A data visualization and broadcasting method based on smart park management

Through the data visualization method of GIS+BIM model, the basic data of the smart park is integrated, the enterprise space operation analysis and the full view analysis are carried out, and the 3D model is constructed, which solves the problem of insufficient information display in the existing technology and realizes the information display in the smart park. Diversified display and real-time monitoring improve management efficiency and service levels.

CN117649496BActive Publication Date: 2024-10-11HUBEI POST TELECOMM PLANNING DESIGN
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311671758.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-07
Publication Date
2024-10-11
Estimated Expiration
2043-12-07

AI Technical Summary

Technical Problem

The existing smart park management system is difficult to fully display various information in the park, resulting in users' insufficient understanding of the park.

Method used

The data visualization method based on GIS+BIM model is used to obtain and integrate the basic data of the smart park, conduct enterprise space operation analysis and panoramic view analysis, build a 3D model, and achieve diverse display and real-time monitoring of information.

Benefits of technology

It achieves a comprehensive display of smart park information, improves managers' understanding of the park and operational efficiency, reduces operating costs, and improves service levels and work efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117649496B_ABST
    Figure CN117649496B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of smart park management technology, specifically a data visualization and broadcasting method based on smart park management. The present invention is based on the GIS+BIM model, constructs a smart park three-dimensional visualization platform with a unified geographic coordinate system and spatial reference frame, supports the centralized display of data, and uses advanced information visualization methods to process and extract the implicit value behind the data, and can reflect the real operation status of the demonstration area in real time through a large screen. It includes a three-dimensional comprehensive display of the location and status data of each system equipment, covering monitoring equipment, access control equipment, energy consumption equipment, building equipment, fire fighting equipment, personnel positioning, vehicles, green ecology and other building equipment, electrical, weak current equipment, and real-time operation monitoring services of each subsystem. The present invention can display more information about the smart park, so that users can have a more comprehensive understanding of the smart park.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of smart park management, and in particular to a data visualization and broadcasting method based on smart park management. Background Art

[0002] With the rapid and healthy development of Internet of Things information technology and three-dimensional visualization, it has provided strong technical support for the construction of smart parks, and promoted the gradual development of smart parks towards green, modern and intelligent.

[0003] Patent CN112184181A discloses an enterprise service management system for a smart park, including a platform PC station, an enterprise application platform and a background management platform. The background management platform is provided with an operating server, and the operating server is connected to the platform PC station and the enterprise application platform through a wireless network connection; the platform PC station accesses the system through management APP, PC portal website, WeChat, and park WIFI coverage access, and the enterprise application platform uses the background management platform to manage applications. In view of the deficiencies of the prior art, the present invention provides an enterprise service management system for a smart park, which facilitates the comprehensive management of the park and incubated enterprises, reduces operating costs, and improves incubation efficiency. In the actual use process, users hope to obtain a variety of information in the smart park and display a variety of information; however, the information that can be displayed in the above-mentioned prior art is limited, making it difficult for users to have a more comprehensive understanding of the smart park, so it is urgent to solve the problem. Summary of the invention

[0004] In order to avoid and overcome the technical problems existing in the prior art, the present invention provides a data visualization and broadcasting method based on smart park management. The present invention can display more information of the smart park, so that users can have a more comprehensive understanding of the smart park.

[0005] To achieve the above object, the present invention provides the following technical solutions:

[0006] A data visualization and broadcasting method based on smart park management includes the following steps:

[0007] S1. Obtain the basic data of the smart park and establish a unified data storage bus to open up the interconnection channels between various departments of the smart park;

[0008] S2. Obtain data of enterprises settled in the smart park and conduct comprehensive analysis of the data, including enterprise space operation analysis and enterprise overall view analysis;

[0009] S3. Based on the analysis results of the data of settled enterprises, a comprehensive 3D model browsing and display of enterprises settled in the smart park is carried out.

[0010] As a further solution of the present invention: the specific steps of step S1 are as follows:

[0011] S11. Obtain various basic data in the smart park through the infrastructure layer in the smart park management system, where the basic data at least includes building information, road information, and air environment information in the smart park;

[0012] S12. Various basic data collected by the infrastructure layer are stored through the data layer in the smart park management system;

[0013] S13, integrating the data stored in the data layer through the data integration layer in the smart park management system to form a data storage bus;

[0014] S14. Various management departments within the smart park share data through the data storage bus, thereby connecting various departments within the smart park.

[0015] As a further solution of the present invention: basic data is obtained by arranging multiple signal acquisition modules in the smart park; the signal acquisition modules include a video data acquisition module for acquiring building information, a Beidou navigation communication module for acquiring road information, and a gas detection module for acquiring air environment information;

[0016] Building information includes the location and appearance of office buildings, the location and appearance of factory buildings, the location of public areas, and the location of warehouse areas within the smart park;

[0017] Road information includes the road distribution status within the smart park, the location and speed of vehicles on the road, and the location and speed of pedestrians on the road;

[0018] Air environment information includes the flow rate and wind direction of gases in the smart park, the composition of the air, and the temperature and humidity of the air.

[0019] As a further solution of the present invention: the specific steps of step S2 are as follows:

[0020] S21. Divide the smart park into different areas based on the basic data obtained;

[0021] S22. According to the division of regions, the data of enterprises settled in each region is recorded through the data registration module of the smart park management system; the data includes the business type, business model, products, partners, upstream and downstream industrial chains and scale of the enterprise;

[0022] S23. Conduct enterprise space operation analysis on the business type, business model and products of each enterprise to obtain the operation status of enterprises in each area;

[0023] S24. Conduct an overall enterprise overview analysis of the operating conditions of enterprises in each region, their partners, their upstream and downstream industrial chains, and their scale, in order to obtain the operating conditions of each enterprise in the smart park.

[0024] As a further solution of the present invention: the specific steps of step S3 are as follows:

[0025] S31. Positioning the locations of office buildings, factory buildings, public areas, and warehouse areas in the smart park to obtain a BIM model of the entire park;

[0026] S32. Integrate the BIM model and the corresponding GIS spatial location into the GIS+BIM model of the smart park;

[0027] S33. Compare the GIS+BIM model with the real-life video images of the smart park site, and adjust the GIS+BIM model to match the actual scene on site;

[0028] S34. Combine the operating conditions of each enterprise in the smart park with the GIS+BIM model so that each enterprise in the GIS+BIM model has indicators that characterize the operating conditions, thereby constructing a 3D model that characterizes the diverse information of the enterprises.

[0029] As a further solution of the present invention: the data registration module of the smart park management system is connected to the data storage bus, and the data of each resident enterprise recorded in the data registration module is circulated to each management department in the smart park through the data storage bus to realize real-time updating of information.

[0030] As a further solution of the present invention: the 3D model includes a topology view unit, a device monitoring unit, a panoramic map display unit and an intelligent alarm unit;

[0031] The equipment monitoring unit is used to detect the power operation data in the smart park, including the temperature, humidity, water level and smoke conditions in the power distribution room of the smart park;

[0032] The topology view unit is used to integrate the monitored power operation data and generate the power grid topology structure;

[0033] The panoramic map display unit is used to combine the generated power grid topology structure with the map in the smart park to form a power grid topology structure and display it in the panoramic map;

[0034] The intelligent alarm unit is used to generate and display alarm information when real-time operating data exceeds the alarm limit.

[0035] As a further solution of the present invention: the 3D model can be embedded in a smart phone or a mobile tablet, and a connection can be established with various management departments in the smart park through the smart phone or the mobile tablet to obtain and feedback information in the smart park in real time.

[0036] As a further solution of the present invention: the roads in the smart park are crisscrossed to form a road traffic network; traffic lights are arranged at the crossroads in the road traffic network, and the road between two adjacent traffic lights and with one-way traffic is defined as the current road; the current road traffic state is determined as follows:

[0037] First, obtain the length L of the current road;

[0038] Then, the distance in front of the traffic light at the end of the current road is defined as the waiting area for vehicles to pass. The length of the waiting area is L 1 , which is the set distance; the distance from the boundary of the waiting area to the traffic light at the beginning of the current road is defined as the vehicle's passage area, and the length of the passage area is L 2 , L=L 1 +L 2 ;

[0039] Then, the number of vehicles in the passing area, the number of vehicles in the waiting area, the time it takes for each vehicle in the passing area to pass through the passing area, and the time it takes for each vehicle in the waiting area to pass through the waiting area are obtained, and the number and the corresponding time are input into the congestion calculation formula to calculate the congestion of the road within the set time period T;

[0040] The formula for calculating congestion is as follows:

[0041]

[0042] Among them, α T Indicates the congestion of the current road within the set time period T, in km / h; S 1,i represents the driving distance of the i-th vehicle in the waiting area from the parking point to the waiting area; t 1,i represents the time it takes for the i-th vehicle in the waiting area to drive out of the waiting area from the parking point, and N represents the number of vehicles that have stayed in the waiting area within the set time period T; t 2,j represents the travel time of the jth vehicle in the pass area, and M represents the number of vehicles passing through the pass area within the set time period T;

[0043] When the congestion of the current road is between [0,15], the current road is in a congested state; when the congestion of the current road is between (15,40], the current road is in a smooth state; when the congestion of the current road is greater than 40, the current road is in a speeding state

[0044] Compared with the prior art, the present invention has the following beneficial effects:

[0045] 1. The present invention is based on the GIS+BIM model to build a 3D visualization platform for the smart park with a unified geographic coordinate system and spatial reference framework, supporting the centralized display of indoor / outdoor, dynamic / static, direct / indirect, independent / related data, and using advanced information visualization methods to process and extract the implicit value behind the data, and can reflect the real operating status of the demonstration area in real time through a large screen. It includes a 3D comprehensive display of the location and status data of each system equipment, covering monitoring equipment, access control equipment, energy consumption equipment, building equipment, fire fighting equipment, personnel positioning, vehicles, green ecology and other construction equipment, electrical and weak current equipment, and real-time operation monitoring services of each subsystem.

[0046] 2. The unified display platform and resource sharing platform of the present invention enables park managers, park enterprises and employees to form a closely related whole, integrate various resources of the park, realize the rational allocation of resources, and obtain efficient, coordinated, interactive and overall benefits.

[0047] 3. The present invention conducts centralized monitoring and management in the smart park management system, and through data processing and analysis, effectively brings into play the association and coordination between various modules, generates applications combining various intelligent features, and realizes management and analysis through a unified interface in the same management system.

[0048] 4. The present invention provides a unified management system for the smart park, which can avoid some cumbersome and repetitive operation processes, greatly improve the work efficiency of the park, and thus improve the management ability and service level within the park. At the same time, the establishment of enterprise dynamic archives can also provide a scientific and reasonable basis for the management and decision-making of enterprises and management committees, thereby realizing the visualization management of park building information GIS+BIM model, remote management of environmental energy consumption, comprehensive security multi-dimensional prevention and visualization operation and maintenance of infrastructure equipment.

[0049] 5. The present invention reduces the operating costs of smart parks, improves the working efficiency of smart parks, and expands the coverage and benefits of services. In addition, the application of technologies such as the Internet of Things and cloud computing promotes the informatization of smart parks, accelerates the pace of building high-tech and smart parks, and is conducive to improving the level and service level of smart parks. BRIEF DESCRIPTION OF THE DRAWINGS

[0050] Figure 1 It is a schematic diagram of the main process structure of the present invention. DETAILED DESCRIPTION

[0051] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0052] See also Figure 1 In an embodiment of the present invention, a data visualization and broadcasting method based on smart park management includes the following steps:

[0053] S1. Obtain the basic data of the smart park and establish a unified data storage bus to open up the interconnection channels among various departments in the smart park.

[0054] The specific steps of step S1 are as follows:

[0055] S11. Obtain various basic data in the smart park through the infrastructure layer in the smart park management system, where the basic data at least includes building information, road information, and air environment information in the smart park;

[0056] S12. Various basic data collected by the infrastructure layer are stored through the data layer in the smart park management system;

[0057] S13, integrating the data stored in the data layer through the data integration layer in the smart park management system to form a data storage bus;

[0058] S14. Various management departments within the smart park share data through the data storage bus, thereby connecting various departments within the smart park.

[0059] Basic data is obtained by arranging a variety of signal acquisition modules in the smart park; the signal acquisition modules include a video data acquisition module for collecting building information, a Beidou navigation communication module for collecting road information, and a gas detection module for collecting air environment information;

[0060] Building information includes the location and appearance of office buildings, the location and appearance of factory buildings, the location of public areas, and the location of warehouse areas within the smart park;

[0061] Road information includes the road distribution status within the smart park, the location and speed of vehicles on the road, and the location and speed of pedestrians on the road;

[0062] Air environment information includes the flow rate and wind direction of gases in the smart park, the composition of the air, and the temperature and humidity of the air.

[0063] S2. Obtain data on enterprises located in the smart park and conduct a comprehensive analysis of the data, including enterprise space operation analysis and enterprise overall view analysis.

[0064] The specific steps of step S2 are as follows:

[0065] S21. Divide the smart park into different areas based on the basic data obtained;

[0066] S22. According to the division of regions, the data of enterprises settled in each region is recorded through the data registration module of the smart park management system; the data includes the business type, business model, products, partners, upstream and downstream industrial chains and scale of the enterprise;

[0067] S23. Conduct enterprise space operation analysis on the business type, business model and products of each enterprise to obtain the operation status of enterprises in each area;

[0068] S24. Conduct an overall enterprise overview analysis of the operating conditions of enterprises in each region, their partners, their upstream and downstream industrial chains, and their scale, in order to obtain the operating conditions of each enterprise in the smart park.

[0069] S3. Based on the analysis results of the data of settled enterprises, a comprehensive 3D model browsing and display of enterprises settled in the smart park is carried out.

[0070] The specific steps of step S3 are as follows:

[0071] S31. Positioning the locations of office buildings, factory buildings, public areas, and warehouse areas in the smart park to obtain a BIM model of the entire park;

[0072] S32, integrating the BIM model with the corresponding GIS spatial location to obtain a GIS+BIM model of the smart park;

[0073] S33. Compare the GIS+BIM model with the real-life video images of the smart park site, and adjust the GIS+BIM model to match the actual scene on site;

[0074] S34. Combine the operating conditions of each enterprise in the smart park with the GIS+BIM model so that each enterprise in the GIS+BIM model has indicators that characterize the operating conditions, thereby constructing a 3D model that characterizes the diverse information of the enterprises.

[0075] Comprehensive browsing and display of 3D models of the smart park in full view and in parts, with diversified browsing modes, and accurate positioning of each component in parts. Browsing from outdoor to indoor, from above ground to underground is possible. 3D models include:

[0076] 1. Electronic sand table scene display: supports 3D building models, 3D GIS models, satellite images, terrain, underground pipe networks, vector display, and multi-layer overlay. It can display the overview of each building, display the internal structure and facilities by floor, the functions of each partition, the situation of the occupied units, the monitoring screens of some key areas, the status of the parking lot (the occupancy status of parking spaces), and basic data such as power distribution, lighting, and air conditioning equipment. The list of some faulty equipment and the weather conditions of the day, etc., convey key information about the entire project of the smart park to visitors and managers at the first time. The electronic sand table can be demonstrated with one click according to the planned demonstration mode, and the project can be introduced to visiting visitors through the automatic roaming function. When it automatically roams to the key focus area, it automatically retrieves and displays relevant data, such as roaming to the main intersection to display real-time monitoring of the intersection, and roaming to the parking lot entrance to display the current remaining parking spaces in the parking lot.

[0077] 2. Zoom in and out function: You can zoom in and out the objects in the 3D window display area, and you can achieve continuous zooming by sliding the mouse wheel forward and backward.

[0078] 3. Rotate the scene left and right: Full-screen overlooking the scene view area, linked with the video, integrating outdoor video surveillance information, and displaying the scene of outdoor video information and GIS integration in real time.

[0079] 4. Supports both keyboard and touch screen operation modes: supports dual-screen interaction function, and the large-screen operation can be controlled through the touch screen.

[0080] 5. Users can have a 360-degree view of the entire smart park and its details.

[0081] 6. Set the ground to be transparent so that the above-ground and underground conditions are clear at a glance, making it easy to query and view underground hidden projects.

[0082] 7. Users can search and browse by entering attributes such as device name or device model.

[0083] 8. After the user clicks on the name of a component in the model, the system will automatically locate the 3D model component and highlight it to the user. The 3D model of the building can be split into floors and rooms to display beams, columns, doors, windows, partitions, pipelines, equipment, etc. If the user selects a specific device, the device information related to the device will appear on the interface, including the name, model, technical parameters, manufacturer, etc. of the device for the user to view. At the same time, the user can also click on the associated label to view various equipment-related documents and information such as "equipment manual", "maintenance information", "supplier information", "emergency disposal plan", "historical maintenance information", and "installation information".

[0084] 9. Through GIS, BIM-based 3D models and the Internet of Things, it is connected to relevant environmental testing information such as rainfall, flow, and water quality. The three-dimensional dynamic display of the construction and operation of the green sponge city in the smart park fully reflects the functions of infiltration, permeation, storage, retention, use, and drainage of the green sponge city in the smart park.

[0085] 10. Users can view complex underground pipe networks, such as water pipes, sewage pipes, drainage pipes, fire water pipes, weak-current integrated pipelines, greening sprinkler irrigation, strong and weak-current pipelines, power lines and related pipe wells, and can directly measure the relative position relationship on the model, display the actual topology of the pipelines and simulate the flow and direction of water.

[0086] 11. Integrated indoor and outdoor display: outdoor GIS geographic scenes and indoor BIM architectural scenes can be scaled and switched seamlessly, rather than through window switching.

[0087] The maximum speed limit on the roads inside the smart park is 40km / h. Vehicles on the roads in the smart park travel at different speeds according to the operating status of the road. The total length of the current road is set to 300 meters, the length of the waiting area is 40 meters, the length of the passing area is 260 meters, and the time period T is set to 5 minutes. Vehicles that have not completely passed through the passing area and the waiting area within this set time period are not counted, and N is 8, the specific data is shown in Table 1; M is 10, the specific data is shown in Table 2.

[0088] Table 1 Data of vehicles in the waiting area

[0089]

[0090] Table 2 Data of vehicles in the traffic area

[0091]

[0092] Substitute the data in Table 1 and Table 2 into the congestion calculation formula:

[0093]

[0094] The current road congestion is 28.398km / m, which is a smooth state.

[0095] The visualization display of the smart park also includes the real-time display of the operating status of the equipment within the demonstration area, which should at least include the following parts:

[0096] 1. Energy consumption monitoring: realize energy consumption and efficiency management, automatic meter reading (water, electricity and gas) and smart office capabilities supported by intelligent facilities, such as lights, air conditioners, curtains, office card electricity, charging piles, street lights, landscapes, etc. And scene mode management of conference rooms. Improve user experience, save energy and reduce consumption, and monitor the water, electricity and gas consumption and consumption curves of each area, building and floor of the demonstration area in real time. When the set consumption index is exceeded, it will immediately alarm and locate the abnormal point to facilitate the staff to check the situation and deal with it in time, summarize and analyze basic information such as energy consumption statistics and energy consumption audits, and count and analyze energy consumption on a daily, weekly, monthly, quarterly and annual basis. The energy consumption of the entire building in the spatial and temporal dimensions can be intuitively displayed in the form of a heat map, and the 24-hour electricity consumption trend chart of each floor can also be viewed by floor and compared with the previous average electricity consumption.

[0097] 2. Security monitoring: realize the access and unified management, analysis and operation of intelligent identification, video surveillance system, access control and access gate, smart fire protection, residual current detection, and electrical fire safety monitoring capabilities; realize emergency command and dispatch, connect the fire protection systems of each sub-demonstration area to the platform, and realize the "double insurance" of fire protection in the demonstration area. In the case of emergency, it can realize fire safety warning and dispatch for each building. It can also be provided to various enterprises as a service, which can view the real-time video and historical video records of each area in the demonstration area. When blacklisted personnel or cross-border personnel are detected, the alarm will be immediately triggered and the video will be located at the abnormal location for the staff to check the situation and deal with it in time.

[0098] 3. Smart facilities: realize smart unified management and operation of smart elevators, public facilities operation and maintenance, smart exhibition halls, shared offices, smart conferences, unmanned aerial vehicle rooms, etc., and realize asset management;

[0099] 4. Access control monitoring: can check the access control status of the demonstration area gate, conference room, corridor, etc. in real time.

[0100] 5. Fire monitoring: It can obtain information on various fire-fighting equipment in real time and immediately alarm when abnormal situations are found. The platform will receive and process alarm messages in a timely manner to ensure fire safety in the demonstration area.

[0101] 6. Building equipment detection: It can view the location information of building equipment in real time and display the operating status. Including but not limited to: monitoring of distribution cabinet data, circuit operating status, monitoring of branch load, temperature, current, voltage and other information; monitoring of water supply and drainage (blockage, water level, pressure, flow monitoring), supply / exhaust fans, water pumps and other equipment; monitoring of elevator, HVAC equipment, fire fighting equipment and other operating data, faults, start and stop data;

[0102] 7. Intelligent lighting: Display the location and status of equipment in the building model, and display various information in charts; display the total number of lamps, the number of operating lamps, the number of each circuit, the number of open circuits, the number of alarm circuits and other information; by connecting to the lighting control platform, click the icon to turn on and off the lights, control the brightness, control the outdoor landscape lighting, etc. At the same time, you can set the control mode for the lighting, such as full-on mode, full-off mode, energy-saving mode, projection mode in the conference room, etc.

[0103] 8. Personnel positioning: Through handheld devices, the location information of staff can be displayed in real time. Split-screen data statistics and analysis. The relevant statistical data of each system equipment is displayed in sections and regions, and the inspection trajectory of security personnel can be displayed in real time and playback.

[0104] 9. Smart environment: Display environmental quality (PM2.5, temperature, humidity, CO2, indoor formaldehyde and other harmful gases), water quality and temperature, noise, weather conditions, etc.; real-time display of water quality parameters (flow, pH, COD, ammonia nitrogen, total phosphorus, total nitrogen, etc.) of the sewage treatment system in the demonstration area, display of the above information in the key monitoring areas of the building and statistical curves of different time units. To achieve environmental monitoring, it can obtain indoor and outdoor air and sewage monitoring and analysis through intelligent sensing.

[0105] 10. Overall operation status diagram of public areas: statistical diagrams of monitoring equipment, access control equipment, energy consumption equipment, building equipment, fire-fighting equipment, and personnel positioning subdivisions, including trend diagrams, horizontal and vertical comparative analysis diagrams, etc.

[0106] 11. Three-level linkage of early warning, alarm and dispatch: It can receive various alarm messages in the demonstration area in real time. When the system equipment issues an early warning or alarm, a reminder will flash on the large screen, and it will be combined with the intelligent dispatch system (event processing within the scope of public area responsibilities) to generate a task work order and enter into emergency linkage processing to ensure the safety of the demonstration area.

[0107] 12. Visualization and processing of alarm messages: When abnormal situations such as early warnings and alarms occur, the intelligent dispatching system receives this information and actively pops up an alarm message to inform the backend staff. At the same time, the intelligent dispatching system will handle events according to its own business logic. See the section on the intelligent dispatching system for details. By viewing by time period, type, status, etc., different types of alarm message statistics can be counted for months, quarters, and years, helping staff analyze the overall status of various types of equipment and demonstration areas.

[0108] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A data visualization and reporting method based on smart park management, It is characterized in that The following steps are involved: S1. Obtain the basic data of the smart park and establish a unified data storage bus to open up the interconnection channels between various departments of the smart park; S2. Obtain data of enterprises settled in the smart park and conduct comprehensive analysis of the data, including enterprise space operation analysis and enterprise overall view analysis; S3. Based on the analysis results of the data of settled enterprises, a comprehensive browsing and display of 3D models of enterprises settled in the smart park is carried out; The specific steps of step S1 are as follows: S11. Obtain various basic data in the smart park through the infrastructure layer in the smart park management system, where the basic data at least includes building information, road information, and air environment information in the smart park; S12. Various basic data collected by the infrastructure layer are stored through the data layer in the smart park management system; S13, integrating the data stored in the data layer through the data integration layer in the smart park management system to form a data storage bus; S14. Various management departments in the smart park share data through a data storage bus, thereby connecting various departments in the smart park; Basic data is obtained by arranging a variety of signal acquisition modules in the smart park; the signal acquisition modules include a video data acquisition module for collecting building information, a Beidou navigation communication module for collecting road information, and a gas detection module for collecting air environment information; Building information includes the location and appearance of office buildings, the location and appearance of factory buildings, the location of public areas, and the location of warehouse areas within the smart park; Road information includes the road distribution status within the smart park, the position and speed of vehicles on the road, and the position and speed of pedestrians on the road; Air environment information includes the flow rate and wind direction of gases in the smart park, the composition of the air, and the temperature and humidity of the air; The specific steps of step S2 are as follows: S21. Divide the smart park into different areas based on the basic data obtained; S22. According to the division of regions, the data of enterprises settled in each region is recorded through the data registration module of the smart park management system; the data includes the business type, business model, products, partners, upstream and downstream industrial chains and scale of the enterprise; S23. Conduct enterprise space operation analysis on the business type, business model and products of each enterprise to obtain the operation status of enterprises in each area; S24. Conduct an overall enterprise view analysis of the operation status of enterprises in each region, their partners, their upstream and downstream industrial chains, and their scale, so as to obtain the operation status of each enterprise in the smart park; The specific steps of step S3 are as follows: S31. Positioning the locations of office buildings, factory buildings, public areas, and warehouse areas in the smart park to obtain a BIM model of the entire park; S32, integrating the BIM model with the corresponding GIS spatial location to obtain a GIS+BIM model of the smart park; S33. Compare the GIS+BIM model with the real-life video images of the smart park site, and adjust the GIS+BIM model to match the actual scene on site; S34. Combine the operation status of each enterprise in the smart park with the GIS+BIM model so that each enterprise in the GIS+BIM model has indicators representing the operation status, thereby constructing a 3D model representing the diversity information of the enterprise; The roads in the smart park are crisscrossed to form a road traffic network. Traffic lights are arranged at the crossroads in the road traffic network. The road between two adjacent traffic lights and with one-way traffic is defined as the current road. The current road traffic status is determined as follows: First, obtain the length L of the current road; Then, the distance in front of the traffic light at the end of the current road is defined as the waiting area for vehicles to pass. The length of the waiting area is L 1 , which is the set distance; the distance from the boundary of the waiting area to the traffic light at the beginning of the current road is defined as the vehicle's passage area, and the length of the passage area is L 2 , L=L 1 +L 2 ; Then, the number of vehicles in the passing area, the number of vehicles in the waiting area, the time it takes for each vehicle in the passing area to pass through the passing area, and the time it takes for each vehicle in the waiting area to pass through the waiting area are obtained, and the number and the corresponding time are input into the congestion calculation formula to calculate the congestion of the road within the set time period T; The formula for calculating congestion is as follows: Among them, represents the congestion degree of the current road in the set time period T, in km / h; represents the driving distance of the i-th vehicle in the waiting area from the parking point to the waiting area; represents the driving time of the i-th vehicle in the waiting area from the parking point to the waiting area, N represents the number of vehicles that have stayed in the waiting area in the set time period T; represents the driving time of the j-th vehicle in the passing area through the passing area, M represents the number of vehicles passing through the passing area in the set time period T; When the congestion degree of the current road is between [0,15], the current road is in a congested state; when the congestion degree of the current road is between (15,40], the current road is in a smooth state; when the congestion degree of the current road is greater than 40, the current road is in a speeding state; The data registration module of the smart park management system is connected to the data storage bus. The data of each settled enterprise recorded in the data registration module is circulated to each management department in the smart park through the data storage bus to realize real-time update of information. The 3D model includes a topology view unit, a device monitoring unit, a panoramic map display unit and an intelligent alarm unit; The equipment monitoring unit is used to detect the power operation data in the smart park, including the temperature, humidity, water level and smoke conditions in the power distribution room of the smart park; The topology view unit is used to integrate the monitored power operation data and generate the power grid topology structure; The panoramic map display unit is used to combine the generated power grid topology structure with the map in the smart park to form a power grid topology structure and display it in the panoramic map; The intelligent alarm unit is used to generate and display alarm information when real-time operating data exceeds the alarm limit; The 3D model can be embedded in a smart phone or mobile tablet, and connected with various management departments in the smart park through the smart phone or mobile tablet to obtain and feedback information in the smart park in real time.