A multi-station round lifting electric furnace suitable for the preparation of scintillation ceramics
Through the design of a multi-station circular lifting furnace, the problem of inconsistent heating time of the ceramic to be fired during scintillation ceramic firing is solved, efficient stacking and quality detection are achieved, and firing efficiency and quality are improved.
Patent Information
- Application Number
- CN202311525206.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-16
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2043-11-16
AI Technical Summary
When the existing electric furnace for scintillation ceramic firing is fired at multiple stations at the same time, there is a difference in the heating time of the ceramic to be fired, which affects the firing quality.
A multi-station circular lifting furnace is designed, using multiple second mounting plates and clips to adjust the position through the adjustment mechanism to achieve efficient stacking and material collection of ceramics, and the quality of the firing is detected by the camera and sliced Clean up the sticky parts.
The stacking efficiency of ceramic firing is improved, ensuring the consistent heating time of each ceramic to be fired is achieved, the firing quality is improved, and the production efficiency is improved through automatic detection and cleaning mechanisms.
Smart Images

Figure CN117663770B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of ceramic preparation equipment, in particular to a multi-station round lifting electric furnace suitable for preparing scintillation ceramics. Background Art
[0002] Scintillating ceramics are ceramics that can absorb high-energy rays and emit specific visible light through the scintillation process. Compared with traditional ceramics, they have higher density and optical transparency, good physical and chemical stability and excellent scintillation performance. They have good application prospects in X-CT detection, medical imaging, digital imaging and anti-terrorism equipment. During the preparation process of scintillation ceramics, they can be fired in an electric furnace.
[0003] In the prior art, in the electric furnace for firing scintillation ceramics, in order to improve the firing efficiency, the electric furnace will be preheated before firing. In the process of placing the ceramics to be fired in the electric furnace, when multiple stations perform firing operations at the same time, if the placement operation takes a long time, it will cause a certain difference in the firing time between the ceramics to be fired at each station. The heating time of each ceramic to be fired is different, which will affect the overall ceramic firing quality. Summary of the invention
[0004] The purpose of the present invention is to solve the shortcomings of the prior art and to propose a multi-station round lifting electric furnace suitable for the preparation of scintillation ceramics.
[0005] In order to achieve the above object, the present invention adopts the following technical solutions:
[0006] A multi-station round lifting electric furnace suitable for preparing scintillation ceramics comprises a base and an electric furnace body, wherein the electric furnace body is connected to the top of the base via a plurality of third electric telescopic rods, a plurality of second mounting plates are slidably mounted on the bottom end of the outer wall of the electric furnace body via an adjusting mechanism, two clips are slidably mounted on the bottom of the second mounting plates, and a plurality of feeding mechanisms are also slidably connected to the outer wall of the base.
[0007] Preferably, a second slide groove is opened at the bottom end of the outer wall of the electric furnace body in a circumferential direction, and the adjustment mechanism includes a second electric slider and a second connecting block. The second electric slider is slidably installed inside the second slide groove, the second connecting block is connected to one side outer wall of the second electric slider, and the second mounting plate is slidably connected to the bottom of the second connecting block.
[0008] Preferably, one side outer wall of the second electric slider is connected to the one side outer wall of the second connecting block through the first electric telescopic rod, the second connecting block can be moved in the horizontal direction through the first electric telescopic rod, the bottom of the second connecting block is connected to the top of the second mounting plate through the second electric telescopic rod, and a third electric rotating rod is also connected between the second connecting block and the fixed end of the second electric telescopic rod.
[0009] Preferably, an extension plate is connected to the outer wall of the second mounting plate away from the electric furnace body, a camera is connected to the bottom of the extension plate, an L-shaped third connecting block is connected to the bottom of the second electric telescopic rod, a fourth connecting block is connected to the top of the second mounting plate, and an outer wall of one side of the third connecting block is connected to an outer wall of one side of the fourth connecting block through a fourth electric telescopic rod.
[0010] Preferably, a fourth slide groove is provided at the bottom of the second mounting plate, and two fourth electric sliders are slidably installed inside the fourth slide groove, and the bottom of the fourth electric slider is connected to the top of the clamp. A plurality of nozzles capable of blowing air outward are installed on one side of the bottom of the second mounting plate, and a bellows is also installed on the top of the second mounting plate above each nozzle, and the bellows is connected to each nozzle through a hose.
[0011] Preferably, a first slide groove is opened in the outer wall of the base along the circumferential direction, a plurality of first electric sliders are slidably connected inside the first slide groove, and the feeding mechanism is rotatably mounted on one side outer wall of the first electric slider.
[0012] Preferably, the feeding mechanism includes a first connecting plate and two first mounting plates rotatably mounted on the outer wall on one side thereof, the outer wall on the other side of the first mounting plate is rotatably connected to the outer wall on one side of the first electric slider via a second electric rotating rod, and the two first mounting plates are rotatably mounted at both ends of the outer wall on one side of the first connecting plate via the first electric rotating rod.
[0013] Preferably, a support plate may be installed and plugged on the top of the first mounting plate, a plurality of molds for ceramic preparation may be plugged on the top of the support plate, and a plurality of air holes are provided on the top of the support plate between the two molds.
[0014] Preferably, the two first mounting plates can be merged into a horizontal line with the first electric rotating rod by rotating the first connecting plate, and the width of the first connecting plate is the same as that of the first mounting plate. Slots are provided on both sides of the top of the first mounting plate, and insertion strips are connected to the two ends of the bottom of the support plate. After the two first mounting plates are merged, the support plate can be inserted into the slot through the insertion strip to connect with the two first mounting plates.
[0015] Preferably, a slice movable in a vertical direction is connected to the bottom of the clamp, a first mounting groove is provided at the bottom of the clamp, and the slice is connected to the inside of the first mounting groove through a fifth electric telescopic rod.
[0016] Compared with the prior art, the present invention has the following beneficial effects:
[0017] 1. In the present invention, by setting a plurality of second mounting plates and two clips at the bottom thereof, when the electric furnace body is preheated and each mold has been placed on the top of the corresponding first mounting plate, the corresponding second mounting plates can be controlled by each adjusting mechanism to adjust the position, and each second mounting plate and the clips at the bottom thereof can sequentially place all the ceramics to be fired into the electric furnace body and stack them. Stacking a plurality of second mounting plates together can improve the stacking efficiency while preventing the overall stacking operation time from being long, resulting in different heating times for each ceramic to be fired, thereby affecting the firing quality of the ceramics.
[0018] 2. In the present invention, by setting a loading mechanism, during the firing process, the next batch of molds to be fired can be placed on the top of each first mounting plate in sequence as described above, and the first connecting plate can rotate the idle first mounting plate to the top to provide unloading conditions for the ceramics after firing. During the material taking process, each second mounting plate can take materials together to improve work efficiency.
[0019] 3. In the invention, a camera is set up to take pictures of the fired ceramics for inspection. The camera can take pictures of the fired ceramics, and the control system compares the pictures taken with the predetermined pictures that meet the requirements to detect whether the fired ceramics are qualified. When the camera finds that the fired ceramic pieces are stuck to the inner wall or top of the mold during the shooting process, in order to prevent the sticky part from solidifying and being difficult to clean due to the lowering of the temperature of the ceramic pieces and the mold during transportation, the sticky part can be cut off and cleaned by extending the slice located inside the clip downward. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 This is an axonometric diagram of a multi-station round lifting electric furnace suitable for preparing scintillation ceramics proposed by the present invention;
[0021] Figure 2 It is a structural schematic diagram of the feeding mechanism in the present invention;
[0022] Figure 3 It is a structural schematic diagram of the second mounting plate in the present invention;
[0023] Figure 4 It is a structural schematic diagram of the second mounting plate in the present invention from another angle;
[0024] Figure 5 It is a schematic diagram of the structure of the clamping piece and the slicing piece in the present invention;
[0025] Figure 6 It is a schematic structural diagram of the second electric rotating rod in the present invention;
[0026] Figure 7 is a schematic structural diagram of the third electric rotating rod in the present invention;
[0027] Figure 8 It is a structural schematic diagram of the support plate in the present invention;
[0028] Fig. 9 It is a schematic diagram of the structure of the mold stacking for ceramic firing in the present invention.
[0029] In the figure: 1. electric furnace body; 2. base; 3. first slide groove; 4. first electric slider; 5. first connecting plate; 6. second slide groove; 7. second electric slider; 8. first electric rotating rod; 9. first mounting plate; 10. slot; 11. first electric telescopic rod; 12. second connecting block; 13. second electric telescopic rod; 14. third connecting block; 15. second mounting plate; 16. fourth electric telescopic rod; 17. camera; 18. fourth slide groove; 19. fourth electric slider; 20. clip; 21. third electric telescopic rod; 22. slice; 23. second electric rotating rod; 24. third electric rotating rod; 25. insert; 26. support plate; 27. bellows; 28. nozzle. DETAILED DESCRIPTION
[0030] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0031] Reference Figure 1-9 A multi-station round lifting electric furnace suitable for the preparation of scintillation ceramics includes a base 2 and an electric furnace body 1. The electric furnace body 1 is connected to the top of the base 2 through multiple third electric telescopic rods 21. Multiple second mounting plates 15 are slidably installed on the bottom end of the outer wall of the electric furnace body 1 through an adjusting mechanism. Two clips 20 are slidably installed on the bottom of the second mounting plate 15. The outer wall of the base 2 is also slidably connected to multiple feeding mechanisms.
[0032] As a technical optimization solution of the present invention, a second slide groove 6 is opened at the bottom end of the outer wall of the electric furnace body 1 in the circumferential direction, and the adjustment mechanism includes a second electric slider 7 and a second connecting block 12. The second electric slider 7 is slidably installed inside the second slide groove 6, the second connecting block 12 is connected to the outer wall of one side of the second electric slider 7, and the second mounting plate 15 is slidably connected to the bottom of the second connecting block 12.
[0033] As a technical optimization scheme of the present invention, the outer wall of one side of the second electric slider 7 is connected to the outer wall of one side of the second connecting block 12 through the first electric telescopic rod 11, the second connecting block 12 can be moved in the horizontal direction through the first electric telescopic rod 11, the bottom of the second connecting block 12 is connected to the top of the second mounting plate 15 through the second electric telescopic rod 13, and a third electric rotating rod 24 is also connected between the second connecting block 12 and the fixed end of the second electric telescopic rod 13. In the process of placing the mold, because the electric furnace body 1 is circular, the positions of the various first mounting plates 9 are different, and when multiple stations simultaneously place the mold into the electric furnace body 1 through the corresponding clamping pieces 20, the molds cannot be stacked neatly because the angles of the molds after clamping between the various stations are different; in the process of placing the molds into the electric furnace body 1 for stacking, the position state of the corresponding first mounting plate 9 can be adjusted by rotating the third electric rotating rod 24 between the bottom of the second connecting block 12 and the fixed end of the second electric telescopic rod 13 to ensure that each mold can be stacked neatly inside the electric furnace body 1.
[0034] As a technical optimization solution of the present invention, the outer wall of the second mounting plate 15 on one side away from the electric furnace body 1 is connected to an extension plate, the bottom of the extension plate is connected to a camera 17, the bottom of the second electric telescopic rod 13 is connected to an L-shaped third connecting block 14, the top of the second mounting plate 15 is connected to a fourth connecting block, and the outer wall of one side of the third connecting block 14 is connected to the outer wall of one side of the fourth connecting block through a fourth electric telescopic rod 16.
[0035] As a technical optimization solution of the present invention, a fourth slide groove 18 is opened at the bottom of the second mounting plate 15, and two fourth electric sliders 19 are slidably installed inside the fourth slide groove 18. The bottom of the fourth electric slider 19 is connected to the top of the clamp 20. A plurality of nozzles 28 that can blow air outward are installed on one side of the bottom of the second mounting plate 15. A bellows 27 is also installed on the top of the second mounting plate 15, above each nozzle 28. The bellows 27 is connected to each nozzle 28 through a hose.
[0036] As a technical optimization solution of the present invention, a first slide groove 3 is opened on the outer wall of the base 2 along the circumferential direction, and multiple first electric sliders 4 are slidably connected inside the first slide groove 3. The loading mechanism is rotatably installed on one side outer wall of the first electric slider 4.
[0037] As a technical optimization solution of the present invention, the feeding mechanism includes a first connecting plate 5 and two first mounting plates 9 rotatably mounted on the outer wall on one side thereof. The outer wall on the other side of the first mounting plate 9 is rotatably connected to the outer wall on one side of the first electric slider 4 through a second electric rotating rod 23. The two first mounting plates 9 are rotatably mounted on both ends of the outer wall on one side of the first connecting plate 5 through the first electric rotating rod 8.
[0038] As a technical optimization solution of the present invention, a support plate 26 can be installed on the top of the first mounting plate 9, and a plurality of molds for ceramic preparation can be inserted on the top of the support plate 26. The top of the support plate 26 is located between the two molds and has a plurality of air holes. The stacking method of a single ceramic firing mold is as follows: Fig. 9 As shown, the protrusion at the bottom of the mold can also be inserted into the slot 10 for fixation to ensure that the mold will not be displaced in subsequent work. A single ceramic firing mold is different from multiple firing molds, which are composed of an upper mold and a lower mold. Single ceramic firing molds can be stacked through the protrusions, and the protrusions will not affect the ceramics to be fired inside the mold. A third mounting groove is provided at both ends of the top of a single firing mold, and the protrusion at the bottom of another single firing mold can be inserted into the corresponding third mounting groove for stacking, which can ensure that the stacking is stable and the protrusion will not affect the ceramics to be fired inside the mold.
[0039] As a technical optimization scheme of the present invention, the two first mounting plates 9 can be merged into a horizontal line with the first electric rotating rod 8 by rotating the first connecting plate 5, and the width of the first connecting plate 5 is the same as that of the first mounting plate 9. Slots 10 are opened on both sides of the top of the first mounting plate 9, and the two ends of the bottom of the support plate 26 are connected with insertion strips 25. The support plate 26 can be inserted into the slot 10 and connected to the two first mounting plates 9 through the insertion strips 25 after the two first mounting plates 9 are merged.
[0040] As a technical optimization solution of the present invention, a slice 22 movable in the vertical direction is connected to the bottom of the clip 20, a first mounting groove is opened at the bottom of the clip 20, and the slice 22 is connected to the inside of the first mounting groove through a fifth electric telescopic rod.
[0041] When the present invention is used, the electric furnace body 1 is placed at a predetermined position and powered on, and then the electric furnace body 1 can be used normally.
[0042] During the firing process of the scintillation ceramics, if the ceramics to be fired are large in size and a single ceramic to be fired needs to be placed inside the electric furnace body 1 for firing, first place the molds in order, such as Figure 2 As shown, the top of the first mounting plate 9 is located at the top of the outer wall on one side of the first connecting plate 5, and the electric furnace body 1 is preheated at the same time; in addition, it should be noted that the top of the mold does not need to be sealed, and the molds are stacked vertically inside the electric furnace body 1, so only the top mold needs to be sealed.
[0043] When the electric furnace body 1 is preheated and each mold has been placed on the top of the corresponding first mounting plate 9, the second mounting plate 15 can be adjusted in the horizontal direction by the first electric telescopic rod 11, and the second mounting plate 15 can be adjusted in the vertical direction by the second electric telescopic rod 13. After adjusting the position of the second mounting plate 15, the mold of the ceramic to be fired is clamped and fixed by two clamps 20; then the third electric telescopic rods 21 are synchronously extended upward to move the electric furnace body 1 upward as a whole to provide working conditions for the placement of the ceramic mold to be fired; the fourth electric telescopic rod 16 on the outer wall of one side of the third connecting block 14 is extended to place the mold inside the electric furnace body 1. In the process of placing the mold, each second mounting plate 15 is simultaneously rotated and adjusted to the inside of the electric furnace body 1 at different heights, so that each mold to be fired is located on the same straight line in the vertical direction, and then each second mounting plate 15 sequentially places all the ceramics to be fired into the electric furnace body 1 and stacks them. Stacking multiple second mounting plates 15 together can improve the stacking efficiency, and the simultaneous entry of each mold to be fired into the electric furnace body 1 can also prevent the overall stacking operation time from being long, resulting in different heating times for each ceramic to be fired, thereby affecting the firing quality of the ceramic.
[0044] It should also be noted that, during the process of placing the mold, because the electric furnace body 1 is circular and the positions of each first mounting plate 9 are different, when multiple stations simultaneously place the mold into the electric furnace body 1 through the corresponding clips 20, the molds cannot be stacked neatly due to the different angles of the molds after clamping between each station; in the process of placing the molds into the electric furnace body 1 for stacking, the position state of the corresponding first mounting plate 9 can be adjusted by rotating the third electric rotating rod 24 between the bottom of the second connecting block 12 and the fixed end of the second electric telescopic rod 13 to ensure that each mold can be stacked neatly inside the electric furnace body 1.
[0045] After the molds inside the electric furnace body 1 are stacked, the third electric telescopic rods 21 can be retracted synchronously, and the electric furnace body 1 can be moved downward to cover the top of the base 2. It should be noted that the fixed end of the third electric telescopic rod 21 is connected to the top of the base 2, so that the third electric telescopic rod 21 can be retracted to complete the cover sealing operation. After that, the power of the electric furnace body 1 can be increased, and the temperature inside the electric furnace body 1 can be increased to officially start the firing work.
[0046] During the firing process, the next batch of molds to be fired can be placed on the top of each first mounting plate 9 in sequence as described above. After the placement is completed, the first connecting plate 5 is rotated 180 degrees outside the first electric slider 4 by the second electric rotating rod 23; at the same time, the first mounting plate 9 is rotated by the first electric rotating rod 8, so that the first mounting plate 9 remains in a horizontal state during the rotation of the first connecting plate 5. The first connecting plate 5 is rotated 180 degrees to rotate the idle first mounting plate 9 to the top, thereby providing material unloading conditions for the ceramics after firing.
[0047] When the ceramics in the electric furnace body 1 are fired and need to be removed, the fired ceramics and the molds can be removed through each second mounting plate 15 and the two clips 20 at the bottom thereof to prevent them from being placed on the top of the idle first mounting plate 9; the second mounting plates 15 can be used together to remove the materials to improve the work efficiency. Then, the first connecting plate 5 is rotated 180 degrees again, and the first mounting plate 9 is rotated by the first electric rotating rod 8 at the same time, so that the first mounting plate 9 is kept in a horizontal state during the rotation of the first connecting plate 5, and the other batch of ceramics and the molds to be fired are rotated to the top, and then the second mounting plate 15 is controlled to perform the loading operation, which can improve the overall ceramic firing efficiency.
[0048] After another batch of ceramics and molds are placed inside the electric furnace body 1 and firing begins, the first mounting plate 9 storing the fired ceramics is rotated 180 degrees, and the first mounting plate 9 is rotated by the first electric rotating rod 8 so that the first mounting plate 9 remains in a horizontal state during the rotation of the first connecting plate 5. Then, the fired ceramics are photographed and inspected by the camera 17 at the bottom of the outer wall extension plate on one side of the second mounting plate 15. The camera 17 can photograph the fired ceramics, and the control system compares the photographed pictures with the established pictures that meet the requirements to detect whether the fired ceramics are qualified. If unqualified, they are moved to the waste area. If qualified, they are transported by the transportation device for processing.
[0049] When the camera 17 finds during filming that the fired ceramic part is stuck to the inner wall or top of the mold, in order to prevent the sticky part from solidifying and becoming difficult to clean due to the lowering of the temperature of the ceramic part and the mold during transportation, the slice 22 located inside the clamp 20 can be extended downward to cut off and clean the sticky part; during the cutting process, the position of the slice 22 can be adjusted by the adjusting mechanism, so that each sticky part between the mold and the ceramic part can be cut off.
[0050] It should also be noted that, during the process of clamping and feeding the mold, the bellows 27 can be started. After the bellows 27 is started, each nozzle 28 can blow air outward. As the second mounting plate 15 clamps the mold, the nozzle 28 can blow and clean the surface of the ceramic to be fired inside the mold to ensure that dust will not remain on the surface of the ceramic to be fired and affect the firing efficiency. At the same time, when the ceramic parts are fired and the sticky parts have been cut off, the mold and the fired ceramics can be blown and cooled down by the nozzle 28; in addition, when the ceramic parts to be fired are placed inside the electric furnace body 1, the dust retained on the top of the base 2 due to the previous batch of fired ceramic parts can also be blown and cleaned by the nozzle 28 to ensure the firing efficiency.
[0051] During the firing process of flashing ceramics, due to the small size of the ceramics, multiple ceramics to be fired need to be fixed by the support plate 26 and then placed into the electric furnace body 1 for firing. The first connecting plate 5 is rotated 90 degrees, and the two first mounting plates 9 are rotated 90 degrees at the same time, so that the two first mounting plates 9 are on the same horizontal line. Since the first connecting plate 5 has the same width as the first mounting plate 9, the two first mounting plates 9 can form a workbench after rotation, and then the insertion strip 25 at the bottom of the support plate 26 can be inserted into the corresponding slot 10 at the top of the first mounting plate 9 for fixation. The clip 20 can be replaced according to work requirements to facilitate the support plate 26 to be moved to the inside of the electric furnace body 1 and multiple ceramics can be fired together.
[0052] In addition, the air holes opened at the top of the support plate 26 between each mold can make the molds evenly heated during the firing process. The molds are all plugged into the top of the support plate 26. The top and bottom of the support plate 26 are both provided with a second mounting groove, and the molds can be plugged into the second mounting groove for fixation. The sliding design of the feeding mechanism and the second mounting plate 15 on the base 2 and the outer wall of the electric furnace body 1 can facilitate adaptive sliding adjustment during the loading and unloading process, and can prevent the third electric telescopic rod 21 from affecting the loading and unloading. The stacking method of a single ceramic firing mold is as follows: Fig. 9 As shown, the protrusion at the bottom of the mold can also be inserted into the slot 10 for fixing to ensure that the mold will not be offset in subsequent work. A single ceramic firing mold is different from multiple firing molds, which are composed of an upper mold and a lower mold. Single ceramic firing molds can be stacked by protrusions, and the protrusions will not affect the ceramic to be fired inside the mold.
[0053] In addition, it should be noted that a heat insulation layer is installed inside the electric furnace body 1. The heat insulation layer is set to prevent the outer wall temperature of the electric furnace body 1 from being too high and affecting the service life of the electronic components on the outer wall. At the same time, the second mounting plate 15 and other original parts extending into the electric furnace body 1 have been heat-resistant to ensure the normal operation of each component. Preheating the ceramic parts to be fired is not the same as pre-firing, and the preheating temperature range will not affect the service life of the electronic components.
[0054] The preferred embodiments of the present invention disclosed above are only used to help illustrate the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to the specific implementation methods described. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.
Claims
1. A multi-station round lifting electric furnace suitable for preparing scintillation ceramics, comprising a base (2) and an electric furnace body (1), It is characterized in that The electric furnace body (1) is connected to the top of the base (2) via a plurality of third electric telescopic rods (21); a plurality of second mounting plates (15) are slidably mounted on the bottom end of the outer wall of the electric furnace body (1) via an adjustment mechanism; two clips (20) are slidably mounted on the bottom of the second mounting plates (15); and a plurality of loading mechanisms are also slidably connected to the outer wall of the base (2); A second slide groove (6) is provided at the bottom end of the outer wall of the electric furnace body (1) along the circumferential direction, and the adjustment mechanism comprises a second electric slider (7) and a second connecting block (12), the second electric slider (7) is slidably mounted inside the second slide groove (6), the second connecting block (12) is connected to the outer wall of one side of the second electric slider (7), and the second mounting plate (15) is slidably connected to the bottom of the second connecting block (12); One side outer wall of the second electric slide block (7) is connected to one side outer wall of the second connection block (12) via the first electric telescopic rod (11); the second connection block (12) moves in the horizontal direction via the first electric telescopic rod (11); the bottom of the second connection block (12) is connected to the top of the second mounting plate (15) via the second electric telescopic rod (13); and a third electric rotating rod (24) is further connected between the second connection block (12) and the fixed end of the second electric telescopic rod (13); An extension plate is connected to an outer wall of one side of the second mounting plate (15) away from the electric furnace body (1); a camera (17) is connected to the bottom of the extension plate; an L-shaped third connecting block (14) is connected to the bottom of the second electric telescopic rod (13); a fourth connecting block is connected to the top of the second mounting plate (15); and an outer wall of one side of the third connecting block (14) is connected to an outer wall of one side of the fourth connecting block via a fourth electric telescopic rod (16); A fourth slide groove (18) is provided at the bottom of the second mounting plate (15), two fourth electric sliders (19) are slidably mounted inside the fourth slide groove (18), the bottom of the fourth electric slider (19) is connected to the top of the clamp (20), a plurality of air blowing nozzles (28) are mounted on one side of the bottom of the second mounting plate (15), a bellows (27) is also mounted on the top of the second mounting plate (15) above each nozzle (28), and the bellows (27) is connected to each nozzle (28) via a hose.
2. A multi-station round lifting electric furnace suitable for preparing scintillation ceramics according to claim 1, It is characterized in that The outer wall of the base (2) is provided with a first slide groove (3) along the circumferential direction, a plurality of first electric slide blocks (4) are slidably connected inside the first slide groove (3), and the feeding mechanism is rotatably mounted on one side outer wall of the first electric slide block (4).
3. A multi-station round lifting electric furnace suitable for preparing scintillation ceramics according to claim 2, It is characterized in that The feeding mechanism comprises a first connecting plate (5) and two first mounting plates (9) rotatably mounted on an outer wall on one side thereof; the outer wall on the other side of the first mounting plate (9) is rotatably connected to an outer wall on one side of the first electric slider (4) via a second electric rotating rod (23); the two first mounting plates (9) are rotatably mounted on both ends of the outer wall on one side of the first connecting plate (5) via a first electric rotating rod (8).
4. A multi-station round lifting electric furnace suitable for preparing scintillation ceramics according to claim 3, It is characterized in that A support plate (26) is plugged and installed on the top of the first mounting plate (9), a plurality of molds for ceramic preparation are plugged on the top of the support plate (26), and a plurality of air holes are provided on the top of the support plate (26) between the two molds.
5. A multi-station round lifting electric furnace suitable for preparing scintillation ceramics according to claim 4, It is characterized in that The two first mounting plates (9) are combined with the first electric rotating rod (8) to form a horizontal line by rotating the first connecting plate (5), and the first connecting plate (5) and the first mounting plate (9) have the same width. Slots (10) are provided on both sides of the top of the first mounting plate (9), and both ends of the bottom of the support plate (26) are connected with insertion strips (25). After the two first mounting plates (9) are combined, the support plate (26) is inserted into the slots (10) through the insertion strips (25) to be plugged into the two first mounting plates (9).
6. A multi-station round lifting electric furnace suitable for preparing scintillation ceramics according to claim 5, It is characterized in that The bottom of the clamp (20) is connected to a slice (22) that moves in a vertical direction. A first mounting groove is provided at the bottom of the clamp (20), and the slice (22) is connected to the inside of the first mounting groove via a fifth electric telescopic rod.
