A one-button start-stop control system suitable for waste incineration plants

By designing a one-click start-stop control system suitable for waste incineration plants, using logical sequence control and auxiliary machine signal feedback technology, the problem of automatic control of waste incineration power plants is solved, and efficient unit automatic start-stop and emergency response capabilities are achieved. .

CN117889441BActive Publication Date: 2024-11-19EVERBRIGHT ENVIRONMENTAL PROTECTION CHINA +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311729550.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-15
Publication Date
2024-11-19
Estimated Expiration
2043-12-15

AI Technical Summary

Technical Problem

The existing self-start and stop control system (APS) of waste incineration power plants has shortcomings in the automation level, especially because the operating characteristics and equipment configuration of waste incineration power plants are different from those of coal-fired power plants, making it difficult to automatically control the start and stop process. Achieve efficient and flexible automation.

Method used

A one-click start-stop control system suitable for waste incineration plants is designed, using logical sequence control method and automatic feedback technology of auxiliary machine signals. Through layered control structure and breakpoint layered control principle, the unit can automatically start-stop in the entire process. , including APS start-up and stop-up, are divided into multiple unit-level and functional group-level program control modules, and use distributed main controller and general control unit to perform conditional logic progression to ensure accurate control without human intervention.

Benefits of technology

It improves the automation level and work efficiency of waste incineration power plants, and can achieve accurate and flexible automatic start and stop of the entire unit process without human intervention, enhancing the ability to deal with emergencies.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117889441B_ABST
    Figure CN117889441B_ABST
Patent Text Reader

Abstract

The present invention discloses a one-button start-stop control system suitable for a waste incineration plant. The system adopts a three-layer structure of unit level, function group level, and function subgroup / device driver level and is designed with a total of five independent breakpoints, including two major program control modules: APS start general program control and APS stop general program control. Each function group-level program control, function subgroup and device driver-level program control under each unit-level general program control adopts sequential control logic, and the function group-level program control includes execution judgments from start permission conditions, start sequence to completion conditions. In view of the fact that garbage paving and combustion regulation play a key role in complete combustion during the garbage incineration process, the APS-ACC function group is designed to complete the transition from APS one-button start to ACC system control of normal combustion. The system of the present invention can effectively improve the start-stop efficiency of a waste incineration plant and is suitable for urban domestic waste incineration plants with different scales of processing capacity.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of automatic control of waste incineration power plants, and in particular to a one-button start-stop control system suitable for waste incineration plants. Background Art

[0002] In recent years, new thermal power units are developing in the direction of large capacity, high parameters, wide monitoring, and multiple operating equipment, which puts forward higher requirements on the operation level of unit operators and the management level of managers. Due to the adjustment of energy structure, the technology of gas-steam combined cycle units has developed rapidly. In order to improve the automation level of combined cycle units, improve the economy of units, and enhance the competitiveness of power companies, the unit automatic start-stop control system (APS, Automatic Procedure Start-up / Shut-down) as an effective way to improve the automation level of units has received more attention and attention.

[0003] At present, the independent design and application of APS are accelerating, and major thermal power generation groups and companies have already made this technology a key construction project. However, the current common APS usually adopts the method of automatic sequential control combined with manual switching interlocking, that is, in fact, the operation of related auxiliary machines is still in manual mode, which reduces the APS automation level of the generator set.

[0004] In addition, the organizational structure of the self-start and stop control system generally adopts a vertical sequential control mode. By setting up several nodes, each stage starts with a node, and the logical steps are executed in sequence. Under each step, the related systems and equipment are hierarchically controlled. The APS of the waste incineration power plant is similar to that of coal-fired power generation in terms of the overall framework organization. However, due to the differences in the operating characteristics, some steps, processes and unit equipment of the waste incineration power generation unit, the technical focus of its start-up and shutdown process and the APS design have their own particularities. For example, the combustion temperature control of the waste incinerator requires a residence time of more than 2s at 850℃; the environmental protection facilities at the tail of the incinerator are equipped with an activated carbon adsorption device to remove dioxin pollutants in the flue gas, etc. There are differences in operating characteristics and equipment configuration. In addition, unlike conventional coal-fired power plants, the main task of waste incineration power plants is to treat waste, so there is a "shutdown without stopping the furnace" working condition. When the steam turbine system fails or needs to be shut down for other reasons, the garbage combustion on the furnace side is generally not affected and continues to treat the garbage. Therefore, waste incineration power plants are all set to the turbine bypass system operation mode, and start-up and low-load temperature and pressure reducer systems are set at the same time. Therefore, there is an urgent need for an APS system that is constructed based on the process characteristics and procedures of waste incineration power generation. Summary of the invention

[0005] Purpose of the invention: In view of the problems of the prior art, the present invention provides a one-button start-stop control system suitable for waste incineration plants. The hierarchical management and control of the system is designed in combination with the equipment and operating characteristics of the waste incineration power generation unit. The logic sequence control method and the automatic feedback technology of the auxiliary machine signal are adopted. Without human intervention, the whole process of automatic start and stop of the unit can be accurately and flexibly controlled with one button.

[0006] Technical solution: The one-button start-stop control system suitable for a waste incineration plant described in the present invention includes two major master control programs: APS start master control program and APS stop master control program. The APS start master control program is divided into three unit-level start control program modules, corresponding to three start breakpoints respectively. The three unit-level start control program modules are auxiliary system start control program, boiler water supply and temperature rise program, and steam turbine grid connection and load rise program. The control logic is executed by the corresponding master control unit. Each unit-level master control program includes multiple function group-level program controls, each function group-level program control program includes multiple function subgroups and device driver-level program controls. Each unit-level master control program includes multiple function subgroups and device driver-level program controls. The function group level program control and the function subgroup and device driver level program control all adopt sequential control logic. The function group level program control includes the execution judgment from the start permission conditions, the start sequence to the completion conditions; the APS stop general program control is divided into two stop program control modules for the operating conditions of shutting down without stopping the furnace during the operation of the waste incineration plant. They correspond to two stop breakpoints respectively. Stop program control one corresponds to stop breakpoint one, which is mainly responsible for shutting down the furnace; stop program control two corresponds to stop breakpoint two, which is mainly responsible for shutting down. When the shutdown program control has been executed, it can be confirmed that the current mode is selected as the shutdown without stopping the furnace mode or the shutdown without stopping the furnace mode, then the shutdown can be carried out according to the execution of stop program control two.

[0007] As a further preference of the present invention, the auxiliary system startup program control corresponds to startup breakpoint one. After the program control is started, several independent distributed main controllers in the same level of the APS are connected in sequence, and progress according to conditional logic. After confirming that the relevant preset conditions and auxiliary machine commissioning / interlocking status are met in each subgroup, the industrial water system, air compressor system, and chemical water system are put into operation. The main control unit sends a signal to the fuel system, hydraulic system, fly ash transportation function group, boiler back-up water function group, lime slurry preparation function group and SNCR preparation function group. The program control of each function group completes its own step in sequence, and then the slag discharge system and bag preparation function group are started. The induced draft fan system, dry system, and deacidification reaction tower system are put into operation after meeting the preset conditions until the temperature reduction water circuit pressure reaches the preset value and the startup is completed.

[0008] As a further preference of the present invention, the boiler water supply and ignition temperature rise program control corresponds to the starting breakpoint 2. After the program control is started, the starting burner and the auxiliary burner are put into operation in sequence to provide heat for heating the furnace bottom; after confirming that the relevant preset conditions and the auxiliary machine operation / interlocking status are met in each sub-group, the circulating water system, the condensate system, and the water supply system are put into operation; the main control unit sends a signal to the starting and auxiliary combustion function group according to the working condition of the water supply system to adjust the steam parameters to achieve boiler preheating; when the steam drum pressure reaches the preset value, the pipe heating system is put into operation, and the bypass system is automatically put into operation according to the set parameters; after the pipe heating is completed, the vacuum system, the shaft sealing system, and the steam turbine body's drainage system are put into operation in sequence; when the middle value of the temperature at the top of the first flue of the incinerator reaches the preset value, the smoke exhaust fan and the lubricating oil pump are started, and the steam turbine's lubricating oil system, the main engine turning system, the EH oil system, the SNCR system, and the activated carbon system are put into operation progressively according to conditional logic.

[0009] As a further preference of the present invention, the turbine grid-connected and load-increasing program control corresponds to starting breakpoint three. After the program control is started, the ATC function group is started and automatically jumps to the turbine main control interface to complete the turbine starting operation, and the low-pressure steam extraction and high-pressure steam extraction are put into operation until the turbine speed reaches the preset value and the unit is ready for grid connection; then the generator grid-connected function group is started, and after automatically determining that the start-up permission conditions are met, the program control begins to execute each step in sequence, so that the generator power reaches the preset value, the load deviation is less than the preset value, and the unit is connected to the grid and the load is increased; then the bypass exit function group is started, and the bypass system exits.

[0010] As a further preferred embodiment of the present invention, when the stop program control is started, after the pre-selection of the oil supply pump is completed and the oil tank level of the pre-selected oil pump reaches the preset value, the fuel system operation function group is started, and the standby oil supply pump is automatically in an interlocked state; when the pressure of the main oil supply pipe and the pressure before the ignition oil supply pipe reach the preset conditions, the fuel system is started; then the control system automatically confirms that the feeding has been stopped through industrial camera status recognition, and the main control unit sends a signal to simultaneously execute the start-up of the auxiliary combustion system, pulse soot blowing, frequency reduction of the recirculation fan and shutdown of the secondary fan, withdrawal of cooling water, shutdown of the slag discharge system, and fixed drainage; when the shutdown of the slag discharge system is completed, the fly ash conveying and hydraulic stations are shut down in sequence; when the fixed drainage is completed, the water supply system and induced draft fan system; when the auxiliary combustion system is put into operation, the furnace temperature is controlled at the set value, and then the pusher is automatically confirmed to stop working through the industrial camera status recognition, and the main control unit automatically marks the shutdown of the furnace at the enterprise end; after the primary fan and the incineration grate are shut down in turn, the industrial camera status recognition automatically confirms that the garbage is burned out, and the main control unit marks the shutdown of the furnace for cooling at the enterprise end; then the auxiliary combustion system and the atomizer are shut down in turn, and when the furnace temperature meets the conditions and the hourly average of dry oxygen meets the preset conditions, the shutdown is marked at the enterprise end; after the auxiliary combustion system is shut down, the main control unit simultaneously sends signals to the bag offline cleaning, SNCR shutdown, activated carbon shutdown and dry shutdown function groups to execute the steps of each function group.

[0011] As a further preferred embodiment of the present invention, when the second stop program control is started, the bypass pipe heating function group before shutdown is started; when the deviation between the high-pressure bypass inlet temperature and the main steam temperature is less than a preset value, the deviation between the high-pressure bypass outlet temperature and the reheat inlet steam temperature is less than a preset value, and the deviation between the low-pressure bypass inlet temperature and the reheater outlet header temperature is less than a preset value, the bypass pipe heating is completed; at this time, the bypass input function group is started, the high-pressure and low-pressure bypass desuperheating water isolation valves are opened, and the desuperheating water is automatically input until the high-pressure and low-pressure bypasses are automatically input, and then the shaft sealing system is put into operation; At the same time, the shutdown function group is started to complete the turbine shutdown; when the main steam pressure is lower than the preset value, the bypass exit function group is started, and both the high and low pressure bypasses are exited; after the bypass is exited and the steam turbine is shut down, the vacuum system shutdown function group is started, the running vacuum pump is stopped and the interlocking state of the standby pump is released; when the vacuum reaches the preset conditions, the shaft seal system shutdown function group is started, and the shaft seal fan is shut down; after the turbine shutdown is completed, when the lubricating oil system has been put into operation, the turntable function group is started, and the turntable starts working; at the same time, the EH oil system shutdown function group is started.

[0012] As a further preference of the present invention, an APS-ACC system function group is included. After the steam turbine is started up and connected to the grid, the full process startup of the whole machine is basically completed. At this time, the APS-ACC system function group is started again to assist the unit in increasing the load, which is used for the transition from the APS one-button start-up to the normal garbage combustion of the ACC system.

[0013] As a further optimization of the present invention, the work flow of the APS-ACC system function group includes: first, after setting the feeding grate material layer thickness and feeding speed, start the feeding grate programming to complete the feeding grate preparation work; then, after setting the incineration grate incineration speed and the number of flipping times, start the incineration grate programming to complete the incineration grate preparation work; then start the primary fan of each unit to complete the primary fan preparation work; then, after setting the oxygen content target, start the secondary fan to complete the secondary fan preparation work; the temperature sensor in the furnace monitors the combustion temperature in real time to ensure that it is stable at not less than 850°C; finally, when the temperature in the furnace meets the requirements and the incinerator load reaches the set percentage, the ACC system is started; after setting the ACC combustion parameters, stop the feeding grate APS-ACC programming, the incineration grate APS-ACC programming, the primary fan APS-ACC programming, and the secondary fan APS-ACC programming in turn, and start the feeding grate, incineration grate, primary fan and secondary fan programming in the ACC system.

[0014] As a further preferred embodiment of the present invention, when there is a link in the function group program control that requires working status confirmation, the master control unit performs status identification and automatic confirmation by coupling with related equipment signal feedback through video images fed back by on-site industrial cameras.

[0015] As a further preferred embodiment of the present invention, the real-time camera image is transmitted to the one-button start-stop control system through the intelligent bus for state identification after data compilation, and the camera image is also presented on the system main control interface through data conversion.

[0016] Beneficial effects:

[0017] (1) The present invention adopts a three-layer structure of unit control level, functional group control level, and functional subgroup / equipment drive control level. The system adopts the breakpoint hierarchical control principle and only sets five breakpoints during the start-stop process, which greatly simplifies the control process and effectively improves the control efficiency and automation level.

[0018] (2) The present invention provides two stop programs for stopping the furnace and stopping the machine respectively. When the waste incineration power plant needs to "stop the machine without stopping the furnace", the mode can be selected to enter the stop breakpoint and execute different stop programs to ensure that the waste combustion in the incinerator continues normally while the steam turbine system is shut down.

[0019] (3) The present invention provides an APS-ACC functional group for a waste incineration plant. For various types of waste with complex components, high moisture content and extremely unstable calorific value, the APS is combined with the ACC system control to reasonably divide the waste into different areas in the grate, start the feeding grate and the incineration grate, complete the material distribution work and prepare for the start-up of the primary and secondary fans to ensure a smooth transition of the incinerator from startup to normal operation.

[0020] (4) The present invention is based on waste incineration power generation and APS system intelligent control to construct a one-button start and stop control system for a waste incineration power plant. It can realize the accurate and flexible one-button control of the full process of automatic start and stop of the unit in the waste incineration power plant without human intervention, thereby improving the working efficiency of the waste incineration power plant and strengthening the response capability of the waste incineration power plant to deal with sudden accidents of the unit. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a diagram of the APS system architecture in an embodiment of the present invention.

[0022] Figure 2 It is the overall program control flow chart of APS startup in the embodiment of the present invention.

[0023] Figure 3 It is a general program control flow chart of APS stop in an embodiment of the present invention.

[0024] Figure 4 It is a control flow chart of the APS-ACC system in an embodiment of the present invention. DETAILED DESCRIPTION

[0025] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention. In addition, the technical features involved in the various embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.

[0026] The present invention provides a one-button start-stop control system suitable for a waste incineration plant, which includes two general program control modules: APS start general program control and APS stop general program control. The architecture organization design is a three-level hierarchical management and control, namely the unit control level, the function group control level, and the function subgroup / equipment drive control level. Each function group level program control and function subgroup / equipment drive level program control under the unit level general program control adopts sequential control logic. After each step is completed, the corresponding feedback signal is accepted as the start condition of the next step, and the completion signal is returned to the upper control logic; a number of independent distributed master controllers in the same level are connected in sequence horizontally, and progress according to conditional logic. In order to simplify the system operation process, the entire system only sets five breakpoints, including three breakpoints at startup and two breakpoints at stop. In view of the fact that the garbage material paving and combustion regulation play a key role in complete combustion during the garbage incineration process, the present invention designs the APS-ACC function group to complete the transition from APS one-button start to ACC system control of normal combustion.

[0027] The functional group-level program control described in the present invention includes four operation options: "start", "reset", "pause" and "skip". When there is no manual intervention, after the total program control meets the start conditions, each functional group-level program control receives the unit-level program control signal and automatically starts one by one according to the sequential control logic, and sends a control signal to the functional sub-group. The functional group level automatically determines the operating status of each device and the completion status of each work ticket, completes the startup sequence in sequence and determines whether the program control completion conditions are met. When a device in a certain sub-program control fails, the fault is automatically alarmed on the system operation interface, and the standby equipment automatically switches to the standby interlocking state and automatically starts. At this time, the faulty equipment automatically stops operating. When a condition in a certain sub-program control needs to be skipped under special working conditions, the operator can select "skip". Each functional group-level program control can be executed independently of the entire sequential control logic, and the operator can select "start" for the sub-program control alone.

[0028] The APS startup general program control is divided into three startup program control modules, corresponding to three startup breakpoints respectively. The three startup program control modules are auxiliary system startup program control, boiler water supply and temperature increase program control, and steam turbine grid connection and load increase program control.

[0029] like Figure 1The master control unit outputs signals to each functional group, and each function is executed according to the corresponding conditions and logic. After receiving the signal from the functional group, the functional sub-group and each device start automatically and feed back the operating status information of the equipment to the master control unit to form a closed loop. Figure 1 The auxiliary system master control unit, boiler master control unit, and steam turbine master control unit are three unit-level startup program control modules. The stop program control module is also divided into three levels: unit level / function group level / function subgroup and equipment driver level. Different from the startup program control, the unit-level master control unit is named stop program control 1 and stop program control 2 according to the shutdown operating characteristics of the waste incineration power plant. The program control sequence is to execute the stop program control 1 master control unit first and then execute the stop program control 2 master control unit according to the conditions. The two unit-level stop program control master control units respectively contain some of the function groups and function subgroups and equipment driver levels mentioned in the startup program control, but their execution conditions are different from those in the startup program control.

[0030] 1) Stop program control - the main control unit includes the following functional groups: fuel system, auxiliary combustion system, bag dust removal and cleaning system, SNCR denitrification system, dry system, activated carbon functional group, etc. The above functional groups correspond to the following functional subgroups and equipment drive levels: fuel supply pump subgroup, auxiliary combustion system subgroup, dust collector subgroup, ammonia pump stop subgroup, Roots blower stop subgroup, feeder stop subgroup, etc.

[0031] 2) Stop the program-controlled second master control unit, including the function groups: bypass heating pipe function group, bypass input function group, bypass exit function group, shaft seal system, vacuum system, EH oil system, etc. The above function groups correspond to the function sub-groups and equipment drive levels: drain pneumatic valve start sub-group, cooling water sub-group, high / low bypass regulating valve sub-group, shaft seal fan sub-group, vacuum pump stop sub-group, EH oil pump stop sub-group, etc.

[0032] In addition, operations involved in the stop program control, such as stopping feeding, require manual monitoring and confirmation to ensure production safety.

[0033] like Figure 2Before the APS start-up general program control is started, after selecting the input permission and the APS start-up mode, the APS automatically confirms that all function group systems have been checked before the start-up conditions of the start-up program control breakpoint 1 can be met. At this time, the sub-program controls contained in the auxiliary system startup program control are executed according to the sequential control logic. The industrial water system startup program control is executed first, and after meeting its completion conditions, the air compressor system startup program control is executed. After meeting its conditions, the chemical water system startup program control is executed. After meeting its completion conditions, a module containing six sub-program controls for fly ash transportation, lime slurry preparation, boiler back-up water, SNCR (selective non-catalytic reduction denitrification) preparation, fuel system and hydraulic system is executed at the same time according to their respective start-up conditions. The six sub-program controls in this module can be manually selected to skip a certain program control. When the program control of this module is completed, the slag discharge system and bag preparation startup program control will continue to be executed. When the slag discharge system is started and the bag is ready, the induced draft fan system startup program control begins to execute. After the induced draft fan is started, the startup program control execution sequence of the dry system and the reaction tower system is entered until all sub-program controls in the auxiliary system startup program control are executed except those manually skipped, and then the boiler water filling and ignition temperature rise program control is executed.

[0034] The boiler water supply and ignition temperature rise program control corresponds to the start breakpoint 2. Before the breakpoint start, APS automatically confirms that all functional group systems have been checked. After the breakpoint is started, the start burner system sub-program control, circulating water system sub-program control, condensate system sub-program control, turbine lubricating oil system sub-program control, EH oil system sub-program control, SNCR start sub-program control and activated carbon system start sub-program control are executed simultaneously. When the start burner is started, the auxiliary burner sub-program control is executed to provide heat for heating the furnace bottom. After confirming that the relevant preset conditions and auxiliary machine commissioning / interlocking status are met in each sub-group, the circulating water system, condensate system, and water supply system are put into operation. When the condensate system is started, the water supply system sub-program control is executed. The main control unit sends signals to the start and auxiliary combustion function groups according to the working conditions of the water supply system to adjust the steam parameters and realize boiler preheating. When the water supply system and the circulating water system are started and the drum pressure reaches the preset value, the bypass pipe heating sub-program is executed, which includes the completion of vacuuming (vacuum system), bypass automatic control, and shaft seal system commissioning. After the pipeline temperature and pressure are increased, the steam turbine body drain sub-program is executed. After the steam turbine lubricating oil system is ready, the main engine cranking system sub-program is executed. After all sub-programs in the boiler water supply and ignition temperature increase program are executed except for those manually skipped, the steam turbine grid connection and load increase program is executed.

[0035] The turbine grid connection and load increase program control corresponds to the start endpoint three. After the program control completes the start conditions, it first executes the ATC function group start sub-program control. The sub-program control automatically links to the main control interface of the turbine system to complete the turbine start operation, and the low-pressure steam extraction and high-pressure steam extraction are put into operation until the turbine speed reaches the preset value and the unit is ready for grid connection. After the ATC function group is started, the generator grid connection sub-program control is executed. After automatically judging that the start permission conditions are met, the program control begins to execute each step in sequence, so that the generator power reaches the preset value, the load deviation is less than the preset value, and the unit grid connection and load increase are completed. After the DEH synchronous start signal is received, the operator needs to confirm before the grid connection can be carried out. After the grid connection, the bypass exit sub-program control is executed. At this point, the execution process of the entire APS startup program control is completed.

[0036] like Figure 3 Before the APS stop master program is started, after selecting the start permission and APS stop mode, the APS automatically confirms that all function group systems have been checked before the start condition of the stop program breakpoint one can be met. In the stop program one, the fuel system operation sub-program is executed first. After the fuel pump preselection is completed and the tank liquid level of the preselected fuel pump reaches the preset value, the fuel system operation function group is started, and the standby fuel pump is automatically in the interlocked state. When the pressure of the fuel supply main pipe and the pressure before the ignition fuel supply pipe reach the preset conditions, the fuel system is started. After ensuring the normal operation of the fuel system, for example, the industrial camera status recognition automatically confirms that the feeding has stopped, and the master control unit sends a signal to stop the feeding to the operation room. After confirming that the feeding has stopped, the pulse soot blowing sub-program, the recirculation fan frequency reduction and secondary fan shutdown sub-program, the auxiliary combustion system operation sub-program, and the cooling water exit sub-program are executed simultaneously. After the auxiliary system is put into operation, it is confirmed that the pusher has no material to push out. The pusher is stopped first. After ensuring that the average temperature of the middle section of the furnace is greater than 850℃ within 5 minutes and that all the garbage is burned out, the furnace can be stopped for cooling and all primary fans can be stopped. The incineration grate is stopped, and the main control unit automatically marks it on the enterprise side. After the two markings are confirmed, the auxiliary combustion system shutdown sub-program control is executed. After meeting its completion conditions, it is ensured that the average temperature of the middle section of the furnace drops to 380℃ within 5 minutes, and the hourly average of dry oxygen is above 19%. The main control unit automatically confirms and marks the shutdown completion. After the auxiliary combustion system is shut down, the bag offline cleaning sub-program control, SNCR shutdown sub-program control, activated carbon system shutdown sub-program control and dry system shutdown sub-program control are executed at the same time. Stop program control 1 confirms that the shutdown is completed. Then, according to the required working conditions, the operator selects one of the modes of "stop without stopping the furnace" or "stop and stop the furnace". Under the condition of completing stop program control 1, the conditions are met to start stop program control 2.

[0037] The second stop program control first executes the bypass pipe heating sub-program control, and after meeting its completion conditions, executes the bypass input sub-program control and the shaft seal input sub-program control, and after meeting its completion conditions, executes the shutdown sub-program control. At this time, it will automatically link to the DEH screen of the steam turbine system. The steam turbine system is equipped with the ability to start and stop independently. When the second stop program control is started, the bypass pipe heating function group before shutdown is started. When the deviation between the high-pressure bypass inlet temperature and the main steam temperature is less than the preset value, the deviation between the high-pressure bypass outlet temperature and the reheat inlet steam temperature is less than the preset value, and the deviation between the low-pressure bypass inlet temperature and the reheater outlet header temperature is less than the preset value, the bypass completes the pipe heating. At this time, the bypass input function group is started, the high- and low-pressure bypass cooling water isolation valve is opened, and the cooling water is automatically put into operation until the high- and low-pressure bypasses are automatically put into operation and the shaft seal system is put into operation. At the same time, the shutdown function group is started to complete the turbine shutdown. When the turbine shutdown is completed, the shutdown sub-program control determines that the completion conditions are met and continues to execute the bypass exit sub-program control downward. After the bypass is exited, the vacuum system shutdown sub-program control is executed, and then the shaft seal system shutdown sub-program control is executed. When the main steam pressure is lower than the preset value, the bypass exit function group is started, and both the high and low pressure bypasses are exited. After the bypass is exited and the steam turbine is shut down, the vacuum system shutdown function group is started, the running vacuum pump is stopped, and the interlocking state of the standby pump is released. When the vacuum reaches the preset conditions, the shaft seal system shutdown function group is started, and the shaft seal fan is shut down. When the steam turbine shutdown is completed, the turning system startup sub-program control and the EH oil system shutdown sub-program control are executed. At this point, the execution process of the entire APS stop program control is completed.

[0038] like Figure 4 In the APS startup program control, after the steam turbine is started and connected to the grid, the startup of the whole machine is basically completed. At this time, the APS-ACC system function group is started to assist the unit in increasing the load, so as to prepare for the commissioning of the ACC system under normal combustion conditions. First, after setting the feeding grate layer thickness and feeding speed, start the feeding grate program control to complete the feeding grate preparation work. Then, after setting the incineration grate incineration speed and the number of flipping times, start the incineration grate program control to complete the incineration grate preparation work. Then start the primary fan of each unit to complete the primary fan preparation work. Then, after setting the oxygen content target, start the secondary fan to complete the secondary fan preparation work. The temperature sensor in the furnace monitors the combustion temperature in real time to ensure that it is stable at no less than 850℃. Finally, when the temperature in the furnace meets the requirements and the incinerator load reaches 70% of the setting, the ACC system starts. After setting the ACC combustion parameters, stop the APS-ACC program control of the feeding grate, the APS-ACC program control of the incineration grate, the APS-ACC program control of the primary fan, and the APS-ACC program control of the secondary fan in turn, and start the program control of the feeding grate, the incineration grate, the primary fan, and the secondary fan in the ACC system. This completes the transition from the APS system startup to the normal garbage combustion of the ACC system.

[0039] As a further optimization, when there are links in the functional group program control that require working status confirmation, such as the operating status of each auxiliary equipment and the completion of each work ticket, the master control unit uses the video screen fed back by the on-site industrial camera to identify the status and automatically confirm the related equipment signal feedback coupling, reducing the manual confirmation link and greatly improving the work efficiency of the monitoring personnel and the start-stop efficiency of the unit. The use of PROFIBUS bus data transmission technology allows the real-time camera screen to be transmitted to the one-button start-stop control system through the intelligent bus after data compilation for status identification, and also presents the camera screen on the system main control interface through data conversion.

Claims

1. A one-button start-stop control system suitable for a waste incineration plant, characterized in that: The system includes two main program controls: APS start-up main program control and APS stop main program control. The APS start-up main program control is divided into three unit-level start-up program control modules, corresponding to three start-up breakpoints respectively. The three unit-level start-up program control modules are auxiliary system start-up program control, boiler water supply and temperature rise program control, and steam turbine grid connection and load rise program control. The control logic is executed by the corresponding main control unit. Each unit-level main program control includes multiple function group-level program controls, each function group-level program control includes multiple function sub-groups and device driver-level program controls. Each function group-level program control and function sub-group and device driver-level program control under each unit-level main program control The drive-level program control adopts sequential control logic, and the function group-level program control includes the execution judgment from the start permission condition, the start sequence to the completion condition; the APS stop general program control is divided into two stop program control modules for the operation of the waste incineration plant without stopping the furnace during operation, corresponding to two stop breakpoints, stop program control one corresponds to stop breakpoint one, mainly responsible for stopping the furnace; stop program control two corresponds to stop breakpoint two, mainly responsible for stopping, and when the furnace stop program control is executed, after confirming that the current mode is selected as the stop without stopping the furnace mode or the stop without stopping the furnace mode, the shutdown can continue according to the execution of stop program control two; The auxiliary system startup program control corresponds to the startup breakpoint 1. After the program control is started, several independent distributed main controllers in the same level of the APS are connected in sequence, and the conditional logic is progressive. After confirming that the relevant preset conditions and the auxiliary machine commissioning / interlocking status are met in each subgroup, the industrial water system, the air compressor system, and the chemical water system are put into operation. The main control unit sends a signal to the fuel system, the hydraulic system, the fly ash conveying function group, the boiler back-up water function group, the lime slurry preparation function group and the SNCR preparation function group. The program control of each function group completes its own steps in sequence, and then the slag discharge system and the bag preparation function group are started. The induced draft fan system, the dry system, and the deacidification reaction tower system are put into operation after the preset conditions are met, until the pressure of the cooling water circuit reaches the preset value, and the startup is completed; The boiler water supply and ignition temperature rise program control corresponds to the start breakpoint 2. After the program control is started, the start burner and auxiliary burner are put into operation in sequence to provide heat for heating the furnace bottom; after confirming that the relevant preset conditions and auxiliary machine operation / interlocking status are met in each subgroup, the circulating water system, condensate system, and water supply system are put into operation; the main control unit sends a signal to the start and auxiliary combustion function group according to the working condition of the water supply system to adjust the steam parameters to realize boiler preheating; when the drum pressure reaches the preset value, the pipe heating system is put into operation, and the bypass system is automatically put into operation according to the set parameters; after the pipe heating is completed, the vacuum system, shaft sealing system, and steam turbine body drainage system are put into operation in sequence; when the middle value of the temperature at the top of the first flue of the incinerator reaches the preset value, the exhaust fan and lubricating oil pump are started, and the steam turbine's lubricating oil system, main engine turning system, EH oil system, SNCR system, and activated carbon system are put into operation progressively according to conditional logic; The turbine grid connection and load increase program control corresponds to the start breakpoint 3. After the program control is started, the ATC function group is started and automatically jumps to the turbine main control interface to complete the turbine start-up operation, and the low-pressure steam extraction and high-pressure steam extraction are put into operation until the turbine speed reaches the preset value, and the unit is ready for grid connection; Then the generator grid connection function group starts, and after automatically judging that the start permission conditions are met, the program control starts to execute each step in sequence, so that the generator power reaches the preset value, the load deviation is less than the preset value, and the unit grid connection and load increase are completed; Then the bypass exit function group is started and the bypass system exits; The system includes an APS-ACC system function group. After the steam turbine is started and connected to the grid, the full process startup of the whole unit is basically completed. At this time, the APS-ACC system function group is started again to assist the unit in increasing the load, which is used for the transition from the APS one-button start to the normal garbage combustion of the ACC system; When the stop program control is started, after the pre-selection of the oil supply pump is completed and the oil tank level of the pre-selected oil pump reaches the preset value, the fuel system operation function group is started, and the standby oil supply pump is automatically in an interlocked state; when the pressure of the main oil supply pipe and the pressure before the ignition oil supply pipe reach the preset conditions, the fuel system is started; then the control system automatically confirms that the feeding has been stopped through industrial camera status recognition, and the main control unit sends a signal to simultaneously execute the start-up of the auxiliary combustion system, pulse soot blowing, frequency reduction of the recirculation fan and shutdown of the secondary fan, exit of the cooling water, shutdown of the slag discharge system, and fixed drainage; when the shutdown of the slag discharge system is completed, the fly ash conveying and hydraulic station are shut down in turn; when the fixed drainage is completed, the water supply system and induced draft fan system; when the auxiliary combustion system is put into operation, the furnace temperature is controlled at the set value, and then the pusher is automatically confirmed to stop working through the industrial camera status recognition, and the main control unit automatically marks the furnace shutdown at the enterprise end; after the primary fan and the incineration grate are shut down in turn, the industrial camera status recognition automatically confirms that the garbage is burned out, and the main control unit marks the shutdown of the furnace and cooling at the enterprise end; then the auxiliary combustion system and the atomizer are shut down in turn, and when the furnace temperature meets the conditions and the hourly average of dry oxygen meets the preset conditions, the shutdown is marked at the enterprise end; after the auxiliary combustion system is shut down, the main control unit simultaneously sends signals to the bag offline cleaning, SNCR shutdown, activated carbon shutdown and dry shutdown function groups to execute the steps of each function group; When the second stop program control is started, the bypass pipe heating function group before shutdown is started; when the deviation between the high-pressure bypass inlet temperature and the main steam temperature is less than the preset value, the deviation between the high-pressure bypass outlet temperature and the reheat inlet steam temperature is less than the preset value, and the deviation between the low-pressure bypass inlet temperature and the reheater outlet header temperature is less than the preset value, the bypass pipe heating is completed; at this time, the bypass input function group is started, the high- and low-pressure bypass cooling water isolation valves are opened, and cooling water is automatically input until the high- and low-pressure bypasses are automatically input and the shaft sealing system is put into operation; at the same time, the shutdown function group is started, the high- and low-pressure bypass cooling water isolation valves are opened, and the cooling water is automatically input until the high- and low-pressure bypasses are automatically input and the shaft sealing system is put into operation; at the same time, the shutdown function group The group is started to complete the turbine shutdown; when the main steam pressure is lower than the preset value, the bypass exit function group is started, and both the high and low pressure bypasses are exited; after the bypass is exited and the steam turbine has been shut down, the vacuum system shutdown function group is started, the running vacuum pump is stopped and the interlocking state of the standby pump is released; when the vacuum reaches the preset conditions, the shaft seal system shutdown function group is started, and the shaft seal fan is shut down; after the turbine shutdown is completed, when the lubricating oil system has been put into operation, the turntable function group is started, and the turntable starts to work; at the same time, the EH oil system shutdown function group is started.

2. The system according to claim 1, characterized in that The working process of the APS-ACC system functional group includes: first, after setting the feeding grate material layer thickness and feeding speed, start the feeding grate program control to complete the feeding grate preparation work; then, after setting the incineration grate incineration speed and the number of flipping times, start the incineration grate program control to complete the incineration grate preparation work; then start the primary fan of each unit to complete the primary fan preparation work; then, after setting the oxygen content target, start the secondary fan to complete the secondary fan preparation work; the furnace temperature sensor monitors the combustion temperature in real time to ensure that it is stable at not less than 850℃; finally, when the furnace temperature meets the requirements and the incinerator load reaches the set percentage, the ACC system is started; after setting the ACC combustion parameters, stop the feeding grate APS-ACC program control, the incineration grate APS-ACC program control, the primary fan APS-ACC program control, and the secondary fan APS-ACC program control in turn, and start the feeding grate, incineration grate, primary fan and secondary fan program control in the ACC system.

3. The system according to claim 1, characterized in that When there is a link in the function group program control that requires working status confirmation, the master control unit will automatically confirm the status through the video screen fed back by the on-site industrial camera and the coupling of related equipment signal feedback.

4. The system according to claim 3, characterized in that The real-time camera images are compiled and transmitted to the one-button start-stop control system through the intelligent bus for status identification. At the same time, the camera images are also presented on the system main control interface through data conversion.