Data storage method, device, electronic device and computer readable medium

By obtaining and integrating the technical parameter data sets of the target material value delivery project, generating and storing the corresponding data sets, the problems of low data set integration efficiency and insufficient data accuracy in the existing technology are solved, and efficient processing of technical parameter data is achieved and real-time query to support effective supervision and management of projects.

CN117743293BActive Publication Date: 2024-12-06STATE GRID MATERIAL CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311514768.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-11-14
Publication Date
2024-12-06
Estimated Expiration
2043-11-14

AI Technical Summary

Technical Problem

Before the project is launched, the integration of technical parameter data sets related to value investment campaigns is inefficient, resulting in complex cross-departmental query, and the generation of technical parameter data sets for random inspections is not accurate enough to effectively supervise project progress in real time.

Method used

A data storage method is proposed to obtain the main data information set and technical specification information of the target material value delivery project, generate value investment plan, project preparation and supply verification results information, and generate corresponding data sets in response to the value calibration information, and These data sets are stored in the technical parameter database to realize the integration and real-time call of the data set.

Benefits of technology

By accurately and efficiently processing technical parameter data sets, cross-departmental data calls and query are simplified, ensuring the accuracy and real-timeness of the data sets, and supporting effective supervision and management of projects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117743293B_ABST
    Figure CN117743293B_ABST
Patent Text Reader

Abstract

The embodiments of the present disclosure disclose a data storage method, device, electronic device and computer-readable medium. A specific implementation of the method includes: obtaining a technical parameter master data information set and technical specification information; generating value investment plan information, value investment project preparation information and value supply verification result information; generating a value investment application technical parameter data set and a technical specification response technical parameter data set; generating a value supply verification technical parameter data set; generating value investment order information; generating a value investment order technical parameter data set; generating sampling test data and equipment supervision test data; generating equipment supervision technical parameter data set and sampling test technical parameter data set; storing each technical parameter data set in a technical parameter database. This implementation can accurately and efficiently realize the effective processing of various technical parameter data sets, and facilitate the real-time call of subsequent cross-departmental technical parameter data.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] Embodiments of the present disclosure relate to the field of computer technology, and in particular to a data storage method, device, electronic device, and computer-readable medium. Background Art

[0002] At present, before a project is launched, project managers are often selected through value investment campaigns. For the processing of technical parameter data corresponding to the value investment campaign, the usual method is: first, the technical personnel of each department manually organize the various technical parameter data sets involved in the value investment campaign. Then, the various technical parameter data sets are fused to generate a fused data set as the technical parameter data set corresponding to the value investment campaign.

[0003] However, the inventors have found that when the above method is adopted, the following technical problems often occur:

[0004] First, the efficiency is too low and the technical parameter data sets corresponding to each department and related to the value input campaign cannot be effectively integrated, which makes the subsequent query of cross-departmental technical parameter data sets too complicated;

[0005] Second, the generation of technical parameter data sets for future random inspection experiments will not be accurate enough, resulting in the inability to effectively monitor the progress of target material value delivery projects in real time.

[0006] The above information disclosed in this Background section is only for enhancement of understanding of the background of the inventive concept and therefore it may contain information that does not form the prior art that is already known in this country to a person of ordinary skill in the art. Summary of the invention

[0007] The content of this disclosure is used to introduce concepts in a brief form, which will be described in detail in the detailed implementation section below. The content of this disclosure is not intended to identify the key features or essential features of the technical solution claimed for protection, nor is it intended to limit the scope of the technical solution claimed for protection.

[0008] Some embodiments of the present disclosure propose data storage methods, devices, electronic devices, and computer-readable media to solve one or more of the technical problems mentioned in the above background technology section.

[0009] In a first aspect, some embodiments of the present disclosure provide a data storage method, including: obtaining a technical parameter master data information set and technical specification information for a target material value investment project; generating value investment plan information, value investment project preparation information and value supply verification result information for the above-mentioned technical parameter master data information set and the above-mentioned technical specification information; in response to receiving value calibration information, generating a value investment application technical parameter data set and a technical specification response technical parameter data set according to the above-mentioned value investment plan information, the above-mentioned value investment project preparation information and the above-mentioned technical parameter master data information set; generating a value supply verification technical parameter data set according to the above-mentioned value supply verification result information and the above-mentioned technical parameter master data information set; generating a value calibration information for the above-mentioned value calibration information. Value investment order information; generate a value investment order technical parameter data set based on the above value investment order information and the above technical parameter master data information set; generate sampling test data and equipment supervision test data for the above value investment order information; generate equipment supervision technical parameter data set and sampling test technical parameter data set based on the above sampling test data, the above equipment supervision test data and the above technical parameter master data information set; store the above value investment application technical parameter data set, the above technical specification response technical parameter data set, the above value supply verification technical parameter data set, the above value investment order technical parameter data set, the above equipment supervision technical parameter data set and the above sampling test technical parameter data set in the technical parameter database for the above target material value investment project.

[0010] In a second aspect, some embodiments of the present disclosure provide a data storage device, including: an acquisition unit, configured to acquire a technical parameter master data information set and technical specification information for a target material value investment project; a first generation unit, configured to generate value investment plan information, value investment project preparation information and value supply verification result information for the above-mentioned technical parameter master data information set and the above-mentioned technical specification information; a second generation unit, configured to generate a value investment application technical parameter data set and a technical specification response technical parameter data set in response to receiving value calibration information, according to the above-mentioned value investment plan information, the above-mentioned value investment project preparation information and the above-mentioned technical parameter master data information set; a third generation unit, configured to generate a value supply verification technical parameter data set according to the above-mentioned value supply verification result information and the above-mentioned technical parameter master data information set; a fourth generation unit, configured to generate a value calibration information set for the above-mentioned value calibration information. the value investment order information of the target material value investment project; the fifth generating unit is configured to generate a value investment order technical parameter data set according to the above value investment order information and the above technical parameter master data information set; the sixth generating unit is configured to generate sampling test data and equipment supervision test data for the above value investment order information; the seventh generating unit is configured to generate an equipment supervision technical parameter data set and a sampling test technical parameter data set according to the above sampling test data, the above equipment supervision test data and the above technical parameter master data information set; the storage unit is configured to store the above value investment application technical parameter data set, the above technical specification response technical parameter data set, the above value supply verification technical parameter data set, the above value investment order technical parameter data set, the above equipment supervision technical parameter data set and the above sampling test technical parameter data set in the technical parameter database for the above target material value investment project.

[0011] In a third aspect, some embodiments of the present disclosure provide an electronic device comprising: one or more processors; a storage device on which one or more programs are stored, and when the one or more programs are executed by the one or more processors, the one or more processors implement the method described in any implementation manner in the first aspect.

[0012] In a fourth aspect, some embodiments of the present disclosure provide a computer-readable medium having a computer program stored thereon, wherein when the program is executed by a processor, the method described in any implementation manner in the first aspect is implemented.

[0013] The above-mentioned embodiments of the present disclosure have the following beneficial effects: through the data storage method of some embodiments of the present disclosure, various technical parameter data sets can be accurately and efficiently processed, which is convenient for the subsequent real-time call of cross-departmental technical parameter data. Specifically, the reason why the relevant cross-departmental technical parameter data is not accurate and efficient is that the efficiency is not only too low, but also the technical parameter data sets corresponding to each department and associated with the value investment campaign cannot be effectively integrated, resulting in the query of the subsequent cross-departmental technical parameter data sets being too complicated. Based on this, the data storage method of some embodiments of the present disclosure first obtains the technical parameter master data information set and technical specification information for the target material value investment project, so as to facilitate the value investment object to determine the value investment plan information, value investment project preparation information and value supply verification result information, so as to achieve the precise delivery of the target material value investment project. In addition, by obtaining the technical parameter master data information set, it is possible to effectively obtain important technical parameter data sets from various aspects corresponding to the target material value investment project, which is convenient for the subsequent technical parameter data call and query between various departments. Then, the value investment plan information, value investment project preparation information and value supply verification result information for the above technical parameter master data information set and the above technical specification information are generated to carry out the value investment, which is also convenient for the acquisition of technical parameter data sets in various aspects. Then, in response to receiving the value calibration information, the value investment application technical parameter data set and the technical specification response technical parameter data set can be accurately generated according to the above-mentioned value investment plan information, the above-mentioned value investment project preparation information and the above-mentioned technical parameter master data information set. Then, according to the above-mentioned value supply verification result information and the above-mentioned technical parameter master data information set, the value supply verification technical parameter data set can be accurately generated. Further, the value investment order information for the above-mentioned value calibration information is generated for the subsequent acquisition of the technical parameter data set for the value investment order. Secondly, according to the above-mentioned value investment order information and the above-mentioned technical parameter master data information set, the value investment order technical parameter data set can be accurately generated. Immediately afterwards, the sampling test data and the equipment supervision test data for the above-mentioned value investment order information are generated for the subsequent generation of the technical parameter data set for the equipment supervision and the technical parameter data set for the sampling test. Furthermore, according to the above-mentioned sampling test data, the above-mentioned equipment supervision test data and the above-mentioned technical parameter master data information set, the equipment supervision technical parameter data set and the sampling test technical parameter data set can be accurately generated. Finally, the above-mentioned value investment application technical parameter data set, the above-mentioned technical specification response technical parameter data set, the above-mentioned value supply verification technical parameter data set, the above-mentioned value investment order technical parameter data set, the above-mentioned equipment supervision technical parameter data set and the above-mentioned sampling experiment technical parameter data set are stored in the technical parameter database for the above-mentioned target material value investment project.In summary, by acquiring technical parameter data sets from various aspects and integrating the technical parameter data sets, and subsequently storing them in a technical parameter database, effective technical parameter data calling and query can be achieved between departments. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] The above and other features, advantages and aspects of the embodiments of the present disclosure will become more apparent with reference to the following detailed description in conjunction with the accompanying drawings. Throughout the accompanying drawings, the same or similar reference numerals represent the same or similar elements. It should be understood that the drawings are schematic and that components and elements are not necessarily drawn to scale.

[0015] Figure 1 is a flow chart of some embodiments of the data storage method according to the present disclosure;

[0016] Figure 2 is a schematic diagram of the structure of some embodiments of the data storage device according to the present disclosure;

[0017] Figure 3 It is a schematic diagram of the structure of an electronic device suitable for implementing some embodiments of the present disclosure. DETAILED DESCRIPTION

[0018] Embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although certain embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be construed as being limited to the embodiments set forth herein. On the contrary, these embodiments are provided to provide a more thorough and complete understanding of the present disclosure. It should be understood that the drawings and embodiments of the present disclosure are only for exemplary purposes and are not intended to limit the scope of protection of the present disclosure.

[0019] It should also be noted that, for ease of description, only the parts related to the invention are shown in the drawings. In the absence of conflict, the embodiments and features in the embodiments of the present disclosure can be combined with each other.

[0020] It should be noted that the concepts such as "first" and "second" mentioned in the present disclosure are only used to distinguish different devices, modules or units, and are not used to limit the order or interdependence of the functions performed by these devices, modules or units.

[0021] It should be noted that the modifications of "one" and "plurality" mentioned in the present disclosure are illustrative rather than restrictive, and those skilled in the art should understand that unless otherwise clearly indicated in the context, it should be understood as "one or more".

[0022] The names of the messages or information exchanged between multiple devices in the embodiments of the present disclosure are only used for illustrative purposes and are not used to limit the scope of these messages or information.

[0023] The present disclosure will be described in detail below with reference to the accompanying drawings and in conjunction with embodiments.

[0024] refer to Figure 1 , shows a process 100 of some embodiments of the data storage method according to the present disclosure. The data storage method comprises the following steps:

[0025] Step 101, obtaining a technical parameter master data information set and technical specification information for a target material value investment project.

[0026] In some embodiments, the executor of the above-mentioned data storage method can obtain the technical parameter master data information set and technical specification information for the target material value delivery project through a wired connection method or a wireless connection method. Among them, the target material value delivery project can be a target value delivery project under the material field. In practice, the target value delivery project can be a bidding project. For example, the target material value delivery project can be a prevention and control material bidding project. The technical parameter master data information set can be the main technical parameter data information set under the target value delivery project. The technical parameter master data information can be the data identifier of the technical parameter master data. The technical specification information can be the specification information of the project technical specifications of the target material value delivery project. In practice, the technical specification information can be the technical requirement specification information of the bidding project. For example, the technical specification information can be the prevention and control technical requirement specification information of the prevention and control material bidding project.

[0027] It should be noted that the technical parameter master data information set and the technical specification information may be information preset by the value placement object. The value placement object may be an object for bidding for the distribution of target material value placement projects.

[0028] Step 102: Generate value investment plan information, value investment project preparation information and value supply verification result information for the above technical parameter master data information set and the above technical specification information.

[0029] In some embodiments, the execution subject may generate value investment plan information, value investment project preparation information and value supply verification result information for the technical parameter master data information set and the technical specification information. Among them, the value investment plan information may be the plan information set by the value investment object. In practice, the value investment object may be a bidding object. The value investment plan information may be the bidding plan information set by the bidding object. For example, the bidding plan information may be the project bidding plan information for the prevention and control material bidding project. The value investment project preparation information may be the project preparation information of the value investment object for the above-mentioned target material value investment project. In practice, the value investment project preparation information may be the prevention and control preparation information for the prevention and control material bidding project. For example, the value investment project preparation information may include but is not limited to at least one of the following: the number of prevention and control resources prepared for each category of items, and the funds prepared for prevention and control resources. The value supply verification result information may be the verification result information of the value supply of the above-mentioned target material value investment project. In practice, the supplier of the value supply for the above-mentioned target material value investment project may be a material supplier. For example, the value supply verification result information may be the result information representing whether the value supply has been verified correctly.

[0030] It should be noted that the value investment plan information, value investment project preparation information and value supply verification result information are all information provided by the value investment object.

[0031] Step 103, in response to receiving the value calibration information, generating a value investment application technical parameter data set and a technical specification response technical parameter data set according to the value investment plan information, the value investment project preparation information and the technical parameter master data information set.

[0032] In some embodiments, in response to receiving the value calibration information, the execution subject may generate a value investment application technical parameter data set and a technical specification response technical parameter data set according to the value investment plan information, the value investment project preparation information and the technical parameter master data set. The value investment application technical parameter data set may be a technical parameter data set associated with the value investment application. In practice, the value investment application may be an application operation related to the value investment plan information. The technical parameter data set corresponding to the value investment application technical parameter data set is a subset of the technical parameter master data information in the technical parameter master data set. The value investment application technical parameter data set may be a technical parameter data set associated with the value investment application extracted from the value investment plan information. The technical specification response technical parameter data set may be a technical parameter data set associated with the technical specification response. In practice, the technical specification response may be a response operation related to the value investment project preparation information. The technical parameter data set corresponding to the technical specification response technical parameter data set is a subset of the technical parameter master data information in the technical parameter master data set. The technical specification response technical parameter data set may be a technical parameter data set associated with the technical specification response extracted from the value investment project preparation information. The value calibration information may be calibration information for calibration of value investment. The value calibration information may be calibration information for the value investment object. In practice, the value calibration information may be identification information, indicating whether the value investment object has won the bid for the target material value investment project.

[0033] As an example, first, a first technical parameter master data information subset associated with the value investment application and a second technical parameter master data information subset associated with the technical specification response are screened out from the above technical parameter master data information set. Then, a technical parameter data set corresponding to the first technical parameter master data information subset is extracted from the above value investment plan information as the value investment application technical parameter data set. Finally, a technical parameter data set corresponding to the second technical parameter master data information subset is extracted from the above value investment project preparation information as the technical specification response technical parameter data set.

[0034] Step 104, generating a value supply verification technical parameter data set based on the above value supply verification result information and the above technical parameter master data information set.

[0035] In some embodiments, the execution entity may generate a value supply verification technical parameter data set based on the value supply verification result information and the technical parameter master data information set. The value supply verification technical parameter data set may be a technical parameter data set associated with the value supply verification. In practice, the value supply verification may be an operation to verify information related to the value supply. The technical parameter data information set corresponding to the value supply verification technical parameter data set is a subset of the technical parameter master data information in the technical parameter master data information set. The value supply verification technical parameter data set may be a technical parameter data set associated with the value supply verification extracted from the value supply verification result information.

[0036] As an example, first, a third technical parameter master data information subset associated with value supply verification is screened out from the above technical parameter master data information set. Then, a technical parameter data set corresponding to the third technical parameter master data information subset is extracted from the above value supply verification result information as the value supply verification technical parameter data set.

[0037] Step 105: Generate value investment order information for the above value calibration information.

[0038] In some embodiments, the execution entity may generate value investment order information for the value calibration information. The value investment order information may be order information of value investment items formulated by the value investment object for the target material value investment project. The value investment items may be project items required in the process of carrying out the target material value investment project. The value investment order information may include: the required number of value investment items and the item price of the value investment items. In practice, the value investment order information may be order information pre-planned by the value investment object for the value calibration information.

[0039] Step 106: Generate a value investment order technical parameter data set based on the value investment order information and the technical parameter master data information set.

[0040] In some embodiments, the execution entity may generate a value investment order technical parameter data set based on the value investment order information and the technical parameter master data information set. The value investment order technical parameter data set may be a technical parameter data set associated with the value investment order. In practice, the value investment order may be an order corresponding to the value investment order information. The technical parameter data information set corresponding to the value investment order technical parameter data set is a subset of the technical parameter master data information in the technical parameter master data information set. The value investment order technical parameter data set may be a technical parameter data set associated with the value investment order extracted from the value investment order information.

[0041] As an example, first, a fourth technical parameter master data information subset associated with a value input order is screened out from the above technical parameter master data information set. Then, a technical parameter data set corresponding to the fourth technical parameter master data information subset is extracted from the above value input order information as a value input order technical parameter data set.

[0042] Step 107, generating sampling test data and equipment supervision test data for the above value input order information.

[0043] In some embodiments, the execution entity may generate sampling test data and equipment manufacturing test data for the value input order information. The sampling test data may be test data of sampling test on various aspects of the quality of the order items in the value input order information. The equipment manufacturing test data is test data of equipment manufacturing test on various aspects of the quality of the equipment related to the order items in the value input order information.

[0044] Step 108, generating an equipment supervision technical parameter data set and a sampling test technical parameter data set based on the sampling test data, the equipment supervision test data and the technical parameter master data information set.

[0045] In some embodiments, the execution subject may generate an equipment supervision technical parameter data set and a sampling test technical parameter data set based on the sampling test data, the equipment supervision test data and the technical parameter master data set. The equipment supervision technical parameter data set may be a technical parameter data set associated with equipment supervision. In practice, the technical parameter data set corresponding to the equipment supervision technical parameter data set is a subset of the technical parameter master data set in the technical parameter master data set. The equipment supervision technical parameter data set may be a technical parameter data set associated with equipment supervision extracted from the equipment supervision test data. The sampling test technical parameter data set may be a technical parameter data set associated with the sampling test. The sampling test may be an operation of sampling and testing the quality of various aspects of the order items in the value input order information. In practice, the technical parameter data set corresponding to the sampling test technical parameter data set is a subset of the technical parameter master data set in the technical parameter master data set. The sampling test technical parameter data set may be a technical parameter data set associated with the sampling test extracted from the sampling test data.

[0046] As an example, first, a fifth technical parameter master data information subset associated with equipment supervision is screened out from the above technical parameter master data information set. Then, a technical parameter data set corresponding to the fifth technical parameter master data information subset is extracted from the above equipment supervision experimental data as the equipment supervision technical parameter data set.

[0047] Similarly, first, a sixth technical parameter master data information subset associated with the sampling test is screened out from the above technical parameter master data information set. Then, a technical parameter data set corresponding to the sixth technical parameter master data information subset is extracted from the above sampling test data as the sampling test technical parameter data set.

[0048] Step 109, storing the above-mentioned value investment application technical parameter data set, the above-mentioned technical specification response technical parameter data set, the above-mentioned value supply verification technical parameter data set, the above-mentioned value investment order technical parameter data set, the above-mentioned equipment supervision technical parameter data set and the above-mentioned sampling experiment technical parameter data set in the technical parameter database for the above-mentioned target material value investment project.

[0049] In some embodiments, the above-mentioned execution entity may store the above-mentioned value investment application technical parameter data set, the above-mentioned technical specification response technical parameter data set, the above-mentioned value supply verification technical parameter data set, the above-mentioned value investment order technical parameter data set, the above-mentioned equipment supervision technical parameter data set and the above-mentioned sampling experiment technical parameter data set in a technical parameter database for the above-mentioned target material value investment project.

[0050] In some optional implementations of some embodiments, storing the value investment application technical parameter data set, the technical specification response technical parameter data set, the value supply verification technical parameter data set, the value investment order technical parameter data set, the equipment supervision technical parameter data set and the sampling experiment technical parameter data set in a technical parameter database for the target material value investment project may include the following steps:

[0051] The first step is to store the above-mentioned value investment application technical parameter data set into the material domain parameter basic public table, and store the above-mentioned technical specification response technical parameter data set into the value investment technical specification public table. Among them, the above-mentioned material domain parameter basic public table and the above-mentioned value investment technical specification public table have at least one identical first field, and the above-mentioned at least one first field includes: a value investment application identification field and a technical specification identification field. Among them, the material domain parameter basic public table can be a data table for storing technical parameter data under the material field. The value investment technical specification public table can be a data table for storing technical specification response technical parameter data sets.

[0052] The second step is to store the above-mentioned value supply verification technical parameter data set into the value supply verification public table. Among them, the above-mentioned value supply verification public table and the above-mentioned material domain parameter basic public table have at least one same second field, and the at least one second field includes: a supply object code field. The value supply verification public table can be a data table for storing value supply verification related data. The supply object code field can represent the code field of the supply object. The supply object code field can represent the unique object identifier of the supply object.

[0053] The third step is to store the above-mentioned value investment order technical parameter data set into the value assurance information table. Among them, the above-mentioned material domain parameter basic public table and the above-mentioned value assurance information table have at least one identical third field, and the above-mentioned at least one third field includes: value investment application identification field, technical specification identification field and value application project number field. In practice, the value assurance information table can be a data table for storing contract-related value data. The value investment application identification field can be the application identification of the value investment application. In practice, the value investment application can be a bidding application. That is, the corresponding value investment application identification field can be the bidding application field. The technical specification identification field can be a specification identification related to the technical specification. The technical specification can be a project-related technical specification set by the value investment party for the target material value investment project. The value application project number field can be the field corresponding to the project identification of the target material value investment project.

[0054] The fourth step is to store the equipment supervision technical parameter data set into the quality supervision public table, wherein the material domain parameter basic public table and the quality supervision public table have at least one third field in common. The quality supervision public table can be a data table for storing equipment supervision technical parameter data.

[0055] The fifth step is to store the above-mentioned sampling test technical parameter data set into the quality supervision sampling public table. Among them, the above-mentioned material domain parameter basic public table and the above-mentioned quality supervision sampling public table have at least one third field in common. The quality supervision sampling public table can be a data table for storing the sampling test technical parameter data set.

[0056] The sixth step is to store the basic public table of material domain parameters after storage, the public table of value input technical specifications after storage, the public table of value supply verification after storage, the public table of value assurance information after storage, the public table of quality supervision and manufacturing after storage, and the public table of quality supervision sampling after storage into the above-mentioned technical parameter database.

[0057] In some optional implementations of some embodiments, after step 109, the steps further include:

[0058] In the first step, in response to receiving data query information for the technical parameter master data sent by the target terminal, the data query information is authorized and verified to obtain an authorization verification result. The target terminal may be a data query terminal. The data query information may be a query request corresponding to the technical parameter data. The authorization verification may be an authorization verification at the data query level.

[0059] In a second step, in response to determining that the authorization verification result indicates that the data query information has passed the authorization verification, data field analysis is performed on the data query data to generate a technical parameter field set.

[0060] As an example, the execution entity may use a target regularization template to perform data field analysis on the data query data to generate a technical parameter field set.

[0061] The third step is to query the technical parameter data associated with the above-mentioned technical parameter field set from the above-mentioned technical parameter database, including the stored material domain parameter basic public table, the stored value input technical specification public table, the stored value supply verification public table, the stored value assurance information table, the stored quality supervision and manufacturing public table and the stored quality supervision sampling public table, as the technical parameter query data to obtain the technical parameter query data set.

[0062] The fourth step is to back up the technical parameter query data set and send the technical parameter query data set to the target terminal according to the stream processing technology.

[0063] In some optional implementations of some embodiments, after step 109, the steps further include:

[0064] The first step is to generate a future equipment supervision technical parameter data set and a future sampling test technical parameter data set for the target future moment based on the above-mentioned equipment supervision technical parameter data set and the above-mentioned sampling test technical parameter data set using the equipment supervision information prediction model and the sampling test information prediction model. The equipment supervision information prediction model can be a neural network model for generating future equipment supervision information. The future equipment supervision information can include the future equipment supervision technical parameter data set. The future sampling test technical parameter data set can be a neural network model for generating future sampling test information. The future sampling test information can include the future sampling test technical parameter data set. Both the equipment supervision information prediction model and the sampling test information prediction model can be time series neural network models.

[0065] As an example, the execution subject may input the equipment supervision technical parameter data set into the equipment supervision information prediction model to generate the future equipment supervision technical parameter data set at the target future moment. The execution subject may input the sampling test technical parameter data set into the sampling test information prediction model to generate the future sampling test technical parameter data set.

[0066] The second step is to perform corresponding project adjustment operations on the above-mentioned target material value investment projects based on the above-mentioned future equipment supervision technical parameter data set and the above-mentioned future sampling experiment technical parameter data set.

[0067] As an example, the execution subject may determine the future equipment supervision change information and the future sampling test change information based on the future equipment supervision technical parameter data set and the future sampling test technical parameter data set. Then, a project adjustment plan for the future equipment supervision change information and the future sampling test change information is generated. Finally, according to the project adjustment plan, the corresponding project adjustment operation is performed on the target material value investment project.

[0068] In some optional implementations of some embodiments, the above-mentioned generating a future equipment supervision technical parameter data set and a future sampling test technical parameter data set for a target future moment by using an equipment supervision information prediction model and a sampling test information prediction model according to the above-mentioned equipment supervision technical parameter data set and the above-mentioned sampling test technical parameter data set may include the following steps:

[0069] The first step is to obtain a target equipment supervision technical parameter data set sequence within a future predetermined time period for the equipment supervision technical parameter data set. The future predetermined time period corresponds to a time period before the target future moment. The target equipment supervision technical parameter data set sequence can be the equipment supervision technical parameter data set corresponding to each future moment.

[0070] The second step is to add the above equipment supervision technical parameter data set to the above target equipment supervision technical parameter data set sequence to obtain the added equipment supervision technical parameter data set sequence.

[0071] The third step is to perform data preprocessing on the equipment manufacturing supervision technical parameter data in the equipment manufacturing supervision technical parameter data set sequence to generate first preprocessing parameter data and obtain a first preprocessing parameter data set sequence.

[0072] The fourth step is to normalize each first preprocessing parameter data in the above-mentioned first preprocessing parameter data set sequence to generate a first normalized parameter data set sequence.

[0073] The fifth step is to perform parameter data grouping adjustment on the first normalized parameter data set sequence to obtain a first normalized parameter data sequence set, wherein each first normalized parameter data sequence has a corresponding first parameter category.

[0074] The sixth step is to generate a first parameter influence knowledge graph based on the obtained first parameter category set, wherein the nodes in the above first parameter influence knowledge graph are first parameter categories, and the directed edges in the first parameter influence knowledge graph represent the influence relationship between parameters.

[0075] As an example, the execution subject may generate the first parameter impact knowledge graph according to the category association relationship between each first parameter category in the first parameter category set, wherein the category association relationship may include: an inter-category relationship.

[0076] Step 7: For each node in the knowledge graph affected by the first parameter, perform the following processing steps:

[0077] In the first sub-step, the node is taken as the origin, and the node in the knowledge graph affected by the first parameter and whose number of interval edges is less than the target number is determined as the first adjacent node, and at least one first adjacent node is obtained. The number of interval edges can be a preset value. For example, the number of interval edges can be 3.

[0078] The second sub-step is to determine at least one first normalized parameter data set corresponding to the at least one first adjacent node.

[0079] In a third sub-step, the at least one first normalized parameter set is input into a time-series coding neural network model to generate at least one first time-series coding information. In practice, the time-series coding neural network model may be a time-series neural network model that performs coding processing. For example, the time-series coding neural network model may be a multi-layer recurrent neural network model. The first time-series coding information may be information in vector form.

[0080] The fourth sub-step is to generate at least one first weight for the at least one first neighboring node using a pre-trained weight generation model. The weight generation model is a multi-layer convolutional neural network model. The weight generation model can be a neural network model that generates weights corresponding to each neighboring node. The first weight can represent the importance of the node data corresponding to the first neighboring node. The fifth sub-step is to multiply the at least one first weight and the at least one first time-series coding information to generate at least one first multiplication result.

[0081] In a fifth sub-step, the at least one first multiplication result is input into a multi-head attention mechanism model with multiple layers connected in series to generate at least one first attention result. The multi-head attention mechanism model may be a multi-head attention mechanism layer in a Transformer.

[0082] The sixth sub-step is to fuse the at least one first attention result to generate a first fusion result.

[0083] As an example, the above-mentioned execution entity may concatenate at least one first attention result to generate a first fusion result.

[0084] The seventh sub-step is to input the first fusion result into a temporal decoding model to generate at least one candidate future equipment supervision technical parameter data. The temporal decoding model may include: a deconvolution layer and a fully connected layer.

[0085] In the eighth step, the obtained candidate future equipment manufacturing supervision technical parameter data sets are classified into parameter categories to generate candidate future equipment manufacturing supervision technical parameter data sets.

[0086] As an example, the execution entity may group candidate future equipment supervision technical parameter data corresponding to the same parameter category in the candidate future equipment supervision technical parameter data set to generate a candidate future equipment supervision technical parameter data group and obtain a candidate future equipment supervision technical parameter data group set.

[0087] In the ninth step, a multi-head attention mechanism model is used to fuse the technical parameter data of each candidate future equipment supervision technical parameter data group in the above-mentioned candidate future equipment supervision technical parameter data group set to generate fused data as the future equipment supervision technical parameter data, and obtain the above-mentioned future equipment supervision technical parameter data set.

[0088] Optionally, the above-mentioned temporal decoding model includes: a first temporal decoding model, a second temporal decoding model, a third temporal decoding model, a multi-head attention mechanism model, a deconvolution network model and a fully connected layer. The first temporal decoding model, the second temporal decoding model and the third temporal decoding model can all be temporal neural network models. The vector dimension of the output vector corresponding to the first temporal decoding model is smaller than the vector dimension of the output vector corresponding to the second temporal decoding model. The vector dimension of the output vector corresponding to the second temporal decoding model is smaller than the vector dimension of the output vector corresponding to the third temporal decoding model. The multi-head attention mechanism model can be a multi-head attention mechanism layer in Transformer.

[0089] Optionally, the step of inputting the first fusion result into a time series decoding model to generate at least one candidate future equipment manufacturing supervision technical parameter data may include the following steps:

[0090] The first step is to input the first fusion result into the first temporal decoding model to generate a first temporal decoding vector.

[0091] The second step is to input the first fusion result into the second temporal decoding model to generate a second temporal decoding vector, wherein the vector dimension corresponding to the second temporal decoding vector is greater than that of the first temporal decoding vector.

[0092] The third step is to input the first fusion result into the third temporal decoding model to generate a third temporal decoding vector, wherein the vector dimension corresponding to the third temporal decoding vector is greater than that of the second temporal decoding vector.

[0093] The fourth step is to use the multi-head attention mechanism model to generate a first decoding weight for the first temporal decoding vector, a second decoding weight for the second temporal decoding vector, and a third decoding weight for the third temporal decoding vector.

[0094] In the fifth step, the first decoding weight, the second decoding weight and the third decoding weight are rounded to generate a first rounding weight, a second rounding weight and a third rounding weight.

[0095] The sixth step is to multiply the first rounding weight and the first temporal decoding vector to obtain a first multiplied vector.

[0096] The seventh step is to multiply the second rounding weight and the second temporal decoding vector to obtain a second multiplied vector.

[0097] In the eighth step, the third rounding weight and the third sequential decoding vector are multiplied to obtain a third multiplied vector.

[0098] The ninth step is to add the first multiplication vector, the second multiplication vector and the third multiplication vector to obtain an addition vector.

[0099] In the tenth step, the above-mentioned added vector is input into the deconvolution network model to generate the deconvolution network result.

[0100] In the eleventh step, the deconvolution network result is input into the fully connected layer to generate the at least one candidate future equipment manufacturing supervision technical parameter data.

[0101] In some optional implementations of some embodiments, the above-mentioned generating a future equipment supervision technical parameter data set and a future sampling test technical parameter data set for a target future moment by using an equipment supervision information prediction model and a sampling test information prediction model according to the above-mentioned equipment supervision technical parameter data set and the above-mentioned sampling test technical parameter data set may include the following steps:

[0102] The first step is to obtain a target sampling experiment technical parameter data set sequence within a future predetermined time period for the above sampling experiment technical parameter data set. The above future predetermined time period corresponds to a time period before the above target future moment. No further details will be given.

[0103] The second step is to add the above-mentioned sampling experiment technical parameter data set to the above-mentioned target sampling experiment technical parameter data set sequence to obtain the added sampling experiment technical parameter data set sequence. The details will not be repeated here.

[0104] The third step is to perform data preprocessing on the sampling experiment technical parameter data in the above sampling experiment technical parameter data set sequence to generate second preprocessing parameter data and obtain a second preprocessing parameter data set sequence.

[0105] The fourth step is to perform normalization processing on each second preprocessing parameter data in the second preprocessing parameter data set sequence to generate a second normalized parameter data set sequence.

[0106] The fifth step is to perform parameter data grouping adjustment on the above second normalized parameter data set sequence to obtain a second normalized parameter data sequence set. Each second normalized parameter data sequence has a corresponding second parameter category. The details will not be repeated here.

[0107] Step 6: Generate a second parameter impact knowledge graph based on the obtained second parameter category set. The nodes in the second parameter impact knowledge graph are second parameter categories, and the directed edges in the second parameter impact knowledge graph represent the impact relationship between parameters. The details will not be repeated here. See the generation of the first parameter impact knowledge graph.

[0108] Step 7: For each node in the knowledge graph affected by the second parameter, perform the following processing steps:

[0109] In the first sub-step, taking the above-mentioned node as the origin, determining the nodes in the knowledge graph affected by the above-mentioned second parameter and having the number of interval edges less than the target number as the second adjacent nodes, and obtaining at least one second adjacent node.

[0110] The second sub-step is to determine at least one second normalized parameter data set corresponding to the at least one second adjacent node.

[0111] The third sub-step is to input the at least one second normalized parameter set into the temporal coding neural network model to generate at least one second temporal coding information.

[0112] The fourth sub-step is to generate at least one second weight for the at least one second adjacent node using a pre-trained weight generation model.

[0113] The fifth sub-step is to multiply the at least one second weight and the at least one second temporal coding information to generate at least one second multiplication result.

[0114] The sixth sub-step is to input the at least one second temporal coding information into a multi-layer serially connected multi-head attention mechanism model to generate at least one second attention result.

[0115] The seventh sub-step is to fuse the at least one second attention result to generate a second fusion result.

[0116] In an eighth sub-step, the at least one second multiplication result is fused to generate a third fusion result.

[0117] The ninth sub-step is to input the second fusion result and the third fusion result into the timing decoding model respectively to generate at least one first candidate future sampling experiment technical parameter data and at least one second candidate future sampling experiment technical parameter data.

[0118] The tenth sub-step is to use a multi-head attention mechanism model to fuse the at least one first candidate future sampling experiment technical parameter data and the at least one second candidate future sampling experiment technical parameter data to generate second fused data.

[0119] In the eighth step, the obtained second fused data set is classified into parameter categories to generate a second fused data set.

[0120] The ninth step is to use the multi-head attention mechanism model to fuse the technical parameter data of each second fusion data group in the above-mentioned second fusion data group set to generate third fusion data as the technical parameter data for future random inspection experiments, and obtain the above-mentioned future random inspection experiment technical parameter data set.

[0121] The above-mentioned "first step to ninth step" as one of the inventive points of the present disclosure solves the second technical problem in the background technology, "the generation of the future sampling experiment technical parameter data set is not accurate enough, resulting in the inability to effectively monitor the project progress of the target material value investment project in real time." Based on this, the present disclosure determines at least one corresponding candidate future sampling experiment technical parameter data through the two attention acquisition methods of the weight generation model and the multi-layer series multi-head attention mechanism model. In this way, a more accurate second fusion data set can be obtained, so that the multi-head attention mechanism model can be used again in the future to accurately generate the future sampling experiment technical parameter data set.

[0122] The above-mentioned embodiments of the present disclosure have the following beneficial effects: through the data storage method of some embodiments of the present disclosure, various technical parameter data sets can be accurately and efficiently processed, which is convenient for the subsequent real-time call of cross-departmental technical parameter data. Specifically, the reason why the relevant cross-departmental technical parameter data is not accurate and efficient is that the efficiency is not only too low, but also the technical parameter data sets corresponding to each department and associated with the value investment campaign cannot be effectively integrated, resulting in the query of the subsequent cross-departmental technical parameter data sets being too complicated. Based on this, the data storage method of some embodiments of the present disclosure first obtains the technical parameter master data information set and technical specification information for the target material value investment project, so as to facilitate the value investment object to determine the value investment plan information, value investment project preparation information and value supply verification result information, so as to achieve the precise delivery of the target material value investment project. In addition, by obtaining the technical parameter master data information set, it is possible to effectively obtain important technical parameter data sets from various aspects corresponding to the target material value investment project, which is convenient for the subsequent technical parameter data call and query between various departments. Then, the value investment plan information, value investment project preparation information and value supply verification result information for the above technical parameter master data information set and the above technical specification information are generated to carry out the value investment, which is also convenient for the acquisition of technical parameter data sets in various aspects. Then, in response to receiving the value calibration information, the value investment application technical parameter data set and the technical specification response technical parameter data set can be accurately generated according to the above-mentioned value investment plan information, the above-mentioned value investment project preparation information and the above-mentioned technical parameter master data information set. Then, according to the above-mentioned value supply verification result information and the above-mentioned technical parameter master data information set, the value supply verification technical parameter data set can be accurately generated. Further, the value investment order information for the above-mentioned value calibration information is generated for the subsequent acquisition of the technical parameter data set for the value investment order. Secondly, according to the above-mentioned value investment order information and the above-mentioned technical parameter master data information set, the value investment order technical parameter data set can be accurately generated. Immediately afterwards, the sampling test data and the equipment supervision test data for the above-mentioned value investment order information are generated for the subsequent generation of the technical parameter data set for the equipment supervision and the technical parameter data set for the sampling test. Furthermore, according to the above-mentioned sampling test data, the above-mentioned equipment supervision test data and the above-mentioned technical parameter master data information set, the equipment supervision technical parameter data set and the sampling test technical parameter data set can be accurately generated. Finally, the above-mentioned value investment application technical parameter data set, the above-mentioned technical specification response technical parameter data set, the above-mentioned value supply verification technical parameter data set, the above-mentioned value investment order technical parameter data set, the above-mentioned equipment supervision technical parameter data set and the above-mentioned sampling experiment technical parameter data set are stored in the technical parameter database for the above-mentioned target material value investment project.In summary, by acquiring technical parameter data sets from various aspects and integrating the technical parameter data sets, and subsequently storing them in a technical parameter database, effective technical parameter data calling and query can be achieved between departments.

[0123] Further references Figure 2 As an implementation of the methods shown in the above figures, the present disclosure provides some embodiments of a data storage device. These device embodiments are Figure 1 Corresponding to the method embodiments shown, the data storage device can be specifically applied to various electronic devices.

[0124] like Figure 2 As shown, a data storage device 200 includes: an acquisition unit 201, a first generation unit 202, a second generation unit 203, a third generation unit 204, a fourth generation unit 205, a fifth generation unit 206, a sixth generation unit 207, a seventh generation unit 208 and a storage unit 209. Among them, the acquisition unit 201 is configured to acquire the technical parameter master data information set and technical specification information for the target material value investment project; the first generation unit 202 is configured to generate value investment plan information, value investment project preparation information and value supply verification result information for the above-mentioned technical parameter master data information set and the above-mentioned technical specification information; the second generation unit 203 is configured to generate a value investment application technical parameter data set and a technical specification response technical parameter data set in response to receiving the value calibration information according to the above-mentioned value investment plan information, the above-mentioned value investment project preparation information and the above-mentioned technical parameter master data information set; the third generation unit 204 is configured to generate a value supply verification technical parameter data set according to the above-mentioned value supply verification result information and the above-mentioned technical parameter master data information set; the fourth generation unit 205 is configured to generate a value investment order information for the above-mentioned value calibration information. information; the fifth generation unit 206 is configured to generate a value investment order technical parameter data set according to the above-mentioned value investment order information and the above-mentioned technical parameter master data information set; the sixth generation unit 207 is configured to generate sampling test data and equipment supervision test data for the above-mentioned value investment order information; the seventh generation unit 208 is configured to generate an equipment supervision technical parameter data set and a sampling test technical parameter data set according to the above-mentioned sampling test data, the above-mentioned equipment supervision test data and the above-mentioned technical parameter master data information set; the storage unit 209 is configured to store the above-mentioned value investment application technical parameter data set, the above-mentioned technical specification response technical parameter data set, the above-mentioned value supply verification technical parameter data set, the above-mentioned value investment order technical parameter data set, the above-mentioned equipment supervision technical parameter data set and the above-mentioned sampling test technical parameter data set in the technical parameter database for the above-mentioned target material value investment project.

[0125] It is understood that the units recorded in the data storage device 200 are similar to the reference Figure 1 Therefore, the operations, features and beneficial effects described above for the method are also applicable to the data storage device 200 and the units contained therein, and will not be described in detail here.

[0126] Reference below Figure 3 , which shows a structural schematic diagram of an electronic device (eg, an electronic device) 300 suitable for implementing some embodiments of the present disclosure. Figure 3 The electronic device shown is only an example and should not bring any limitation to the functions and scope of use of the embodiments of the present disclosure.

[0127] like Figure 3 As shown, the electronic device 300 may include a processing device (e.g., a central processing unit, a graphics processing unit, etc.) 301, which can perform various appropriate actions and processes according to a program stored in a read-only memory (ROM) 302 or a program loaded from a storage device 308 into a random access memory (RAM) 303. In the RAM 303, various programs and data required for the operation of the electronic device 300 are also stored. The processing device 301, the ROM 302, and the RAM 303 are connected to each other via a bus 304. An input / output (I / O) interface 305 is also connected to the bus 304.

[0128] Typically, the following devices may be connected to the I / O interface 305: input devices 306 including, for example, a touch screen, a touch pad, a keyboard, a mouse, a camera, a microphone, an accelerometer, a gyroscope, etc.; output devices 307 including, for example, a liquid crystal display (LCD), a speaker, a vibrator, etc.; storage devices 308 including, for example, a magnetic tape, a hard disk, etc.; and communication devices 309. The communication devices 309 may allow the electronic device 300 to communicate with other devices wirelessly or by wire to exchange data. Although Figure 3 The electronic device 300 is shown with various devices, but it should be understood that it is not required to implement or possess all the devices shown. More or fewer devices may be implemented or possessed instead. Figure 3 Each block shown in the figure may represent one device, or may represent multiple devices as required.

[0129] In particular, according to some embodiments of the present disclosure, the process described above with reference to the flowchart can be implemented as a computer software program. For example, some embodiments of the present disclosure include a computer program product, which includes a computer program carried on a computer-readable medium, and the computer program includes a program code for executing the method shown in the flowchart. In some such embodiments, the computer program can be downloaded and installed from the network through the communication device 309, or installed from the storage device 308, or installed from the ROM 302. When the computer program is executed by the processing device 301, the above-mentioned functions defined in the method of some embodiments of the present disclosure are executed.

[0130] It should be noted that the computer-readable medium in some embodiments of the present disclosure may be a computer-readable signal medium or a computer-readable storage medium or any combination of the two. The computer-readable storage medium may be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination of the above. More specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In some embodiments of the present disclosure, the computer-readable storage medium may be any tangible medium containing or storing a program that can be used by or in combination with an instruction execution system, device or device. In some embodiments of the present disclosure, the computer-readable signal medium may include a data signal propagated in a baseband or as part of a carrier wave, in which a computer-readable program code is carried. This propagated data signal may take a variety of forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination of the above. The computer readable signal medium may also be any computer readable medium other than a computer readable storage medium, which may send, propagate or transmit a program for use by or in conjunction with an instruction execution system, apparatus or device. The program code contained on the computer readable medium may be transmitted using any suitable medium, including but not limited to: wires, optical cables, RF (radio frequency), etc., or any suitable combination of the above.

[0131] In some embodiments, the client and the server may communicate using any currently known or future developed network protocol such as HTTP (HyperText Transfer Protocol), and may be interconnected with any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include a local area network ("LAN"), a wide area network ("WAN"), an internet (e.g., the Internet), and a peer-to-peer network (e.g., an ad hoc peer-to-peer network), as well as any currently known or future developed network.

[0132] The above-mentioned computer-readable medium may be included in the above-mentioned electronic device; or it may exist independently without being assembled into the electronic device. The above-mentioned computer-readable medium carries one or more programs. When the above-mentioned one or more programs are executed by the electronic device, the electronic device: obtains the technical parameter master data information set and technical specification information for the target material value investment project; generates value investment plan information, value investment project preparation information and value supply verification result information for the above-mentioned technical parameter master data information set and the above-mentioned technical specification information; in response to receiving the value calibration information, generates a value investment application technical parameter data set and a technical specification response technical parameter data set according to the above-mentioned value investment plan information, the above-mentioned value investment project preparation information and the above-mentioned technical parameter master data information set; generates a value supply verification technical parameter data set according to the above-mentioned value supply verification result information and the above-mentioned technical parameter master data information set; generates a value supply verification technical parameter data set for The value investment order information of the above-mentioned value calibration information; generating a value investment order technical parameter data set based on the above-mentioned value investment order information and the above-mentioned technical parameter master data information set; generating sampling test data and equipment supervision test data for the above-mentioned value investment order information; generating an equipment supervision technical parameter data set and a sampling test technical parameter data set based on the above-mentioned sampling test data, the above-mentioned equipment supervision test data and the above-mentioned technical parameter master data information set; storing the above-mentioned value investment application technical parameter data set, the above-mentioned technical specification response technical parameter data set, the above-mentioned value supply verification technical parameter data set, the above-mentioned value investment order technical parameter data set, the above-mentioned equipment supervision technical parameter data set and the above-mentioned sampling test technical parameter data set in the technical parameter database for the above-mentioned target material value investment project.

[0133] Computer program code for performing the operations of some embodiments of the present disclosure may be written in one or more programming languages ​​or a combination thereof, including object-oriented programming languages ​​such as Java, Smalltalk, C++, and conventional procedural programming languages ​​such as "C" or similar programming languages. The program code may be executed entirely on the user's computer, partially on the user's computer, as a separate software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In cases involving a remote computer, the remote computer may be connected to the user's computer via any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computer (e.g., via the Internet using an Internet service provider).

[0134] The flow chart and block diagram in the accompanying drawings illustrate the possible architecture, function and operation of the system, method and computer program product according to various embodiments of the present disclosure. In this regard, each square box in the flow chart or block diagram can represent a module, a program segment or a part of a code, and the module, the program segment or a part of the code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some implementations as replacements, the functions marked in the square box can also occur in a sequence different from that marked in the accompanying drawings. For example, two square boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each square box in the block diagram and / or flow chart, and the combination of the square boxes in the block diagram and / or flow chart can be implemented with a dedicated hardware-based system that performs a specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.

[0135] The units described in some embodiments of the present disclosure may be implemented by software or by hardware. The described units may also be provided in a processor, for example, may be described as: a processor including an acquisition unit, a first generation unit, a second generation unit, a third generation unit, a fourth generation unit, a fifth generation unit, a sixth generation unit, a seventh generation unit and a storage unit. The names of these units do not constitute limitations on the units themselves in certain circumstances, for example, the acquisition unit may also be described as "a unit for acquiring a master data information set and technical specification information of technical parameters for a target material value investment project".

[0136] The functions described above herein may be performed at least in part by one or more hardware logic components. For example, without limitation, exemplary types of hardware logic components that may be used include: field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), complex programmable logic devices (CPLDs), and the like.

[0137] The above descriptions are only some preferred embodiments of the present disclosure and an explanation of the technical principles used. Those skilled in the art should understand that the scope of the invention involved in the embodiments of the present disclosure is not limited to the technical solutions formed by a specific combination of the above-mentioned technical features, but should also cover other technical solutions formed by any combination of the above-mentioned technical features or their equivalent features without departing from the above-mentioned inventive concept. For example, the above-mentioned features are replaced with the technical features with similar functions disclosed in the embodiments of the present disclosure (but not limited to) and the technical solutions formed.

Claims

1. A data storage method, comprising: Obtain the technical parameter master data information set and technical specification information for the target material value delivery project; Generate value investment plan information, value investment project preparation information and value supply verification result information for the technical parameter master data information set and the technical specification information; In response to receiving the value calibration information, generating a value investment application technical parameter data set and a technical specification response technical parameter data set according to the value investment plan information, the value investment project preparation information and the technical parameter master data information set; Generate a value supply verification technical parameter data set according to the value supply verification result information and the technical parameter master data information set; Generating value input order information for the value calibration information; Generate a value input order technical parameter data set according to the value input order information and the technical parameter master data information set; Generate sampling test data and equipment supervision test data for the value input order information; Generate an equipment supervision technical parameter data set and a sampling test technical parameter data set according to the sampling test data, the equipment supervision test data and the technical parameter master data information set; The value investment application technical parameter data set, the technical specification response technical parameter data set, the value supply verification technical parameter data set, the value investment order technical parameter data set, the equipment supervision technical parameter data set, and the sampling experiment technical parameter data set are stored in a technical parameter database for the target material value investment project, wherein the value investment application technical parameter data set, the technical specification response technical parameter data set, the value supply verification technical parameter data set, the value investment order technical parameter data set, the equipment supervision technical parameter data set, and the sampling experiment technical parameter data set are stored in the technical parameter database for the target material value investment project, including: The value input application technical parameter data set is stored in the material domain parameter basic public table, and the technical specification response technical parameter data set is stored in the value input technical specification public table, wherein the material domain parameter basic public table and the value input technical specification public table have at least one common first field, and the at least one first field includes: a value input application identification field and a technical specification identification field; The value supply verification technical parameter data set is stored in a value supply verification public table, wherein the value supply verification public table and the material domain parameter basic public table have at least one identical second field, and the at least one second field includes: a supply object code field; The value investment order technical parameter data set is stored in the value assurance information table, wherein the material domain parameter basic public table and the value assurance information table have at least one third field in common, and the at least one third field includes: a value investment application identification field, a technical specification identification field, and a value application project number field; The equipment manufacturing supervision technical parameter data set is stored in a quality supervision manufacturing public table, wherein the material domain parameter basic public table and the quality supervision manufacturing public table have at least one third field in common; The sampling test technical parameter data set is stored in a quality supervision sampling public table, wherein the material domain parameter basic public table and the quality supervision sampling public table have at least one third field in common; The stored material domain parameter basic public table, the stored value input technical specification public table, the stored value supply verification public table, the stored value assurance information table, the stored quality supervision and manufacturing public table and the stored quality supervision sampling public table are stored in the technical parameter database.

2. The method according to claim 1, wherein: The method further comprises: In response to receiving data query information for technical parameter master data sent by the target terminal, performing authorization verification on the data query information to obtain an authorization verification result; In response to determining that the authorization verification result indicates that the data query information passes the authorization verification, performing data field parsing on the data query data to generate a technical parameter field set; Querying the technical parameter data associated with the technical parameter field set from the stored material domain parameter basic public table, the stored value input technical specification public table, the stored value supply verification public table, the stored value assurance information table, the stored quality supervision and manufacturing public table, and the stored quality supervision sampling public table included in the technical parameter database as technical parameter query data to obtain a technical parameter query data set; The technical parameter query data set is backed up, and the technical parameter query data set is sent to the target terminal according to the stream processing technology.

3. The method according to claim 2, wherein: The method further comprises: According to the equipment supervision technical parameter data set and the sampling test technical parameter data set, using the equipment supervision information prediction model and the sampling test information prediction model, generate a future equipment supervision technical parameter data set and a future sampling test technical parameter data set for a target future moment; According to the future equipment manufacturing supervision technical parameter data set and the future sampling experiment technical parameter data set, a corresponding project adjustment operation is performed on the target material value investment project.

4. The method according to claim 3, wherein: The generating of a future equipment supervision technical parameter data set and a future sampling test technical parameter data set for a target future moment by using an equipment supervision information prediction model and a sampling test information prediction model according to the equipment supervision technical parameter data set and the sampling test technical parameter data set includes: Acquire a target equipment manufacturing supervision technical parameter data set sequence within a future predetermined time period for the equipment manufacturing supervision technical parameter data set, wherein the future predetermined time period corresponds to a time period before the target future time; Adding the equipment manufacturing supervision technical parameter data set to the target equipment manufacturing supervision technical parameter data set sequence to obtain the added equipment manufacturing supervision technical parameter data set sequence; Performing data preprocessing on the equipment manufacturing supervision technical parameter data in the added equipment manufacturing supervision technical parameter data set sequence to generate first preprocessing parameter data, thereby obtaining a first preprocessing parameter data set sequence; Normalizing each first preprocessing parameter data in the first preprocessing parameter data set sequence to generate a first normalized parameter data set sequence; Performing parameter data grouping adjustment on the first normalized parameter data set sequence to obtain a first normalized parameter data sequence set, wherein each first normalized parameter data sequence has a corresponding first parameter category; Generate a first parameter impact knowledge graph according to the obtained first parameter category set, wherein the nodes in the first parameter impact knowledge graph are first parameter categories, and the directed edges in the first parameter impact knowledge graph represent the impact relationship between parameters; For each node in the knowledge graph affected by the first parameter, the following processing steps are performed: Taking the node as the origin, determining the nodes in the knowledge graph affected by the first parameter and having the number of interval edges less than the target number as the first adjacent nodes, and obtaining at least one first adjacent node; Determine at least one first normalized parameter data set corresponding to the at least one first neighboring node; Inputting the at least one first normalized parameter data set into a temporal coding neural network model to generate at least one first temporal coding information; Generate at least one first weight for the at least one first neighboring node using a pre-trained weight generation model, wherein the weight generation model is a multi-layer series convolutional neural network model; Multiplying the at least one first weight and the at least one first temporal coding information to generate at least one first multiplication result; Inputting the at least one first multiplication result into a multi-head attention mechanism model of multiple layers in series to generate at least one first attention result; Performing result fusion on the at least one first attention result to generate a first fusion result; Inputting the first fusion result into a time series decoding model to generate at least one candidate future equipment manufacturing supervision technical parameter data; Classifying the obtained candidate future equipment supervision technical parameter data sets into parameter categories to generate candidate future equipment supervision technical parameter data sets; A multi-head attention mechanism model is used to perform technical parameter data fusion on each candidate future equipment manufacturing supervision technical parameter data group in the candidate future equipment manufacturing supervision technical parameter data group set to generate fused data as future equipment manufacturing supervision technical parameter data, thereby obtaining the future equipment manufacturing supervision technical parameter data set.

5. The method according to claim 4, wherein: The temporal decoding model includes: a first temporal decoding model, a second temporal decoding model, a third temporal decoding model, a multi-head attention mechanism model, a deconvolution network model and a fully connected layer; and The step of inputting the first fusion result into a time series decoding model to generate at least one candidate future equipment manufacturing supervision technical parameter data comprises: Inputting the first fusion result into the first temporal decoding model to generate a first temporal decoding vector; Inputting the first fusion result into the second temporal decoding model to generate a second temporal decoding vector, wherein the vector dimension corresponding to the second temporal decoding vector is greater than that of the first temporal decoding vector; Inputting the first fusion result into the third temporal decoding model to generate a third temporal decoding vector, wherein the vector dimension corresponding to the third temporal decoding vector is greater than that of the second temporal decoding vector; Using the multi-head attention mechanism model, generating a first decoding weight for the first temporal decoding vector, a second decoding weight for the second temporal decoding vector, and a third decoding weight for the third temporal decoding vector; Rounding the first decoding weight, the second decoding weight, and the third decoding weight to generate a first rounding weight, a second rounding weight, and a third rounding weight; Multiplying the first rounding weight and the first temporal decoding vector to obtain a first multiplied vector; Multiplying the second rounding weight and the second temporal decoding vector to obtain a second multiplied vector; Multiplying the third rounding weight and the third temporal decoding vector to obtain a third multiplied vector; Adding the first multiplication vector, the second multiplication vector and the third multiplication vector to obtain an addition vector; Inputting the added vector into a deconvolution network model to generate a deconvolution network result; The deconvolution network result is input into the fully connected layer to generate the at least one candidate future equipment manufacturing supervision technical parameter data.

6. A data storage device, comprising: An acquisition unit is configured to acquire a technical parameter master data information set and technical specification information for a target material value delivery project; A first generating unit is configured to generate value investment plan information, value investment project preparation information and value supply verification result information for the technical parameter master data information set and the technical specification information; a second generating unit configured to generate, in response to receiving the value calibration information, a value investment application technical parameter data set and a technical specification response technical parameter data set according to the value investment plan information, the value investment project preparation information and the technical parameter master data information set; A third generating unit is configured to generate a value supply verification technical parameter data set according to the value supply verification result information and the technical parameter master data information set; A fourth generating unit is configured to generate value input order information for the value calibration information; A fifth generating unit is configured to generate a value input order technical parameter data set according to the value input order information and the technical parameter master data information set; A sixth generating unit is configured to generate sampling test data and equipment supervision test data for the value input order information; A seventh generating unit is configured to generate an equipment supervision technical parameter data set and a sampling test technical parameter data set according to the sampling test data, the equipment supervision test data and the technical parameter master data information set; A storage unit is configured to store the value investment application technical parameter data set, the technical specification response technical parameter data set, the value supply verification technical parameter data set, the value investment order technical parameter data set, the equipment supervision technical parameter data set and the sampling experiment technical parameter data set in a technical parameter database for the target material value investment project, wherein the storing of the value investment application technical parameter data set, the technical specification response technical parameter data set, the value supply verification technical parameter data set, the value investment order technical parameter data set, the equipment supervision technical parameter data set and the sampling experiment technical parameter data set in the technical parameter database for the target material value investment project includes: storing the value investment application technical parameter data set in a material domain parameter basic public table, and storing the technical specification response technical parameter data set in a value investment technical specification public table, wherein the material domain parameter basic public table and the value investment technical specification public table have at least one identical first field, and the at least one first field includes: a value investment application identification field and a technical specification identification field; storing the value supply verification technical parameter data set in a value investment application basic public table ... A supply verification public table, wherein the value supply verification public table and the material domain parameter basic public table have at least one identical second field, and the at least one second field includes: a supply object code field; the value input order technical parameter data set is stored in the value assurance information table, wherein the material domain parameter basic public table and the value assurance information table have at least one identical third field, and the at least one third field includes: a value input application identification field, a technical specification identification field, and a value application project number field; the equipment manufacturing supervision technical parameter data set is stored in the quality supervision and manufacturing public table, wherein the material domain parameter basic public table and the quality supervision and manufacturing public table have at least one identical third field; the sampling experiment technical parameter data set is stored in the quality supervision and sampling public table, wherein the material domain parameter basic public table and the quality supervision and sampling public table have at least one identical third field; the stored material domain parameter basic public table, the stored value input technical specification public table, the stored value supply verification public table, the stored value assurance information table, the stored quality supervision and manufacturing public table, and the stored quality supervision and sampling public table are stored in the technical parameter database.

7. An electronic device comprising: one or more processors; a storage device having one or more programs stored thereon, When the one or more programs are executed by the one or more processors, the one or more processors implement the method according to any one of claims 1 to 5.

8. A computer readable medium having a computer program stored thereon, wherein: When the program is executed by a processor, the method according to any one of claims 1 to 5 is implemented.