mentioned historical management scenario information can include: the front-end management page is displayed normally, and the front-end management page has a page jamming problem. For example, the historical management scenario information can be determined by the attribute value corresponding to the target historical management page parameter information included in the historical management page parameter information set. In response to determining that the target historical management page parameter information included in the above-mentioned historical management page parameter information set has an attribute value, it is determined that the above-mentioned front-end management page is displayed normally as the historical management scenario information. The above-mentioned target historical management page parameter information can represent information on whether the historical management page corresponding to the front-end management page is displayed normally. In response to determining that the target historical management page parameter does not have an attribute value, it is determined that the front-end management page has a page jamming problem as the historical management scenario information.
[0045] In the third step, in response to determining that the above historical management scenario information is the first management scenario information, according to the first historical management page parameter information subset corresponding to the above first management scenario information, the first historical management page resource information for the above front-end management page information is determined as the current management page resource information. Among them, the above first management scenario information represents the solution to the page jamming problem corresponding to the historical front-end management page, and the above historical front-end management page is the historical front-end management page corresponding to the above front-end management page information. The above solution to the historical front-end management page can represent that the front-end management page information has a page jamming problem, but the page jamming problem before the current display of the front-end management page has been solved. The above historical front-end management page can be a management page that has been rendered before the current rendering of the front-end management page. The above first historical management page parameter information subset can be a subset of the above management page parameter information set that represents whether the front-end management page information has a page jamming problem. The above first historical management page resource information can be static resource information required for rendering the front-end management page between the current rendering of the front-end management page. The above first historical management page parameter information subset includes: the first historical management page parameter information and the second historical management page parameter information. The first historical management page parameter information may be parameter information for reporting alarm information of page jamming problems and page jamming recovery of the historical front-end management page. The historical front-end management page may be a management page opened between the time when the front-end management page is currently opened. For example, the first historical management page parameter may be a time parameter. The second historical management page parameter information may represent parameter information for changing the page resource path corresponding to the front-end management page information. The second historical management page parameter information may be parameter information for adding the time when the front-end management page is currently opened to the page resource path. For example, the second historical management page parameter may be an arr parameter. For example, first, the first time of the page resource path parameter information corresponding to the first historical management scenario information may be determined. The first time may be the valid time when the page resource path parameter corresponding to the first historical management scenario information is stored in the local database. Then, in response to determining that the first time is invalid, the current management page resource information is retrieved from the server. The server may be a server for storing management page resource information. Finally, in response to determining that the first time is not invalid, the first historical management page resource information is obtained from the local database as the current management page resource information.
[0046] The third step, in response to determining that the above historical management scenario information is the second management scenario information, according to the first historical management page parameter information subset corresponding to the above second management scenario information, determine the second historical management page resource information for the above front-end management page information as the current management page resource information. Among them, the above second historical management page resource information represents the page freeze problem corresponding to the historical front-end management page that has not been solved. For example, you can first determine the second time of the page resource path parameter information corresponding to the above second historical management scenario information. Among them, the above second time can be the effective time when the page resource path parameter corresponding to the second historical management scenario information is stored in the local database. Then, in response to determining that the above second time is invalid, the current management page resource information is retrieved from the server. Finally, in response to determining that the above second time is not invalid, the second historical management page resource information is obtained from the local database as the current management page resource information.
[0047] In the fourth step, in response to determining that the above historical management scenario information is the third management scenario information, according to the third historical management page parameter information subset corresponding to the third management scenario information, the third historical management page resource information for the above front-end management page information is determined as the current management page resource information. Among them, the third historical management page resource information indicates that the historical front-end management page does not have the problem of historical page jamming. The third historical management page parameter information subset can indicate that the historical management scenario information is a parameter information subset of the third historical management scenario information. The third historical management page resource information can be the management page resource information obtained for the page resource path corresponding to the front-end management page information. For example, first, the third time of the page resource path parameter information corresponding to the third historical management scenario information can be determined. Among them, the third time can be the effective time when the page resource path parameter corresponding to the third historical management scenario information is stored in the local database. Then, in response to determining that the third time is invalid, the current management page resource information is retrieved from the server again. Finally, in response to determining that the third time is not invalid, the third historical management page resource information is obtained from the local database as the current management page resource information.
[0048] In the fifth step, based on the current management page resource information, page rendering is performed for the front-end management page information to obtain the current front-end management page. For example, the execution subject may first parse the management page information to obtain a DOM (Document Object Model) tree. Then, the DOM tree is filled using the current management page resource information to obtain the current front-end management page.
[0049] The above-mentioned related content, as an inventive point of the present invention, solves the technical problem three mentioned in the background technology, "the problem of page jamming is prone to occur, which is not conducive to real-time monitoring of monitoring equipment". The factors that are prone to page jamming and are not conducive to real-time monitoring of monitoring equipment are often as follows: Since infrastructure involves more monitoring equipment, page jamming is prone to occur when managing each monitoring equipment. If the above factors are solved, the effect of alleviating page jamming can be achieved. In order to achieve this effect, first, the historical management page parameter information set and the front-end management page information corresponding to the above-mentioned management page are obtained. Then, according to the above-mentioned historical management page parameter information set, the historical management scenario information is determined. As a result, it is convenient to adopt different solutions through different scenario information in the future, which can improve the accuracy of solving the problem. Then, in response to determining that the above-mentioned historical management scenario information is the first management scenario information, according to the first historical management page parameter information subset corresponding to the above-mentioned first management scenario information, the first historical management page resource information for the above-mentioned front-end management page information is determined as the current management page resource information. Among them, the above-mentioned first management scenario information represents the solution to the page jamming problem corresponding to the historical front-end management page, and the above-mentioned historical front-end management page is the historical front-end management page corresponding to the above-mentioned front-end management page information. Thus, by automatically acquiring the management page resource information for the first historical management scene information, the problem of historical management page freeze is solved. Finally, according to the above current management page resource information, page rendering is performed for the front-end management page information to obtain the current front-end management page. Thus, through the historical management page parameter information set, the problem of historical page freeze is automatically discovered and solved in a timely manner.
[0050] Reference below Figure 2 , which shows a schematic diagram of the structure of an electronic device (e.g., a computing device) 200 suitable for implementing some embodiments of the present invention. The electronic devices in some embodiments of the present invention may include, but are not limited to, mobile terminals such as mobile phones, notebook computers, digital broadcast receivers, PDAs (personal digital assistants), PADs (tablet computers), PMPs (portable multimedia players), vehicle-mounted terminals (e.g., vehicle-mounted navigation terminals), etc., and fixed terminals such as digital TVs, desktop computers, etc. Figure 2 The electronic device shown is only an example and should not bring any limitation to the functions and scope of use of the embodiments of the present invention.
[0051] like Figure 2As shown, the electronic device 200 may include a processing device (e.g., a central processing unit, a graphics processing unit, etc.) 201, which can perform various appropriate actions and processes according to a program stored in a read-only memory (ROM) 202 or a program loaded from a storage device 208 to a random access memory (RAM) 203. In the RAM 203, various programs and task data required for the operation of the electronic device 200 are also stored. The processing device 201, the ROM 202, and the RAM 203 are connected to each other via a bus 204. An input / output (I / O) interface 205 is also connected to the bus 204.
[0052] Typically, the following devices may be connected to the I / O interface 205: an input device 206 including, for example, a touch screen, a touch pad, a keyboard, a mouse, a camera, a microphone, an accelerometer, a gyroscope, etc.; an output device 207 including, for example, a liquid crystal display (LCD), a speaker, a vibrator, etc.; a storage device 208 including, for example, a magnetic tape, a hard disk, etc.; and a communication device 209. The communication device 209 may allow the electronic device 200 to communicate with other devices wirelessly or by wire to exchange task data. Although Figure 2 The electronic device 200 is shown with various devices, but it should be understood that it is not required to implement or possess all the devices shown. More or fewer devices may be implemented or possessed instead. Figure 2 Each block shown in the figure may represent one device, or may represent multiple devices as required.
[0053] In particular, according to some embodiments of the present invention, the process described above with reference to the flowchart can be implemented as a computer software program. For example, some embodiments of the present invention include a computer program product, which includes a computer program carried on a computer-readable medium, and the computer program includes a program code for executing the method shown in the flowchart. In some such embodiments, the computer program can be downloaded and installed from the network through the communication device 209, or installed from the storage device 208, or installed from the ROM 202. When the computer program is executed by the processing device 201, the above-mentioned functions defined in the method of some embodiments of the present invention are executed.
[0054] It should be noted that the computer-readable medium recorded in some embodiments of the present invention may be a computer-readable signal medium or a computer-readable storage medium or any combination of the above two. The computer-readable storage medium may be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination of the above. More specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In some embodiments of the present invention, a computer-readable storage medium may be any tangible medium containing or storing a program that can be used by or in combination with an instruction execution system, device or device. In some embodiments of the present invention, a computer-readable signal medium may include a mission data signal propagated in a baseband or as part of a carrier wave, which carries a computer-readable program code. Such a propagated mission data signal may take a variety of forms, including but not limited to an electromagnetic signal, an optical signal, or any suitable combination of the above. Computer readable signal media may also be any computer readable medium other than computer readable storage media, which may send, propagate or transmit a program for use by or in conjunction with an instruction execution system, apparatus or device. The program code contained on the computer readable medium may be transmitted using any appropriate medium, including but not limited to: wires, optical cables, RF (radio frequency), etc., or any suitable combination of the above.
[0055] In some embodiments, the client and the server may communicate using any currently known or future developed network protocol such as HTTP (HyperText Transfer Protocol), and may be interconnected with any form or medium of digital task data communication (e.g., a communication network). Examples of communication networks include a local area network ("LAN"), a wide area network ("WAN"), an internet (e.g., the Internet), and a peer-to-peer network (e.g., an ad hoc peer-to-peer network), as well as any currently known or future developed network.
[0056] The computer-readable medium may be included in the electronic device, or may exist independently without being incorporated into the electronic device. The computer-readable medium carries one or more programs. When the one or more programs are executed by the electronic device, the electronic device: the power communication network system is connected to the field communication network system through a remote communication network, and the Beidou control user terminal is connected to the Beidou satellite communication; the field communication network system is connected to the Beidou satellite communication through the Beidou satellite measurement and control center ground station; the infrastructure site monitoring equipment includes: Beidou safety helmet, Beidou smart bracelet, compactor intelligent monitoring terminal, pile foundation operation intelligent monitoring terminal; the Beidou safety helmet is used to collect infrastructure data collected at the infrastructure construction site, and upload the collected infrastructure data to the power communication network system; the Beidou smart bracelet is used to collect physical information of the operator, and upload the collected physical information to the power communication network system; the compactor intelligent monitoring terminal is used to monitor earth backfill construction, and upload the monitored earth backfill construction information to the power communication network system; the pile foundation operation intelligent monitoring terminal is used to monitor pile foundation construction, and upload the monitored pile foundation construction information to the power communication network system.
[0057] Computer program code for performing the operations of some embodiments of the present invention may be written in one or more programming languages or a combination thereof, including product-oriented programming languages such as Java, Smalltalk, C++, and conventional procedural programming languages such as "C" or similar programming languages. The program code may be executed entirely on the user's computer, partially on the user's computer, as a separate software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In the case of a remote computer, the remote computer may be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computer (e.g., through the Internet using an Internet service provider).
[0058] The flow chart and block diagram in the accompanying drawings illustrate the possible architecture, function and operation of the system, method and computer program product according to various embodiments of the present invention. In this regard, each square box in the flow chart or block diagram can represent a module, a program segment or a part of a code, and the module, the program segment or a part of the code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the square box can also occur in a sequence different from that marked in the accompanying drawings. For example, two square boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each square box in the block diagram and / or flow chart, and the combination of the square boxes in the block diagram and / or flow chart can be implemented with a dedicated hardware-based system that performs the specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.
[0059] The functions described above herein may be performed at least in part by one or more hardware logic components. For example, without limitation, exemplary types of hardware logic components that may be used include: field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), complex programmable logic devices (CPLDs), and the like.
[0060] The above descriptions are only some preferred embodiments of the present invention and the explanation of the technical principles used. Those skilled in the art should understand that the scope of the invention involved in the embodiments of the present invention is not limited to the technical solutions formed by the specific combination of the above technical features, but should also cover other technical solutions formed by any combination of the above technical features or their equivalent features without departing from the above inventive concept. For example, the above features are replaced with the technical features with similar functions disclosed in the embodiments of the present invention (but not limited to) by each other.
Claims
1. An infrastructure security perception system based on electric power Beidou, the infrastructure security perception system comprising: The power communication network system and the on-site communication network system, the power communication network system includes: infrastructure control system, security access gateway, Beidou communication front-end server, serial port server and Beidou control user terminal, the on-site communication network system includes: edge IoT proxy server, access gateway and infrastructure on-site monitoring equipment, characterized in that, The electric power communication network system is communicatively connected to the field communication network system via a remote communication network, and the Beidou control user terminal is communicatively connected to the Beidou satellite; The on-site communication network system is connected to the Beidou satellite communication via the Beidou satellite measurement and control center ground station; The infrastructure site monitoring equipment includes: Beidou safety helmet, Beidou smart bracelet, compactor smart monitoring terminal, pile foundation operation smart monitoring terminal; The Beidou safety helmet is used to collect infrastructure data from infrastructure construction sites, and upload the collected infrastructure data to the power communication network system; The Beidou smart bracelet is used to collect physical information of the operator and upload the collected physical information to the power communication network system; The compactor intelligent monitoring terminal is used to monitor earth backfill construction and upload the monitored earth backfill construction information to the power communication network system; The pile foundation operation intelligent monitoring terminal is used to monitor the pile foundation construction and upload the monitored pile foundation construction information to the power communication network system; Characterized in that the infrastructure control system is communicatively connected with the Beidou communication front-end server through the secure access gateway; The Beidou communication front-end server is communicatively connected with the serial port server; The serial port server is communicatively connected to the Beidou control user terminal; The edge IoT proxy server is communicatively connected to the secure access gateway via a remote communication network; The edge IoT proxy server is communicatively connected with the access gateway; It is characterized in that the infrastructure site monitoring device is configured to: transmit the collected infrastructure site data to the edge IoT proxy server; In response to receiving the infrastructure site data, the edge IoT proxy server sends the received infrastructure site data to the infrastructure control system; The infrastructure control system analyzes and displays the received infrastructure site data in response to receiving the infrastructure site data; Characterized in that the infrastructure control system is configured to: In the edge device management page, the infrastructure site monitoring equipment is managed by equipment warehousing management, equipment import function management, edge device and sensing device binding management, equipment list information management, equipment detailed information management, edge device and project binding management, equipment and operation site binding management, equipment online status management, equipment power management, and equipment alarm management; In the sensing equipment management page, the lifting weight and the inclination angle of the internal suspension and internal wire pole decomposition tower are monitored in combination with the equipment monitoring list, equipment monitoring details, equipment monitoring graphic monitoring, single project equipment monitoring list, unit-level equipment monitoring list, over-threshold alarm list, and over-threshold alarm details; In the operation area management page, you can draw digital operation fences by importing the project operation area, important project operation area, longitude and latitude, and two-dimensional maps; Characterized in that the power communication network system is configured as follows: Sending communication data to the access gateway included in the field communication network system, so as to send it to the field communication network system, wherein the communication data includes: the power communication network system address and the field communication network system address; In response to determining that the communication data is written successfully, generating communication information corresponding to the communication data; In response to feedback data being read from the access gateway, generating communication feedback information according to the feedback data; Based on the communication information and the communication feedback information, determining whether the communication data is successfully sent to the on-site communication network system; Characterized in that the power communication network system is configured as follows: storing the communication information and the communication feedback information in a local database respectively, and setting the state of the communication information to a pending confirmation state; Determine a time point in a local database according to the sending time of the communication information, wherein an initial value of the time point is the sending time of the earliest communication information sent in the local database; Characterized in that the power communication network system is configured as follows: In response to determining to execute the message status confirmation task, obtaining a time point in a local database; According to the acquired time point, select candidate communication information and candidate communication feedback information from the local database, wherein the candidate communication information is communication information whose sending time is not less than the time point and whose status is to be confirmed, and the candidate communication feedback information is communication feedback information whose receiving time is not less than the time point; Matching the candidate communication information with the candidate communication feedback information, and adjusting the state of the candidate communication information according to the matching result; Characterized in that the power communication network system is configured as follows: For each management page, perform the following processing steps: Obtaining a historical management page parameter information set and front-end management page information corresponding to the management page; Determining history management scenario information according to the history management page parameter information set; In response to determining that the historical management scenario information is the first management scenario information, determining, according to a first historical management page parameter information subset corresponding to the first management scenario information, first historical management page resource information for the front-end management page information as the current management page resource information, wherein the first management scenario information represents a solution to a page freeze problem corresponding to a historical front-end management page, and the historical front-end management page is a historical front-end management page corresponding to the front-end management page information; In response to determining that the historical management scenario information is the second management scenario information, determining, according to the first historical management page parameter information subset corresponding to the second management scenario information, second historical management page resource information for the front-end management page information as the current management page resource information, wherein the second historical management page resource information indicates that a page freeze problem corresponding to the historical front-end management page has not been resolved; In response to determining that the historical management scenario information is the third management scenario information, determining, according to a third historical management page parameter information subset corresponding to the third management scenario information, third historical management page resource information for the front-end management page information as the current management page resource information, wherein the third historical management page resource information indicates that the historical front-end management page does not have a historical page freeze problem; According to the current management page resource information, page rendering is performed for the front-end management page information to obtain the current front-end management page.
2. An electronic device, characterized in that: include: one or more processors; a storage device having one or more programs stored thereon; When the one or more programs are executed by the one or more processors, the one or more processors implement the infrastructure safety perception system as claimed in claim 1.
3. A computer readable medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the infrastructure safety perception system as claimed in claim 1 is implemented.