A new method for pile cutting, sand removal and forced landing to correct inclination
The method of cutting pile sand and tilt correction is solved by drilling pile cutting holes and filling the sand and soil bags and drilling the holes between the holes. Combined with cutting holes, sand and soil are adjusted, the safety risks in the tilt correction of pile foundations in high-rise buildings are solved and The high cost problem has achieved accurate correction and reinforcement, and shortened the construction cycle.
Patent Information
- Application Number
- CN202410068664.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-17
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2044-01-17
AI Technical Summary
The existing methods for inclination correction of pile foundations in high-rise buildings have problems such as high safety risks, high cost and long construction period. Especially when the drilling and drilling and pile cutting methods are difficult to achieve accurate deviation correction when the pile foundation is deep and length.
The method of cutting piles and sand is used to force-landing and tilt correction is used to drill pile cutting holes on the pile foundation and fill sand and soil bags. The strips between the holes are cut by water grinding to cut brittle deformation into plastic deformation, and the sand is adjusted through the partition holes. The amount of soil can achieve accurate tilt and reinforcement of the building.
This method reduces safety risks, shortens the construction cycle, achieves accurate correction and reinforcement of high-rise buildings, reduces secondary damage to the main structure, reduces the risk of correction, and saves costs and resources.
Smart Images

Figure CN117888592B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of high-rise building tilt correction and reinforcement engineering in the field of industrial and civil construction, and relates to a method for tilt correction by pile cutting, sand excavation and forced landing. Background Art
[0002] According to the different types of building foundations, the foundation forms of high-rise buildings are divided into raft foundations and pile foundations. For rock foundations, the foundation bearing capacity is relatively large and can generally meet the bearing capacity requirements of high-rise building foundations, so raft foundations are often used; for soil foundations, the foundation bearing capacity is relatively small and generally cannot meet the bearing capacity requirements of high-rise building foundations. Pile foundations or pile raft foundations are required to transfer the upper structure load to the deep rock or soil layers. After a high-rise building with a pile foundation or pile raft foundation tilts, the building correction method faces great difficulties.
[0003] In the prior art, there are several methods for rectifying the inclination, such as forced landing by drilling and soil extraction, jacking up by cutting piles, and forced landing by cutting piles. However, these methods have corresponding disadvantages:
[0004] 1. Due to the drilling and soil extraction in the rock or soil layer at the bottom of the pile foundation, the pile foundation of the high-rise building is relatively long. When the drilling and soil extraction forced landing correction method is adopted, a large amount of earth needs to be excavated in the construction work space. At the same time, due to the deep depth of the pile foundation, after the deformation of the bottom soil extraction hole, the deformation of the pile foundation and the upper soil layer is coordinated, and the deformation transmitted to the foundation of the high-rise building is small. Therefore, the amount of soil required to achieve the target settlement value is large, there is a great safety risk, and the soil extraction forced landing period is long.
[0005] 2. When using the pile cutting and jacking correction method, the pile foundations of high-rise buildings need to be disconnected one by one, and jacks are placed on each pile for jacking. Due to the high height and heavy weight of high-rise buildings, a large number of large-tonnage jacks are required when jacking is used, which is costly. At the same time, the risk is high and there are many uncontrollable dangerous factors during the jacking process.
[0006] 3. The correction method of forced landing of piles is to weaken the bearing capacity of the pile foundation by drilling holes in the pile foundation, causing plastic deformation of the concrete between the holes in the pile foundation, thereby achieving the correction of the forced landing of high-rise tilted buildings. In response to the "forced landing correction method of cutting piles by holes", Wang Zhen et al. proposed the "forced landing correction method of cutting piles by holes", which converts the brittle failure of the holes into plastic deformation failure. However, due to the long deformation cycle of the holes, the construction period of the "forced landing correction method of cutting piles by holes" is relatively long. In addition, if the holes do not deform or the deformation is small, the correction target cannot be achieved. Or, in order to achieve the correction target, further measures are taken to cut the strips between the holes, and the cutting of piles by holes is developed into cutting piles hole by hole. After cutting piles hole by hole, the possibility of brittle failure of the pile foundation increases, and the safety risk of high-rise building correction increases. Summary of the invention
[0007] The invention aims to provide a method for rectifying the inclination of a high-rise building by cutting piles, removing sand and forcing the building to land, which can reduce the safety risk to the maximum extent while rectifying the inclination of the high-rise building.
[0008] To achieve the above object, the technical solution adopted by the present invention is: a method for pile cutting, sand excavation, forced landing and tilt correction, which is carried out according to the following steps:
[0009] Step 1: Divide the anti-tilt side and the tilt-correcting side of the inclined high-rise building according to the tilt condition of the inclined high-rise building and the bearing capacity of the foundation;
[0010] Step 2: Calculate and verify the vertical load borne by the pile foundation of the inclined high-rise building, excavate the foundation soil of the inclined high-rise building to correct the tilt, cut the pile foundation rock core for compressive strength test, and verify the ultimate bearing capacity of the pile foundation;
[0011] Step 3: excavate the foundation soil for correcting the tilt of the tilted high-rise building, expose the foundation piles of the tilted high-rise building one by one, drill holes on each exposed foundation pile, and drill multiple pile cutting holes in the horizontal direction at the designed height on each exposed foundation pile when drilling and cutting piles; each time a pile cutting hole is drilled, the pile cutting hole is immediately filled with a dense sand bag, and all the pile cutting holes are filled with dense sand bags;
[0012] Step 4: According to the tilting deformation and tilting speed of the inclined high-rise building, a water-grinding drill is used to cut the strips between the water-grinding drilled holes of the pile foundation on all the foundation piles with cut-pile holes (interval-hole cutting, that is, when cutting piles, there should be a strip between two adjacent cut-pile holes to prevent all of them from being cut into pieces, that is, skip-hole cutting). Under the upper load of the inclined high-rise building, the brittle deformation and damage of the strips between the cut-pile holes are gradually transformed into plastic deformation of the sand bag and the strips between the holes;
[0013] When cutting the strips between holes, it should be ensured that the ultimate bearing capacity of the remaining pile foundation after cutting is greater than 15% of the vertical load of the pile foundation. During the cutting process of the strips between holes, concrete crushing cracks will appear in the strips between the holes of the foundation piles.
[0014] Step 5: According to the tilting deformation and tilting rate of the tilted high-rise building, the sand excavation method of interleaved holes is adopted. The outer bags where sand needs to be excavated are opened and the sand is excavated. When the sand is excavated initially, a small amount of sand is excavated first, and then the amount of sand excavated is adjusted according to the tilting rate of the tilted high-rise building. During the sand excavation process, the tilting rate of the tilted high-rise building is monitored in real time. If the maximum settlement rate of the tilting correction side is greater than 5mm / d, the sand excavation is stopped immediately and the outer bags are refilled with sand; if the maximum settlement rate of the tilting correction side is less than 2mm / d, the amount of sand excavation is increased, and the sand bags that have not been excavated are opened for sand excavation to ensure that the building gradually tilts back;
[0015] Step 6: After the tilt correction of the high-rise building is completed, high-ductility concrete is used to immediately reinforce the pile holes and cracks. After the grouting reinforcement is completed, the foundation soil layer of the high-rise building after the correction is backfilled and grouting is reinforced to complete the correction of the building.
[0016] The method for correcting the tilt of a tilted high-rise building with a pile foundation or a pile raft foundation by cutting piles and removing sand is suitable for correcting the tilt of the tilted high-rise building. After weakening the strength of the foundation of the building on the side to be corrected, the building's self-weight is used to compress the deformation of the foundation of the building on the side to be corrected to achieve the tilt of the building. The method for weakening the strength of the foundation of the building on the side to be corrected is to cut piles by a water-grinding drill. However, during the process of cutting piles by a water-grinding drill, the load of the building still acts on the existing pile foundation, so the safety risk is high during the process of cutting piles by a water-grinding drill. The method for correcting the tilt of the tilt of the present invention fills sand bags in the pile cutting holes during the process of cutting piles by a water-grinding drill, transfers the vertical load of the pile foundation to the sand bags in the pile cutting holes, and then, by taking out the coarse sand in the sand bags, the compression deformation of the building foundation is achieved, and finally the correction of the building tilt is completed.
[0017] The tilt correction method of the present invention has the following advantages:
[0018] 1. In the process of pile foundation cut-off pile hole deformation, the brittle deformation of the hole is avoided, and the brittle deformation of the hole is transformed into plastic deformation of the sand bag and the strip between the holes;
[0019] 2. During the correction process, the amount and speed of sand removal can be adjusted in real time according to the tilt deformation of the tilted building. The correction process is fully controllable, and the precise correction of tilted buildings is truly achieved;
[0020] 3. The flexible deformation characteristics of the foundation are guaranteed during the correction process, the secondary damage to the main structure is reduced, and the correction process is safe and reliable;
[0021] 4. Short construction period, greatly shortening the correction period and saving the correction cost of high-rise buildings;
[0022] 5. The correction process can be "dynamically adjusted", reducing the risk of correcting tilted buildings;
[0023] 6. After the tilt correction is completed, both pile grouting reinforcement and foundation grouting reinforcement are carried out, and the foundation reinforcement effect is obvious;
[0024] 7. It is suitable for high-rise buildings with pile foundation and pile raft foundation, with a wide range of applications and broad application prospects;
[0025] 8. Avoid large-scale excavation, save energy and environment, and save manpower, material resources and resources. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a schematic diagram of the division between the tilt correction side and the tilt prevention side of a tilted high-rise building.
[0027] Figure 2 It is a schematic diagram of drilling pile holes on the foundation piles for correcting the tilt of a tilted high-rise building.
[0028] Figure 3 It is a schematic diagram of filling sand bags in the pile holes.
[0029] Figure 4 It is a schematic diagram of cutting the strips between foundation holes between adjacent pile holes on the same foundation pile.
[0030] Figure 5 This is a schematic diagram of taking sand out of a sand bag.
[0031] Figure 6 It is a schematic diagram of the foundation piles after grouting reinforcement around the cut pile holes and cracks.
[0032] Figure 7 It is a time-sedimentation variation curve diagram when correcting the tilt in the embodiment.
[0033] Figure 8 3 is a time-tilt rate variation curve during tilt correction in the embodiment. DETAILED DESCRIPTION
[0034] The present invention is described in detail below with reference to the accompanying drawings and specific embodiments.
[0035] For rock foundation, the foundation bearing capacity is relatively large, which can generally meet the bearing capacity requirements of high-rise building foundation, and raft foundation is often used; for soil foundation, the foundation bearing capacity is relatively small, which generally cannot meet the bearing capacity requirements of high-rise building foundation, and pile foundation or pile raft foundation is required to transfer the upper structure load to the deep rock or soil layer. The present invention provides a method for correcting the tilt of an inclined high-rise building with a pile foundation or a pile raft foundation, which is performed in the following steps:
[0036] Step 1: Divide the anti-tilt side and the corrective side of the inclined high-rise building according to the inclination of the inclined high-rise building and the bearing capacity of the foundation, such as Figure 1 Specifically:
[0037] 1) According to the center of gravity height calculation formula h=∑(W i × h i ) / W Determine the center of gravity of a tilted high-rise building;
[0038] Where: h is the height of the center of gravity of the inclined high-rise building, in meters; W i —weight of the i-th floor of an inclined high-rise building, in kN; h i —Height of the centroid of the ith floor of an inclined high-rise building, in m; W—total weight of an inclined high-rise building, in kN.
[0039] After the centroid height h of the inclined high-rise building is determined, the centroid of the inclined high-rise building at this height is the centroid of the inclined high-rise building. The inclination rate and inclination direction of the entire inclined high-rise building are determined according to the offset distance and offset direction between the centroid of the inclined high-rise building and the centroid of the foundation of the inclined high-rise building;
[0040] 2) Determine the neutral axis of a tilted high-rise building:
[0041] The neutral axis of an inclined high-rise building is the dividing line between the anti-sinking area and the coordination area of the inclined high-rise building; the neutral axis is characterized by "passing through the center of gravity of the building and being perpendicular to the tilt direction". The neutral axis is drawn on the plan of the inclined high-rise building according to the characteristics of the neutral axis;
[0042] 3) Determination of the stop-sinking area and coordination area:
[0043] The tilted high-rise building is divided into two parts with the neutral axis as the boundary, of which the part outside the neutral axis (on the side of the tilt direction) is the anti-tilt side, and the part inside the neutral axis (on the side of the tilt correction direction) is the tilt correction side. During the tilt correction and reinforcement process, the foundation reinforcement should be carried out on the anti-tilt side to stop the sinking, and the forced landing should be carried out on the tilt correction side to correct the tilt;
[0044] Step 2: Calculate and verify the vertical load borne by the pile foundation of the inclined high-rise building, excavate the foundation soil to correct the tilt of the inclined high-rise building, cut the pile foundation rock core for compressive strength test, and verify the ultimate bearing capacity of the pile foundation; the vertical load borne by the pile foundation and the verification of the ultimate bearing capacity of the pile foundation are to pave the way for the number of strips to be cut between holes in step 4. The number of strips to be cut between holes should ensure that the ultimate bearing capacity of the remaining pile foundation is greater than 15% of the vertical load of the pile foundation.
[0045] Step 3: Excavate the foundation soil for the tilted high-rise building, expose the foundation piles of the tilted high-rise building one by one, and use a water-grinding drill to drill holes on each exposed foundation pile. When drilling and cutting piles, drill multiple pile cutting holes in sequence in the horizontal direction at the designed height on each exposed foundation pile, such as Figure 2 As shown in the figure, each time a pile hole is drilled, it is immediately filled with a dense sand bag. All the pile holes are filled with dense sand bags. Figure 3 shown.
[0046] The sand bag is composed of an outer bag made of geotextile (fabric) and coarse sand densely filled in the outer bag, and the two ends of the outer bag are sealed and tied tightly.
[0047] Step 4: According to the tilt deformation and tilt speed of the tilted high-rise building (the maximum settlement rate on the tilt correction side is controlled at 2-5 mm / d, and the horizontal tilt rate on the top of the building is controlled at about 30 mm / d. If the two are inconsistent, the maximum settlement rate on the forced landing side shall prevail), use a water-grinding drill to cut the strips between the water-grinding drilled holes of the pile foundation on all the foundation piles with cut-pile holes, that is, drill the strips between the cut-pile holes of the same foundation pile with a cut-pile hole, and the strips between two adjacent holes ( Figure 4 There are two pile cutting holes between the small round holes in the Figure 4 As shown in the figure, during the drilling process of the hole strips, the pile foundation concrete was crushed and plastically deformed, and linear cracks appeared. Figure 4 The line between the two cut pile holes between the two adjacent inter-hole strips is the linear crack. Under the upper load of the inclined high-rise building, the brittle deformation and failure of the inter-hole strips of the cut pile holes gradually transforms into plastic deformation of the sand bag and the inter-hole strips;
[0048] When cutting the strips between holes, it should be ensured that the ultimate bearing capacity of the remaining pile foundation after cutting is greater than 15% of the vertical load of the pile foundation. During the cutting process of the strips between holes, concrete compression cracks will appear in the strips between holes on the foundation piles.
[0049] Step 5: According to the tilt deformation and tilt speed of the tilted high-rise building (the maximum settlement rate on the tilt correction side is controlled at 2-5 mm / d, and the horizontal tilt rate on the top of the building is controlled at about 30 mm / d. If the two are inconsistent, the maximum settlement rate on the forced landing side shall prevail), use the method of hole-by-hole sand excavation to open the outer bag where the sand needs to be excavated, and excavate the sand. Figure 5 As shown, when initially excavating sand, excavate a small amount of sand first, and then adjust the amount of sand excavation according to the tilting rate of the tilted high-rise building. During the excavation process, monitor the tilting rate of the tilted high-rise building in real time. If the tilting rate is too large (the maximum settlement rate on the tilting correction side is greater than 5mm / d), stop excavating sand immediately and refill the outer bag with sand. If the tilting rate is too small (the maximum settlement rate on the tilting correction side is less than 2mm / d), increase the amount of sand excavation and open the sand bags that have not been excavated to excavate sand, so as to ensure that the building gradually tilts back. As the building gradually tilts back, the compression cracks of the strip concrete between the pile foundation holes increase further;
[0050] Step 6: After the tilt correction of the high-rise building is completed, high-ductility concrete is used to reinforce the pile holes and cracks. Figure 6 After the grouting reinforcement is completed, the foundation soil layer of the high-rise building after the tilt correction is backfilled and grouting is reinforced to complete the tilt correction and reinforcement of the building. Example
[0051] 1) Project Overview
[0052] Building 9# in a residential area in Jiuzhou, Lanzhou, is located on a loess backfill site. The building is 49.00m long, 13.00m wide and 35.50m high respectively, with one underground floor and twelve above-ground floors. The structure is a reinforced concrete cast-in-place frame-shear wall structure. According to the survey report, the strata of the site are mainly composed of miscellaneous fill and sandstone, and the thickness of the fill area is about 30m.
[0053] The construction of this residential building started in January 2008 and was completed in June 2010. Since 2013, cracks have been found in the walls and the overall structure has tilted during use. The qualified unit conducted a structural safety inspection and appraisal, and the appraisal results were as follows: the number of bored piles on site was less than the number required after the design change, the foundation status did not meet the design requirements, there was basically no enlarged head at the bottom of the pile and the pile end did not enter the bearing layer; the uneven deformation of the pile foundation on both sides of the building caused the building structure to tilt significantly, and some concrete components and filling walls of the upper structure deformed and cracked, with the width of the concrete crack exceeding 0.5mm; some shear walls and frame columns in the basement cracked, and the maximum surface crack of the concrete component was 2.44mm; the maximum settlement deformation of adjacent column foundations in the longitudinal and transverse directions of the structure was 0.0126L and 0.0169L; construction defects caused the frame column and the pile under the column to be misaligned, and the pile foundation under the frame column shifted to the south, with a maximum inclination of 1.8%. According to the observation results of overall tilt deformation, as of October 2016, the displacement between the top and bottom measuring points of the residential building was between 225 and 357 mm, and the tilt rate was between 8.05 and 12.75‰. According to the appraisal results, the building must be corrected and reinforced before it can be used normally.
[0054] 2) Analysis of treatment measures
[0055] According to the existing tilt status of the building and the geological conditions of the site, the correction method of the building is determined to be the forced landing method, with the north side as the forced landing area and the south side as the anti-sinking area. Taking into account the opinions of experts at the scheme demonstration meeting, the social impact of the project and the project cost, this project adopts the "drilling, cutting and sand excavation method" to correct the building body, and the "anchor static pressure pile + micro steel pipe pile" combination method to reinforce the building body. The anchor static pressure pile is arranged on the south side, and its main function is to stop the tilt and prevent the building from continuing to tilt to the south. During the pile pressing process, the foundation soil is compacted to increase the density of the foundation soil. After the anchor static pressure pile achieves the initial tilt-stopping purpose, the drilling, cutting and sand excavation forced landing correction is started until the building tilts back to the range allowed by the specification. After the building is corrected and straightened, micro steel pipe piles are constructed, and a cap and raft are added on the top of the steel pipe piles to connect with the original columns and bottom plates, so that the upper load of the building is finally transmitted to the newly added piles, so that the micro steel pipe piles and anchor static pressure piles are subjected to force at the same time.
[0056] 3) Treatment effect
[0057] After nine months, the building's tilt correction and reinforcement work was basically completed. During the process, the design and construction plan were strictly followed, and a monitoring network was deployed to dynamically monitor the building's settlement and tilt, ultimately making the building safe, stable, and linearly regressed to meet national standards.
[0058] The time-settlement change curve and time-inclination change curve of the entire building from before construction to after construction, such as Figure 7 and Figure 8 As shown in the figure, in the early stage of construction, the building was still in an unstable state, with the south side sinking and the north side moving up. The entire building continued to tilt to the south. Before the construction of the anchor static pressure piles, the maximum tilt of the building had reached 13.75‰. The implementation of the anchor static pressure piles basically played a role in preventing sinking.
[0059] It can be clearly seen from the settlement curve and the inclination rate curve that the drilling, cutting, sand removal and forced landing method does have the effect of rapid correction and effective control. In 4 months, the maximum settlement of the building was close to 200mm, and the maximum inclination dropped from the original 13.75‰ to 2.99‰, basically meeting the control standards for tilted buildings. With the reinforcement of the foundation, the settlement and inclination rate of the building have basically reached stability. After half a year of monitoring, the inclination rate of the building has gradually stabilized within 3‰, and the maximum inclination rate is 2.8‰, which meets the requirements of relevant national standards and also marks the successful completion of the entire correction and reinforcement project.
Claims
1. A method for correcting the inclination of pile cutting, sand excavation and forced landing. It is characterized in that The tilt correction method is carried out in the following steps: Step 1: Divide the anti-tilt side and the corrective side of the inclined high-rise building according to the inclination of the inclined high-rise building and the bearing capacity of the foundation, specifically: 1) Determine the center of gravity of a high-rise building: According to the center of gravity height calculation formula: h=∑(W i × h i ) / W Where: h—height of the center of gravity of the inclined high-rise building, unit: m; W i —weight of the i-th floor of an inclined high-rise building, in kN; h i —Height of the centroid of the i-th floor of the inclined high-rise building, in m; W—total weight of the inclined high-rise building, in kN; After the centroid height of the inclined high-rise building is determined, the centroid of the inclined high-rise building at this height is the centroid of the inclined high-rise building, and the inclination rate and inclination direction of the entire inclined high-rise building are determined according to the offset distance and offset direction between the centroid of the inclined high-rise building and the base centroid of the inclined high-rise building; 2) Draw the neutral axis on the inclined high-rise building plan according to the characteristics of the neutral axis; the neutral axis characteristics are "through the center of gravity of the building and perpendicular to the tilt direction"; 3) Divide the inclined high-rise building into the anti-tilt side and the tilt-correcting side based on the neutral axis; Step 2: Calculate and verify the vertical load borne by the pile foundation of the inclined high-rise building, excavate the foundation soil of the inclined high-rise building to correct the tilt, cut the pile foundation rock core for compressive strength test, and verify the ultimate bearing capacity of the pile foundation; Step 3: excavate the foundation soil for correcting the tilt of the tilted high-rise building, expose the foundation piles of the tilted high-rise building one by one, drill holes on each exposed foundation pile, and drill multiple pile cutting holes in the horizontal direction at the designed height on each exposed foundation pile when drilling and cutting piles; each time a pile cutting hole is drilled, the pile cutting hole is immediately filled with a dense sand bag, and all the pile cutting holes are filled with dense sand bags; Step 4: According to the tilting deformation and tilting speed of the inclined high-rise building, the strips between the holes are cut off from every other hole on all the foundation piles with cut-pile holes. Under the load from the upper part of the inclined high-rise building, the brittle deformation and failure of the strips between the cut-pile holes are gradually transformed into plastic deformation of the sand bag and the strips between the holes. Inter-hole strips are cut off from alternate holes: Inter-hole strips are drilled between the cut pile holes of the same foundation pile, and there are two cut pile holes between two adjacent inter-hole strips; when the inter-hole strips are cut off, ensure that the ultimate bearing capacity of the remaining pile foundation after the cutting is completed is greater than 15% of the vertical load of the pile foundation; The return tilt speed is: the maximum settlement rate of the correcting side is 2-5mm / d, and the horizontal return tilt rate of the top of the building is 30mm / d. If the two are inconsistent, the maximum settlement rate of the forced landing side shall prevail; Step 5: According to the tilting deformation and tilting rate of the tilted high-rise building, the outer bag seal of the sand bag that needs to be dug out is opened to dig out the sand. When digging sand initially, a small amount of sand is dug out first, and then the amount of sand dug is adjusted according to the tilting rate of the tilted high-rise building. During the sand digging process, the tilting rate of the tilted high-rise building is monitored in real time. If the maximum settlement rate of the tilting correction side is greater than 5mm / d, the sand digging is stopped immediately and the outer bag is refilled with sand; if the maximum settlement rate of the tilting correction side is less than 2mm / d, the amount of sand dug is increased, and the sand bags that have not been dug out are opened for sand digging to ensure that the building gradually tilts back; Step 6: After the tilt correction of the tilted high-rise building is completed, use high-ductility concrete to grout the pile holes and around the cracks for reinforcement. After the grouting reinforcement is completed, the foundation soil layer of the high-rise building after the correction is backfilled and grouting is reinforced to complete the correction of the building.