A park management system based on digital twin
By setting up multiple external import modules and system model building units in the park management system, the authenticity and accuracy of the initial conditions are ensured, the problem of production capacity deviation caused by relying on assumptions and conjectures in the existing technology is solved, and the output is accurately close to reality. production capacity, and provides efficient management and deployment solutions.
Patent Information
- Application Number
- CN202410003018.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-02
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2044-01-02
AI Technical Summary
During the simulation mapping process, the existing park twin management system relies on initial data based on assumptions and conjectures, which leads to biased conclusions and cannot accurately reflect actual production capacity.
Design a park management system based on digital twins, set initial conditions from many aspects through multiple external import modules, such as environment, personnel, park scale and energy supply, and directly measure some data through relevant equipment to ensure the authenticity of the data and accuracy, using the periodic method to record temperature, humidity and number of personnel, and the system builds a one-dimensional data model for simulation operation and independent decision-making.
The final output obtained by the system can be infinitely close to the actual production capacity, and the optimal working period and failure rate range of physical equipment can be calculated to provide highly authoritative production capacity management and deployment solutions.
Smart Images

Figure CN117808263B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of digital twins, and in particular to a park management system based on digital twins. Background Art
[0002] Digital twins make full use of physical models, sensor updates, operation history and other data, integrate multi-disciplinary, multi-physical quantity, multi-scale, and multi-probability simulation processes, and complete mapping in virtual space, thereby reflecting the entire life cycle of the corresponding physical equipment. Digital twins are a concept that transcends reality and can be regarded as a digital mapping system of one or more important and interdependent equipment systems.
[0003] A park refers to an area designated by the government under centralized and unified planning, where a certain type of industry and form of enterprises and companies are specially set up for unified management. Typical examples include industrial parks, free trade zones, industrial parks and animation parks. Digital twin technology is concentrated in the field of industrial production. By importing specific data into the twin system and setting relevant algorithms, simulation mapping within a cycle is completed, and the output of the park is simulated in the virtual space.
[0004] However, the existing park twin management system has the following shortcomings:
[0005] During the simulation mapping process of the twin system, it is necessary to first import multiple setting data required for the deduction. The system maximizes the optimal output value based on the amount of resources presented by the data. Since the final conclusion is affected by a variety of initial data, the initial data obtained by the traditional twin management system are set through assumptions and conjectures. The imported initial data deviates greatly from the actual data, and the conclusion obtained cannot be fully combined with the production capacity range that can be achieved by the park resources.
[0006] So we proposed a park management system based on digital twins to solve the problems raised above. Summary of the invention
[0007] The purpose of the present invention is to provide a park management system based on digital twins. The system is equipped with multiple external import modules, and initial conditions are set from multiple aspects, such as environment, personnel, park scale, energy supply and the amount of physical equipment installed, and some data are directly measured through relevant equipment in the park, with high authenticity and accuracy. The import of external data such as temperature and humidity inside the production plant and auxiliary personnel are recorded using the periodic method, so that the temperature and humidity values and the number of personnel will not fluctuate greatly. Under the above-mentioned data restrictions, the final output obtained by the system can be infinitely close to the actual production capacity of the park, so as to solve the problems raised by the above-mentioned background technology.
[0008] To achieve the above-mentioned object, the present invention provides the following technical solutions: a park management system based on digital twins, comprising an external import unit, a theoretical import unit, an execution setting unit, a system model building unit, a database, a simulation operation unit and a self-decision-making unit;
[0009] The external import unit imports various external data that affect the production capacity;
[0010] The theoretical import unit includes star rating, formula selection and standard definition, which are used to import the manufacturing proficiency of the park, algorithm model setting and the quality of the obtained products into the system;
[0011] The execution setting unit has control mode, site structure, energy supply and information transmission, which are used to introduce the execution mode of related equipment, the arrangement and quantity of physical entities in the site, the type and content of energy required for manufacturing and the stability of network signals into the system;
[0012] The system model building unit is used to build a one-dimensional data model, which includes the amount of consumed components, production capacity value, maximum load value, related equipment failure rate and optimal environment value;
[0013] The database is used for data storage and importing secondary data;
[0014] The simulation operation unit compares the actual production capacity obtained with the various data of the expected production capacity, and gives the shortcomings of the park that has reached the expected conditions;
[0015] The autonomous decision-making unit, based on the existing scale of the park, expands from three aspects: design, operation and maintenance, and production, and gives the output value that the park should be able to obtain after reaching the expected value.
[0016] Preferably, the external import unit, the theoretical import unit and the execution setting unit are all electrically connected to the system model building unit, the system model building unit is electrically connected to the database, the simulation operation unit is electrically connected to the system model building unit and the database respectively, and the simulation operation unit is electrically connected to the self-decision-making unit;
[0017] The database includes a writing module;
[0018] The writing module is used to import the ideal yield value;
[0019] The input end of the writing module is connected to the system model building unit signal, and the output end of the writing module is connected to the simulation operation unit signal.
[0020] Preferably, the external import unit includes a basic input module and a data acquisition module;
[0021] The basic input module can import basic product information and the number of auxiliary personnel into the system respectively;
[0022] The data acquisition module, through its internal structure, can import the internal temperature and humidity of the production plant and the production capacity values achieved under the same scale conditions into the system;
[0023] The output ends of the basic input module and the data acquisition module are both connected to the system model building unit signal.
[0024] Preferably, the theory introduction unit includes a digital conversion module;
[0025] The digital conversion module is used to convert various data into digital patterns that can be recognized by the computer;
[0026] The output end of the digital conversion module is signal-connected to the system model building unit.
[0027] Preferably, the execution setting unit includes a primary model building module;
[0028] The primary model building module is used to build a one-dimensional data model, which can directly limit the obtained capacity value;
[0029] The output end of the primary model building module is signal-connected to the system model building unit.
[0030] Preferably, the system model building unit includes a secondary model building module;
[0031] The secondary model building module is used to build a one-dimensional model to represent the component quantity, production capacity, load value, failure rate and optimal temperature and humidity values;
[0032] The output end of the secondary model building module is respectively connected to the database and the simulation operation unit signal.
[0033] Preferably, the simulation operation unit includes a secondary reconstruction module, a real-time disassembly module, an algorithm execution module and a data feedback module;
[0034] The secondary reconstruction module is used to import the expected capacity value imported from the database into the system model construction unit, and analyze the various condition values to be achieved for the output;
[0035] The real-time disassembly module compares the actual values of each item with the expected values, and disassembles each item and matches them one by one;
[0036] The algorithm execution module is used to calculate the difference of each set of data to reflect the shortcomings of the existing park;
[0037] The data feedback module is used for transmitting various data and providing a stable virtual transmission channel.
[0038] Preferably, the input end of the secondary reconstruction module is respectively connected to the system model building unit and the database signal, the output end of the secondary reconstruction module is connected to the real-time disassembly module signal, the output end of the real-time disassembly module is connected to the algorithm execution module signal, and the output end of the algorithm execution module is connected to the data feedback module signal.
[0039] Preferably, the autonomous decision-making unit includes a conclusion summarizing module, a best evaluation module and a display module;
[0040] The conclusion summary module, by combining various differences, analyzes from the three aspects of design, operation and maintenance, and production one by one how to change the initial condition range of each stage in order to achieve the expected output value of the park;
[0041] The optimal assessment module uses the existing park resources to find relevant initial conditions that can be improved and reasonably calculates the production capacity of subsequent parks;
[0042] The display module is used to display various data to facilitate personnel to record and summarize.
[0043] Preferably, the input end of the conclusion summary module is signal-connected to the simulation operation unit, the output end of the conclusion summary module is signal-connected to the best evaluation module, and the output end of the best evaluation module is signal-connected to the display module.
[0044] Compared with the prior art, the present invention has the following beneficial effects:
[0045] 1. The present invention sets initial conditions from multiple aspects, such as environment, personnel, park scale, energy supply and physical equipment quantity, etc., by setting multiple external import modules, and some data are directly measured by relevant equipment in the park, with high authenticity and accuracy. The import of external data, such as temperature and humidity inside the production plant and auxiliary personnel, are recorded by periodic method, so that the temperature and humidity values and the number of personnel will not fluctuate greatly. Under the above data restrictions, the final output obtained by the system can be infinitely close to the actual production capacity of the park, and the system can further calculate the load of physical equipment during the whole cycle of production, the failure rate and the optimal working period of physical equipment under the set temperature and humidity range, which is convenient for park managers to adjust related projects. The execution mode of this system can truly calculate the production capacity value in the park, and has high authority, which is conducive to production reliability during actual production and effective management of the allocation of related projects in the park.
[0046] 2. The relevant modules of the present invention can simulate the ideal data deduction by themselves, and actually compare the standard output value, and specifically expand to each stage of the park production to obtain the missing amount of each data. At the same time, the relevant modules can increase the amount of related projects under limited conditions according to the actual scale of the park, and formulate a more reasonable capacity upgrade plan. BRIEF DESCRIPTION OF THE DRAWINGS
[0047] Figure 1 This is a systematized diagram of the main framework in a digital twin-based park management system of the present invention;
[0048] Figure 2 This is a detailed framework system diagram of a digital twin-based park management system in the present invention;
[0049] Figure 3 This is a structural system diagram of an external import unit in a digital twin-based park management system of the present invention;
[0050] Figure 4 This is a system diagram of the internal structure of an autonomous decision-making unit in a digital twin-based park management system of the present invention;
[0051] Figure 5 This is a system diagram of the internal structure of a digital twin-based park management system in the present invention.
[0052] In the figure: 1. External import unit; 101. Basic input module; 102. Data acquisition module; 2. Theoretical import unit; 201. Digital conversion module; 3. Execution setting unit; 301. Primary model building module; 4. System model building unit; 401. Secondary model building module; 5. Database; 501. Writing module; 6. Simulation operation unit; 601. Secondary reconstruction module; 602. Real-time disassembly module; 603. Algorithm execution module; 604. Data feedback module; 7. Self-decision-making unit; 701. Conclusion summary module; 702. Best evaluation module; 703. Display module. DETAILED DESCRIPTION
[0053] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0054] Example 1, please refer to the attached Figure 1 -Attached Figure 5As shown, the present invention provides a technical solution: a park management system based on digital twins, including an external import unit 1, a theoretical import unit 2, an execution setting unit 3, a system model building unit 4, a database 5, a simulation operation unit 6 and a self-decision-making unit 7, the external import unit 1, imports various external data affecting production capacity, the theoretical import unit 2, which has star rating, formula selection and standard definition, and is used to import the park manufacturing proficiency, algorithm mode setting and obtained product quality into the system, the execution setting unit 3, which has control mode, site structure, energy supply and information transmission, and is used to import the execution mode of related equipment, the arrangement mode and quantity of physical entities in the site, the type and content of energy required for manufacturing and the stability of network signals into the system, and the system model building unit 4, which is used to build a one-dimensional data model, including the amount of consumed components, production capacity value, maximum load value, related equipment failure rate and optimal environment The external import unit 1, the theoretical import unit 2 and the execution setting unit 3 are all electrically connected to the system model building unit 4, the system model building unit 4 is electrically connected to the database 5, the simulation operation unit 6 is electrically connected to the system model building unit 4 and the database 5 respectively, the simulation operation unit 6 is electrically connected to the self-decision-making unit 7, and the database 5 includes a write module 501, the write module 501 is used for importing ideal production values, the input end of the write module 501 is connected to the system model building unit 4 signal, and the output end of the write module 501 is connected to the simulation operation unit 6 signal.
[0055] The effect achieved by the entire embodiment 1 is as follows: the external import unit 1 imports external influencing data into the system model building unit 4, such as the temperature and humidity of the factory area and the number of auxiliary personnel, both of which will directly determine the actual working time of the physical equipment; the theoretical import unit 2 mainly imports product manufacturing proficiency, appropriate algorithm settings and product qualified standard values into the system, which enables the system to accurately obtain the output of the factory area in each period; the execution setting unit 3 mainly imports aspects such as the factory area scale, operation mode, energy supply and data transmission stability, and each of its data is an actual value, so it can play a necessary role in limiting the subsequent output value and ensuring To ensure the accuracy of the obtained values, the system model construction unit 4 can independently construct a standard production capacity model based on multiple numerical values, and the obtained values can basically match the actual conditions. If the output value does not reach the expected range, the preset value written in the database 5 can be reversely imported into the system model construction unit 4 by the simulation operation unit 6. At this time, the system model construction unit 4 will obtain multiple variable values based on the expected value range, and then the simulation operation unit 6 will combine the standard variable value with the expected variable value to calculate the output value of each data. Finally, the independent decision-making unit 7 determines the multiple conditions that the park should have to achieve the expected output value, and gives reasonable suggestions.
[0056] Embodiment 2, according to Figure 1 , Figure 2 and Figure 3 As shown, the external import unit 1 includes a basic input module 101 and a data acquisition module 102. The basic input module 101 can import basic product information and the number of auxiliary personnel into the system respectively. The data acquisition module 102, through its internal structure, can import the internal temperature and humidity of the production plant and the production capacity value that can be achieved under the same scale conditions into the system. The output ends of the basic input module 101 and the data acquisition module 102 are both signal-connected to the system model building unit 4.
[0057] The effect achieved by the entire embodiment 2 is as follows: the product information contained in the basic input module 101 mainly determines the types of products that the park needs to produce, the personnel information mainly determines the specific number of auxiliary personnel, and the multi-sensor equipment contained in the data acquisition module 102 has the ability to collect temperature and humidity data, and the data is accurate within a cycle. Since the temperature in the factory can directly affect the working time of machines and personnel, and the humidity determines the storage environment of the product, the example sharing can be used as important theoretical data because there are multiple real cases in the park of the same specification, and after being imported into the system.
[0058] Embodiment 3, according to Figure 1 and Figure 2 As shown, the theory import unit 2 includes a digital conversion module 201, which is used to convert various data into digital patterns that can be recognized by a computer. The output end of the digital conversion module 201 is signal-connected to the system model building unit 4.
[0059] The effect achieved by the entire embodiment 3 is: because the twin system is mainly created by relying on a computer ecosystem, the data imported into the system should conform to a format readable by the computer system, and the digital conversion module 201 can quickly convert multiple information into a digital format.
[0060] Embodiment 4, according to Figure 1 and Figure 2 As shown, the execution setting unit 3 includes a primary model building module 301, which is used to build a one-dimensional data model and can directly limit the obtained capacity value. The output end of the primary model building module 301 is signal-connected to the system model building unit 4.
[0061] The effect achieved by the entire embodiment 4 is: there are many types of actual data provided by the execution setting unit 3, and the primary model construction module 301 can summarize each type of data in turn and draw a model diagram identical to the system, which is convenient for subsequent system collection and deduction.
[0062] Embodiment 5, according to Figure 1 and Figure 2 As shown, the system model building unit 4 includes a secondary model building module 401, which is used to build a one-dimensional model to represent the component quantity, production capacity, load value, failure rate and optimal temperature and humidity values respectively. The output end of the secondary model building module 401 is respectively connected to the database 5 and the simulation operation unit 6 signal.
[0063] The effect achieved by the entire embodiment 5 is as follows: the system model construction unit 4 is more limited by multiple data, and can reasonably infer the required number of components, the load range of physical equipment, the failure rate of periodic working equipment and the working time of each stage of related environmental numerical equipment under actual production. The secondary model construction module 401 combines multiple data to complete the model construction, making the display of various data more intuitive.
[0064] Embodiment 6, according to Figure 1 , Figure 2 and Figure 4As shown, the simulation operation unit 6 includes a secondary reconstruction module 601, a real-time disassembly module 602, an algorithm execution module 603 and a data feedback module 604. The secondary reconstruction module 601 is used to import the expected capacity value imported from the database 5 into the system model construction unit 4, and analyze the output and the values of various conditions to be achieved. The real-time disassembly module 602 compares the actual values with the expected values, and disassembles each item and pairs them one by one. The algorithm execution module 603 is used to calculate the difference between each group of data to reflect the shortcomings of the existing park. The data feedback module 604 is used for the transmission of various data and provides a stable virtual transmission channel. The input end of the secondary reconstruction module 601 is respectively connected to the system model construction unit 4 and the database 5, the output end of the secondary reconstruction module 601 is connected to the real-time disassembly module 602, the output end of the real-time disassembly module 602 is connected to the algorithm execution module 603, and the output end of the algorithm execution module 603 is connected to the data feedback module 604.
[0065] The effect achieved by the entire embodiment 6 is as follows: the secondary reconstruction module 601 can quickly import the ideal output value data into the system model construction unit 4, and the numerical values of the results obtained by the subsequent system model construction unit 4 are all changed, while the secondary reconstruction module 601 disassembles each item in the actual data and the ideal data in turn, and then structures them one by one, integrates the data of the same type, and then the algorithm execution module 603 obtains the output value between each item in the actual data and each item in the ideal data, and finally transmits it to the lower level by the data feedback module 604.
[0066] Embodiment 7, according to Figure 1 , Figure 2 and Figure 5 As shown, the self-decision-making unit 7 includes a conclusion summary module 701, a best evaluation module 702 and a display module 703. The conclusion summary module 701, by combining various differences, analyzes one by one from the three aspects of design, operation and maintenance, and production how the park needs to change the initial condition range of each stage to achieve the expected output value. The best evaluation module 702 finds the relevant initial conditions that can be improved based on the existing park resources, and reasonably calculates the subsequent production capacity of the park. The display module 703 is used to display various data to facilitate personnel recording and summarizing. The input end of the conclusion summary module 701 is signal connected to the simulation operation unit 6, the output end of the conclusion summary module 701 is signal connected to the best evaluation module 702, and the output end of the best evaluation module 702 is signal connected to the display module 703.
[0067] The effect achieved by the entire embodiment 7 is: the operation of the park mainly includes the stages of design, operation and maintenance, and production. The design stage refers to the setting of the park scale, the operation and maintenance stage refers to the various indicators required for the production of goods, and the production stage refers to the external conditions that limit the actual production capacity of the park. Then 801 can obtain the actual production capacity and the ideal production volume missing from multiple limiting conditions in each stage based on each difference, and 802 will carry out relevant expansion based on the actual situation of the park, reasonably increase the amount of various conditions, and obtain the maximum output that the park can achieve in a short period of time, and use 803 for display.
[0068] Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A park management system based on digital twins, characterized by: It includes an external import unit (1), a theoretical import unit (2), an execution setting unit (3), a system model building unit (4), a database (5), a simulation operation unit (6) and a self-decision-making unit (7); The external import unit (1) imports various external data affecting production capacity; The theoretical import unit (2) includes star rating, formula selection and standard definition, and is used to import the manufacturing proficiency of the park, algorithm model setting and the quality of the obtained products into the system; The execution setting unit (3) has control mode, site structure, energy supply and information transmission, and is used to introduce the execution mode of relevant equipment, the arrangement mode and quantity of physical entities in the site, the type and content of energy required for manufacturing, and the stability of network signals into the system; The system model building unit (4) is used to build a one-dimensional data model, which includes the amount of consumed components, the production capacity value, the maximum load value, the failure rate of related equipment and the optimal environment value; The database (5) is used for data storage and importing secondary data; The simulation operation unit (6) compares the actual production capacity obtained with the various data of the expected production capacity, and gives the shortcomings of the park that has reached the expected conditions; The autonomous decision-making unit (7) is configured to expand the existing park scale from the three aspects of design, operation and maintenance, and production, and provide the output value that the park should be able to obtain after reaching the expected value; The external import unit (1) comprises a basic input module (101) and a data acquisition module (102); The basic input module (101) can import basic product information and the number of auxiliary personnel into the system respectively; The data acquisition module (102) can import the temperature and humidity inside the production plant and the production capacity value achieved under the same scale conditions into the system through its internal structure; The output ends of the basic input module (101) and the data acquisition module (102) are both signal-connected to the system model building unit (4); The system model building unit (4) comprises a secondary model building module (401); The secondary model building module (401) is used to build a one-dimensional model to represent the component quantity, production capacity, load value, failure rate and optimal temperature and humidity values respectively; The output end of the secondary model construction module (401) is respectively connected to the database (5) and the simulation operation unit (6) by signals; The simulation operation unit (6) comprises a secondary reconstruction module (601), a real-time disassembly module (602), an algorithm execution module (603) and a data feedback module (604); The secondary reconstruction module (601) is used to import the expected capacity value imported from the database (5) into the system model construction unit (4), and analyze the expected capacity value and the numerical values of various conditions to be achieved; The real-time decomposition module (602) compares the actual values of each item with the expected values, and decomposes each item and matches them one by one; The algorithm execution module (603) is used to calculate the difference of each set of data to reflect the deficiencies of the existing park; The data feedback module (604) is used for transmitting various data and providing a stable virtual transmission channel; The input end of the secondary reconstruction module (601) is signal-connected to the system model building unit (4) and the database (5), respectively; the output end of the secondary reconstruction module (601) is signal-connected to the real-time disassembly module (602); the output end of the real-time disassembly module (602) is signal-connected to the algorithm execution module (603); and the output end of the algorithm execution module (603) is signal-connected to the data feedback module (604); The self-decision making unit (7) comprises a conclusion summarizing module (701), a best evaluation module (702) and a display module (703); The conclusion summary module (701) combines various differences to analyze how the initial condition range of each stage needs to be changed from the three aspects of design, operation and maintenance, and production to achieve the expected output value of the park; The optimal assessment module (702) finds relevant initial conditions that can be improved based on the existing park resources and reasonably calculates the subsequent park production capacity; The display module (703) is used to display various data to facilitate personnel to record and summarize; The input end of the conclusion summary module (701) is signal-connected to the simulation operation unit (6), the output end of the conclusion summary module (701) is signal-connected to the best evaluation module (702), and the output end of the best evaluation module (702) is signal-connected to the display module (703); The external import unit (1), the theoretical import unit (2) and the execution setting unit (3) are all electrically connected to the system model construction unit (4), the system model construction unit (4) and the database (5) are electrically connected, the simulation operation unit (6) is electrically connected to the system model construction unit (4) and the database (5) respectively, and the simulation operation unit (6) and the self-decision-making unit (7) are electrically connected.
2. The digital twin-based park management system according to claim 1 is characterized in that: The database (5) comprises a writing module (501); The writing module (501) is used to import the ideal production value; The input end of the writing module (501) is signal-connected to the system model building unit (4), and the output end of the writing module (501) is signal-connected to the simulation operation unit (6).
3. The digital twin-based park management system according to claim 1 is characterized in that: The theory introduction unit (2) comprises a digital conversion module (201); The digital conversion module (201) is used to convert various data into digital patterns that can be recognized by a computer; The output end of the digital conversion module (201) is signal-connected to the system model building unit (4).
4. The digital twin-based park management system according to claim 1 is characterized in that: The execution setting unit (3) comprises a primary model building module (301); The primary model building module (301) is used to build a one-dimensional data model, which can directly limit the obtained capacity value; The output end of the primary model construction module (301) is signal-connected to the system model construction unit (4).